Loading...
HomeMy WebLinkAbout20120658 Ver 1_Year 5 Monitoring Report_201901043 r Stream and Vegetation Monitoring Year 5 Report Duke University Water Reclamation Pond Stream Restoration / January 2019 / DKU-16040 '1 McADAms FOR T. Ryan Lavinder, PE Civil Engineer Duke Utility & Engineering Services, FMD Duke University STREAM AND VEGETATION MONITORING YEAR 5 REPORT Duke University Water Reclamation Pond Stream Restoration Durham, NC Issued: January 4, 2019 by The John R. McAdams Company, Inc. Project No. DKU-16040 Kelly Roth Environmental Consultant The John R. McAdams Company, Inc. -iA/O Si nature M MCADAMS Table of Contents WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 1.0 INTRODUCTION.......................................................................................................................................1 1.1 Project Location and Description......................................................................................................1 1.2 Project Goals and Objectives............................................................................................................1 2.0 CHANNEL STABILITY ASSESSMENT..........................................................................................................2 2.1 Cross Sections and Longitudinal Profile............................................................................................2 2.2 Pebble Counts...................................................................................................................................2 2.3 Crest Stage Gauge.............................................................................................................................3 2.4 Bank Pins...........................................................................................................................................3 2.5 Channel Stability Assessment Summary...........................................................................................3 3.0 VEGETATION CONDITION AND COMPARISON........................................................................................4 3.1 Vegetation Monitoring Plots.............................................................................................................4 3.2 Vegetation Monitoring Plot Photos and Data Sheets.......................................................................4 3.3 Photo Stations...................................................................................................................................4 4.0 INVASIVE SPECIES MONITORING.............................................................................................................4 5.0 REFERENCES.............................................................................................................................................6 Appendix A: Site Maps Figure 1: Site Location Map Figure 2: Conservation Easement Maps Appendix B: Stream Morphology Data Appendix C: Log Sill Structures Assessment Appendix D: Vegetation Assessment Data Table 1: Vegetation Plot Mitigation Success Summary Table 2: Planted Stem Count by Vegetation Plot Table 3: Planted Species Survival by Vegetation Plot Appendix E: Vegetation Monitoring Plot Photos Appendix F: Vegetation Monitoring Plot Data Sheets Appendix G: Photo Station Photos creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 'J MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 1.0 INTRODUCTION 1.1 Project Location and Description The Duke University Water Reclamation Pond Stream Restoration project (Stream Restoration project) is on the main campus of Duke University, in Durham, Durham County, North Carolina (Appendix A, Figure 1). More specifically, the Conservation Easement (CE) for the Stream Restoration project is 7.01 acres in size and starts just south of NC Highway 147, runs parallel to Campus Drive, crosses Campus Drive and ties back in to the receiving waters at Oregon Street (Appendix A, Figures 2.1 and 2.2). The Stream Restoration project is approximately 1.5 miles from the proposed stream impacts associated with the Duke University water reclamation pond. The Stream Restoration project is located within the Cape Fear River Basin USGS Hydrologic Unit 03030002 (USGS 1974), local watershed 14-digit basin 03030002060110, and the North Carolina Division of Water Resources (DWR) sub -basin 03-06-05. The unnamed tributary flows directly into Sandy Creek (DWR stream index number of 16-41- 1-11) approximately 2.5 miles downstream of the project terminus. The drainage area of the unnamed tributary is approximately 141 acres at the downstream end. Based on a detailed watershed analysis, approximately 27 percent (39 acres) of the watershed area is impervious. The Stream Restoration project is located within the Piedmont Physiographic Province of North Carolina. A review of the Ecoregions of North Carolina and South Carolina (Griffith et al., 2002) shows the geology of the Stream Restoration project is comprised of quaternary to tertiary red sandy loam to silty clay decomposition residuum, sandstone, conglomerate, mudstone, shale, coal, dikes, and sills within the Triassic Basin. There are currently no agricultural croplands or activities within the watershed; however, there was stream channelization and relocation associated with the sanitary sewer line installation adjacent to the unnamed tributary. 1.2 Project Goals and Objectives The purpose of this Stream and Vegetation Monitoring Year 5 report is to assess the Stream Restoration project in order to determine restoration success. The monitoring plan to evaluate the success of the Site is based the U.S. Army Corps of Engineers (USACE) Stream Mitigation Guidelines (April 2003) and the North Carolina Ecosystem Enhancement Program (NCEEP) Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation (November, 2011). Monitoring of the Site will occur annually for seven (7) full years. Construction of the Stream Restoration project occurred in the summer of 2013. During the month of November 2013, riparian buffer restoration activities began following construction of the restored active stream channel. Riparian buffer restoration activities included planting trees and staking vegetation plots within the CE. The goal of the stream restoration project is to modify the dimension, pattern, and profile of the channel so that a stable and self -maintaining channel is created by utilizing natural channel design techniques and procedures. The design was developed utilizing Rosgen-based natural channel design principles (Rosgen, 1996). Preventing future stream bank erosion will be accomplished by fulfilling the following general objectives: 1) Conversion of approximately 3,459 linear feet of the tributary from an eroding, degraded channel to a natural, stable system with restored aquatic habitat. 2) Reduction of sediment loading to a river system that flows into Jordan Lake - a recreational water body. 3) Establishment of a riparian corridor that has a restored floodplain, aquatic, and morphological functions which provide habitat connectivity to the area and will be protected in perpetuity. The following specific objectives will allow the restoration plan to succeed in obtaining the project's goal: creating experiences through experience 1 of 6 'J MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 1) Design a channel with the appropriate cross -sectional dimension, pattern and longitudinal profile utilizing the existing channel condition survey and collected reference reach data as a guide. 2) Improve upon and create bedform and aquatic habitat diversity (riffles, runs, pools and glides). 3) Create a nested floodplain (bankfull bench) that will be accessible at the proposed bankfull channel elevation along the entire reach. 4) Ensure channel and stream bank stabilization by integrating in -channel grade control structures and native vegetation into the proposed restoration design while also creating a stable and functional aquatic and terrestrial habitat. 5) Establish a native forested riparian plant community within a minimum of 50 feet from the proposed top of the bankfull channel along with the removal of exotic vegetation during construction implementation and the elimination of current embankment maintenance practices. 2.0 CHANNEL STABILITY ASSESSMENT Channel stability will be reflected in the surveyed permanent cross -sections, longitudinal profile, evaluation of bank stability and cover, evaluation of in -stream structure performance and to a lesser degree pebble counts compared to the as -built and any previously collected monitoring data. The general trend should reflect a stable or slightly decreasing riffle cross -sectional area whereas pools may increase and yet be considered relatively stable. The longitudinal profile will typically adjust depending on the frequency of bankfull or greater storm events. Normally, the constructed channel profile will adjust (especially in a sand dominated bed) but it will need to function without significant degradation (bed scour), aggradation (mid -channel bars) or bank erosion. The Bank Height Ratio (BHR) shall not exceed 1.2 and the Entrenchment Ratio shall be no less than 2.2. The stream shall remain stable over seven years and through two bankfull events as indicated by visual surveys, cross -sections and bank pins. If monitoring (including vegetation) demonstrates success by year five (5), a proposal can be issued by the Owner to terminate monitoring of the site. 2.1 Cross Sections and Longitudinal Profile The stream geometry is successful if the cross-section geometry, profile and sinuosity are stable or reach a dynamic equilibrium. It is expected there will be minimal changes in the designed cross sections, profile and/or substrate composition. Changes that may occur during the monitoring period were evaluated to determine if they represent a movement toward a more unstable condition (e.g. down cutting, erosion, mid- channel bars, etc.) or are minor changes that represent an increase in stability (e.g. settling, vegetative changes, coarsening of bed material, etc.). Deviation from the design ratios will not necessarily denote failure, as it is possible to maintain stability and not stay within the design geometry. Cross section survey data will be collected and reported in years 1, 2, 3, 5 and 7. In Monitoring Year 5, the cross sections were surveyed on October 17 and 18, 2018 (Appendix B). The longitudinal profile will be surveyed in years 1 and 7. The longitudinal profile was not surveyed as part of the Monitoring Year 5 field assessment. 2.2 Pebble Counts The composition of the streambed and banks is an important facet of stream character, influencing channel form and hydraulics, erosion rates, sediment supply and other parameters. The most efficient basic technique in measuring the streambed and banks is the Wolman Pebble Count method. This requires measuring individual substrate particles along a cross section and tallying the size class of each particle. Pebble counts are conducted to determine bed particle size distribution at each riffle cross section (Cross Sections 1, 3, 6 and 9). Pebble Counts will be conducted and reported in years 1, 2, 3, 5 and 7. Pebble count data for Monitoring Year 5 was collected on October 17 and 18, 2018 (Appendix B). creating experiences through experience 2 of 6 'J MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 2.3 Crest Stage Gauge A Crest Stage Gauge (CSG) was installed during Monitoring Year 1 field activities to document bankfull events. The CSG was installed at Station 15+57 near Vegetation Plot 5 (Appendix A, Figures 2.1 and 2.2). CSG measurements will be conducted and reported in all years of monitoring. CSG measurements were not recorded during the Monitoring Year 5 field assessment due to a malfunction of the CSG. However, abundant indicators of overbank flow, such as wrack lines and bent vegetation, were observed throughout the Stream Restoration project during the Monitoring Year 5 field assessment. A photo showing evidence of overbank flow at Cross Section 4 in Monitoring Year 5 is included in Appendix G. Table 1 provides a list of bankfull events based on the installed CSG and observed indicators of overbank flow. Table 1. Verification of Bankfull Events Monitoring Year Method Collection Date Depth Reading (CSG) Rainfall Depth* Date of Rainfall* MY2 CSG 10/30/2015 2.4 feet 2.46 inches 10/03/2015 MY3 CSG 12/13/2016 2.6feet 4.46inches 10/09/2016 MY5 I Bankfull Indicators 10/10/2018 N/A 4.48 inches 9/17/2018 *Data from NC CRONOS NC-DH-6 — Durham 1.2 NW weather station 2.4 Bank Pins Bank erosion rates are measured using bank pins that were installed into the stream banks during the As -built monitoring set up. The bank pins were installed so that they can be measured over time in order to observe changes in the stream bank profile. Bank pin measurements can then be used to estimate rates of erosion and sediment loading. Bank pin measurements will be conducted and reported in years 1, 2, 3, 5 and 7. Bank pin data for Monitoring Year 5 was collected on October 17 and 18, 2018 and is included in Appendix B. 2.5 Channel Stability Assessment Summary As part of the Monitoring Year 5 field assessment, the entire stream restoration project was visually inspected, Below is a summary and recommendations based on the visual inspection. > As noted in previous years, mowing activities continue to occur within the Northern and Central sections of the CE. Mowing within the CE needs to cease immediately for the project to receive full credit upon close out. > Two large trees have fallen across the channel and sanitary sewer easement in the Southern section of the stream restoration project. These trees may create obstructions in the channel that