HomeMy WebLinkAboutByrds Creek - Closeout Meeting Notes 2019-03-25Date: March 22, 2019 Project Name: Byrds Creek
Notes, Sketch, Action Items, etc.:
Office Review:
*2 Beaver Dams removed on BC3 in Nov. 2018 (MY5).
*Stream repair in MY5 on SC3 (caused from beaver)
*0.8% invasives mentioned but not listed anywhere.
*Volunteer tree species: LOTS of Sweetgum in Plots 4, 5, 6, 8, 9, 10, 12, 13.
*No Ledger in the plan: Approved SMUs in Mit Plan are 5371 SMUs
*In 2018: Encroachment on BC4 near Veg Plot 7 (replanted)
as pasture h-3 VCoppx-fitJ
�rYvc�
- ce� -Cc3 k nowzcr-' W/ \ 2Z , -c-ovCA
kz�- \ce. 0e-\,--oGe-<A
a()Ile
— ?fir
bark rec-o'\r
a(-A-i
50'
reipa,rc�ve�c-
a,CA06
q0'
C4N�.r
a o\� �o-c� c c�\:2oLrer� bI✓.ec Ssa� �u�- ~; e�
Credit Release/Site Closeout Information (for monitoring or closeout reviews only)
Stream Credits
Wetland Credits
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
Requested
Approved*
Result of Monitoring Report or Closeout Review Extended Monitoring Required
Project Manager Signature Date
*The updated credit ledger for the project, which includes this release, must be approved by the Project Manager.
Page 2 of 2 Form Updated 03/20/2019