Loading...
HomeMy WebLinkAboutNCC204578_NOT Supporting Documents_20230108•, HOLLY SPRINGS Town of Holly Springs Utilities and Infrastructure Department Certificate of Compliance for Preliminary Soil Erosion and Sedimentation Control THIS IS TO CERTIFY that the Soil Erosion and Sedimentation Control measures have been installed in accordance with the approved plan at the project site of: Peterson Station located at Sunset Lake Road and Stephenson Road. and in accordance with the provisions of Environmental Development Permit No. 17-2022. Verification of the above facts has been ascertained by Jeff Peters, Engineering Technician, through means of an on -site inspection, and receipts of records on 1/4/2023. With this compliance, the project is now released for any required Building or Land Use Permits with the understanding that final stabilization or cover of the remaining denuded portions of the site will occur within the time limits as prescribed by the Soil Erosion and Sedimentation Control Ordinance of the Town of Holly Springs. If not, the applicant will be subject to appropriate legal action by the Town of Holly Springs to the limits prescribed by Ordinance. Jeff Peters, Engineering Technician 9043 Certificate of Compliance Page 1 10/24/09