could lead to bank erosion during high flows and cause stability issues. It is recommended that the fallen trees be removed from the channel. > There are several areas of moderate bank erosion primarily within the Northern section of the site. The cross-section survey and bank pin monitoring data suggest potential stability issues in the areas of Cross Sections 1, 2, 4 and 5 (Appendix B). Moderate erosion was noted at several log sills in the Northern section in Monitoring Year 4, and these areas have continued to experience erosion in Monitoring Year 5. A Log Sill Structures Assessment (Appendix C) that includes a repair plan for the impaired log sills was completed in April 2018 and is in the process of being implemented. Record rainfall in 2018 is likely a contributing factor to bank erosion within the stream restoration reach. It is recommended that the stream banks, particularly in the Northern section of the site, be monitored for stability; repair may be needed if the banks continue to become less stable. creating experiences through experience 3 of 6 MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 3.0 VEGETATION CONDITION AND COMPARISON The primary focus of the vegetative monitoring will be solely on the tree stratum, although shrub and herbaceous species encountered may also be recorded. Vegetation planting success criteria will be based on the survival of a minimum density of 320 trees per acre (to include both planted and existing trees) after three (3) years of monitoring. After five (5) years of monitoring, the density shall be no less than 260 trees per acre (to include both planted and existing trees). After seven (7) years of monitoring, the density shall be no less than 210 trees per acre (to include both planted and existing trees). In addition, planted vegetation must average 10 feet in height in each plot at year seven (7). If the height standard is met and the stem density is trending toward success after five (5) years of monitoring, monitoring of vegetation on the site may be terminated provided written approval is provided by the USACE and NCDWQ. 3.1 Vegetation Monitoring Plots All vegetation monitoring methodologies followed the most current templates and guidelines provided by DMS (EEP, 2010; EEP, 2011). Baseline vegetation monitoring was conducted in accordance with CVS-EEP Protocol for Recording Vegetation (CVS-EEP, V4.2). All six (6) vegetation monitoring plots installed by McAdams were located in Monitoring Year 5. Figures 2.1 and 2.2 (Appendix A) depict the location of the vegetation monitoring plots. Plant species, density, survival rates and the cause of mortality, if identifiable, were recorded within each vegetation monitoring plot. Table 1 (Appendix D) provides a success summary for each vegetation monitoring plot. In Monitoring Year 5, the Stream Restoration project had six (6) vegetation monitoring plots encompassing 0.1483 acres, containing 61 planted stems, which yielded a density of 411 planted stems per acre. Monitoring Year 5 field activities were conducted on October 10 and 12, 2018. The planted vegetation survival threshold was met for five (5) of the six (6) vegetation monitoring plots. Table 2 (Appendix D) provides a summary of the planted stem counts for each vegetation plot. Table 3 (Appendix D) provides a summary of planted stem survival compared to the As Built. 3.2 Vegetation Monitoring Plot Photos and Data Sheets Photographs of the vegetation monitoring plots are in Appendix E. Vegetation Monitoring Plot Data Sheets are provided in Appendix F. Each Vegetation Monitoring Plot Data Sheet provides measurements, location and vigor of each planted species within a respective vegetation monitoring plot. 3.3 Photo Stations Photo documentation is essential to monitoring the success of the Bank Parcel. Photos provide a visual assessment of the vegetation conditions. Photo documentation will be provided and reported in all years of monitoring. All nine (9) photo stations installed by McAdams were located in Monitoring Year 5. Figures 2.1 and 2.2 (Appendix A) depict the locations of the photo stations. Photographs were taken at high resolution using an iPhone 7 camera. Photographs for the photo stations are located in Appendix G. 4.0 INVASIVE SPECIES MONITORING Construction of the Stream Restoration project required disturbing land within the CE resulting in the creation of a highly disturbed early successional ecological system that contains tree sapling and shrub species in addition to naturally occurring early emergent vegetative species. Over time, tree sapling and shrub species mature and proliferate while naturally occurring early emergent vegetative species dwindle. creating experiences through experience 4 of 6 '' WADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT The new, highly disturbed early successional ecological system created during the construction of Stream Restoration project resulted in prime habitat for many invasive species that were known to occur within the CE prior to construction activities, in addition to the surrounding areas (Invasive Species Management Plan, May, 2014). It is understood that naturally occurring early emergent vegetative species will thrive within the CE during the early years of the Stream Restoration project. The early emergent vegetative species can be aggressive and have characteristics of an invasive species; however, they are generally accepted as part of a naturally occurring ecological system. Therefore, a definition of what is an invasive species is warranted. Invasive Species are defined as non-native alien species that have the potential to negatively affect the environment. These species occupy habitat within the riparian buffer and outcompete and suppress native vegetation, thereby inhibiting both the establishment and natural succession of the native riparian community. Considerable effort was made to remove most of the observed invasive species populations during the construction phase of the Stream Restoration project by both mechanical and chemical means. Although considerable effort was made to remove the invasive plants species from within the CE, remnant populations of these invasive species were recorded in a post construction site visit conducted in May, 2014. Future treatment is likely to be required for the observed invasive species, but additional invasive species may expand the list. As part of the Monitoring Year 5 stream and vegetation monitoring efforts, invasive species monitoring and treatment were conducted in the spring and fall. All identified populations of invasive plant species were treated with herbicide by qualified professionals from River Works. River Works staff noted during their fall monitoring and treatment that wisteria (Wisteria sp.) and porcelain berry (Ampelopsis brevipedunculata) are encroaching into the CE and may need additional treatment. An onsite meeting with River Works will be scheduled for winter 2019 to discuss the level of monitoring and treatment required in spring and fall of 2019 to effectively control these populations. creating experiences through experience 5 of 6 �' MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT 5.0 REFERENCES Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. CVS-EEP Protocol for Recording Vegetation Level. Version 4.2. McAdams and Landscape Sanctuaries, May, 2014. Invasive Species Management Plan, Duke University Water Reclamation Pond Stream Restoration. Morris, George; River Works; Spring 2015 Treatment at Sandy Creek Campus Drive; May 12, 2015. Morris, George; River Works; Fall 2015 Treatment at Sandy Creek Campus Drive; September 3, 2015. North Carolina Ecosystem Enhancement Program (NCEEP) 2004. Guidelines for Riparian Buffer Restoration. Available at internet site: http://www.nceep.net/news/reports/buffers.pdf. North Carolina Ecosystem Enhancement Program (NCEEP) November 7, 2011. Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation. Schafale MP and AS Weakley. 1990. Classification of the Natural Communities of North Carolina: Third Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, Department of Environment and Natural Resources. Raleigh, North Carolina. The John R. McAdams Company, Inc. October 2012. Stream Restoration Plan for the Duke University Water Reclamation Pond. US Army Corps of Engineers April, 2013. Stream Mitigation Guidelines. creating experiences through experience 6 of 6 �' MCADAMS WATER RECLAMATION POND STREAM RESTORATION APPENDIX A SITE MAPS > MONITORING YEAR 5 REPORT creating experiences through experience PROJECT no. DKU-14060 DUKE UNIVERSITY WATER THE JOHN R. McADAMS FILENAME: DKU14060X,DWG RECLAMATION POND k COMPANY, INC. tv SCALE: 1�� = 1,oDD. STREAM RESTORATION �►��••��� FIGURE 1. SITE LOCATION MAP )$96ARCHmwwila ru IE.DumnHARLQr[E rn DATE: O06 vww4d mmmi DvYa� NC Lt7W 10-06-14 DURHAM, NORTH CAROLINA °0a"�'°'°'�'1aieNaiC-0t°' Li CAWA aaKiE_ z- r DLI1� I�r1�eel►tY i1GIW VICINITY MAP NTS I EX. CITY OF DURHAM SEWER EASEMENT fl r RESTORED STREAM �/ r CHANNEL = VEG. PLOT #B LEGEND -70 VEG. PLOT 0 1►� CREST STAGE GAUGE ' i CONSERVATION EASEMENT CONSERVATION EASEMENT (TOTAL AREA - 7.01 AC.) EXISTING CITY OF DURHAM SEWER EASEMENT VEGETATION PLOTS CONSERVATION EASEMENT LIMITS CREST STAGE GAUGE RESTORED STREAM CHANNEL �r r TOP OF HEADWALLr rr VEG. PLOT /4 r -50' VEG. PLOT 9&3 th CONSERVATION EASEMENT VEG. PLOT #1 VEG. PLOT #2 / 47 5❑ t t EX. CITY OF DURHAM SEWER t EASEMENT GRAPHIC SCALE N 200 ❑ 100 200 400 1 inch = 200 & V IL Q Q <O Z Lj wQ:fQ w Of a I— Ld x v) LLI w Z �af O F- > Ir F—w Z �� O rY I) Ld > 0 CV ZZ W O It W 0 Y LL. D 0 o a _ � C N N I NORTH (2.86 AC.) RESTORED STREAM TOP OF BANK CENTRAL (2.03 AC.) RESTORED STREAM CHANNEL i i CONSERVATION EASEMENT ur^- DI AT Y1 VEG. PLOT #3 `ter EX. CITY OF r DURHAM SEWER EASEMENT r I Tz� / SOUTH (2.12 AC.) gw RESTORED STREAM TOP OF BANK RESTORED STREAM CHANNEL " VEG. PLOT #5 7"1 RESTORED STREAM -� TOP OF BANK nR� ' CONSERVATION EASEMENT a « • TOP OF HEADWALL \\\\\ X\" EX. CITY OF DURHAM SEWER EASEMENT If. LEGEND CONSERVATION EASEMENT (TOTAL AREA - 7.01 AC.) EXISTING CITY OF DURHAM SEWER EASEMENT VEGETATION PLOTS CONSERVATION EASEMENT LIMITS CREST STAGE GAUGE • CAI ONK • VICINITY MAP N TS GRAPHIC SCALE 700 0 50 too 200 1 inch = 100 ft z 0 a Q <0 z Li wa w- �0 �C ~ L,..I Z �� OS e 30--2 C �- Q � �� ZC �O� V) LLJ ' >0 Nc zz Of Ld 0 Y LL. 0 1 ■I ICAnua 1 �' MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT STREAM MORPHOLOGY DATA creating experiences through experience Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 1 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 361.19 0.00 361.22 0.00 361.22 0.00 361.24 0.00 361.20 0.07 360.16 0.12 360.08 0.06 360.13 0.13 360.21 5.31 359.13 3.42 359.45 5.63 359.15 6.41 359.16 4.38 359.29 17.05 358.25 9.03 359.96 21.38 357.60 14.48 358.75 15.01 358.49 28.09 357.65 15.98 358.57 32.76 357.79 19.22 357.89 20.95 357.78 35.67 357.79 20.32 357.88 36.45 357.86 27.70 357.78 32.31 357.74 37.24 357.18 28.39 357.70 37.85 357.67 37.53 357.73 37.69 357.71 38.20 354.54 35.13 357.97 38.50 357.35 39.08 357.05 39.14 357.09 39.08 354.37 37.78 357.62 39.14 357.07 40.30 356.44 39.85 356.80 40.34 354.51 39.15 357.01 39.95 356.78 40.75 356.05 40.50 356.45 41.40 354.86 40.70 356.42 40.79 356.27 40.69 355.87 40.60 355.81 42.10 355.02 42.21 356.28 41.43 355.82 41.61 355.75 41.18 355.51 43.17 355.40 42.25 356.18 41.04 356.03 42.52 355.85 41.70 355.47 44.26 355.57 42.46 356.17 41.65 355.85 43.33 355.91 43.10 355.73 46.13 355.90 42.60 356.18 42.85 355.93 44.13 355.96 43.85 355.83 47.65 355.93 42.82 356.20 44.26 355.90 44.96 355.89 44.64 355.71 49.51 356.17 42.98 356.20 46.02 355.85 45.85 355.81 45.75 355.73 51.18 356.54 43.19 356.08 46.77 355.94 46.60 355.92 46.23 355.81 57.21 357.53 43.45 356.08 47.01 356.05 46.93 355.99 46.81 356.22 62.03 359.34 43.64 356.09 48.33 356.09 47.52 356.00 49.97 356.38 68.01 360.99 43.68 356.23 50.36 356.28 48.15 356.02 52.42 356.83 43.93 356.17 54.78 357.56 49.32 356.17 56.37 357.59 44.00 356.23 57.64 357.80 51.84 356.62 59.65 358.43 44.04 356.27 62.01 359.40 54.09 357.30 61.75 359.28 44.24 356.25 67.98 359.63 57.52 357.53 65.00 359.55 44.49 356.16 68.15 361.00 62.20 359.35 67.72 359.70 44.70 356.12 68.07 359.61 68.03 360.97 44.88 356.17 68.06 360.98 45.03 356.11 45.38 356.09 45.63 356.14 45.95 356.14 46.07 356.17 46.25 356.13 46.51 356.14 46.71 356.20 46.77 356.21 46.98 356.22 47.11 356.20 47.27 356.13 47.49 356.08 47.71 356.08 47.93 356.10 48.20 356.11 48.34 356.12 48.45 356.15 48.59 356.18 48.86 356.19 49.32 356.15 49.72 356.24 50.88 356.38 53.11 357.09 54.69 357.51 57.46 357.63 60.24 358.72 62.37 359.41 68.04 359.65 68.15 360.97 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County. North Carolina • December 2018 Sandy Creek Cross Section 1 - Riffle 362 361 360 359 358 > 357 m li7 356 - - - Bankfull _ 355 -� Year-0, 2013 Year-1, 2014 354 t Year-2, 2015 0 15 20 25 30 35 40 45 50 55 60 65 70 75 - Year-3, 2016 t Year-5, 2018 Width from River Left to Right (ft) YEAR-5, 2018 SURVEY DATA PROJECT SANDY CREEK TASK CROSS SECTION REACH UPPER DATE 10/17/2018 CREW KR,MB C..mmnra, TnM CROSS SECTION PLOT - LOOKING DOWNSTREAM CROSS-SECTION: 1 FEATURE: Riffle Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 18.9 20.3 20.1 23.5 33.3 Bankfull Width ft 19.5 18.1 19.5 19.2 21.1 Bankfull Mean Depth 11 1.0 1.1 1.0 1.2 1.6 Bankfull Max Depth ft 1.5 1.8 1.8 2.2 3.3 Width/Depth Ratio 20.1 16.2 18.9 15.7 13.4 Entrenchment Ratio 2.8 3.0 2.9 3.5 3.2 Classification C C C C C Bank Heigbt Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 357.62 357.62 357.62 357.62 357.62 D50 mm 13.1 9.3 15.1 14.0 D84 mm 36.3 32.0 64.0 1 55.0 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 2 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 360.68 0.00 360.71 0.00 360.70 0.00 