Loading...
HomeMy WebLinkAbout#5620 12- Final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5620 Laboratory Name: Agri-Waste Technology, Inc. Inspection Type: Field Commercial Initial Inspector Name(s): Jeffrey R. Adams Inspection Date: June 19, 2012 Date Report Completed: July 2, 2012 Date Forwarded to Reviewer: July 2, 2012 Reviewed by: Todd Crawford Date Review Completed: July 2, 2012 Cover Letter to use: X Insp. Initial Insp. Reg. Insp. No Finding Insp. CP __ Corrected Unit Supervisor: Dana Satterwhite Date Received: July 2, 2012 Date Forwarded to Linda: July 5, 2012 Date Mailed: July 5, 2012 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Agri-Waste Technology, Inc. NPDES PERMIT #: NCG551448 ADDRESS: 5400 Etta Burke Ct. Suite 200 Raleigh, NC, 27606 CERTIFICATE #: 5620 DATE OF INSPECTION: June 19, 2012 TYPE OF INSPECTION: Field Commercial Initial AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Julie Peele I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was clean and well organized. The laboratory is currently monitoring only for pH. Records were well organized, however, some quality control procedures need to be implemented. This facility has recently obtained its certification and no compliance data has been generated to date. Proficiency testing samples have been analyzed for all certified parameters for the 2012 calendar year and the graded results were 100% acceptable. The laboratory was given a packet containing North Carolina Laboratory Certification quality control requirements and policies during the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Traceability A. Finding: The laboratory needs to increase the documentation of purchased materials and reagents. Requirement: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Documentation of solution preparation must include the analyst’s initials, date of preparation, the volume or weight of standard(s) used, the solvent and final volume of the solution. This information as well as the vendor and/or manufacturer, lot number, and expiration date must be retained for chemicals, reagents, standards and consumables used for a period of five years. Consumable materials such as pH buffers and lots of pre-made standards are included in this requirement. Ref: Quality Assurance Policies for Field Page 2 #5620 Agri-Waste Technology, Inc. Laboratories. Please submit examples of traceability documentation with the response to this report. pH – Standard Methods, 18th Edition, 4500 H+ B B. Finding: The laboratory was using only one standard pH buffer (i.e., pH 7.0) to calibrate the meter. Requirement: For routine work, use a pH meter accurate and reproducible to 0.1 pH unit with a range of 0 to 14, equipped with a temperature compensation device. Follow all manufacturers’ recommendations for the calibration of the meter each analysis day. The meter must be calibrated with at least two buffers. In addition to the calibration standards, the meter must be verified with a third calibration standard. The calibration and check standard buffer must bracket the range of the samples being analyzed. Ref: Technical Assistance for Field Analysis of pH. Comment: Follow the manufacturer’s instructions for calibrating the pH meter. IV. PAPER TRAIL INVESTIGATION: No paper trail was performed. V. CONCLUSIONS: Correcting the above-cited findings will help this lab to produce quality data and meet certification requirements. The inspector would like to thank the staff for its assistance during the inspection and data review process. Please respond to all findings. Report prepared by: Jeffrey R. Adams Date: July 2, 2012 Report reviewed by: Todd Crawford Date: July 2, 2012