Loading...
HomeMy WebLinkAbout20230072 Ver 1_08_Princeton SouthPine_401_Buffer Pre-filing Meeting Request Confirmation_20230112From: 401PreFile To: Allison Keith Subject: Automatic reply: [External] 401/Buffer Pre -filing Meeting Request Date: Friday, September 16, 2022 11:42:45 AM This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and submit this documentation as part of your 401 application (PCN Application) as required by federal law. DWR will not be able to accept your application without this federally required documentation. 401 applications received without documentation that a pre -filing meeting request was submitted at least 30 days prior will be returned as incomplete. Responses to this email are not monitored. Background On April 6, 2022, the United States Supreme Court issued an order staying a lower court's vacatur of the Trump Administration's 2020 "Clean Water Act Section 401 Certification Rule" ("Federal Rule"). As a result of the United States Supreme Court order, the Trump Administration's Federal Rule has sprung back into effect. The Trump Administration's Federal Rule imposes additional procedural requirements on applicants for 401 Certifications and on DWR's processing of those applications. One requirement is that 401 applicants must request a pre -filing meeting request at least 30 days prior to submitting their 401 application. [40 C.F.R. §121.4] In turn, the Federal Rule requires that applicants include documentation of their pre -filing meeting request in their 401 Certification application. [40 C.F.R §121.1, 40 C.F.R. §121.5]. Please refer to the Federal Rule for more information. Per 40 CFR §121 and §121.5, a 401 Certification application that does not include the required pre -filing meeting request documentation does not constitute a "certification request." As a result of the reinstatement of the Trump Administration's Federal Rule, all 401 applications received after April 6, 2022 that do not have documentation that a pre -filing meeting request was submitted at least 30 days prior to submittal of a 401 Certification application will be returned as incomplete. If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact list(s). For Non -Transportation Central Staff: https://deq.nc.gov/about/divisions/water-resources/water-quality permitting/401-buffer- permitting/401-buffer-permitting-contacts For Non -Transportation Regional Staff: https://edocs.deq.nc.g_ovov/WaterResources/DocView.aspx?dbid=0&id=2162034&cr=1 For all Transportation Projects Including NCDOT Projects: https://deq.nc. og_v/about/divisions/water-resources/water-resources-permits/transportation- permitting/staff-contacts