360.73 0.00 360.74 0.03 359.66 0.12 359.76 0.29 359.68 0.33 359.78 4.12 358.73 4.04 359.84 8.90 357.97 8.56 357.80 2.59 359.44 14.25 356.44 8.98 357.80 17.89 355.55 18.78 355.38 8.13 358.07 28.69 355.19 12.99 356.85 32.10 355.09 29.41 355.01 11.45 357.32 39.64 355.05 16.01 355.97 42.74 354.61 39.04 354.93 17.44 355.74 45.02 354.73 18.59 355.44 43.54 354.52 46.09 354.13 26.66 355.22 45.97 354.34 24.75 355.10 45.30 354.34 46.66 353.80 36.05 355.14 46.47 353.93 32.45 355.03 46.09 354.16 47.29 353.58 44.35 354.95 47.77 353.43 38.32 355.02 46.59 353.88 47.95 353.13 45.99 354.60 48.86 353.51 43.16 354.56 47.17 353.69 48.90 352.81 46.82 354.12 49.85 352.88 43.31 354.60 47.56 353.36 49.56 352.49 47.34 353.75 51.23 352.62 45.86 353.95 47.45 353.65 50.38 352.21 47.57 353.47 52.90 351.89 47.39 353.64 48.05 353.28 51.44 352.00 48.32 353.34 54.33 352.31 48.44 353.59 48.58 353.11 52.08 351.83 49.98 353.07 55.29 352.67 48.56 353.48 49.27 352.87 52.95 352.69 50.95 352.73 55.75 353.59 48.92 353.27 50.03 352.76 53.74 352.63 52.59 351.93 56.07 354.39 49.35 353.20 50.58 352.33 53.99 353.58 53.29 351.68 57.22 354.82 49.57 353.15 51.07 352.18 55.06 353.92 53.51 352.21 59.89 355.16 49.82 353.04 51.63 352.02 55.77 354.28 54.59 352.81 67.17 357.00 49.98 352.94 52.24 351.91 56.90 354.60 54.86 353.48 66.93 357.07 50.15 352.88 53.01 351.94 57.92 354.95 55.02 353.82 73.82 359.12 50.42 352.74 53.47 352.12 61.69 355.22 56.48 354.48 80.71 362.04 50.72 352.38 54.06 352.48 65.89 356.33 57.62 354.94 50.99 352.34 54.54 352.78 73.09 358.62 58.93 355.08 51.29 352.12 54.74 353.70 80.49 360.93 62.58 355.55 51.75 351.88 55.39 354.24 80.52 362.02 66.60 356.63 52.01 351.67 55.99 354.45 70.73 357.98 52.20 351.60 56.97 354.72 75.13 359.41 52.67 351.47 58.08 355.01 80.93 361.16 52.74 351.62 61.14 355.15 81.18 362.10 52.92 351.61 64.80 356.03 53.13 351.84 74.73 359.17 53.39 352.42 81.00 361.11 53.59 352.90 81.06 362.11 53.83 353.15 54.16 353.77 57.35 354.95 61.42 355.22 65.28 356.18 72.06 358.28 76.43 359.79 81.19 361.18 81.19 362.09 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 2 - Riffle 363 362 361 360 359 358 357 0 356 355 A 354 W 353 352 351 350 - - - - Bankfull Year-0, 2013 Year-1, 2014 t Year-2, 2015 - Year-3, 2016 t Year-5, 2018 - 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Pool TASK CROSS SECTION REACH UPPER DATE 10/17/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec area (s7 15.9 17.4 17.2 15.4 17.1 Bankfull Width ft 13.7 13.8 15.0 10.8 11.3 Bankfull Mean Depth ft 1.2 1.3 1.2 1.4 1.5 Bankfull Max Depth ft 3.1 2.7 2.8 2.9 2.7 Width/Depth Ratio 11.8 11.0 13.0 7.6 7.5 Entrenchment Ratio 4.5 3.0 3.9 5.4 5.1 Classification E E C C C Bank Heigbt Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 354.60 354.60 354.60 354.60 354.60 D50 mm --- --- --- D84 mm --- --- --- 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 3 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 354.55 0.00 350.66 0.00 354.54 0.00 354.48 0.00 354.53 0.00 353.46 0.17 353.35 0.14 353.38 0.11 353.37 0.83 353.22 2.93 352.67 8.79 351.16 2.83 352.70 4.82 352.17 3.82 352.35 6.49 351.70 13.38 350.78 7.24 351.39 9.32 351.15 10.03 350.90 10.99 350.82 16.05 350.16 13.22 350.73 13.59 350.74 17.58 350.39 13.81 350.77 16.45 349.94 17.96 350.18 17.81 350.44 17.74 349.61 13.66 350.77 17.41 349.76 18.77 349.90 18.75 350.18 18.77 349.47 15.58 350.18 18.52 349.62 19.50 349.61 19.79 349.90 19.29 348.92 16.89 349.84 19.59 349.51 20.36 349.61 20.32 349.58 20.37 348.84 18.69 349.76 20.83 349.25 20.64 349.33 20.45 349.14 21.21 348.76 20.78 349.68 21.42 349.16 21.07 348.91 20.78 348.37 22.23 348.71 21.67 349.44 22.26 349.07 21.81 348.83 21.47 348.44 23.35 348.60 23.08 349.35 23.31 349.02 22.66 348.81 22.39 348.76 24.27 348.40 23.30 348.96 23.88 348.46 23.30 348.74 23.53 348.93 25.58 348.26 23.49 348.93 24.67 348.21 24.00 348.44 24.12 349.09 27.21 347.58 23.84 348.84 25.64 348.23 24.70 348.51 25.19 348.63 27.94 348.05 23.92 348.81 26.29 348.19 25.53 348.45 26.16 348.18 28.26 348.71 24.19 348.79 26.98 348.45 26.09 348.53 26.98 348.35 28.81 349.74 24.50 348.79 27.59 349.42 26.58 349.31 27.66 349.16 29.31 350.33 24.64 348.81 28.19 350.02 27.35 349.59 27.81 349.56 32.56 350.87 24.80 348.83 29.16 350.36 28.60 350.41 28.19 350.44 41.88 351.37 24.92 348.84 30.95 350.76 34.41 350.71 29.48 350.67 47.99 354.12 25.26 348.84 40.35 350.73 40.12 350.86 31.32 350.87 25.48 348.92 47.96 352.50 43.93 351.85 36.33 350.87 25.78 348.94 47.92 353.70 47.90 352.45 41.30 351.08 25.96 348.98 47.91 353.71 45.13 352.24 26.13 348.99 47.57 352.48 26.27 349.03 47.89 353.66 26.46 349.04 26.61 349.50 28.93 350.52 30.07 350.71 35.21 350.72 39.77 350.87 43.16 351.92 45.73 352.52 48.03 352.50 47.94 353.72 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 3 - Riffle 355 354 - 353 352 351 0 ----- --------- 350 m W 349 - - - Bankfull -� Year-0, 2013 348 Year-1, 2014 347 10 15 20 25 30 35 40 45 50 t Year-2, 2015 - Year-3, 2016 t Year-5, 2018 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Riffle TASK CROSS SECTION REACH UPPER DATE 10/17/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 17.3 22.1 18.8 18.3 26.1 Bankfull Width ft 23.1 27.1 22.1 16.6 20.1 Bankfull Mean Depth ft 0.8 0.8 0.9 1.1 1.3 Bankfull Max Depth ft 2.0 2.6 2.3 2.6 3.2 Width/Depth Ratio 30.8 33.1 26.0 15.1 15.4 Entrenchment Ratio 2.0 3.0 2.1 2.9 2.4 Classification B B B B B Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 350.77 350.77 350.77 350.77 350.77 D50 mm 9.7 12.9 1.0 0.5 D84 mm 48.2 57.7 48.2 55.0 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 4 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 353.99 0.00 353.98 0.00 353.99 0.00 353.93 0.00 354.08 0.11 352.98 0.18 352.89 0.18 352.82 0.26 352.91 0.50 352.84 2.42 352.52 6.55 351.07 5.09 351.54 4.02 351.99 6.15 351.18 7.68 350.89 11.60 349.69 11.36 349.65 7.34 350.88 11.94 349.74 11.27 349.77 16.20 349.62 16.40 349.55 11.52 349.69 16.12 349.36 14.83 349.56 16.76 349.50 17.27 349.12 15.14 349.67 16.72 348.85 17.89 349.17 17.24 349.19 18.63 348.17 16.53 349.69 16.75 347.82 18.49 348.22 17.63 349.04 18.10 347.49 16.95 349.26 17.70 346.35 18.90 347.70 17.94 348.14 18.59 347.06 17.34 348.92 18.71 346.42 19.49 347.39 17.91 348.24 19.30 346.85 17.41 347.98 20.67 346.06 19.85 347.38 18.40 347.55 20.28 346.61 18.13 346.74 23.86 346.97 20.10 347.43 19.07 347.21 21.50 346.90 19.93 346.10 26.55 347.30 20.69 347.43 19.85 347.18 22.84 346.86 21.61 346.37 28.28 347.79 21.01 347.67 20.76 347.20 24.02 347.12 23.73 346.97 28.99 348.53 21.03 347.84 21.97 347.31 24.95 347.23 25.00 347.02 29.95 349.05 21.40 347.95 22.84 347.50 25.97 347.49 26.26 347.28 39.48 349.59 21.95 347.96 23.95 347.74 26.72 347.63 27.25 347.36 46.68 350.24 22.27 348.03 25.26 347.88 27.44 347.74 28.24 347.81 48.72 351.36 22.89 348.01 26.66 347.93 27.81 348.15 28.38 348.18 49.86 352.59 23.23 348.03 28.09 348.03 28.13 348.53 28.60 348.83 23.57 348.05 28.38 348.12 29.07 349.00 28.98 349.22 23.89 347.99 28.83 348.62 32.27 349.06 29.69 349.32 24.54 348.03 29.15 348.98 38.55 349.45 32.53 349.50 24.92 348.09 29.86 349.14 44.82 349.44 36.06 349.55 25.30 348.02 39.21 349.44 47.46 350.45 41.90 349.61 25.77 348.04 43.00 349.45 49.22 351.47 45.60 349.69 26.20 348.14 44.98 349.54 49.99 351.64 48.59 351.21 26.63 348.18 48.99 351.45 50.05 352.66 49.75 351.63 26.93 348.24 49.91 351.67 49.99 352.63 27.73 348.34 50.08 352.65 30.16 348.92 32.17 349.07 36.95 349.49 44.37 349.54 46.18 349.94 47.45 350.47 49.13 351.62 50.15 351.81 50.16 352.65 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 4 - Pool 355 354 353 352 351 350 a A349 ----- - - - - -- 348 7 W Bankfull 347 -� Year-0, 2013 346 Year-1, 2014 345 t Year-2, 2015 10 15 20 25 30 35 40 45 50 55 - Year-3, 2016 -F Year-5, 2018 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Pool TASK CROSS SECTION REACH UPPER DATE 10/17/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 13.5 17.2 19.4 26.3 28.6 Bankfull Width ft 15.4 13.8 14.7 12.0 15.7 Bankfull Mean Depth ft 0.9 1.2 1.3 2.2 1.8 Bankf ill Max Depth ft 1.8 2.0 2.5 3.1 3.1 Width/Depth Ratio 17.5 11.2 11.1 5.5 8.6 Entrenchment Ratio 2.6 3.0 3.0 3.9 3.0 Classification C E E E E Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 349.17 349.17 349.17 349.17 349.17 D50 mm --- --- --- --- D84 mm --- --- --- --- 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 5 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 345.91 0 346.03 0.00 345.97 0.00 345.86 0.00 345.81 0.11 345.02 0.13 344.92 0.03 344.93 0.18 344.82 1.27 344.29 1.56 344.32 4.78 342.91 6.96 341.88 4.14 343.14 3.60 343.01 4.78 342.91 11.51 340.11 12.42 339.87 7.70 341.45 9.87 340.38 9.46 340.75 17.18 339.56 15.65 339.65 11.05 340.09 13.03 339.61 12.44 339.82 17.84 339.32 17.51 339.41 13.75 339.56 13.99 338.76 17.25 339.49 18.54 338.82 18.01 339.11 14.44 339.32 14.60 338.37 18.18 338.97 19.28 338.3 18.22 338.77 14.92 338.86 14.77 336.83 19.44 338.37 20 337.66 18.52 338.27 15.19 338.34 15.36 336.21 19.55 338.28 20.73 337.06 18.61 337.84 14.91 337.43 17.76 335.34 19.84 338.10 21.43 336.79 19.20 337.33 17.03 336.98 20.80 335.32 19.97 337.87 21.91 336.7 19.97 336.62 22.55 335.56 23.00 335.72 20.13 337.90 22.47 336.7 20.93 336.19 24.00 335.67 24.38 336.48 20.24 337.68 23.19 336.81 21.68 336.19 25.46 336.13 26.28 336.74 20.49 337.54 23.45 336.92 22.71 336.48 26.81 336.66 27.50 338.08 20.67 337.51 24.15 337.45 24.02 336.95 27.46 338.03 27.78 338.58 20.85 337.46 25.0 338.0 24.91 337.43 27.32 338.54 28.48 339.31 20.98 337.38 25.95 338.12 25.78 337.86 27.78 339.13 43.23 339.75 21.17 337.40 26.49 338.25 26.45 338.36 28.55 339.35 63.18 340.89 21.41 337.45 26.58 338.45 26.79 338.68 32.66 339.32 74.00 342.83 21.53 337.50 27.68 338.73 27.46 338.90 38.96 339.77 74.88 343.85 21.68 337.52 28.58 338.84 28.65 339.02 47.01 339.79 21.74 337.66 29.26 338.95 37.05 339.71 53.60 340.03 22.03 337.74 30.22 339.02 48.59 339.84 59.98 340.61 22.22 337.81 31.27 339.02 60.80 340.74 66.94 341.24 22.58 337.78 32.3 339.06 71.87 342.60 71.71 342.48 22.89 337.69 33.24 339.33 74.87 342.97 74.66 342.93 23.28 337.86 41.52 339.85 74.90 344.01 74.82 343.94 23.64 337.93 52.69 340.15 23.84 337.84 64.6 341.24 24.05 338.04 73.3 342.94 24.23 338.12 74.84 343.07 24.47 338.14 74.96 344.02 24.69 338.17 24.78 338.20 25.11 338.26 25.39 338.29 25.98 338.42 27.20 338.71 33.08 339.23 35.43 339.66 45.29 339.87 53.29 340.16 62.20 340.99 69.18 341.86 71.77 342.58 74.01 343.09 74.75 343.01 74.84 344.01 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 5 - Pool 347 346 345 344 343 342 341 340 0 339 338 W 337 336 - - - Bankfull Year-0, 2013 - 335 334 Year-1, 2014 t Year-2,2015 - Year-3, 2016 ---� Year-5, 2018 15 20 25 30 35 40 45 50 55 60 65 70 75 80 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Pool TASK CROSS SECTION REACH MIDDLE DATE 10/17/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 16.1 20.0 22.1 37.5 45.8 Bankfull Width ft 17.3 18.2 15.9 18.8 13.9 Bankfull Mean Depth ft 0.9 1.1 1.4 2.0 3.3 Bankf ill Max Depth ft 2.1 2.8 3.2 3.8 4.2 Width/Depth Ratio 18.6 16.6 11.5 9.5 4.2 Entrenchment Ratio 3.5 3.0 4.2 3.8 5.2 Classification C C E E E Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 339.49 339.49 339.49 339.49 339.49 D50 mm --- --- --- D84 mm --- --- --- 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 6 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0.00 341.46 0 337.87 0.07 340.36 0.00 341.45 0.00 341.42 0.08 340.59 0.14 340.49 4.87 337.96 0.23 340.52 0.52 340.24 3.78 339.39 5.01 338 8.77 335.51 1.77 339.34 6.13 337.73 7.01 336.41 10.02 334.94 12.69 334.60 4.99 338.00 9.05 335.65 9.33 335.05 13.23 334.62 13.97 334.25 7.25 336.40 13.99 335.01 12.67 334.68 14.15 333.99 14.66 333.99 10.09 334.98 14.62 334.35 13.38 334.43 14.74 333.71 15.46 333.81 14.00 334.63 15.21 333.37 14.02 334.24 15.63 333.65 15.93 333.54 14.90 334.28 15.90 332.83 14.78 333.76 15.95 333.23 16.17 333.30 15.55 333.71 17.84 332.89 15.92 333.44 16.29 333.31 16.54 332.88 16.02 333.62 20.18 332.80 16.14 333.28 16.35 332.98 16.93 332.85 16.03 333.24 21.09 332.54 16.37 333.14 16.83 332.93 17.72 332.77 16.13 332.72 22.52 332.71 16.50 333.15 17.56 332.98 18.96 332.95 17.30 332.63 23.52 332.85 16.69 333.14 18.48 333.05 19.89 333.21 17.96 332.65 24.22 333.32 16.89 333.08 19.22 332.99 20.51 333.28 19.42 332.67 24.17 334.11 17.01 333.11 19.77 333.02 21.36 333.20 20.60 332.73 24.98 334.46 17.20 333.03 20.3 333.0 21.60 333.22 21.97 332.79 27.78 334.68 17.28 333.13 21.1 332.94 22.72 333.39 22.72 333.09 35.80 335.15 17.49 333.14 22 333 25.18 333.65 23.43 333.27 41.81 335.66 17.69 333.03 22.84 333.26 27.25 334.03 23.86 333.47 17.87 333.02 23.2 333.26 29.45 334.42 24.29 333.82 17.98 333.04 24.31 333.48 34.18 334.87 26.00 334.24 18.14 333.03 25.24 333.49 39.90 335.13 26.80 334.38 18.41 333.10 26.31 333.58 42.98 335.81 31.18 334.85 18.53 333.11 27.01 333.69 43.13 337.03 35.41 335.00 18.62 333.10 27.47 333.72 40.28 335.29 18.70 333.09 28.33 334.29 43.02 335.80 18.82 333.05 30.23 334.73 43.17 337.03 18.98 333.06 36.77 335.05 19.12 333.15 41.13 335.39 19.27 333.17 43.11 335.82 19.47 333.19 43.24 337.04 19.50 333.26 19.58 333.29 19.74 333.20 19.84 333.17 20.01 333.16 20.06 333.18 20.26 333.20 20.46 333.17 20.59 333.14 20.79 333.12 20.85 333.17 20.96 333.21 21.13 333.20 21.28 333.25 21.99 333.26 24.70 333.48 27.40 333.72 30.58 334.66 36.00 335.00 40.76 335.31 43.13 335.92 43.22 337.05 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 6 - Riffle 342 341 340 339 338 337 0 336 335 W _ Bankfull - - - - - - - - - - 334 Year-0, 2013 333 Year-1, 2014 332 +Year-2, 2015 10 15 20 25 30 35 40 45 � Year-3, 2016 tYear-5, 2018 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Riffle TASK CROSS SECTION REACH MIDDLE DATE 10/17/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec area s 15.0 19.0 13.9 14.0 14.9 Bankfull Width ft 16.4 16.5 16.1 12.2 10.3 Bankfull Mean Depth ft 0.9 1.2 0.9 1.2 1.4 Bankf ill