Loading...
HomeMy WebLinkAbout20150116 Ver 1_More Info Received_20150218 (2) Johnson, Alan From:Chris Brown <Chris.Brown@Mcgillengineers.Com> Sent:Wednesday, February 18, 2015 12:29 PM To:david.w.brown@usace.army.mil; Johnson, Alan Cc:Matthew Oetting Subject:Revised Plans and Page 4 of PCN Attachments:REVISED GRADING C-211_16Feb15.pdf; REVISED GRADING C-212_16Feb15.pdf; REVISED DETAIL C-503_16Feb15.pdf; REVISED DETAIL C-507_16Feb15.pdf; PV3 USACE PCN REVISED Page 4_16FEB15.pdf Gentlemen, Thank you for your patience on getting this information to you. I am enclosing 4 revised drawings which show the revised items clouded. Some of the notes are just to further clarify. Two of the drawings are detail sheets. I am sending back sheet 4 of the PCN, which has also been revised. Please note that the column for the “Average Stream Width” has changed, some of the numbers according to Alan’s field observation. Matthew is going out to the site on Friday for a field inspection. He is going to have another look at and measure the stream widths. I can wait to send you the hard copies in the mail, incase his field work shows differently (mainly on S3). The number given is from field shots edge of water, I took from our surveyor’s survey. If you see anything on the attachments that you have a question about or need us to revise, please let me know. Alan, to answer your question about the length of time the temporary crossings will be in, is until around 2/28/16, which is projected end of project date. They may be able to come out sooner if the work in that area is done earlier. Thanks, Christine Christine Brown Engineering Technician III th 1240 19 St. Lane, NW| Hickory, NC 28601 Phone: 828.328.2024 | Cell: 828.234.2044 | Fax: 828.328.3870 Chris.brown@mcgillengineers.com | www.mcgillengineers.com 1