Loading...
HomeMy WebLinkAbout#5602_07_2012_FINALINSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5602 Laboratory Name: National Committee for the New River Inspection Type: Field Initial Inspector Name(s): Jason Smith Inspection Date: July 10, 2012 Date Report Completed: July 26, 2012 Date Forwarded to Reviewer: July 26, 2012 Reviewed by: Nick Jones Date Review Completed: July 30, 2012 Cover Letter to use: X Insp. Initial _ Insp. Reg. _ Insp. No Finding _ Insp. CP _Corrected Unit Supervisor: Gary Francies Date Received: 7/30/2012 Date Forwarded to Linda: 8/2/2012 Date Mailed: � I L I t a �,C - �I Ja NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary August 2, 2012 5602 Ms. Courtney Wait National Committee for the New River P.O. Box 1480 West Jefferson, NC 28694 Subject: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Initial Inspection Dear Ms. Wait: Enclosed is a report for the inspection performed on July 10, 2012 by Jason Smith. Where finding(s) are cited in this report, a response is required. Within thirty days of receipt, please supply this office with a written item for item description of how these finding(s) were corrected. If the finding(s) cited in the enclosed report are not corrected, enforcement actions may be recommended. For certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email or if you have questions or need additional information, please contact us at 828-296-4677. Sincerely, Gary Francies Certification Unit Supervisor Laboratory Section Enclosure cc: Jason Smith Master File DENR DWO Laboratory Section NC Wastewater/Groundwater Laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road. Raleigh, North Carolina 27607-6445 Phone: 919-733-3908 \ FAX: 919-733-6241 Internet: www.dwglab.org An Equal Opportunity \ Affirmative Action Employer LABORATORY NAME: ADDRESS: CERTIFICATE #: DATE OF INSPECTION: TYPE OF INSPECTION: AUDITOR(S): LOCAL PERSON(S) CONTACTED: ffifllliagr On -Site Inspection Report National Committee for the New River P.O. Box 1480 West Jefferson, NC 28694 5602 July 10, 2012 Field Initial Jason Smith Courtney Wait This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: This is the initial inspection for this facility. The laboratory was clean and well organized. The facility has all the equipment necessary to perform the analyses. The laboratory analyzes samples once per month up and downstream of several wastewater treatment facilities. The data is reported directly to the Division of Water Quality's River Coalition Program. 111. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Documentation Comment: Some instances of over writing were observed and error corrections were not initialed and dated when performed. The Quality Assurance Policies for Field Laboratories document states: All documentation errors must be corrected by drawing a single line through the error so that the original entry remains legible. Entries shall not be obliterated by erasures or markings. Wite-Out®, correction tape or similar products designed to obliterate documentation are not to be used. Write the correction adjacent to the error. The correction must be initialed by the responsible individual and the date of change documented. All data and log entries must be written in indelible ink. Pencil entries are not acceptable. Notification of acceptable corrective action (i.e., this policy will be implemented beginning with the next sampling event) was received by email on July 11, 2012. No further response is necessary for this finding. Comment: The time recorded was not labeled to indicate that it was the sample collection/analysis time. The North Carolina Administrative Code, 15A NCAC 2H .0805 (g) (1) states: Data pertinent to each analysis must be maintained for five years. Certified Data must consist of date collected, time collected, samples site, sample collector, and sample analysis time. The field benchsheets must provide a space for the signature of the analyst, and proper units of measure for all analyses. Notification of acceptable corrective action (i.e., the collection/analysis times are now clearly documented) was received by email on July 11, 2012. No further response is necessary for this finding. Page 2 #5602 National Committee for the New River Comment: The analyst's signature or initials were not documented in the field log. The North Carolina Administrative Code, 15A NCAC 2H .0805 (g) (1) states: Data pertinent to each analysis must be maintained for five years. Certified Data must consist of date collected, time collected, samples site, sample collector, and sample analysis time. The field bench sheets must provide a space for the signature of the analyst, and proper units of measure for all analyses. Notification of acceptable corrective action (i.e., the analysts initials are now documented in the field log) was received by email on July 11, 2012. No further response is necessary for this finding. Comment: The units of measure for pH (S.U.) were not documented in the field log. The North Carolina Administrative Code, 15A NCAC 2H .0805 (g) (1) states: Data pertinent to each analysis must be maintained for five years. Certified Data must consist of date collected, time collected, samples site, sample collector, and sample analysis time. The field bench sheets must provide a space for the signature of the analyst, and proper units of measure for all analyses. Notification of acceptable corrective action (i.e., the units of measure for pH are now documented in the field log) was received by email on July 11, 2012. No further response is necessary for this finding. Proficiencv Testin Comment: The laboratory did not document Proficiency Testing (PT) sample analyses in the same manner as environmental samples. The Proficiency Testing Requirements, February 20, 2012, Revision 1.2. document states: All PT sample analyses must be recorded in the daily analysis records as for any environmental sample. This serves as the permanent laboratory record. Notification of acceptable corrective action (i.e., PT analyses will be documented in the field log the same as environmental samples beginning this year) was received by email on July 11, 2012. No further response is necessary for this finding. pH — Standard Methods, 20th Edition, 4500 H+ B Conductivity — Standard Methods, 20th Edition, 2510 B Temperature — Standard Methods, 20th Edition, 2550 B Dissolved Oxyaen — Standard Methods, 20th Edition, 4500 O G Comment: The probe was not being rinsed with deionized or distilled water between samples. The YSI Professional Plus User Manual states: Thoroughly rinse the sensor tip with distilled or deionized water. Notification of acceptable corrective action (i.e., the probe is now rinsed between samples) was received by email on July 25, 2012. No further response is necessary for this finding. Temperature — Standard Methods, 20th Edition, 2550 B A. Finding: The temperature sensor has not been verified with a NISI certified or traceable thermometer. Requirement: All thermometers and temperature measuring devices must be checked every 12 months against a NIST certified or NIST traceable thermometer and the process documented. To check a thermometer or the temperature sensor of a meter, read the temperature of the thermometer/meter against a NIST certified or NIST traceable thermometer and record the two temperatures. The thermometer/meter readings must be less than or equal to 10C from the NIST certified or NIST traceable thermometer reading. (NC Wastewater/Groundwater Laboratory Certification Policy). The documentation must include the serial number of the NIST certified thermometer or NIST -traceable thermometer that was used in the comparison. Also document any correction that applies on both the thermometer/meter and on a separate sheet to be filed. (NOTE: Other certified laboratories may provide assistance in meeting this requirement.) Ref: IV. Page 3 #5602 National Committee for the New River Approved Procedure for Field Analysis of Temperature. Please submit a copy of the temperature sensor verification with the reply to this report. Conductivity — Standard Methods, 20'" Edition, 2510 B B. Finding: The Conductivity Automatic Temperature Compensator (ATC) has not been verified. Requirement: The Automatic Temperature Compensator (ATC) must be verified by analyzing a standard at 25 °C (the temperature that conductivity values are compensated to) and a temperature(s) that bracket the temperature ranges of the samples to be analyzed. This may require the analysis of a third temperature reading that is > 25 °C. This must be performed on an annual (i.e., 12 month) basis. Ref: Approved Procedure for Field Analysis of Specific Conductance (Conductivity). Please submit a copy of the ATC verification with the reply to this report. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for January, February, and March, 2012. The following errors were noted: Date Parameter Location Value on Benchsheet or Contract Lab Report Value on Client Report 1/23/12 pH K7010000 7.25 S.U. 7.0 S.U. 1 /23/12 TKN K3000000 1.12 mg/L 1.98 mg/L In order to avoid questions of legality, it is recommended that you submit amended report(s) to the DWQ River Coalition Program. A copy of this report will be made available to the Winston-Salem Regional Office and the DWQ River Coalition Program. Comment: In an email received on July 11, 2012, the laboratory stated that all data would be reviewed, corrected, and re -submitted corrected by July 31, 2012. V. CONCLUSIONS: Correcting the above -cited findings will help this la requirements. The inspector would like to thank the data review process. Please respond to all findings. Report prepared by: Jason Smith Report reviewed by: Nick Jones b to produce quality data and meet certification staff for its assistance during the inspection and Date: July 26, 2012 Date: July 30, 2012