Max Depth ft 1.4 1.7 1.7 1.8 1.9 Width/Depth Ratio 17.9 14.4 18.5 10.6 7.1 Entrenchment Ratio 2.1 3.0 2.2 2.9 3.3 Classification B B B B B Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 334.43 334.43 334.43 334.43 334.43 D50 mm 4.7 5.4 0.4 0.1 D84 mm 24.2 22.1 14.0 1 7.2 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 7 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0 345.92 0 345.92 0.00 345.92 0.00 345.95 4.00 342.15 0.07 344.73 0.12 344.83 0.05 344.83 0.00 344.79 11.57 337.54 5.99 340.57 6.26 341.07 9.25 339.82 3.41 342.85 22.94 333.31 11.3 339.05 14.72 337.09 18.71 335.31 8.34 339.37 28.66 333.19 17.45 336.09 21.19 334.35 22.72 333.89 16.51 336.48 29.59 332.65 22.15 334.05 23.88 333.87 28.00 333.57 19.61 334.92 30.33 332.03 27.63 333.51 27.39 333.6 29.48 333.01 24.65 333.90 30.75 331.33 28.88 332.91 28.56 333.33 30.70 332.47 28.11 333.59 31.55 330.43 29.76 332.36 29.56 333.02 31.40 332.31 29.17 333.11 32.88 330.19 30.04 332.19 29.99 332.29 32.41 332.32 29.76 332.83 34.99 329.77 30.34 331.95 30.86 332.2 32.75 332.16 29.91 332.33 38.27 330.53 30.44 331.94 31.43 332.28 33.23 331.89 30.41 331.88 39.33 330.90 30.7 331.94 32.04 332.53 33.74 331.73 31.36 331.77 39.90 331.18 30.98 331.95 32.37 332.25 34.58 331.47 33.00 331.06 40.96 331.89 31.18 331.96 32.97 332.23 35.35 331.73 34.42 330.69 41.72 332.57 31.54 332.04 32.98 332.08 36.44 331.97 34.56 330.59 42.57 332.96 31.89 332.07 33.7 332.1 37.36 331.93 36.16 330.93 43.66 333.08 32.1 332.0 34.5 332.19 37.40 332.20 36.64 331.13 53.27 333.01 32.31 331.97 35.19 332.07 38.31 332.61 37.97 331.38 64.88 333.34 32.68 331.92 36.23 332.13 38.78 333.00 39.26 332.00 73.69 336.04 33.14 331.86 36.62 332.24 40.10 333.14 39.55 332.29 33.66 331.86 38 332.35 50.17 333.42 40.39 332.75 33.95 331.82 39.73 332.36 60.42 333.70 41.85 333.06 34.41 331.6 40.81 332.48 68.57 335.39 42.52 333.26 34.73 331.56 42.13 332.57 74.91 337.46 47.01 333.70 35.16 331.64 42.52 332.81 75.01 338.34 52.14 333.75 35.43 331.63 43.16 332.98 57.77 333.76 35.95 331.6 44.29 333.09 62.96 334.04 36.51 331.53 46.13 333.2 66.19 334.61 36.79 331.5 52.78 333.64 70.87 336.12 37.09 331.47 58.34 333.73 74.82 337.42 37.35 331.52 65.96 334.45 75.06 338.36 37.54 331.58 71.46 336.52 37.8 331.63 74.93 337.5 38.24 331.7 75.06 338.36 38.46 331.77 38.8 331.79 39.25 331.82 39.44 331.89 39.61 331.97 39.84 332.07 40.05 332.19 40.48 332.29 44.33 332.68 49.32 333.43 57.01 333.68 65.34 334.37 70.8 336.18 74.89 337.5 75.02 338.38 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 7 - Pool 347 346 345 344 343 342 341 - 340 � 339 338 0 337 4 336 335 W 334 - - _ Bankfull 333 - - 332 -a- Year-0, 2013 331 330 Year-1, 2014 329 _ Year-2, 2015 0 15 20 25 30 35 40 45 50 55 60 65 70 75 - Year-3, 2016 --� Year-5, 2018 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Pool TASK CROSS SECTION REACH MIDDLE DATE 10/18/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 18.3 11.4 8.0 17.7 28.1 Bankfull Width ft 19.2 16.4 9.4 12.6 12.8 Bankfull Mean Depth ft 1.0 0.7 0.9 1.4 2.2 Bankf ill Max Depth ft 1.7 1.1 1.5 2.5 3.2 Width/Depth Ratio 20.2 23.4 10.9 8.9 5.8 Entrenchment Ratio 2.4 3.0 4.7 4.0 4.6 Classification C C E E E Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 333.02 333.02 333.02 333.02 333.02 D50 mm --- --- --- --- D84 mm --- --- --- --- 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 8 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0 336.01 0 336.07 0.00 336.02 0.00 336.04 0.00 336.05 0.04 335.03 0.1 334.96 -0.01 334.92 0.11 335.06 1.85 334.34 1.03 334.78 6.25 333.04 6.92 332.43 4.48 333.51 12.02 331.02 7.61 332.13 12.54 330.97 12.32 330.92 10.63 331.32 21.23 329.58 15.28 330.27 19.27 329.57 17.15 329.79 16.95 329.86 29.01 329.26 28.17 328.92 25.53 329.15 25.62 329.05 25.09 329.19 30.06 328.47 31.41 328.22 29.22 328.78 29.16 328.76 28.65 328.99 32.06 327.99 33.5 327.67 31.45 328.07 30.99 328.32 30.14 328.80 31.74 327.45 35.05 327.5 31.72 327.72 31.62 327.81 31.16 328.53 32.63 327.12 35.11 327.41 32 327.44 32.12 327.47 31.51 328.16 34.00 327.02 35.25 327.35 32.41 327.53 34.08 327.51 31.94 327.47 36.15 326.62 35.4 327.36 32.62 327.24 35.76 327.52 32.85 327.10 38.25 326.51 35.56 327.35 33.52 327.23 37.68 327.44 34.09 326.90 38.98 326.97 35.69 327.38 34.44 327.22 38.36 327.32 35.02 326.88 39.52 327.26 35.83 327.35 35.29 327.19 39.26 327.25 36.89 326.58 40.41 327.71 36.42 327.26 36.07 327.13 40.17 327.40 37.80 326.58 40.81 328.39 36.54 327.26 36.8 327.1 40.59 327.75 38.53 326.68 44.66 330.28 36.6 327.2 37.58 327.01 42.60 328.89 40.01 327.37 48.99 332.73 36.79 327.22 38.38 326.82 45.61 330.68 40.37 327.45 50.92 334.57 36.94 327.18 39.01 326.65 48.76 332.49 40.58 328.04 37.11 327.12 39.62 326.96 51.22 333.66 41.24 328.35 37.31 327.08 40.3 327.44 51.10 334.59 42.11 328.90 37.56 326.99 40.81 327.72 42.88 329.05 37.87 326.92 41.5 328.24 44.67 330.00 38.13 326.87 42.87 329.13 46.74 331.64 38.33 326.84 47.41 331.8 49.21 332.86 38.48 326.84 50.98 333.63 50.77 333.61 38.68 326.84 51.11 334.64 51.10 334.60 38.88 326.8 39.03 326.78 39.2 326.78 39.54 326.83 39.56 326.83 39.84 327 40.12 327.11 40.18 327.22 40.34 327.3E 40.47 327.3E 40.5 327.57 44.81 330.19 48.58 332.53 51.15 333.61 51.14 334.58 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 337 336 Sandy Creek Cross Section 8 - Pool 335 334 333 332 x 331 ° 330 329 W 328 - - - Bankfull 327 Year-0, 2013 326 Year-1, 2014 325 t Year-2, 2015 10 15 20 25 - Year-3, 2016 --� Year-5, 2018 Width from River Left to Right (ft) YEAR-5, 2018 SURVEY DATA PROJECT SANDY CREEK TASK CROSS SECTION REACH LOWER DATE 10/18/2018 CREW KR,MB C..mmnra, TnM 30 35 40 45 50 CROSS SECTION PLOT - LOOKING DOWNSTREAM CROSS-SECTION: 8 FEATURE: Pool Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec area (s7 17.1 17.9 15.3 18.7 19.1 Bankfull Width ft 14.8 14.2 15.0 12.8 12.4 Bankfull Mean Depth 11 1.2 1.3 1.0 1.5 1.5 Bankfull Max Depth ft 2.2 2.2 1.6 2.3 2.4 Width/Depth Ratio 12.8 11.2 14.7 8.7 8.1 Entrenchment Ratio 2.3 3.0 2.1 2.8 2.9 Classification C E B B B Bank Heigbt Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 328.92 328.92 328.92 328.92 328.92 D50 mm --- --- --- --- D84 mm --- --- --- --- 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 9 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0 331.44 0 331.45 0.00 331.46 0.00 331.44 0.00 331.35 0.06 330.3 0.16 330.3 0.14 330.25 0.13 330.31 0.74 329.93 2.61 329.52 7.08 328.04 6.57 329.14 3.25 329.23 4.73 328.90 9.2 327.65 12.93 326.99 12.93 326.96 7.92 327.89 12.39 326.89 14.93 326.83 15.44 326.72 17.51 326.64 14.12 326.93 18.83 326.59 20.34 326.54 18.47 326.64 20.32 326.47 19.31 326.69 19.81 325.32 22.16 325.77 18.76 326.13 21.09 326.14 19.92 326.08 20.48 325.04 23.6 324.98 19.44 325.61 21.70 325.53 20.42 325.47 21.87 324.97 23.64 324.85 20.25 325.43 22.31 325.24 20.79 325.06 23.03 324.76 23.75 324.83 20.91 325.36 22.45 324.83 21.50 324.88 24.08 324.47 23.87 324.77 21.5 325.41 22.61 324.67 22.08 324.79 23.94 324.47 24.06 324.77 22.51 325.15 23.09 324.49 23.07 324.57 25.16 324.51 24.17 324.73 22.68 325.15 24.11 324.62 24.31 324.59 26.68 324.57 24.52 324.67 22.96 324.88 25.05 324.70 25.29 324.67 28.46 324.63 24.69 324.62 23.12 324.61 26.10 324.70 26.66 324.73 30.79 324.96 24.83 324.62 23.56 324.4 26.99 324.62 27.54 324.73 32.07 325.70 25.17 324.6 24.3 324.4 28.07 324.58 28.75 324.82 32.69 326.16 25.4 324.6 25.69 324.54 29.23 324.72 29.67 324.83 35.29 326.26 25.66 324.73 26.88 324.55 30.32 324.75 30.14 324.90 40.09 328.58 25.85 324.74 28.48 324.57 30.89 324.83 30.73 324.82 42.27 330.25 26.01 324.76 29.79 324.69 31.60 324.89 31.86 324.98 26.22 324.76 31.16 324.71 32.47 325.09 32.47 325.54 26.4 324.81 31.93 324.88 35.71 326.37 32.88 326.05 26.54 324.84 32.6 324.96 39.01 327.96 33.38 326.19 26.77 324.87 33.6 325.41 42.44 329.24 35.40 326.34 26.91 324.8 37.3 327.21 42.48 330.41 39.05 328.21 27.07 324.72 40.68 328.55 42.10 329.22 27.24 324.75 42.4 329.25 42.42 330.40 27.45 324.8 42.48 330.41 27.69 324.81 27.89 324.76 28.06 324.8 28.15 324.83 28.41 324.84 28.5 325 29.2 325.05 33.31 325.3 36.12 326.74 37.65 327.55 41.02 329 42.49 329.34 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 332 331 330 329 �R 328 0 327 326 W 325 - Bankfull -� 324 Year-0, 2013 Year-1, 2014 323 t Year-2, 2015 Year-3, 2016 ---� Year-5, 2018 YEAR-5, 2018 SURVEY DATA PROJECT SANDY CREEK TASK CROSS SECTION REACH LOWER DATE 10/18/2018 CREW KR,MB C..mmnra, TnM Sandy Creek Cross Section 9 - Riffle 10 15 20 25 30 35 40 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM CROSS-SECTION: 9 FEATURE: Riffle Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec area (s7 19.3 27.7 21.5 19.4 23.2 Bankfull Width ft 15.4 17.7 15.6 15.7 17.0 Bankfull Mean Depth 11 1.3 1.6 1.4 1.2 1.4 Bankf ill Max Depth ft 1.9 2.2 2.0 1.8 2.1 Width/Depth Ratio 12.2 11.3 11.3 12.8 12.4 Entrenchment Ratio 2.2 3.0 2.2 2.0 2.0 Classification B B E E E Bank Heigbt Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 326.54 326.54 326.54 326.54 326.54 D50 mm 5.7 7.1 2.7 7.6 D84 mm 32.0 1 49.8 49.8 1 27.0 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 SANDY CREEK CROSS-SECTION: 10 Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft Station ft Elev. ft 0 331.89 0 331.89 0.00 331.89 0.00 331.91 1.60 328.32 0.01 330.67 0.02 330.51 -0.02 330.49 0.23 330.60 3.78 328.48 1.93 329.8 7.97 327.06 6.26 327.77 3.13 329.14 10.09 326.23 9.02 326.88 12.27 325.83 11.47 325.98 7.26 327.33 14.70 325.98 12.31 325.77 14.69 325.6 12.67 325.77 12.09 325.95 14.89 326.03 16.16 325.48 16.09 325.54 15.24 325.65 15.13 325.85 16.59 325.18 18.16 324.23 16.85 325.08 16.73 324.84 16.62 325.31 17.13 324.41 18.98 323.9 17.67 324.47 17.63 324.56 17.59 324.67 18.18 323.88 19.15 323.82 18.46 323.94 18.36 324.11 18.21 324.21 18.40 323.76 19.53 323.6 18.93 323.95 18.69 323.99 18.36 323.95 19.45 323.47 19.77 323.48 18.8 323.83 19.13 323.80 18.43 323.89 20.77 323.47 20.01 323.35 19.34 323.69 19.75 323.44 18.98 323.81 22.18 323.51 20.28 323.37 20.15 323.52 20.29 323.22 19.45 323.62 24.20 323.47 20.53 323.35 21.02 323.53 21.35 323.39 19.71 323.56 24.62 323.89 20.92 323.48 21.88 323.54 22.23 323.66 20.37 323.69 24.54 324.49 21.17 323.55 22.73 323.54 22.87 323.69 20.71 323.64 25.11 324.99 21.5 323.65 23.7 323.7 23.33 323.95 21.15 323.72 26.33 325.90 21.9 323.7 24.29 323.93 24.08 324.18 21.70 323.71 29.05 326.04 22.41 323.8 25.04 324.13 25.47 324.42 22.35 323.73 35.51 325.50 22.76 323.83 26.06 324.25 29.53 324.80 22.90 323.86 49.15 326.67 22.97 323.79 26.05 324.23 36.92 325.50 23.09 323.99 60.78 328.01 23.16 323.78 27.05 324.37 51.00 326.96 23.22 324.37 62.68 329.22 23.56 323.78 27.98 324.4 62.84 328.10 23.42 324.62 23.65 323.8 29.18 324.95 62.92 329.25 23.64 324.97 23.86 323.82 33.71 325.2 24.57 325.19 24.08 323.87 39.57 325.8 25.47 325.31 24.46 323.91 47.24 326.48 30.66 325.38 24.72 323.87 56.18 327.63 36.10 325.65 25.16 324.01 62.81 328.15 41.21 326.06 30.34 324.63 62.95 329.26 47.54 326.59 44.24 326.09 52.63 327.17 60.28 327.99 57.12 327.81 62.85 328.17 62.63 328.16 62.88 329.24 62.72 329.27 0 MCADAMS Sandy Creek Stream Restoration Site Monitoring Year 5 Report • Durham County, North Carolina • December 2018 Sandy Creek Cross Section 10 - Pool 332 331 330 329 �R 328 WE 0 327 326 W 325 'Bankfull - - - - - - 324 -� Year-0, 2013 Year-1, 2014 323 t Year-2, 2015 10 15 20 25 30 35 40 45 50 55 60 - Year-3, 2016 t Year-5, 2018 Width from River Left to Right (ft) CROSS SECTION PLOT - LOOKING DOWNSTREAM YEAR-5, 2018 SURVEY DATA CROSS-SECTION: PROJECT SANDY CREEK FEATURE: Pool TASK CROSS SECTION REACH LOWER DATE 10/18/2018 CREW KR,MB Rummary Data Year-0 Year-1 Year-2 Year-3 Year-5 Year-6 Year-7 Bankfull X-sec areas 22.9 27.8 20.5 10.0 14.9 Bankfull Width ft 22.3 27.0 21.4 14.4 9.8 Bankfull Mean Depth 11 1.0 1.0 1.0 0.7 1.5 Bankfull Max Depth ft 2.1 2.3 2.3 1.8 2.0 Width/Depth Ratio 21.6 26.2 22.3 20.5 6.4 Entrenchment Ratio 2.2 3.0 2.5 3.2 5.1 Classification C B C C C Bank Heigbt Ratio 1.0 1.0 1.0 1.0 1.0 Bankfull Elevation ft 325.48 325.48 325.48 325.48 325.48 D50 mm --- --- --- D84 mm --- --- --- --- 0 MCADAMS RIVERMORPH PARTICLE SUMMARY River Name: Duke Stream Restoration Reach Name: Upper Sample Name: xS1-MY5 Survey Date: 01/02/2019 Size (mm) TOT # ITEM % CUM 0 - 0.062 16 13.79 13.79 0.062 - 0.125 6 5.17 18.97 0.125 - 0.25 0 0.00 18.97 0.25 - 0.50 20 17.24 36.21 0.50 - 1.0 4 3.45 39.66 1.0 - 2.0 0 0.00 39.66 2.0 - 4.0 6 5.17 44.83 4.0 - 5.7 0 0.00 44.83 5.7 - 8.0 2 1.72 46.55 8.0 - 11.3 0 0.00 46.55 11.3 - 16.0 6 5.17 51.72 16.0 - 22.6 0 0.00 51.72 22.6 - 32.0 24 20.69 72.41 32 - 45 0 0.00 72.41 45 - 64 24 20.69 93.10 64 - 90 4 3.45 96.55 90 - 128 2 1.72 98.28 128 - 180 2 1.72 100.00 180 - 256 0 0.00 100.00 256 - 362 0 0.00 100.00 362 - 512 0 0.00 100.00 512 - 1024 0 0.00 100.00 1024 - 2048 0 0.00 100.00 Bedrock 0 0.00 100.00 D16 (mm) 0.09 D35 (mm) 0.48 D50 (mm) 14.44 D84 (mm) 55.64 D95 (mm) 78.32 D100 (mm) 180 Silt/Clay (%) 13.79 Sand (%) 25.87 Gravel (%) 53.44 Cobble (%) 6.9 Boulder (%) 0 Bedrock (%) 0 Total Particles = 116. XS 1-MY5 0-0.062 0.25-0.50 2.0-4.0 11.3-16.0 45-64 90-128 0.062-0.125 0.50-1.0 5.7-8.0 22.6-32.0 64-90 128-180 Particle Size (mm) RIVERMORPH PARTICLE SUMMARY River Name: Duke Stream Restoration Reach Name: Upper Sample Name: xs3-MY5 Survey Date: 01/02/2019 Size (mm) TOT # ITEM % CUM 0 - 0.062 8 7.55 7.55 0.062 - 0.125 20 18.87 26.42 0.125 - 0.25 28 26.42 52.83 0.25 - 0.50 0 0.00 52.83 0.50 - 1.0 0 0.00 52.83 1.0 - 2.0 0 0.00 52.83 2.0 - 4.0 0 0.00 52.83 4.0 - 5.7 0 0.00 52.83 5.7 - 8.0 2 1.89 54.72 8.0 - 11.3 0 0.00 54.72 11.3 - 16.0 6 5.66 60.38 16.0 - 22.6 0 0.00 60.38 22.6 - 32.0 16 15.09 75.47 32 - 45 0 0.00 75.47 45 - 64 16 15.09 90.57 64 - 90 4 3.77 94.34 90 - 128 6 5.66 100.00 128 - 180 0 0.00 100.00 180 - 256 0 0.00 100.00 256 - 362 0 0.00 100.00 362 - 512 0 0.00 100.00 512 - 1024 0 0.00 100.00 1024 - 2048 0 0.00 100.00 Bedrock 0 0.00 100.00 D16 (mm) 0.09 D35 (mm) 0.17 D50 (mm) 0.24 D84 (mm) 55.73 D95 (mm) 94.43 D100 (mm) 128 Silt/Clay (%) 7.55 Sand (%) 45.28 Gravel (%) 37.74 Cobble (%) 9.43 Boulder (%) 0 Bedrock (%) 0 Total Particles = 106. 