Loading...
HomeMy WebLinkAboutNCC205520_Annual Fee NOD Letter_20230117ROY CDC) PER Ca�ernar EUZABETH S. i315ER Serretary' DOUCLAS IL ANSEL NORTH C;AROLINA fn mm Nrltrw Fnwra entalQuufltp 1 /17/2023 NVR Inc. Attn: Kevin Connery 13924 Professional Center Drive Suite 100 Huntersville. NC 28078-7949 Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC205520-2022 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 12/1/2022 and was due on 1/1/2023. The annual fee applies to the following construction site: Holcomb Woods Phase 2 - Supplemental EC Plan for Ryan Homes, Lots 220-223 & 345- Harvest Gold Drive, Harrisburg, NC Cabarrus County Certificate of Coverage No. NCC205520 NC Reference No. NCG01-2020-5520 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Danny Smith at danny.smith@ncdenr.gov or me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources NonhCamllna 6epanmew er EmlYmrnenear $.ellty I Wnlmn of Energy. Wmeral and Land Re9ouroe5 IME 512 Norllh5aliabury'%r t 11{12h4iI 5rrric Ce Ul I Rk .Noeth Carolina 27694-1b12 414.767.92U0