HomeMy WebLinkAboutSandy Creek - Closeout Meeting Notes 2019-03-25Date: March 25, 2019 Project Name: Sandy Creek - Charles Williams
Notes, Sketch, Action Items, etc.:
Office Review;
I. Why was Ell proposed at 1.5:1 in the first place? Was Ell or El work done on site?
2. Stream monitoring started before the site was planted.
3. Invasives include privet and multiflora rose.
4. Apparent down -cutting around sta.1175
cD r feo_ro , um-A-o-n) VDLK-
1�-c
nC') , �t��cuGreS
e"Z_fi
in a�-
a3a1n5+ _f�jGrn3 will 6e.
rc7v`elr^e�zcred �sched
Cro sS r n - Gu I v e�� f
NP(-tvre*)
o�ae� ro ►-> co �u s=r 1c�n� t fs�
l oyl5 fro fie. - &_K� A-6 c Arl-Cy\ me trod r��k 1 v2 i r 1
Credit Release/Site Closeout Information (for monitoring or closeout reviews only)
Stream Credits
Wetland Credits
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
Requested
1,168
0.98
Approved'
Result of Monitoring Report or Closeout Review
Project Manager Signature
F
Date
i ne upoazea creme ieager Tor the project, wnicn inclucles this release, must be approved by the Project Manager.
Page 2 of 2 Form Updated 03/20/2019