HomeMy WebLinkAboutNCC201677_Notice of Termination_20230111Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 1/11/2023 3:44:35 PM (NOT Submittal)
Approve by Clark, Paul B 1/14/2023 4:23:09 PM (NOT Request Review - NCC201677)
• The task was assigned to Clark, Paul B by round robin distribution 1/11/2023 3:44 PM
The task was assigned to DEMLR NCG01 NOT Review Team. The due date is: January 16, 2023 5:00
PM 1/11/2023 3:44 PM
Use this form to submit a Notice of Termination (NOT) request for a project covered under the N.C. NPDES
General Permit for Construction Activities NCGO10000 (or NCG250000). If approved, the Certificate of Coverage
(COC) will be rescinded.
Certificate of NCC201677
Coverage (COC) No.* Enter the Certificate of Coverage Number
2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status
May be blank if N/A PAID PAID
May be blank if N/A May be blank if N/A
2023 Annual Fee Status
May be blank if N/A
Information associated with this permit:
Project Name Dormie Club - Phase 3 Cottages
Lots Covered by this This information is especially helpful when more lots were added with Modifications since the original permit
Permit COC (if
issuance.
applicable)
No longer visible on the initial form (data not captured from initial application)
Address
Beulah Hill Church Road, West End, NC
County
Moore
Latitude
35.2611
Longitude
-79.5016
Permittee Listed
Sampson Construction Co., Inc.
Legally Responsible
Justin Hall
Individual
NC Reference No.
NCG01-2020-1677
E&SC Plan ID
MOORE-2020-045
Original NOI Tracking
24704
No.
Date COC Issued
4/24/2020
Prior Rescission Date
Date populates only if COC was already rescinded at time of submittal.
Reason for Rescission/Termination Request:
Reason for • Project Closed -Out
Termination of Sale (Another Owner/Operator obtained new COC)
Coverage* Mistake or Invalid Coverage
Other
Additional More information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Documentation if applicable.
Documentation Must be PDF format
Project Close-out Information:
Erosion Control Plan 1/3/2023
Close-out Date
Erosion Control Plan SWPPP Phase 3 Final Inspection.pdf 37.97KB
Close-out Must be PDF format
Documentation
North Carolina General Statute 143-215.613 (1) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I, as an authorized representative, hereby request rescission of coverage under the
NPDES Stormwater Permit for the subject facility. I am familiar with the information
contained in this request and to the best of my knowledge and belief such information
is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
Type Name* Justin Hall
Title* Senior Project Manager
Organization* Sampson Construction Co., Inc.
Date * 01 /11 /2023
Email for justin.hall@sampson-construction.com
Confirmation *
Contact Telephone* 402-416-6569
NOT Certification 19011 Phase 3 SWPPP NOT Form.pdf 688.58KB
Form Must be PDF Format
Is this COC Already Ensure this COC has not been rescinded since submittal!
Rescinded?
Additional Email CC'd on Notification Emails
(Optional)
Original Permittee CC'd on Notification Emails
Email justin.hall@sampson-construction.com
Original Site Contact CGd on Notificaiton Ennails
Email peter.erickson@sampson-construction.com