3 XS3-MY5 N N O O CDCECD O m N 00 Cfl N O O ? ' LO L6 M O O O N N N (0 7 N O O O Particle Size (mm) RIVERMORPH PARTICLE SUMMARY River Name: Duke Stream Restoration Reach Name: Middle Sample Name: xS6-MY5 Survey Date: 01/02/2019 Size (mm) TOT # ITEM % CUM --------------------------------------------------- 0 - 0.062 90 72.58 72.58 0.062 - 0.125 0.00 72.58 0.125 - 0.25 4 3.23 75.81 0.25 - 0.50 4 3.23 79.03 0.50 - 1.0 2 1.61 80.65 1.0 - 2.0 0 0.00 80.65 2.0 - 4.0 0 0.00 80.65 4.0 - 5.7 0 0.00 80.65 5.7 - 8.0 4 3.23 83.87 8.0 - 11.3 0 0.00 83.87 11.3 - 16.0 12 9.68 93.55 16.0 - 22.6 0 0.00 93.55 22.6 - 32.0 4 3.23 96.77 32 - 45 0 0.00 96.77 45 - 64 2 1.61 98.39 64 - 90 2 1.61 100.00 90 - 128 0 0.00 100.00 128 - 180 0 0.00 100.00 180 - 256 0 0.00 100.00 256 - 362 0 0.00 100.00 362 - 512 0 0.00 100.00 512 - 1024 0 0.00 100.00 1024 - 2048 0 0.00 100.00 Bedrock 0 0.00 100.00 D16 (mm) 0.01 D35 (mm) 0.03 D50 (mm) 0.04 D84 (mm) 11.36 D95 (mm) 26.83 D100 (mm) 90 Silt/Clay (%) 72.58 Sand (%) 8.07 Gravel (%) 17.74 Cobble (%) 1.61 Boulder (%) 0 Bedrock (%) 0 Total Particles = 124. N 4 ry 4-0 � 2 N n XS6-MY5 N LLO CD O CD O (0 0) r 00 CO N p p � M LO lf) lf) Co CO IZI, CO O N N LO O N 7 O N O Particle Size (mm) RIVERMORPH PARTICLE SUMMARY River Name: Duke Stream Restoration Reach Name: Lo er Sample Name: XS9-MY5 Survey Date: 01/02/2019 Size (mm) TOT # ITEM % CUM 0 - 0.062 0 0.00 0.00 0.062 - 0.125 0 0.00 0.00 0.125 - 0.25 28 25.45 25.45 0.25 - 0.50 10 9.09 34.55 0.50 - 1.0 2 1.82 36.36 1.0 - 2.0 0 0.00 36.36 2.0 - 4.0 0 0.00 36.36 4.0 - 5.7 0 0.00 36.36 5.7 - 8.0 18 16.36 52.73 8.0 - 11.3 0 0.00 52.73 11.3 - 16.0 20 18.18 70.91 16.0 - 22.6 0 0.00 70.91 22.6 - 32.0 28 25.45 96.36 32 - 45 0 0.00 96.36 45 - 64 2 1.82 98.18 64 - 90 2 1.82 100.00 90 - 128 0 0.00 100.00 128 - 180 0 0.00 100.00 180 - 256 0 0.00 100.00 256 - 362 0 0.00 100.00 362 - 512 0 0.00 100.00 512 - 1024 0 0.00 100.00 1024 - 2048 0 0.00 100.00 Bedrock 0 0.00 100.00 D16 (mm) 0.2 D35 (mm) 0.62 D50 (mm) 7.62 D84 (mm) 27.43 D95 (mm) 31.5 D100 (mm) 90 Silt/Clay (%) 0 Sand (%) 36.36 Gravel (%) 61.82 Cobble (%) 1.82 Boulder (%) 0 Bedrock (%) 0 Total Particles = 110. 3 E XS9-MY5 O O O O O O N r- 06 (fl N Cfl m M O , , In Lf ) Lf) if ) M Co CO N N O N 7 O N O Particle Size (mm) M WADAMS BANK PIN MONITORING DATA > DKU-16040 BANK PIN MONITORING DATA Duke University Water Reclamation Pond Stream Restoration - Monitoring Year 5 Report October 17 & 18, 2018 BANK PIN MONITORING METHODOLOGY Two sets of bank pins were installed in the outer bend of each of five pool cross sections (Cross Sections 2, 4, 5, 7 and 10) during the As -built monitoring setup. Each set of bank pins consists of two bank pins installed near the water line with one pin approximately 6 to 12 inches above the other. In each cross section, the lower of the two pins in a set is referred to as 'Pin 1', and the upper pin is referred to as 'Pin 2" as depicted in the cross -sectional schematic below. At each cross section, the two sets of bank pins were installed with the one set a few feet upstream of the center of the bend (Pin Set 1) and the second set a few feet downstream of the center of the bend (Pin Set 2), as depicted in the following plan view schematic. Cross Section ------------ --- z --------------------- A LL 0 creating experiences through experience 1 of 5 M WADAMS BANK PIN MONITORING DATA > DKU-16040 All bank pins were installed flush with the bank during As -built monitoring and all subsequent measurements are compared to the initial "zero" position. Erosion is monitored by measuring the length of exposed pin. Measurements of bank erosion are expressed in negative numbers representing inches of exposed pin. Bank aggradation is difficult to measure using bank pins because the pins become buried and are not visible. Therefore, bank aggradation is not measured. When a buried bank pin was located, aggradation was noted but not measured. In the following tables, a positive number one is used to represent that aggradation has taken place where a buried pin was located, but the amount of aggradation is not quantified. A zero is used to represent a pin that is flush with the bank and the length of exposed pins are represented as negative numbers. In Monitoring Year 5, seven bank pins were not located. This may be due to bank pins being buried by sediment, making them difficult to locate, or by erosion exposing the entire pin and then the pin being washed away during high flows. BANK PIN MONITORING DATA XS2-1 Bank Pins 0 7 Pin 2 (upper) ■ Pin 1 (lower) -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year-5, 2018 Note: lower pin not located in 2018 XS2-2 Bank Pins -1m 0 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 Exposed pin length change (in.) Pin 2 (upper) Pin 1 (lower) ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 creating experiences through experience 2 of 5 M MCADAMS XS4-1 Bank Pins 0 -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year-5, 2018 Note: lower pin not located in 2018 XS4-2 Bank Pins 0 mm -16 -14 -12 -10 -8 -6 -4 -2 0 2 Exposed pin length change (in.) ■ Year-2, 2015 ■ Year-3, 2016 ■ Year-5, 2018 Note: lower pin not located in 2018 XS5-1 Bank Pins -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 Note: lower pin not located in 2018 BANK PIN MONITORING DATA > DKU-16040 Pin 2 (upper) Pin 1 (lower) Pin 2 (upper) Pin 1 (lower) Pin 2 (upper) Pin 1 (lower) creating experiences through experience 3 of 5 M MCADAMS XS5-2 Bank Pins mm -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 Note: lower pin not located in 2018 XS7-1 Bank Pins BANK PIN MONITORING DATA > DKU-16040 Pin 2 (upper) Pin 1 (lower) . Pin 2 (upper) Pin 1 (lower) -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 Note: upper pin not located in 2018 creating experiences through experience 4 of 5 M MCADAMS XS7-2 Bank Pins 0 BANK PIN MONITORING DATA > DKU-16040 Pin 2 (upper) Pin 1 (lower) -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 XS10-1 Bank Pins v_ N 0 a C a 0 -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 Note: upper pin not located in 2018 XS10-2 Bunk Pins 0 0 Pin 2 (upper) Pin 1 (lower) Pin 2 (upper) Pin 1 (lower) -10 -8 -6 -4 -2 0 2 Exposed pin length change {in.} ■ Year-2, 2015 ■ Year-3, 2016 ■ Year 5, 2018 creating experiences through experience 5 of 5 M MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT APPENDIX C LOG SILL STRUCTURES ASSESSMENT creating experiences through experience DUKE UNIVERSITY CAMPUS DRIVE STREAM RESTORATION DURHAM, NORTH CAROLINA LOG SILL STRUCTURES ASSESSMENT PROJECT NUMBER: DKU-16040 DESIGNED BY: JOSHUA C. ALLEN, PE, CFM DATE: APRIL 2018 1 MC"'-' DAMS 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 NC Llc. # C-0293 ,����1111lIIIII C AR 0 /, ss10.'� SEAL 40761 o 6'IL. TI MCADAMS REPORT > DKU-16040 DUKE UNIVERSITY CAMPUS DRIVE STREAM RESTORATION Log Sill Structures Assessment General Description & Background The Duke University Campus Drive Stream Restoration project is on the main campus of Duke University, in Durham, North Carolina. The Conservation Easementfor the project is 7.01 acres in size and startsjust south of NC Highway 147, runs parallel to Campus Drive, crosses Campus Drive and ties back in to the receiving waters at Oregon Street. The Stream Restoration project is located within the Cape Fear River Basin USGS Hydrologic Unit 03030002 (USGS 1974), local watershed 14-digit basin 03030002060110, and the North Carolina Division of Water Resources (DWR) sub -basin 03-06-05. The unnamed tributary flows directly into Sandy Creek (DWR stream index number of 16-41-1-11) approximately 2.5 miles downstream of the project terminus. Methodology The project corridor was walked on March 29, 2018 to assess the current condition of the log sill structures that were installed as part of the stream restoration in the summer of 2013. Additionally, repair plans were developed for some of the structures that were impaired. The condition of each log sill was categorized into four different priorities. Those priorities are as follows: Priority 1: These log sill structures were considered to have failed and need repair. A repair plan was created for each Priority 1 log sill. Priority 2: These log sill structures were considered impaired and are not functioning as designed. A repair plan was created for each Priority 2 log sill. Priority 3: These log sill structures are functioning as designed but should be monitored closely due to potential future impairments. Priority 4: These log sill structures are functioning as designed. Discussion of Results The breakdown of log sill structures by reach is as follows: Reach South Central North # of Log Sills 12 6 30 The breakdown of log sill structures by priority is as follows: Priority 1 2 3 4 # of Log Sills 6 9 14 19 creating experiences through experience 2905 Meridian Parkway, Durham, NC / 919. 361. 5000 T] WADAMS The following tables breakdown the condition of each log sill structure by reach: South Reach REPORT > DKU-16040 Priority 1 2 3 4 # of Log Sills 1 4 2 5 Central Reach Priority 1 2 3 4 # of Log Sills 1 --- 3 2 North Reach Priority 1 2 3 4 # of Log Sills 4 5 9 12 The following reports detail the condition of each log sill structure. It should be noted that the stationing of each structure taking from the approved construction drawings, dated March 8, 2013. This document should be included with the annual monitoring documentation to ensure that the condition of the structures is monitored accordingly. creating experiences through experience 2905 Meridian Parkway, Durham, NC / 919. 361. 5000 PRIORITY 1 LOG SILL REPORTS CAMPUS DRIVE STREAM RESTORATION DKU-16040 LOG SILL #9 PRIORITY SOUTH REACH - STATION 16+57 1 NOTES: THIS LOG SILL IS CAUSING SIGNIFICANT EROSION ON THE RIGHT BANK. IT d � .,, ��;;;�..... • '- �� 'i.-. APPEARS THAT THE STREAM IS 4 `.• .,'- ``'r, ATTEMPTING TO BYPASS THE SILL t4. : ENTIRELY. Ir 11 ��•, - ;r LOOKING UPSTREAM ACTION ITEMS: CUT THE LOG SILL ROUGHLY 3—FEET FROM THE TOE OF THE LEFT BANK AND AT THE TOE OF THE RIGHT 1 ��;a'•;'3' ". �� �:'- •... , r.,.: BANK. "A - — REMOVE SECTION OF THE LOG SILL AND PIN TO THE CUT FACE OF THE & REMAINING LOG SILL AND THE TOE OF THE RIGHT BANK AND USING #4 :s .• �v- REBAR. STABILIZE THE EROSION ON THE RIGHT BANK WITH MATTING AND LIVE STAKES AS NEEDED. yy..++�• ' A r f :T A,. Y LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKU1 6040— Log Sill Memos.dw 4 6 2018 10:05:02 AM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UN�RSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No h`110 ca Doa 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #6 PRIORITY CENTRAL REACH - STATION 22+56 1 1 NOTES: THIS LOG SILL IS CAUSING SIGNIFICANT ?I• EROSION ON THE RIGHT BANK. IT Ms•.. "` APPEARS THAT THE STREAM IS ATTEMPTING TO BYPASS THE SILL J. '.: . ENTIRELY. LOOKING UPSTREAM ACTION ITEMS: i — CUT THE LOG SILL ROUGHLY 4—FEET FROM THE TOE OF THE LEFT BANK AND AT THE TOE OF THE RIGHT BANK. 0z�- -'.: , — REMOVE SECTION OF THE LOG SILL q:ls9 "' ;� p,•..,,,. -.• x .. �.: ;�;'='; :. AND PIN TO THE CUT FACE OF THE `_'• '` '� k :'= s ' REMAINING LOG SILL AND THE TOE %+ r'•:;: OF THE RIGHT BANK AND USING #4 STABILIZE THE EROSION ON THE RIGHT BANK WITH MATTING AND LIVE STAKES AS NEEDED. Y LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 6 2018 10:07:44 AM, Allen, Joshua PROJECT No. DKU-16040 L Ftt.EN"E DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL # 14 PRIORITY NORTH REACH - STATION 35+23 1 NOTES: THIS LOG SILL IS CAUSING SIGNIFICANT 4 -.' , _ :-,.. _ Jam" •� :: �!'+. 1,�' +; EROSION ON THE RIGHT BANK. IT APPEARS THAT THE STREAM IS �t.. •;.l;' �'• ATTEMPTING TO BYPASS THE SILL ENTIRELY. • `{i� _ ,:{g is ! 1 �� - •u-- ' ��� -- may. �~' � A-y, LOOKING UPSTREAM ACTION ITEMS: - CUT THE LOG SILL AT THE END OF �:: •; !' . 1-.. I ry THE POINT BAR ON THE LEFT BANK �• r= ' ... �'- n� .... -, AND AT THE TOE OF THE RIGHT BANK. �' REMOVE SECTION OF THE LOG SILL �..," `.• - "" AND PIN TO THE CUT FACE OF THE REMAINING LOG SILL AND THE TOE OF THE RIGHT BANK AND USING #4 REBAR. i' sSi. +ram { LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 6 2018 10:13:44 AM, Allen, Joshua L PROJECT No. DKU-16040 DUKE UNIVERSITY IJ FD.EN"E OKU 16040-SILLS ba CAMPUS DRIVE STREAM RESTORATION 34W Tafte— Way h`' lCamlma SCALE: N TS Chadoae, No 28277 LUG SILL REPAIR PLAN MCADAMS LAcense -0293 704. 627..0800NMcAdameCoxara DATE: 04-06-18 LOG SILL #27 PRIORITY NORTH REACH - STATION 39+77 1 NOTES: THIS LOG SILL HAS CAUSED A BANK FAILURE ON THE LEFT BANK. THE STREAM HAS BYPASSED THE SILL ENTIRELY. LL t rr N. LOOKING UPSTREAM ACTION ITEMS: CUT THE LOG SILL AT THE END OF THE POINT BAR ON THE RIGHT BANK. I, REMOVE SECTION OF THE LOG SILL �. js, f _ ��. •r . �: AND PIN TO THE TOE OF THE LEFT BANK AND USING #4 REBAR. TA' �tiw:•�..y — STABILIZE THE EROSION ON THE LEFT BANK WITH MATTING AND LIVE STAKES AS NEEDED. 3 LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 6 2018 10:16:34 AM, Allen, Joshua L PROJECT No. DKU-16040 DUKE UNIVERSITY IJ FILENAME OKU16040—SILLS ba CAMPUS DRIVE STREAM RESTORATION 34WTaxf e—Way �110 SCALE: N TS cnarroae, Norfh C 28277 LUG SILL REPAIR PLAN MCADAMS LAcense No.:DATE: 704. 627.. 0800 n McAdamaC.oxara 04-06-18 LOG SILL #28 PRIORITY NORTH REACH - STATION 40+08 1 _ NOTES: ; ' p '1w-- THIS LOG SILL HAS CAUSED A BANK ;:„ rt-,.., ,�...-: _ , ,;:;:•,-n .,n: ;,�-.., ==�,�� :�`; <, FAILURE ON THE LEFT BANK. THE STREAM F .•-.:�. _ f. ,.-.•r•:...-.