Loading...
HomeMy WebLinkAbout#5002_03_2015_FINAL&74A i!C 'EH-R North Carolina Department of Environment and Natural Resources Pat McCrory Governor April 6, 2015 5002 Mr. Lawrence Battaile Dare Co. North RO WTP 600 Mustian St. Kill Devil Hills, NC 27948 John E. Skvarla, III Secretary SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Mr. Battaile: Enclosed is a report for the inspection performed on March 25, 2015 by Nick Jones. Since the finding(s) cited during the inspection were all corrected prior to the completion of the enclosed report, a response is not required. The staff is commended for taking the initiative in correcting the findings in such a timely manner. For certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by electronic mail, or if you have questions or need additional information, please contact me at (828) 296-4677. Attachment cc: Master file Nick Jones Sincerely, Gary Francies, Technical Assistance/Compliance Specialist Division of Water Resources Water Sciences Section NC Wastewater/Groundwater Laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road, Raleigh, North Carolina 27607 Phone: 919-733-39081 FAX: 919-733-6241 Internet: www.dwglab.orp An Equal Opportunity t, Affirmative Adler) Employer INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: Laboratory Name: Inspection Type: Inspector Name(s): Inspection Date: Date Report Completed: Date Forwarded to Reviewer: Reviewed by: Date Review Completed: Cover Letter to use: Unit Supervisor/Chemist III: Date Received: 5002 Dare Co. North RO WTP Field Maintenance Nick Jones March 25, 2015 March 31, 2015 March 31, 2015 Beth Swanson April 1, 2015 ❑ Insp. Initial ❑ Insp. Reg. ❑ Insp. No Finding ❑ Insp. CID ® Corrected Gary Francies 4/1 /2015 Date Forwarded to Linda: 4/6/2015 Date Mailed: 1� l� I I S U _ On -Site Inspection Report LABORATORY NAME: NPDES PERMIT # : ADDRESS: CERTIFICATE #: DATE OF INSPECTION: TYPE OF INSPECTION: AUDITOR(S): LOCAL PERSON(S) CONTACTED: I. INTRODUCTION: Dare Co. North RO WTP NCO070157 600 Mustian St. Kill Devil Hills, NC 27948 5002 March 25, 2015 Field Maintenance Nick Jones Lawrence Battaile and Nathan Cartwright This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. IL GENERAL COMMENTS: The laboratory was clean and well organized. The facility has all the equipment necessary to perform the analyses. Proficiency Testing (PT) samples for the 2015 proficiency testing calendar year have not yet been analyzed. The laboratory is reminded that these results must be submitted to this office directly from the vendor by September 30, 2015. Contracted analyses are performed by Environmental Chemists, Inc (Envirochem) (Certification #94) and Environmental Testing Solutions, Inc. (Certification #600). Current quality assurance policies for Field Laboratories and approved procedures for the analysis of the facility's currently certified parameters were provided at the time of the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Documentation Comment: The lab did not have a system of traceability for the documentation of purchased materials and reagents. The NC WW/GW LC Quality Assurance Policies for Page 2 #5002 Dare Co. North RO WTP Field Laboratories document states: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. A system (e.g., traceable identifiers) must be in place that links standard/reagent preparation information to analytical batches in which the solutions are used. Consumable materials such as pH buffers and lots of pre -made standards are included in this requirement. Demonstration of acceptable corrective action (i.e., laboratory personnel implemented the traceability log provided by the inspector) was witnessed during the inspection. No further response is necessary for this finding. Comment: The benchsheet for pH used by the laboratory did not contain all of the necessary labeling information. No instrument identification is documented. The NC WW/GW LC Approved Procedure for the Analysis of pH states: The following must be documented in indelible ink whenever sample analysis is performed: Instrument identification. This requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., a statement that as of 3/25/2015 the lab has implemented the benchsheets supplied by the inspector) was received by e-mail on 3/30/2015. No further response is necessary for this finding. Comment: The laboratory was not documenting Proficiency Testing (PT) sample analyses in the same manner as environmental samples. The NC WW/GW LC Proficiency Testing Requirements documents states: All PT sample analyses must be recorded in the daily analysis records as for any environmental sample. This serves as the permanent laboratory record. This requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., a statement that as of 3/25/2014 PT samples will be documented in the same manner as environmental samples) was received on 3/30/2015. No further response is necessary for this finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing original records (e.g., laboratory benchsheets, logbooks, etc.) and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Resources. Data were reviewed for December, 2014 and January and February, 2015. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: All findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Nick Jones Date: March 25, 2015 Report reviewed by: Beth Swanson Date: April 1, 2015