Loading...
HomeMy WebLinkAbout20140984 Ver 1_Emails_20150213Fox, Tim From: Fox, Tim Sent: Friday, February 13, 2015 12:37 PM To: 'Crystal Fox; Price, Zan (George) Subject: RE: Requested Sweetwater PDF Crystal, Hope all is well. This is a friendly reminder that the deadline is today for the Sweetwater project. Have a good weekend. Tim Tim Fox - tim.fox(bncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources— Water quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828- 296 -4500 Fax: 828- 299 -7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Crystal Fox [mailto:CFOx @smeine.com] Sent: Thursday, January 15, 2015 3:06 PM To: Fox, Tim; Price, Zan (George) Subject: RE: Requested Sweetwater PDF Thank you for your understanding — it's kinds lil<ejenga.. we think we got it then one piece causes the whole thing to kaput. Thanks' From: Fox, Tim rmailto'tim fox @ncdenr gov] Sent: Wednesday, January 14, 2015 10:00 AM To: Crystal Fox; Price, Zan (George) Subject: RE: Requested Sweetwater PDF Crystal, Yes, We will extend the deadline to February 13, 2015. Please submit and follow the required response to the address on the Additional Information letter. Thanks and have a good rest of your week. Tim Tim Fox - tim.fox@ncdenr.¢ov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources— Water Quality Programs. 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828- 296 -4500 Fax: 828- 299 -7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Crystal Fox [mailto:CFox@smeinc com] Sent: Wednesday, January 14, 2015 9:21 AM To: Fox, Tim; Price, Zan (George) Subject: RE: Requested Sweetwater PDF Dear Tim, I would like to request an additional extension for the Sweetwater Project. The gas company is working with the landowner to get their buy in, the most recent design (which I previously provided) is till additionally being reviewed by the Gas Co for constructability. Can we extend to February 13, 2015? I'm hopeful that the parties can come to a mutual agreement by this date. Thanks! From: Fox, Tim [mailto:tim.fox(&ncdenr aov] Sent: Friday, January 09, 2015 2:37 PM To: Crystal Fox; Price, Zan (George) Subject: RE: Requested Sweetwater PDF Crystal, I did not see any glaring conceptual design issues. However, DWR will want to assess the stability of the project. We will want to see the outlet protection detail, pipe slope information, invert elevations, pipe profile and any other appropriate information. The project will need to meet the general conditions for Water Quality Certification 3883. Please follow and submit your response to the address on the Additional Information Requested letter. If you have any additional questions please let us know. Thanks and have a great weekend. Tim Tim Fox - tim.foxPncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources - Water Quality Programs 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828- 296 -4500 Fax: 828- 299 -7043 - Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Crystal Fox [mailto :CFoxPsmeinc com] Sent: Wednesday, January 07, 2015 9:33 AM To: Price, Zan (George); Fox, Tim Subject: Fwd: Requested Sweetwater PDF See below and attached C Sent from my Yerizon Wireless 4G LTF DROID -- - - - - -- Original Message -- - - - - -- Subject: Requested Sweetwater PDF From: "Steven L. Sams" <ssamsosmeinc.com> To: Crystal Fox <CFox smncmc.corn> CC: "Mark A. Taylor" <matavlor @smeinc.com >,Carl Rogers <CRogers @smeinc.com> Good Morning Crystal; The attached PDF shows al I the storm features from the survey. That really is just the existing 24" pipe, and the 18" pipe with an inlet at Sweetwater Hills road. I was told that the 24" pipe also connects to a road inlet, but our survey didn't extend far enough to show that. The PDF shows the existing pipes as black lines, and the proposed pipes are dashed wide green lines. The proposed manholes are yellow circles, and have 5' separation from the gas line. If it is possible, can you get an existing depth of the existing gas line? We need to have an accurate size and depth of that line to see if we can get the proposed outfall pipe underneath the gas line. Please let me know if I can be of any further assistance. Thanks, -Steve Steve Sams Civil Designer E ENGINEERING INTEGRITY. S &ME, Inc. 9751 Southern Pine Boulevard Charlotte INC 28273 M. Ph'. 704- 523-4726 Fax: 704 -565 -4929 ssamsamasinccom wv✓w.smeinc.con,