�� ;�•;r�� I rr- �5r4�,�:';� HAS BYPASSED THE SILL ENTIRELY. .. (fie. - � .. :i�•' X. i+ ram' •[t. •.,� LOOKING UPSTREAM ACTION ITEMS: CUT THE LOG SILL AT THE TOE OF Y THE RIGHT BANK. "` `' '� ' "• Y t` — REMOVE SECTION OF THE LOG SILL AND PIN TO THE TOE OF THE RIGHT BANK AND USING 4 REBAR. # STABILIZE THE EROSION ON THE sRIGHT BANK WITH MATTING AND LIVE r } STAKES AS NEEDED. ��_- - - �" - •tip . _ � ;xi: LOOKING DOWNSTREAM X: Projects -Shared DKU DKU-16040 Stream Restoration - Log Sill Re ort Current Drawin s DKUl 6040- Log Sill Memos.dw 4 6 2018 10:18:14 AM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCAM. N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #5 PRIORITY NORTH REACH - STATION 32+53 1 NOTES: THIS LOG SILL HAS CAUSED A BANK 4 FAILURE ON THE LEFT BANK. THE STREAM 4 HAS BYPASSED THE SILL ENTIRELY. kr- �w W LOOKING UPSTREAM ACTION ITEMS: CUT THE LOG SILL ROUGHLY 5—FEET FROM THE EXPOSED END OF THE LOG SILL AND DISPOSE OF THE LOG IN THE FLOODPLAIN TO CREATE HABITAT. RESHAPE AND STABILIZE THE EROSION ON THE LEFT BANK WITH MATTING AND LIVE STAKES AS T�� .•. ;•r. �, NEEDED. 5 •ter ( `+J _--r:`,�.". LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:08:08 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara PRIORITY LOG SILL REPORTS CAMPUS DRIVE STREAM RESTORATION DKU-16040 LOG SILL #3 PRIORITY SOUTH REACH - STATION 11 +50 1 2 NOTES: THIS LOG SILL WAS SET HIGHER THAN •- -' :` : ••. �,; �-. -. •. , THE STREAMBED ELEVATION AND IS NOT C. •: LEVEL, RESULTING IN INCREASED NEAR —BANK STRESS. ADDITIONALLY, THE SILL WAS SET AN AN ANGLE WHICH ' DIRECTS THE MAIN FLOW VECTORS AT THE } g RIGHT BANK. w � LOOKING UPSTREAM ACTION ITEMS: 4 .. NOTCH THE LOG IN THE DIRECTION 1 • �•� _ � � _ •�.�• .. � OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. MONITOR THE BANKS FOR ANY INCREASED INSTABILITY. ,�� ,,,?�" _ `-ram:= �� • '_.' �,..•- - � 14 s- r LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:06:28 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY W OKU 16040—SILLS 34W Todne— Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION cbar�are, No a1 C 10a11na 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #7 PRIORITY SOUTH REACH - STATION 13+21 1 2 NOTES: THIS LOG SILL WAS SET HIGHER THAN THE STREAMBED ELEVATION AND IS NOT LEVEL, RESULTING IN INCREASED NEAR —BANK STRESS ON THE RIGHT BANK. IN rm y � ALtir,~� • F*" ,,fir. •.,. f LOOKING UPSTREAM ACTION ITEMS: NOTCH THE LOG IN THE DIRECTION OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM wy STREAMBED ELEVATION. MONITOR THE BANKS FOR ANY . :_ . .. INCREASED INSTABILITY. LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:06:53 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No a1 C 10a11na 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL # 10 PRIORITY SOUTH REACH - STATION 17+20 1 2 NOTES: kF _ f " THIS LOG SILL WAS SET HIGHER THAN '• '' `" THE STREAMBED ELEVATION AND IS NOT • - "�� . • _ a.�"� .• 1•.�-. -. •:.:.:..fir_. �`�' LEVEL, RESULTING IN INCREASED NEAR —BANK STRESS ON THE LEFT BANK. MZ f I - •: may, _ V 1 yy 1r - _ 'Y P LOOKING UPSTREAM ACTION ITEMS: NOTCH THE LOG IN THE DIRECTION OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. °r' — MONITOR THE BANKS FOR ANY INCREASED INSTABILITY. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:07:16 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL # 12 PRIORITY SOUTH REACH - STATION 17+75 1 2 NOTES: =N !•`. ` ° �: = ti-i THIS LOG SILL WAS SET HIGHER THAN 44 ^" THE STREAMBED ELEVATION AND IS NOT of r LEVEL, RESULTING IN INCREASED W. ir..y t ter« _ NEAR —BANK STRESS ON THE RIGHT BANK. F, 74 w a� f � !� ` '��.- fir'` r' •..�. - i LOOKING UPSTREAM ACTION ITEMS: -. 'F':n�•;^, F•r~ .���• - — NOTCH THE LOG IN THE DIRECTION OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. b.o .�. r+r.� ram. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:07:39 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY !jj OKU 16040—SILLS 8488 Twine —Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�ith 110 28277 LAcense No.:DATE: LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n Mc 04-06-18 AdamaC.oxara LOG SILL #30 PRIORITY NORTH REACH - STATION 40+77 1 2 NOTES: THIS LOG SILL WAS SET SUCH THAT FLOW IS CONCENTRATED CLOSE TO THE LEFT BANK. .. LOOKING UPSTREAM ACTION ITEMS: — NOTCH THE LOG IN THE DIRECTION OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM '- µ} � . ��r `,, !b$g; - ', � ,;_a STREAMBED ELEVATION. .i7 ^y: 31 LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:05:52 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY W OKU 16040—SILLS 34W Tafte— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #4 PRIORITY NORTH REACH - STATION 32+31 1 2 NOTES: '� Y:.F;:-„• -:., <. THIS LOG SILL WAS SET HIGHER THAN THE STREAMBED ELEVATION AND IS NOT LEVEL, RESULTING IN INCREASED NEAR —BANK STRESS. LOOKING UPSTREAM ACTION ITEMS: PF NOTCH THE LOG IN THE DIRECTION a., OF FLOW AT THE THALWEG OF THE ° STREAM DOWN TO THE UPSTREAM } • STREAMBED ELEVATION. MONITOR THE BANKS FOR ANY f �' !' ' ^'f ', f `: " • jp. INCREASED INSTABILITY. f LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:04:04 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #6 PRIORITY NORTH REACH - STATION 32+80 1 2 NOTES: ! THIS LOG SILL WAS SET HIGHER THAN THE STREAMBED ELEVATION, RESULTING IN INCREASED NEAR —BANK STRESS DURING eHIGHER FLOWS. i _ � y . 7 LOOKING UPSTREAM ACTION ITEMS: mar •.j'': — NOTCH THE LOG IN THE DIRECTION s� OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. — MONITOR THE BANKS FOR ANY - . INCREASED INSTABILITY. air fh' LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:04:28 PM, Allen, Joshua PROJECT No. DKU-16040 RSIL AGMADANS L FD.EN"E DUKE UNIVEITY !jj unjow OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 Ucenft DATE: LUG SILL REPAIR PLAN 704. 527. 0800N McAdarairoxara 04-06-18 MCADAMS LOG SILL #21 PRIORITY NORTH REACH - STATION 37+53 1 2 NOTES: THIS LOG SILL WAS SET SUCH THAT FLOW a IS CONCENTRATED CLOSE TO THE LEFT •I;IQ a, :,�-•. •.'�. r .' y BANK. ,. rr i- `Y y, fi � r7 LOOKING UPSTREAM ACTION ITEMS: —"' — NOTCH THE LOG IN THE DIRECTION OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. Ai� T. af ' � � • ,. '> - ¢ � - - -� - _.= -_ . � " awe.=. t _ 1 .. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:05:02 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 8488 Twine —Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #29 PRIORITY NORTH REACH - STATION 40+31 1 2 NOTES: .. �, : �-;:•,; FRM '_ ` THIS LOG SILL WAS SET SUCH THAT FLOW IS CONCENTRATED CLOSE TO THE RIGHT BANK. Sv All J Z 1 ,� • P I J r� LOOKING UPSTREAM ACTION ITEMS: 'i :-.... — NOTCH THE LOG IN THE DIRECTION _ OF FLOW AT THE THALWEG OF THE STREAM DOWN TO THE UPSTREAM STREAMBED ELEVATION. �d sir �,• , .T LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:05:31 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara PRIORITY LOG SILL REPORTS CAMPUS DRIVE STREAM RESTORATION DKU-16040 LOG SILL #5 PRIORITY SOUTH REACH - STATION 12+53 1 3 NOTES: ' THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED AND IS CONCENTRATING FLOW CLOSE TO THE LEFT BANK. .. ' Al - LOOKING UPSTREAM ACTION ITEMS: r — MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED INSTABILITY. .;. �. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:03:02 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 8488 Twine —Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' 1Camlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL # 11 PRIORITY SOUTH REACH - STATION 17+50 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED AND IS CONCENTRATING FLOWS CLOSE TO THE LEFT BANK. d ~ j ^. ;k .. i ytyt. r+e.�. {�i• Sr �. LOOKING UPSTREAM ACTION ITEMS: — MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED INSTABILITY. ' :tom-r • _ - '4*a� • C LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:03:29 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #4 PRIORITY CENTRAL REACH - STATION 22+01 1 3 NOTES: T' THIS LOG SILL IS FUNCTIONING, BUT IS er `..r ;•f{ _ ?•r • --'�ln''.'+ SET HIGHER THAN DESIRED. `.� •:�„s - �~ 'ram r ;'•. . _ _ s f LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED INSTABILITY. Y v� LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:01:49 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY W OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL # 1 PRIORITY CENTRAL REACH - STATION 20+75 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS -•R.+' ,; SET HIGHER THAN DESIRED. '.-� ' sic• rm: �^'., _:s�..:-:� .z - _ �:'.. &W-1 tk- �V ,� � � • �.. ... may. LOOKING UPSTREAM ACTION ITEMS: ' — MONITOR THE SILL AND NEARBY .. v��-. 2 z, BANKS FOR ANY INCREASED INSTABILITY. ,ram` • - YAK -�' •-w>�`}iaFg. ^Q` _ .� . I LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:01:01 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #2 PRIORITY CENTRAL REACH - STATION 21+27 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS %' " '`S CONCENTRATING FLOWS CLOSE TO THE S Id,F �; ; ' , i':'• RIGHT BANK. ilk, 6 r*.N,z LOOKING UPSTREAM ACTION ITEMS: J.`il••: �r;�.: — MONITOR THE SILL AND NEARBY . ; : ._• �, r�.�:::` ;,i BANKS FOR ANY INCREASED INSTABILITY. 4• Y 74 ­0, s—LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:01:23 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #25 PRIORITY NORTH REACH - STATION 38+29 1 3 NOTES: `.` .`•_ k �� I`, THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED. YES - ._��i!1' .�' • . '��1 �Air �S LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED INSTABILITY. A - :ALL LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:00:30 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #7 PRIORITY NORTH REACH - STATION 33+ 17 1 3 NOTES: =,`•' '.,.:' THIS LOG SILL IS FUNCTIONING, BUT IS }ems° SET HIGHER THAN DESIRED. :.T: ,,,+fit..=,u,���.. .'•.:'gig �, ••app�ee..- - _�� i S{ i LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED 14Y` �°�� INSTABILITY. -- a :ice �a •:J LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:57:31 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY W OKU 16040-SILLS 34W Todne— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #8 PRIORITY NORTH REACH - STATION 33+63 1 3 NOTES: i THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED. 04 5 Odo r- LOOKING UPSTREAM ACTION ITEMS: 'r MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED / INSTABILITY. I LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:57:52 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS C 34WTar1ng Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110a11na 28277 DATE: LUG SILL REPAIR PLAN MCADAMS 704. 527.. 0800 n MLAcenft No.:c 04-06-18 AdamaC.oxara LOG SILL # 10 PRIORITY NORTH REACH - STATION 34+44 1 3 NOTES: it •� .I :��'y i`�`''' THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED. y Z •..�.1 e• ' LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY BANKS FOR ANY INCREASED INSTABILITY. r •• Ai i - 1ti LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:58:18 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY !!j OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 Ucenft DATE: LUG SILL REPAIR PLAN 704. 527. 0800N McAdarairoxara 04-06-18 MCADAMS LOG SILL # 12 PRIORITY NORTH REACH - STATION 34+62 1 3 NOTES: c ° • j `,'.:' '; 't,` f�` -- THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED. �$'.I � r^�F!ll: ,',,Ji#h,'�76� ! � �' � ny: r ,'�L>:',)..`�• ' A' ..35?4', �: •� ,J ',[_ ej - ':i"r,?[�, 1ym .r �; ti..: `8' ,:' ';,, . •.f ,, .. �: E'� � .�.�. r� fli '.�' � � ­2Yam, :.,:. �v .:.. 1d• : S - "ate LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY f.,7. BANKS FOR ANY INCREASED } INSTABILITY. • t LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:58:38 PM, Allen, Joshua PROJECT No. DKU-16040 L Ftt.EN"E DUKE UNIVERSITY !!j OKU16040—SILLS 34WTbfd e—Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No a1 C 10a11na 28277 04-06-18 MCADAMS DATE: LUG SILL REPAIR PLAN 704. 527.0800NMeAdamsro.c= LOG SILL # 15 PRIORITY NORTH REACH - STATION 35+23 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS CONCENTRATING FLOWS CLOSE TO THE RIGHT BANK. «;r '. � •� .�R'-".r�q � ..fie- :,e:�� • r fe {. _ � J f., C } 1% s LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY ' BANKS FOR ANY INCREASED INSTABILITY. LF f 'W4— .... - - LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:58:59 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�ith 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL # 16 PRIORITY 1 NORTH REACH - STATION 35+63 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS F i A '1'. SET HIGHER THAN DESIRED. a74.. •.'xam LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY k L 4 Ir;r i' j BANKS FOR ANY INCREASED INSTABILITY. •l LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:59:20 PM, Allen, Joshua L PROJECT No. DKU-16040 DUKE UNIVERSITY FILENAME OKU16040—SILLS W ba CAMPUS DRIVE STREAM RESTORATION 34W Tafte— Way 110 28277 cnar�oae, No�C SCALE: N TS LUG SILL REPAIR PLAN MCADAMS rfh LAcense No.:DATE: 704. 627.. 0800 n McAdamaC.oxara 04-06-18 LOG SILL # 18 PRIORITY NORTH REACH - STATION 35+95 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS SET HIGHER THAN DESIRED. f_ • LOOKING UPSTREAM ACTION ITEMS: F r " MONITOR THE SILL AND NEARBY $" '' BANKS FOR ANY INCREASED INSTABILITY. 5 r17 :.. -'.. .- .�'�-deli "��• :.'-�"ay LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:59:44 PM, Allen, Joshua PROJECT No. DKU-16040 RSIL AGMADANS L FILENAME DUKE UNIVEITY !jj unjow OKU 16040—SILLS 34W Tafte— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: LUG SILL REPAIR PLAN MCADAMS 704. 527.. 0800 n Mc 04-06-18 AdamaC.oxara LOG SILL #20 PRIORITY NORTH REACH - STATION 37+32 1 3 NOTES: THIS LOG SILL IS FUNCTIONING, BUT IS CONCENTRATING FLOWS CLOSE TO THE RIGHT BANK. ,.�.rr. ;,l.Y,t: � "•' �",.:a� � ,fir .'!4 i .. - •��4'y-' !m y .t. • r rr �1 .� , ►y LOOKING UPSTREAM ACTION ITEMS: MONITOR THE SILL AND NEARBY --= BANKS FOR ANY INCREASED INSTABILITY. F F '=r Z. • r 9 i5; _- p w - LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 4:00:06 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 Ucenft DATE: LUG SILL REPAIR PLAN 704. 