HomeMy WebLinkAbout20140957 Ver 1_Emails_20141020From: Burdette Jennifer
Sent: Monday, October 20.2OI43:38PM
To: 'Brown. Craig J5AVV'; Spencer ThcheU; jhammer@nng-Ucznm;
jennifer.cbrousn@dom.conT Bailey, David E SAW; Shaeffer, David L SAW; Greer, Emily
SAW; Wicker, Christine VV SAW; Tur|ington, Chad; Graham, James
Cc: 8etpr, Dale E SAW; Gibb}| Jean B SAW; Wicker, Henry K4]R SAW; McLendon, Scott [
SAW; Gibsnn, Steven VV NA0
Subject: RE: Atlantic Coast Pipeline -SAVV-3Ol4-OIG58;9-3O-l4 meeting (UN[LASSlB£D)
To clarify, buffer mitigation would be required if the construction corridor runs parallel in Zone 1; an individual
perpendicular crossing impacts greater than 150 If of riparian buffer; or if an individual perpendicular crossing impacts
greater than 40 If, but less than 150 If of riparian buffer and the maintenance corridor exceeds 10 feet in width.
DWR Regional personnel will be responsible for attending the ]D verification meetings and providing stream
determinations for the project in their respective region. Contact information and county assignments for regional staff
are listed below. Please contact them directly to schedule site visits.
Chad Tudington-910-433-332O chad.turlington@ncdenr.gov (Sampson, Cumberland & Robeson) James Graham - 919-
791-4256 - james.graham@ncdenr.gov (Northampton, Halifax, Nash, Wilson and Johnston)
Thanks,
Jennifer
]enniferBurdette
401/8ufferCoordinaLor
4O1Q Buffer Permitting Unit
Wetlands Branch
NCDE0R— Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
(919) 807'6364phone
*Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.*
----- Original Message -----
From: Brown, Craig SAW [nnai|to:CraiglBrovvn@usacearmy.noi|]
Sent: Wednesday, October U1,281410:0DAM
To: SpencerThcheU; wjhammoer@nrg-Uc.com; jenniferc.brousn@dnnn.conn; Burdette, Jennifer a; Brown, Craig SAW;
Bailey, David E SAW; Shaeffer, David LSAVV Greer, Emily SAW; Wicker, Christine VVSAW
Cc: Beter, Dale ESAVV; Gibby,)ean 8S4VV; Wicker, Henry MJRSAW; McLendon, Scott CSAW; Gibson, Steven VV NAO
Subject: RE: Atlantic Coast Pipeline -SAVV'2014-01558; 9-30'14 meeting (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE