HomeMy WebLinkAbout20230072 Ver 1_01_Princeton SouthPine_PCN_Supplemental_Streams_Table_230112_202301123. Stream Impacts
3g.
3h.
3b.
3c.
A
Stream
Impact
Site
Impact
Impact
3d.
3e.
Jurisdiction
Width
length
#
3a. Impact Reason
Duration
Type
Stream Name
Stream Type
Type
(avg ft)
(linear ft)
Culvert
NWW-A, UT
replacement with
Crossing/
to Beaverdam
S1
outlet protection
Permanent
Culvert
Creek
Intermittent
Both
2
22
Regrade and
NWW-A, UT A
increase ditch
to Beaverdam
S2
capacity
Permanent
Excavation
Creek
Intermittent
Both
2
716
NWW-A, UT A
Dewatering Sites
to Beaverdam
S3
S1 and S2
Temporary
Dewatering
Creek
Intermittent
DWR
2
716
NWW-A, UT
Crossing/
to Beaverdam
S4
Inlet protection
Temporary
Culvert
Creek
Intermittent
Both
2
5
Culvert
NWW-A, UT A
replacement with
Crossing/
to Beaverdam
S5
outlet protection
Permanent
Culvert
Creek
Intermittent
Both
2
18
Culvert
NWW-A, UT
replacement with
Crossing/
to Beaverdam
S6
outlet protection
Permanent
Culvert
Creek
Intermittent
Both
2
80
NWW-A, UT
Dewatering Sites
to Beaverdam
S7
S5 and S6
Temporary
Dewatering
Creek
Intermittent
DWR
2
98
NWW-A, UT A
Crossing/
to Beaverdam
S8
Inlet protection
Temporary
Culvert
Creek
Intermittent
Both
2
5
Culvert
NWW-A, UT
replacement with
Crossing/
to Beaverdam
S9
outlet protection
Permanent
Culvert
Creek
Intermittent
Both
2
49
Regrade and
NWW-A, UT A
increase ditch
to Beaverdam
S10
capacity
Permanent
Excavation
Creek
Intermittent
Both
2
134
NWW-A, UT
Dewatering Sites
to Beaverdam
S11
S9 and S10
Temporary
Dewatering
Creek
Intermittent
DWR
2
134
Culvert removal
NWW-A, UT
and replacement
Crossing/
to Beaverdam
Jurisdictional
S12
with rip rap
Permanent
Culvert
Creek
Ditch
Both
2
7
Culvert
NWW-A, UT
replacement with
Crossing/
to Beaverdam
Jurisdictional
S13
outlet protection
Permanent
Culvert
Creek
Ditch
Both
2
6
NWW-A, UT
Dewatering Sites
to Beaverdam
Jurisdictional
S14
S12 and S13
Temporary
Dewatering
Creek
Ditch
DWR
2
13
3. Stream Impacts (continued)
3g.
3h.
3b.
3c.
3f.
Stream
Impact
Site
Impact
Impact
3d.
3e.
Jurisdiction
Width
length
#
3a. Impact Reason
Duration
Type
Stream Name
Stream Type
Type
(avg ft)
(linear ft)
Removal of
culvert (S12),
NWW-I, UT I
placement of rip
to Beaverdam
Jurisdictional
S15
rap
Permanent
Fill
Creek
Ditch
Both
1
5
NWW-I, UT 1
10
to Beaverdam
Jurisdictional
S16
Dewatering S13
Temporary
Dewatering
Creek
Ditch
DWR
1
Removal of
7
culvert (S12),
NWW-H, UT H
placement of rip
to Beaverdam
Jurisdictional
S17
rap
Permanent
Fill
Creek
Ditch
Both
1
NWW-H, UT H
13
to Beaverdam
Jurisdictional
S18
Dewatering S17
Temporary
Dewatering
Creek
Ditch
DWR
1
NWW-K, UT K
15
Excavation of
to Beaverdam
Jurisdictional
S19
surcharge area
Permanent
Excavation
Creek
Ditch
Both
1
Installation of
NWW-K, UT K
5
outlet protection
to Beaverdam
Jurisdictional
S20
(from S13)
Permanent
Fill
Creek
Ditch
Both
1
NWW-K, UT K
15
Dewatering S19
to Beaverdam
Jurisdictional
S21
and S20
Temporary
Dewatering
Creek
Ditch
DWR
1
Installation of
NWW-J, UT
2
outlet protection
to Beaverdam
Jurisdictional
S22
(from S11)
Permanent
Fill
Creek
Ditch
Both
1
NWW-J, UT
26
Excavation of
to Beaverdam
Jurisdictional
S23
surcharge area
Permanent
Excavation
Creek
Ditch
Both
1
NWW-J, UT
Dewatering S22
to Beaverdam
Jurisdictional
S24
and 23
Temporary
Dewatering
Creek
Ditch
DWR
1
26
NWW-A, UT
Remove culvert
Culvert/
to Beaverdam
Jurisdictional
S25
and junction box
Permanent
Crossing
Creek
Ditch
Both
--
--
Add second
NWW-A, UT
culvert and outlet
Culvert/
to Beaverdam
Jurisdictional
S26
protection
Permanent
Crossing
Creek
Ditch
Both
1.5
10
Regrade and
NWW-A, UT A
increase capacity
to Beaverdam
Jurisdictional
S27
of ditch
Permanent
Excavation
Creek
Ditch
Both
3
584
NWW-A UT A
Dewatering S26
to Beaverdam
Jurisdictional
S28
and S27
Temporary
Dewatering
Creek
Ditch
Both
3
584
NWW-A UT A
Crossing/
to Beaverdam
Jurisdictional
S29
Inlet protection
Temporary
culvert
Creek
Ditch
Both
3
5
3. Stream Impacts (continued)
3g.
3h.
3b.
3c.
A
Stream
Impact
Site
Impact
Impact
3d.
3e.
Jurisdiction
Width
length
#
3a. Impact Reason
Duration
Type
Stream Name
Stream Type
Type
(avg ft)
(linear ft)
Culvert outlet
NWW-L, UT L
protection (from
to Beaverdam
Jurisdictional
S30
S26)
Permanent
Fill
Creek
Ditch
Both
1
6
NWW-L, UT L
to Beaverdam
Jurisdictional
S31
Dewatering S23
Temporary
Dewatering
Creek
Ditch
Both
1
6
Regrade and
NWW-M, UT
increase capacity
M to
of ditch (from
Beaverdam
Jurisdictional
S32
S27)
Permanent
Fill
Creek
Ditch
Both
1
13
NWW-M, UT
M to
Beaverdam
Jurisdictional
S33
Dewatering S32
Temporary
Dewatering
Creek
Ditch
DWR
1
13
Regrade and
NWW-N, UT N
increase capacity
to Beaverdam
Jurisdictional
S34
of ditch (S29)
Permanent
Fill
Creek
Ditch
Both
1
14
NWW-N, UT N
to Beaverdam
Jurisdictional
S35
Dewatering S34
Temporary
Dewatering
Creek
Ditch
DWR
1
14
Regrade and
NWW-O, UT O
increase capacity
to Beaverdam
Jurisdictional
S36
of ditch (S29)
Permanent
Fill
Creek
Ditch
Both
1
14
NWW-O, UT O
to Beaverdam
Jurisdictional
S37
Dewatering S36
Temporary
Dewatering
Creek
Ditch
DWR
1
14
Culvert
NWW-B, UT B
replacement with
Crossing/
to Beaverdam
Jurisdictional
S38
outlet protection
Permanent
Culvert
Creek
Ditch
Both
2
10
Regrade and
NWW-B, UT B
increase capacity
to Beaverdam
Jurisdictional
S39
of ditch
Permanent
Excavation
Creek
Ditch
Both
2
554
NWW-B UT B
Dewatering S38
to Beaverdam
Jurisdictional
S40
and S39
Temporary
Dewatering
Creek
Ditch
Both
2
564
NWW-B, UT B
Crossing/
to Beaverdam
S41
Inlet protection
Temporary
Culvert
Creek
Intermittent
Both
2
5
Regrade and
NWW-S, UT S
increase capacity
to Beaverdam
Jurisdictional
S42
of ditch (S39)
Permanent
Fill
Creek
Ditch
Both
1
16
NWW-S, UT S
to Beaverdam
Jurisdictional
S43
Dewatering S42
Temporary
Dewatering
Creek
Ditch
DWR
1
16
3. Stream Impacts (continued)
3g.
3h.
3b.
3c.
3f.
Stream
Impact
Site
Impact
Impact
3d.
3e.
Jurisdiction
Width
length
#
3a. Impact Reason
Duration
Type
Stream Name
Stream Type
Type
(avg ft)
(linear ft)
Regrade and
increase capacity
NWW-U, UT U
of ditch (from
to Beaverdam
Jurisdictional
S44
S10)
Permanent
Fill
Creek
Ditch
Both
1
2
NWW-U, UT U
to Beaverdam
Jurisdictional
S45
Dewatering S36
Temporary
Dewatering
Creek
Ditch
DWR
1
2
11. Total jurisdictional ditch impacts:
2,596 linear feet
12. Total permanent stream impacts:
1,019 linear feet
13. Total temporary stream impacts:
958 linear feet
14. Total stream and ditch impacts:
4,573 linear feet
3j. Comments
1. Permanent and temporary stream impacts are listed as Sites S1 through S11 and are
included in the PCN and this attached sheet. Additional potential jurisdictional streams
assessed to be ephemeral drainage ditches (Sites S12 through S45) are more numerous than
available space on the PCN and are included on this sheet.