527. 0800N Mc 04-06-18 MCADAMS Adarasroxara PRIORITY LOG SILL REPORTS CAMPUS DRIVE STREAM RESTORATION DKU-16040 LOG SILL # 1 PRIORITY SOUTH REACH - STATION 10+52 1 4 NOTES: i THIS LOG SILL IS FUNCTIONING AS DESIGNED. •=+i - Y •I LOOKING UPSTREAM ACTION ITEMS: i. NONE. �AWA i LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:55:09 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 8488 Twine —Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' 1Camlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #2 PRIORITY SOUTH REACH - STATION 11+24 1 4 NOTES: ` ' THIS LOG SILL IS FUNCTIONING AS DESIGNED. r Yt , 4 a' LOOKING UPSTREAM ACTION ITEMS: NONE. dc,s.r Fl _ a Mj �G f_ + LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:55:30 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 3436 C Todngd— Way ba SCALE: N TS CAMPUS D-0293 RIVE STREAM RESTORATION cbar�ace, No�rfh 110a11na 28277 License No.:DATE: LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdameCoxara 04-06-18 LOG SILL #4 PRIORITY SOUTH REACH - STATION 12+23 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS r' DESIGNED. r " -401 LOOKING UPSTREAM ACTION ITEMS: 6 - < NONE. 4. ly r t LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:55:53 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040-SILLS 34WTaaf e—Way ba SCAM. N TS CAMPUS DRIVE STREAM RESTORATION Chaftfte, No h`' lCarafta 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #6 PRIORITY SOUTH REACH - STATION 13+04 1 4 NOTES: _ THIS LOG SILL IS FUNCTIONING AS DESIGNED. 4. R � • JC,. H r. LOOKING UPSTREAM ACTION ITEMS: a'F `':i.�= • rpp a a P _ f NONE. • � "raw.;. _ ��:'��., �� 1 ��, y+ I f LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKU1 6040— Log Sill Memos.dw 4 5 2018 3:56:16 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #8 PRIORITY SOUTH REACH - STATION 16+24 1 4 NOTES: "'` THIS LOG SILL IS FUNCTIONING AS DESIGNED. LOOKING UPSTREAM ACTION ITEMS: NONE. nT LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:56:40 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040-SILLS 8488 Twine —Way ba SCAM: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' 1Camlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #5 PRIORITY CENTRAL REACH - STATION 22+33 4 NOTES: THIS LOG SILL IS FUNCTION AS DESIGNED. j i 111A `:": JFS ` •�-`5�• t'^Knl w x' % . 1� 14, LOOKING UPSTREAM ACTION ITEMS: i k: ;e." =c,�'a' _ •. NONE. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:54:42 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UN�RSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #3 PRIORITY CENTRAL REACH - STATION 21 +72 1 4 NOTES: THIS LOG SILL IS FUNCTION AS DESIGNED. Y•_ ,c w y ; ilk'.. ; 'i'. _ � 7S K: f r ax' Y - y ,r LOOKING UPSTREAM ACTION ITEMS: NONE. ti ti LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:54:16 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU 16040—SILLS 8488 Twine —Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL # 1 PRIORITY NORTH REACH - STATION 31 +65 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS DESIGNED. y.� q - 'S LOOKING UPSTREAM y ACTION ITEMS: i, NONE. IL LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:48:44 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UN�RSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chaftfte, No h`110 ca Doa 28277 -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800LAcense N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #2 PRIORITY NORTH REACH - STATION 31 +85 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS DESIGNED. '� I ••.wry. ��" if .... .,'�jc� ti I,• • yr: �=' Vz 's 'i R'AV LOOKING UPSTREAM ACTION ITEMS: NONE. J. rye+. fff LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:49:08 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY !jj OKU 16040—SILLS 34W Tafte— Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: LUG SILL REPAIR PLAN 704. 627.. 0800 n Mc 04-06-18 MCADAMS AdameCoxara LOG SILL #3 PRIORITY NORTH REACH - STATION 32+06 1 4 NOTES: 'k'. THIS LOG SILL IS FUNCTIONING AS DESIGNED. PM LOOKING UPSTREAM ACTION ITEMS: NONE. LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:49:34 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chaftfte, No h`' 1Camlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #9 PRIORITY NORTH REACH - STATION 34+34 1 4 NOTES: ';11. :''y THIS LOG SILL IS FUNCTIONING AS DESIGNED. III y: r: ti LOOKING UPSTREAM ACTION ITEMS: NONE. - �..i�-ice• � f{� - k/4 ' LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:50:05 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UN�RSITY IJ OKU 16040—SILLS 34W Todneon Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, Nsufte o 110 0 s�7 a7 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 527.. 0800 n McAdamaC.o.com LOG SILL # 11 PRIORITY NORTH REACH - STATION 34+62 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS :I •. ,., ..1. ,.. ��. ?r .: DESIGNED. _ {}L sky •kq.� •• - 'A` r i LOOKING UPSTREAM ACTION ITEMS: NONE. 4 ,� •. 401 r a, - r LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:50:33 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY W OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:-0293 DATE: LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara 04-06-18 LOG SILL # 13 PRIORITY NORTH REACH - STATION 35+ 12 1 4 NOTES: - THIS LOG SILL IS FUNCTIONING AS DESIGNED. �jk { a- 3 L 'T �P. LOOKING UPSTREAM ACTION ITEMS: NONE. �kry �Y'• � � s :. ';A j .. •kpWJ �-L 1 j�j4• �I�'k:. ' 7M •. di �4. - .T LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:51:00 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU16040—SILLS 8488Twine— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL # 17 PRIORITY NORTH REACH - STATION 35+83 1 4 ,.. - NOTES: THIS LOG SILL IS FUNCTIONING AS e.• DESIGNED. �1 r • • . LOOKING UPSTREAM ACTION ITEMS: x s�`Y,_,br-s, 0. NONE. `, 'x a '.• . rs M .:,'.'.#sue . LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:51:51 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU16040—SILLS 8488Twine— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chadoae, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL # 19 PRIORITY NORTH REACH - STATION 37+ 17 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS r ;N ' DESIGNED. L �S LOOKING UPSTREAM ACTION ITEMS: n; NONE. ' y .;; LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:52:11 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�ith 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. r,27.. 0800 n McAdamaC.oxara LOG SILL #22 PRIORITY NORTH REACH - STATION 37+72 1 4 NOTES: 'f THIS LOG SILL IS FUNCTIONING AS f�' �} �.- `�:•. _'':, :4 �: DESIGNED. r .T• r _, f sal `. l� . ..�', •- .. ;'� ' > � , �'� �.� _ rA ..? is .1 �i•� �'•°T.;:.:-';..�;�_-_,a.,rU'K �• c 4�!'�.• .y � r�� _ ter" '.•'• „`� LOOKING UPSTREAM ACTION ITEMS: NONE. Opp 0- LOOKING DOWNSTREAM X: Projects _Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:52:35 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chaftfte, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627..0800NMcAdameCoxara 04-06-18 MCADAMS LOG SILL #23 PRIORITY NORTH REACH - STATION 37+91 1 4 NOTES: THIS LOG SILL IS FUNCTIONING AS DESIGNED. Y _ 1 ■M 5 LOOKING UPSTREAM ACTION ITEMS: NONE. _. , � � - . ire .`�: •§.: __ %�, _. ... rFn 1 ft :i LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:52:55 PM, Allen, Joshua PROJECT No. DKU-16040 L FILENAME DUKE UNIVERSITY IJ OKU16040—SILLS 34WTaxf e—Way ba SCALE: C N TS CAMPUS DRIVE STREAM RESTORATION cnar�oae, No�rfh 110 28277 LAcense No.:DATE: 04-06-18 LUG SILL REPAIR PLAN MCADAMS 704. 627.. 0800 n McAdamaC.oxara LOG SILL #24 PRIORITY NORTH REACH - STATION 38+02 1 4 _ NOTES: THIS LOG SILL IS FUNCTIONING AS DESIGNED. 3 S lid k � 4,; � ��,`�;�.�.� is �• � _ha LOOKING UPSTREAM ACTION ITEMS: 1 NONE. !F a; 'e o- LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:53:15 PM, Allen, Joshua PROJECT No. DKU-16040 L FD.EN"E DUKE UNIVERSITY IJ OKU 16040—SILLS 34W Tafte— Way ba SCALE: N TS CAMPUS DRIVE STREAM RESTORATION Chaftfte, No h`' lCamlma 28277 LAcense -0293 DATE: LUG SILL REPAIR PLAN 704. 627.. 0800N McAdamaC.oxara 04-06-18 MCADAMS LOG SILL #26 PRIORITY 1 4 NORTH REACH - STATION 38+40 NOTES: THIS LOG SILL IS FUNCTIONING AS DESIGNED. ��ii�i�5 �9i •� tp- LOOKING UPSTREAM ACTION ITEMS: NONE. •..- i I 4� `i �. f..: w ;. t LOOKING DOWNSTREAM X: Projects —Shared DKU DKU-16040 Stream Restoration — Log Sill Re ort Current Drawin s DKUl 6040— Log Sill Memos.dw 4 5 2018 3:53:36 PM, Allen, Joshua L PROJECT No. DKU-16040 DUKE UNIVERSITY IJ FILEN"E OKU 16040—SILLS ba CAMPUS DRIVE STREAM RESTORATION 34W Tafte— Way h`' lCamlma SCALE: N TS Chadoae, No 28277 LUG SILL REPAIR PLAN MCADAMS LAcense -0293 704. 62,.. 0800N McAdamaC.oxara DATE: 04-06-18 M MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT APPENDIX D VEGETATION ASSESSMENT DATA creating experiences through experience Table 1. Vegetation Plot Mitigation Success Summary Duke University Water Reclamation Pond Stream Restoration Site Durham, NC MONITORING YEAR 5 McAdams Project #: DKU-16040 Vegetation Plot ID Vegetation Threshold Met?* Tract Mean 1 Yes 83% 2 Yes 3 Yes 4 NO 5 Yes 6 Yes * Target density is a minimum of 320 trees (both planted and existing) per acre after three years of monitoring, 260 trees (both planted and existing) per acre after five years of monitoring, and 210 trees (both planted and existing) per acre after seven years of monitoring, according to the "Stream Restoration Plan for the Duke University Water Reclamation Pond", October, 2012. Table 2. Planted Stem Count by Vegation Plot Duke University Water Reclamation Pond Stream Restoration Site Durham, NC MONITORING YEAR 5 McAdams Proiect #: DKU-16040 Scientific Name Common Name Species Type CURRENT PLOT YEAR ANNUAL TOTALS VP-1 VP-2 VP-3 VP-4 VP-5 VP-6 MY-5 (DEC. 2018) MY-3 (NOV. 2016) MY-2 (NOV. 2015) MY-1 (SEPT. 2014) AS BUILT (JUN. 2014) Alnus serrulato tag alder shrub 2 2 2 3 3 3 Asimina triloba pawpaw small tree 0 0 1 1 1 Cercis canadensis eastern red bud tree 1 1 1 1 1 1 Corpus amomum silky dogwood shrub 0 0 2 5 5 Corpus florida flowering dogwood small tree 1 1 1 1 1 1 Fraxinus pennsylvanica green ash tree 2 2 3 7 8 8 8 11 Lindera benzion spicebush shrub 0 1 2 3 4 Liriodendron tulipifera tulip poplar tree 2 2 2 2 2 2 Nysso sylvatica black gum tree 4 4 5 5 5 5 Platanus occidentalis sycamore tree 4 3 5 5 1 18 18 18 20 20 Quercus lyrata overcup oak tree 1 1 Quercus michouxii swamp chestnut oak tree 8 1 2 8 19 20 23 24 24 Quercus phellos willow oak tree 2 2 3 3 4 4 Viburnum dentatum arrowood shrub 2 1 1 4 5 5 6 6 Stem Count Total 12 11 11 6 9 12 61 66 74 83 87 Size of Vegetation Plot (Acres) 0.02 0.02 0.02 0.02 0.02 0.02 0.1483 0.1483 0.1483 0.1483 0.1483 Number of Different Species 2 7 4 2 5 2 11 11 26 27 28 Stems Per Acre 486 445 445 243 364 486 411 445 499 560 587 Total CE Area = 7.01 acres Table 3. Planted Species Survival by Vegation Plot Duke University Water Reclamation Pond Stream Restoration Site Durham, NC MONITORING YEAR 5 McAdams Project #: DKU-16040 VP-1 VP-2 VP-3 VP-4 VP-5 VP-6 Monitoring Year 5 Planted Stem Count Total 12 11 11 6 9 12 As Built Planted Stem Count Total 18 13 14 14 11 17 Planted Stem Difference from As Built -6 -2 -3 -8 -2 -5 Surival Rate (%) 1 67% 1 85% 1 79% 1 43% 1 82% 1 71510 M MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT APPENDIX E VEGETATION MONITORING PLOT PHOTOS creating experiences through experience '' WADAMS MONITORING YEAR 5 REPORT > DKU-16040 VEGETATION PLOT PHOTOS Duke University Water Reclamation Pond Stream Restoration — Monitoring Year 5 Report October 10 & 12, 2018 Vegetation Plot 1 Vegetation Plot 2 creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 If � 1 C . �. � �,��•' `-"I�T Gam. M MCADAMS MONITORING YEAR 5 REPORT > DKU-16040 Vegetation Plot 5 Vegetation Plot 6 creating experiences through experience 3 of 3 M MCADAMS WATER RECLAMATION POND STREAM RESTORATION > MONITORING YEAR 5 REPORT APPENDIX F VEGETATION MONITORING PLOT DATA SHEETS creating experiences through experience Site: Duke Sandy Creek Restoration Veg Plot No.: 1 Page: 1 Monitoring Year: MY5 Date: 10/10/2018 Area: 10x10 CURRENT MONITORING YEAR DATA X Y ddh Height DBH Map ID Scientific Name Source meter meter mm cm cm Vigor Notes 1 Quercus michauxii B 0.3 0.4 Missing 2 Fraxinus pennsylvanica B 0.7 3.1 Missing 3 Fraxinus pennsylvanica B 0.8 4.7 Missing 4 Fraxinus pennsylvanica B 0.7 5.1 Missing 5 Platanus occidentalis B 0.2 5.6 427 2.9 3 6 Quercus michauxii B 1 3.8 9.1 1 46 0.91 7 Platanus occidentalis B 2.8 4.3 488 2.8 8 Quercus michauxii B 4.8 1.5 9 Quercus michauxii B 5.6 3.5 Missing 10 Quercus michauxii B 5.8 8.4 142 0.5 11 Platanus occidentalis B 7.4 0.4 671 7.213H 12 Platanus occidentalis B 8.2 3.1 500 3.4 13 Quercus michauxii B 8.1 5.8 145 0.6 14 Quercus michauxii B 7.9 6.5 53 0.4 15 Quercus michauxii B 9.9 9.4 86 1.1 3 16 Quercus michauxii B 9.5 6.9 43 1.0 3 17 Quercus michauxii B 9.9 4.1 102 18 Quercus michauxii B 9.7 1.2 165 B = bare root C= containerized ` Campus Drive Volunteers <50 cm 50-100 cm 100+ cm Liquidambar styraciflua 2 9 28 Pinus taeda 1 6 28 Liriodendron tuli ifera 0 0 7 Quercus laurifolia 0 1 0 Quercus I rata 0 0 1 Fraxinus pennsylvanica 0 1 0 Site: Duke Sandy Creek Restoration Veg Plot No.: 1 Page: 2 Monitoring Year: MY5 Date: 10/10/2018 Area: 10x10 10 9 8 7 6 5 4 3 2 1 0 - 0 ------ ------ ------ ------- I ----- ------ I ------- ------ ----- ------ I ------- ------ -------------------- ------ ----- ----- 15 ------ -------------------- ------------ ------ ------ ------------ ------------ ------ ------ ------------ ------ ------ ------ ------ ------- I ----- ------ I ------- ------ ------------ I ------- ------- L ----- ------ ------ -------------------- ------ ------ ------------- -------------------- 4 ------ ------------------- ------ ------ ----------------- 1 ------------- 16 ------ 5 - 4 ------ -------I ----- ------ ------ - --- ------------------- ------- 13 ------ , ----------- ----- ------ ------ ------------ --L------------------------------------------------- ------ ----- ------ 17 ---------------------------------- ----- ------ ------ ------ ----- - ------ ------------ ------ ------ ------ ------ ------- ------ ------ ------ ------ ----- ------ I ------- ------ ----- ------ I ------- ------ ------------ I ------- ------ ------ ----- ------ ------ ------ ------ ------ ------ ------ 8 ----- ------ ------ -------------------- ------ ------ ------------- 18 t ------ I ------- ------ ------------ 0 ----- ----- -------------------- 1 2 3 4 5 6 7 8 9 10 0 Fraxinus pennsylvanka 0 Platanus occidentalis 0 Quercus mkhouxii OMissing Site: Duke Sandy Creek Restoration Veg Plot No.: 2 Page: 1 Monitoring Year: MY5 Date: 10110/2018 Area: 10x10 CURRENT MONITORING YEAR DATA X Y ddh Height DBH Map ID Scientific Name Source meter meter mm cm cm Vigor Notes 1 Quercus phellos B 0.0 1.5 457 3.1 3 2 Quercus I rata* B 4.3 1.0 335 2.1 3 3 Quercus phellos B 6.8 1.6 6 76 3 4 Platanus occidentalis B 9.7 1.4 914 9.7 3 5 Cersis canadensis (sp. not on planting list) C 7.9 4.5 488 3.1 3 6 Quercus phellos B 5.41 4.0 Missing 7 1 Fraxinus pennsylvanica C 2.9 3.3 549 5.4 3 8 Platanus occidentalis B 2.7 5.7 1 762 6.9 3 9 Quercus michauxii B 5.6 6.2 366 2.1 3 10 Cornus florida C 9.8 7.8 305 2.9 11 Alnus serrulata B 5.6 8.8 Dead 12 Fraxinus pennsyivanica C 2.8 8.0 640 7.3 3 13 Platanus occidentalis B 8.1 9.7 396 3.1 3 is = pare root -species taennnea amerenay in na r4 tnan aunng Hs -nuns anoior m r,1 monrtonng C= containerized y 0,0 x Volunteers <50 cm 50-100 cm 100+ cm Liquidambar styraciflua 0 2 19 Liriodendron tuli ifera 1 5 15 Pinus taeda 0 5 40 0 E U Site: Duke Sandy Creek Restoration Veg Plot No.: 2 Page: 2 Monitoring Year: MY5 Date: 10/10/2018 Area: 10x10 10.0 ------------- ------ L ------------ I ------- ------ ------ ------ ------------ ------ ------ ------------ 3 ------ --- ------ ------ ------ 9.0 ------ ------ ----- ------ ------ ------ ------ ------- I ----------- 471 --- --------------------------- ----- ------------- ------ 8.0 I ------ ------------- ------ ------------- ------ ------------- ------------- I ------ ------ ------------- I ------------- I ------------- UO ------ 7.0 ------ - -----`------------I------- ------ ------ ------ ------------ -- ------- L ----- ------ ------ ----- I ------- ------ ------ 6.0 ------ ------ ----- ------ - ------ ------ ------- T ------ ----- ------- F ----- ------ T ------ - - ----- ------ ------ ------- 5.0 ------------- ------ ------------------- ------ ------------- ------------- : ------ ------ : ------------- 5 ---- : ------- ------ ------ 4.0 3.0 ------ ------ ----- ----------- 7 ------ ----- ------ ------ ----- J ------- ------ ----- ------ ------ ----- ------ ------ ------ 2.0 ------ ------ ------------ ------ ------ ------ ------ -------- ------ ------ ----- ------ ------ ----- - ------------ ------------ * ------- --------------------------- ------ ------ -------- ------------------- ------ 10 2 ------------- I ------ ------------ ------ ------------ ------ ------ ------------- I ------------ ------------- ------ 0.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 * Quercus lyrata 0AInus serrulata 0 Cersis canadensis OComusfiorida * Fraxinus pennsylvanica 0 Platanus occidentalis 0 Quercus michauxii 0 Missing * Dead 0 Quercus phellos 510 510 Site: Duke Sandy Creek Restoration Veg Plot No.: 3 Page: 1 Monitoring Year: MY5 Date: 10/10/2018 Area: 10x10 CURRENT MONITORING YEAR DATA X Y ddh Height DBH Map ID Scientific Name Source meter meter mm cm cm Vigor Notes 1 Fraxinus pennsylvanica B 1.2 2.8 229 1.2 3 2 Viburnum dentatum B 2.7 1.9 Missing 3 Platanus occidentalis B 2.7 4.5 335 1.8 3 4 Platanus occidentalis B 1.1 5.5 Missing 5 Platanus occidentalis B 3.7 7.6 198 0.7 3 6 Platanus occidentalis B 4.4 8.1 12 146 3 Insects 7 Platanus occidentalis B 1.8 9.9 61 66 3 8 1 Quercus michauxii B 4.5 5.9 8 91 3 Res rout 9 Quercus michauxii B 4.6 3.1 9 51 3 10 Viburnum dentatum B 5.7 1.5 5 28 3 Res rout 11 Fraxinus pennsylvanica B 7.6 3.3 213 0.9 3 12 Platanus occidentalis B 9.0 2.5 Dead 13 Viburnum dentatum B 9.4 7.0 7 61 3 14 Platanus occidentalis B 9.8 9.2 8 891 1 3 1 Insects b = dare root C= containerized y 0,0 x Volunteers <50 cm 50-100 cm 100+ cm Liquidambarstyraciflua 0 6 0 Pinus taeda 0 9 47 M rica cerifera 0 0 8 Site: Duke Sandy Creek Restoration Veg Plot No.: 3 Page: 2 Monitoring Year: MY5 Date: 10/10/2018 Area: 10x10 10 9 8 7 6 5 4 3 2 1 ------ 7 ------ ------ ------ ------ ------ ------------- ------ ----- ------ ------ ------ ------------------- 14 ------------- ------ ------ ------------ ------ ------ ------ 6 6 ------ ------------ ------ ------ ------------ ------ ------ ------ -------------------- ------------- ------------ ------------- ------------ ------------- ------------ j ------------- ------ ------------- 4 ------ ---------------------------- ------ ------ ------------- ------ 4 ------ ------ ------------ ------ 13 ------ ------ 4 — ------- -------------------- I ------- Iff 8 ------- I ------ ------- I ----- ------ I ------- ------- I ------------ I ------- ------ ------ ------------- ------ ------ ------ ------ ------- I ------ ------- I ----- ------ I ------- ------ ------------ ------ ------ ------ ------------------- ------ ------ ------ ------ ------------ ------ ----- ------ ------ ------ ------ ------ ------ ------ ------ ------------------- ------ ------ ----- ------ ------------ ------ ------ ------ ----- ---- ---- ------ ------ ------ I ------- U2 ------ ------------------- ------ ------ ------ ------ ------ ------------ ------ ------ ------ ------------- I -------------- ------------ ------ ------ ------------- ------------ -------------- ------------ ------ ------ ------ 0 - 0.0 H 278' 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 OPlatanusoccidentafis OFraxinuspennsylvanka OQuercusmichauxii OViburnumdentatum OMissing XDead Site: Duke Sandy Creek Restoration Veg Plot No.: 4 Page: 1 Monitoring Year: MY5 Date: 10110/2018 Area: 20x5 CURRENT MONITORING YEAR DATA X meter Y meter ddh mm Height cm DBH cm Vigor Notes Map ID Scientific Name Source 1 Platanus occidentalis B 1.1 1.2 274 1.5 3 2 Lindera benzion B 2.2 3.2 Missin 3 Cornus amomum B 3.3 0.2 Missing 4 Platanus occidentalis B 5.6 3.5 366 2.2 3 5 Cornus amomum B 6.8 4.9 Dead 6 Lindera benzion B 8.4 2.91 Missing 7 1 Platanus occidentalis B 11.3 3.1 183 0.5 3 8 Viburnum dentatum B 13.9 2.9 9 119 3 9 Platanus occidentalis B 14.2 4.9 427 2.5 3 10 Asimina triloba B 17.1 4.9 Missing 11 Lindera benzion B 17.2 3.6 Dead 12 Viburnum dentatum B 19.1 0.3 Dead 13 Lindera benzion B 19.6 3.2 Dead 14 Platanus occidentalis B 19.4 5.01 366 1.7 Abrasion i B = bare root C= containerized y 0,0 Volunteers <50 cm 50-100 cm 100+ cm Liquidambar styraciflua 0 2 2 Liriodendron tuli ifera 0 0 1 Pinustaeda 0 7 39 Li ustrum sinense 0 0 1 Quercus phellos 0 1 0 M rica cerifera 0 0 5 Site: Duke Sandy Creek Restoration Veg Plot No.: 4 Page: 2 Monitoring Year: MY5 Date: 10/10/2018 Area: 20x5 5 - 4 ------------ --- --- ---- ---- --- --- ---- --- --- -------- --- - -- ------- ---- ---- -------- --- 3 - ------- --- --- ---- ---- ------- --- --- -------- 2 ---------- ----- ---- -------- --- I I --- --- --- --- ---- ---- --- -------- --- --- --- --- ---- --- --- --- --- ---- --- --- --- --- i--- L 0 Cn3 --------- ---- ------- -------- --- ---- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 Platanus occidentalis OAsimina triloba 0 Cornus amornum 0 Viburnum dentaturn 0 Lindera benzion X Dead 0 Missing Site: Duke Sandy Creek Restoration Vag Plot No.: 5 Page: 1 Monitoring Year: MY5 Date: 10/12/2018 Area: 10x10 CURRENT MONITORING YEAR DATA X meter Y meter ddh mm Height cm DBH cm Vigor Notes Map ID Scientific Name Source 1 Cornus amomum B 2.8 3.1 Dead 2 Liriodendron tuli ifera B 2.1 5.0 274 1.4 3 3 Liriodendron tuli ifera B 5.2 6.6 16 137 3 4 Alnus serrulata B 2.6 7.3 12 102 3 5 Platanus occidentalis B 9.9 8.4 518 2.8 3 6 Viburnum dentatum B 1 8.6 9.1 101 1221 3 7 Alnus serrulata B 5.8 8.9 202 0.6 3 8 Fraxinus pennsylvanica B 8.5 9.4 9 86 3 9 Fraxinus pennsylvanica B 9.9 9.6 183 0.8 3 10 Fraxinus pennsylvanica B 4.4 9.8 160 0.5 3 11 Fraxinus pennsylvanica B 1.0 9.5 Missing is = Dare root C= containerized 0,0 Volunteers <50 cm 50-100 cm 100+ cm Liquidambarstyraciflua 23 24 11 Liriodendron tuli ifera 10 20 7 Platanus occidentalis 0 0 8 Pinus taeda 30 65 68 M rica cerifera 0 0 4 Quercus phellos 1 0 0 Site: Duke Sandy Creek Restoration Veg Plot No.: 5 Page: 2 Monitoring Year: MY5 Date: 10/12/2018 Area: 10x10 10 --------- ------ ------ -------------- ------------ ------ I ------- ------ ------ 9 ------ ------------- ------ ------ ------- ------ ----- ------- ------ ------- -------------- ------ ------ ------------ - ------ 5 8 L----- ----- ------ ----- --- ------ ------ ----- ------ ------ ------ ------ ------------- ------ ------ ------ ------ 7 ------------ ------ ------ ------ ------ ------------ ------ ------ ------ ------ ------ ------ ------ I ------- ------ ------ ------------ ------ ------ ------ ------ ------ ----- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ 5 ------ ----- I ------- ------ I ------- ------- I ------ ------ ------ ------ 4 ---------------------- : ------ ------ ------ ------ ----------------------------------- ------ ------------------------------------------------- 3 I I I I j ------------- ------------- ------ ------- ------------ ------- ------ ------- ------- ------------- ------------- ------- ------ ------ 2 ------------ ------ ------ ------ -------------------- I ------- ------ I ------- ------- I ------ ------ ------ ------ I ------- ------ ------ ----- ------ ------ ------ ------ ------ ------ ----- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ 0 0 1 2 3 4 5 6 7 8 9 10 0 Platanus occidentalis 0 Fraxinus pennsylvanica 0AInus serrulata 0 Viburnum dentaturn OCornusamomum OUriodendrontulipifera XDead 0 Missing 258' Site: Duke Sandy Creek Restoration Veg Plot No.: 6 Page: 1 Monitoring Year: MY5 Date: 10/12/2018 Area: 10x10 CURRENT MONITORING YEAR DATA X meter Y meter ddh mm Height cm DBH cm Vigor Notes Map ID Scientific Name Source 1 Cornus amomum B 0.2 1.2 Dead 2 N ssa s Ivatica B 3.3 1.1 Dead 3 Cornus amomum B 6.3 0.8 Dead 4 N ssa s Ivatica B 9.1 0.8 203 0.5 5 Quercus michauxii B 4.91 2.5 9 97 6 Quercus michauxii B 0.8 3.3 1 216 0.6 7 Quercus michauxii B 2.8 3.7 9 99 8 Quercus michauxii B 6.0 4.0 13 130 9 Quercus michauxii B 9.2 4.2 10 102 10 Quercus michauxii B 1.7 5.9 11 124 11 N ssa s Ivatica B 4.4 6.6 8 71 12 Quercus michauxii B 5.7 7.7 6 58 2 Res rout 13 N ssa s Ivatica B 7.5 6.81 8 124 14 N ssa s Ivatica B 9.6 7.2 61 69 15 Quercus michauxii B 9.9 9.1 188 0.4 16 Quercus michauxii 113 7.0 9.3 1 IMissing 17 Quercus michauxii 113 3.8 9.2 1 IMissing B = bare root - • C= containerized I • I y 0,0 x forest edge Volunteers <50 cm 50-100 cm 100+ cm Liquidambar styraciflua 15 15 13 Platanus occidentalis 0 4 5 Pinus taeda 15 20 60 Liriodendron tuli ifera 4 0 0 Site: Duke Sandy Creek Restoration Veg Plot No.: 6 Page: 2 Monitoring Year: MY5 Date: 10/12/2018 Area: 10x10 10 9 ----- ------ ------ ------ ------ ------ ----- ------ ------ ------ ------ ------ I ----- - ------- ------ I ------- ----- ------ ------ ------ ------ ------ ------------ ------ ------ ------ ------ ------------- ------ ------ ------ ------ 8 ------------ ------ ------ ------ ------- I ------------ I ------- ------ I -- -- ------- L ------ ------ ------ ------ I ------- ------------- 14 ------------ ------ ------ ------ ------ --------- 0 ------ 4 ------ ------------- ---- ------- ------ ------ ------ ------ 6 ---------------------------- 7 I ------ ------- I ----------------------------------- --------------------- ------ -------------- ------- ------ 5 -------------- ------------ ------ ------ ------ ------ ------------ ------------- ------------- ------------- ------ ------ ------ 4 8 ------ ------ ------ -- ------- L ------ ------ ------ ------ ------ ------------- ------ ------ ------ ------ ------ 3 ------- I ------------------- ------ ------ ------ ------------ --- cs ------ ------ ------ ------ ------ ------ ------ ------ ------ 2 - ----- ------ I ------- ------ ------ -------------------------- -------------- -------------- ------ ------ -------------- ------ ------ 1 4 j------- ------- I ------ ------ ------------ ------ ------ ------ ----- ------ ------ ------ ------ j ------- ------ ------ 0 1 2 3 4 5 6 7 8 1 10 ONyssasylvatica OCornusamomum OQuercusmichauxii XDead OMissing E 222' �' MCADAMS WATER RECLAMATION POND STREAM RESTORATION APPENDIX G PHOTO STATION PHOTOS > MONITORING YEAR 5 REPORT creating experiences through experience '' WADAMS MONITORING YEAR 5 REPORT > DKU-16040 PHOTO STATION PHOTOS Duke University Water Reclamation Pond Stream Restoration — Monitoring Year 5 Report October 10 & 12, 2018 Photo Station 1: View facing downstream Photo Station 2: View facing upstream creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 �' MCADAMS MONITORING YEAR 5 REPORT > DKU-16040 Photo Station 2: View facing downstream Photo Station 3: View facing upstream creating experiences through experience 2 of 7 1 ly a hJ �� ti ✓`" 1�a5' _ µ I .� Z is `— M MCADAMS MONITORING YEAR 5 REPORT > DKU-16040 Photo Station 5: View facing upstream Photo Station 5: View facing downstream creating experiences through experience �1 MCADAMS MONITORING YEAR 5 REPORT > DKU-16040 Photo Station 6: View facing upstream Photo Station 7: View facing downstream creating experiences through experience 5 of 7 ISO A l " 1 C s Y°' �9 C n' s r�s-