HomeMy WebLinkAbout20150012 Ver 1_Agent Authorization Letter_20150216A NOT A CAMA PERMIT
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
February 16, 2015
Sally Martin
P.O. Box 39
Jones Mills, PA 15646
Donald R. van der Vaart
Secretary
DWR # 15 -0027
Hyde County
Subject: AUTHORIZATION CERTIFICATE PER THE TAR - PAMLICO RIPARIAN BUFFER
PROTECTION RULES (15A NCAC 02B.0259) WITH ADDITIONAL CONDITIONS
Martin Cottage Addition — 44 North Pond Road in Ocracoke
Dear Mrs. Martin:
You have our approval for the impacts listed below for the purpose described in your application
dated December 30, 2014, received by the Division of Water Resources (Division) on January 8,
2015 with subsequent information received on January 28, 2015. Please note that you should get
any other federal, state or local permits before proceeding with your project, including those
required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply
Watershed regulations. This Authorization Certificate shall expire five (5) years from the date of
this letter.
This approval requires you to comply with the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and general
conditions of the Buffer Rules are met. No other impacts are approved, including incidental
impacts [15A NCAC 02B. 0259(8)].
Type of Impact
Amount Approved
Amount
Plan location/ Reference
(units)
Approved
Attached
Permanent
(units)
Temporary
Buffers —Zone 2
B1
133 (square feet)
10 (square feet)
Site Map
2. Diffuse Flow
Division of Water Resources — Water Quality Regional Operations Section — Washington Regional Office
943 Washington Square Mall, Washington, NC 27889
Phone: 252 - 946 -64811 Fax: 252 - 975 -37161 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Acton Employer- Made in part by recycled paper
Sally Martin
DWR# 15 -0027
BUFFER APPROVAL
Page 2 of 3
An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive
velocities through the protected stream buffers and will not re- concentrate before discharging
into the stream as identified within 15A NCAC 26 .0259(5).
3. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Authorization. If
you change your project, you must notify the Division and you may be required to submit a
new application package with the appropriate fee. If the property is sold, the new owner
must be given a copy of this approval letter and Authorization and is responsible for
complying with all conditions. [15A NCAC 02B .0507(d)(2)]
4. This approval and its conditions are final and binding unless contested. {G.S. 143- 215.51
This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B
by filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known as OAH). A petition form may be obtained from the OAH at
http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A
petition is considered filed when the original and one (1) copy along with any applicable OAH filing
fee is received in the OAH during normal office hours (Monday through Friday between 8:00am
and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the
petition along with any applicable OAH filing fee is received by the OAH within five (5) business
days following the faxed transmission.
Mailing address for the OAH
If sendi I
g via US Postal Service:
If sending via delivery service (UPS,
IFedEx,
etc):
Office of
Administrative Hearings
Office of Administrative Hearings
6714 Mail
Service Center
1711 New Hope Church Road
Raleigh,; NC 27699 -6714
Raleigh, NC 27609 -6285
I
One (1) copy of the petition must also be served
to DEN R:
John C. Evans, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699 -1601
I
•
Sally Martin
DWR# 15 -0027
BUFFER APPROVAL
Page 3 of 3
This letter completes the review of the Division under the Tar - Pamlico Riparian Buffer Rules as
described in 15A NCAC 02B .0259. Please contact Anthony Scarbraugh at 252- 948 -3924 or
anthony.scarbraush @ncdenr.gov if you have any questions or concerns.
Sincerely,
W�
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDENR
cc: File
Jennifer Burdette, DWR 401 & Buffer Permitting Unit
Steve Trowell, DCM WaRO
Thomas Pahl, Landmark Building and Design, LLC
PO Box 1056, Ocracoke, NC 27960
i�
I
v
Q
0
i�
v
:o
PAMLICO SOUND
Existing Piled Riprap
MIVLAN DER
APPROVED
MRM 0WOUNA OMMNMENTAL
NT COMMISSION
0jVjqM0FWAMpZWt.lRCES
OKI�, 2011E
I pwppMmtNa t
I
I
30' CAMA Buffer
I �
I �
� I
o
o, I
O New 8x8 Pilings 8'0.C.
8'deep Ali
�I
No Ro -
ni iM/W4�AbO,otdsfe.;.
_ � "aIN3W draMagi _ -.
a' I
u, Existing House with I
proposed added deck
(shaded)
rnl
cl
i � I
i
I I
i
I K
I Root Overhang
I �
I �
I
I
I I
I
I I
I I
Emnno '
and DNnc°y '
North Pond Road (Blacktop)
Note: 14.6%
Impervious surface
within 75' of Normal High Water
North
in
u
m a R
9w
0
8.2
C O
{a
Z�_
r 5 a°