Loading...
HomeMy WebLinkAboutSandy Creek - Closeout Meeting Notes 2019-03-25Date: March 25, 2019 Project Name: Sandy Creek - Charles Williams Notes, Sketch, Action Items, etc.: Office Review; I. Why was Ell proposed at 1.5:1 in the first place? Was Ell or El work done on site? 2. Stream monitoring started before the site was planted. 3. Invasives include privet and multiflora rose. 4. Apparent down -cutting around sta.1175 cD r feo_ro , um-A-o-n) VDLK- 1�-c nC') , �t��cuGreS e"Z_fi in a�- a3a1n5+ _f�jGrn3 will 6e. rc7v`elr^e�zcred �sched Cro sS r n - Gu I v e�� f NP(-tvre*) o�ae� ro ►-> co �u s=r 1c�n� t fs� l oyl5 fro fie. - &_K� A-6 c Arl-Cy\ me trod r��k 1 v2 i r 1 Credit Release/Site Closeout Information (for monitoring or closeout reviews only) Stream Credits Wetland Credits Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Requested 1,168 0.98 Approved' Result of Monitoring Report or Closeout Review Project Manager Signature F Date i ne upoazea creme ieager Tor the project, wnicn inclucles this release, must be approved by the Project Manager. Page 2 of 2 Form Updated 03/20/2019