Loading...
HomeMy WebLinkAboutNC0021962_Authorization to Construct_19940304State of NCIrth Depa:t:ner, Health. arid Natural Resources Division of Environmental Management James F-j. Hunt, f,iovernor Jor .i :; ,• 3. Howes, Secretary A. F` ,.1;:: on Howard, Jr., P.E., Director March 4, 1994 Mr. Scott Eaton Citgo F _!trole'im Corporation P.O. Box 47427 Doraville, GA 30362 ALIC"rA �EHNFi Subject: Permit No. AC0021962 Authorization to Construct Citgo Petroleum / Paw Creek Terminal Stripperator Addition Mecklenburg County Dear M1. Eaton: A letter of request for an Authorization to Construct was received October 15, 1993 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of an Ejector Systems Stripperator unit including all necessary appurtenances needed for proper operation with discharge of treated wastewater into an unnamed tributary tc_ Gum Branch. This A? thoEza.tion to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021962 issued July 17, 1989, and shall be subject to revocation unless the wastewater trdatment facilities :sic. constructed in accordance with the conditions and limitations specified in Permit No. NC002 1962. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacemew, wastewater treatment or disposal facilities. There shall be no bypass of the treatment units for any reason. The equalization tank should be sufficient storage for the treatment units to be repaired or replaced before backup would occur. The Mooresville Regional Office, telephone number 704-663-1699, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the notrnal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephorto 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consume; paper Permit No. NC0021962 Authorization to Construct Citgo Petroleum Corp. March 4, 1994 Page 2 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Randy L. Kepler, telephone number 919/733-5083. Sincerely, APreston Howard, Jr:;'P.E. cc: Mecklenburg County Health Department Mooresville Regional Office, Water Quality Training and Certification Unit Central Files