Loading...
HomeMy WebLinkAbout20150012 Ver 1_Agent Authorization Letter_20150216A NOT A CAMA PERMIT NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 16, 2015 Sally Martin P.O. Box 39 Jones Mills, PA 15646 Donald R. van der Vaart Secretary DWR # 15 -0027 Hyde County Subject: AUTHORIZATION CERTIFICATE PER THE TAR - PAMLICO RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B.0259) WITH ADDITIONAL CONDITIONS Martin Cottage Addition — 44 North Pond Road in Ocracoke Dear Mrs. Martin: You have our approval for the impacts listed below for the purpose described in your application dated December 30, 2014, received by the Division of Water Resources (Division) on January 8, 2015 with subsequent information received on January 28, 2015. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This Authorization Certificate shall expire five (5) years from the date of this letter. This approval requires you to comply with the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts [15A NCAC 02B. 0259(8)]. Type of Impact Amount Approved Amount Plan location/ Reference (units) Approved Attached Permanent (units) Temporary Buffers —Zone 2 B1 133 (square feet) 10 (square feet) Site Map 2. Diffuse Flow Division of Water Resources — Water Quality Regional Operations Section — Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252 - 946 -64811 Fax: 252 - 975 -37161 Internet: www.ncdenr.gov An Equal Opportunity 1 Affirmative Acton Employer- Made in part by recycled paper Sally Martin DWR# 15 -0027 BUFFER APPROVAL Page 2 of 3 An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive velocities through the protected stream buffers and will not re- concentrate before discharging into the stream as identified within 15A NCAC 26 .0259(5). 3. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and Authorization and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 4. This approval and its conditions are final and binding unless contested. {G.S. 143- 215.51 This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH If sendi I g via US Postal Service: If sending via delivery service (UPS, IFedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh,; NC 27699 -6714 Raleigh, NC 27609 -6285 I One (1) copy of the petition must also be served to DEN R: John C. Evans, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 I • Sally Martin DWR# 15 -0027 BUFFER APPROVAL Page 3 of 3 This letter completes the review of the Division under the Tar - Pamlico Riparian Buffer Rules as described in 15A NCAC 02B .0259. Please contact Anthony Scarbraugh at 252- 948 -3924 or anthony.scarbraush @ncdenr.gov if you have any questions or concerns. Sincerely, W� Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDENR cc: File Jennifer Burdette, DWR 401 & Buffer Permitting Unit Steve Trowell, DCM WaRO Thomas Pahl, Landmark Building and Design, LLC PO Box 1056, Ocracoke, NC 27960 i� I v Q 0 i� v :o PAMLICO SOUND Existing Piled Riprap MIVLAN DER APPROVED MRM 0WOUNA OMMNMENTAL NT COMMISSION 0jVjqM0FWAMpZWt.lRCES OKI�, 2011E I pwppMmtNa t I I 30' CAMA Buffer I � I � � I o o, I O New 8x8 Pilings 8'0.C. 8'deep Ali �I No Ro - ni iM/W4�AbO,otdsfe.;. _ � "aIN3W draMagi _ -. a' I u, Existing House with I proposed added deck (shaded) rnl cl i � I i I I i I K I Root Overhang I � I � I I I I I I I I I Emnno ' and DNnc°y ' North Pond Road (Blacktop) Note: 14.6% Impervious surface within 75' of Normal High Water North in u m a R 9w 0 8.2 C O {a Z�_ r 5 a°