Loading...
HomeMy WebLinkAboutSW4220901_Plan Set (Revised)_20221128PROPERTY INFORMATION: PARCEL ID NUMBER: 6726-01-35-5385 M CD U ZONING: RA-3 " ACREAGE: 30.00 Z_ N � Q GRAPHIC SCALE PROPERTY OWNER/DEVELOPER: �hti O J DCA LEXINGTON PROPERTIES, LLC �� U p Of 60 0 30 60 120 240 500 BIESECKER ROAD �° p U LEXINGTON, NC 27295 y Z PHONE: N = ^ Q p O CONTACT: m� g 2 � Q ( IN FEET) email: mA SITE Z C 1 inch = 60 ft. x .� Z = N 00 aa) ENGINEER: ( w co -6 ALLIED DESIGN, INC. W J O N 4720 KESTER MILL ROAD B/ESECKERRD Z_ w Q WINSTON-SALEM, N.C. 27103 Z UU) Z co M (.0 PHONE: (336) 765-2377 A Z w p co 3: CONTACT: STEVE M. CAUSEY, PE m ,� J Y � aj email: scausey@allied-engsurv.com Qo j � Z 0 i« �oeti` Q U li w RIM=752.68' INV IN=744.19' INV OUT=744.07'@ W H 86° 52' 3 "W 480 W A i;2 W/L W � W W� W rvro93 o �r n rA ,46' 44.09"W, 247.530' l VICINITY MAP NOT TO SCALE ♦ �S87° 05' 30. 95 E 692.132' I 1 1 ♦ Lo In 1 �1 M N ° O v- �a 1 76s, qr�T og 9 61 pFMF/yT ♦ �y\��, `�� Soy TF Olild �•'`\` MpoRgRy qT e� qp✓ co &T3 \ gcFN \To 6167-1 � F'1 S7- 0� FqS '� RMgN FMFNT I 0 �NTFgg N� \\ tip �'$�.,� ► i�HLL � nun � OwilaI -MMEME"Ii1 i i 1 •1 � 1 1 1 1 II '1 M 11 11 1 W 111 1 1 0� 1 ' 1 '1 M 11 1'1 1 � 1 1 1 1 j I n '1 1 I i 1 ' I I I I I 1 I 1 I 1 1 1 I ' ' 1 1 1 ' I ' I ' I 1 1 ' I 1 � 1 I 1 1 1 1 1 1 1 � '1 1 I � � 1 I 1 1 it I it I I I 1 I 1 I 1 I 1 1 I 1 I I 1 1 I I I , S89° 46' 59.91 W 276.7�r� W W FIRM LICENSE C-1891 Q z U o Z Lu o � Q 0 U U Q 0 mLuLU O 0 Q Z Lu= U) U Lu cn � z Lu m0 D 0 oo O z 0 0 0 0 I` w () N 04 Z C/) N N N O U 00 w Z CoZ p w Y O Q w IL p U p w w w w U) z w z z 2 z O z a¢ O O W _j 0 U d 2 W W z Cl) z z U) O #On O 00 Ov Ow O O w w z z w U O w U Z v> x z Lu z U a W W Lu Lu Q I a O0 0 0 z ZO 0 U D D D H LQ D O W W W O0 W W 0 W w w Q w w N N N N N N N N � O O O O O O O Q N M CO Q N N O O N � m rn o 0 0 0 0 O z PRE DEVELOPMENT PLAN SHEET swm 1 n O GRAPHIC SCALE 60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. 240 KEY NOTES OA NEW PERMANENT WET POND. SEE SWIM 5-7 FOR DETAILS. ®NEW DITCH SECTION WITH RIP RAP. SEE DETAIL SHEETS FOR DIMENSIONS. ONEW 4' HIGH MININUM CHAINLINK FENCE AND SWING GATE. COORDINATE MATERIAL AND GATE LOCATION WITH OWNER. O NEW WOODEN GUARD RAIL. USE 5' LONG 8"X8" PRESSURE TREATED WOOD POSTS AND 8' LONG 4"X12" PRESSURE TREATED RAILS. POSTS SHALL HAVE T EXPOSED AND 2' BURIED IN CONCRETE AND SHALL BE INSTALLED EVERY 8'. MOUNT RAILS WITH GALVANIZED BOLTS, WASHERS AND NUTS. PROPERTY INFORMATION: PARCEL ID NUMBER: 6726-01-35-5385 ZONING: RA-3 ACREAGE: 30.00 PROPERTY OWNER/DEVELOPER: DCA LEXINGTON PROPERTIES, LLC 500 BIESECKER ROAD LEXINGTON, NC 27295 PHONE: CONTACT: email: ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 CONTACT: STEVE M. CAUSEY, PE email: scausey@allied-engsurv.com BUA CALCULATIONS Davidson Charter Academy WOODS SQ. FT. ACRE BARB WIRE FENCE TOTAL SITE AREA: 1,306,800 30.000 (DILAPIDATED) TAX PIN ID: 6726-01-46-1036 - �. �S87' 05' 30.59"E B9�32, ZONING: RA-3 EXISTING BUA ♦ �� - -x _ BUILDING: 0 0.000 PAVEMENTS/GRAVEL: 17,397 0.399 ♦ `�` TOTAL: 17,397 0.399 PERCENT BUA: 1.33% EXISTING BUA TO BE REMOVED BUILDING: 0 0.000 PAV E M ENT/G RAVEL: 0 0.000 TOTAL: 0 0.000 CULTIVATED FIELD (SOYBEANS) PROPOSED BUA BUILDING: 63,941 1.468 PAVEMENT/GRAVEL: 203,769 4.678 TOTAL: 267,710 6.146 m FINAL DEVELOPMENT BUA a GRg11F4 BUILDING: 63,941 1.468 �ORIE ,sSF TaT PAVEMENT/GRAVEL: 221,166 5.077 ♦ \ °8926AGM6VT wooDs FUTURE IMPERVIOUS 43,560 1.000 I , � q T�Mp�RgRy qT TOTAL: 328,667 7.545 °"u °✓ATo tf �s RGCT/oN PERCENT BUA: 25.15% ° PER' , /V, �ASFi4FiVT ♦ ♦ \0 Oy\�, Cn I I Q 0 NV N=744.19' "�/U�• �• 480 8�SAN SEWER � •_ L_ T-- - - - -- I �+ y y I C3 'If, FA Ir Fp .03' INV=782.78' / DI /11 0o GRATE=789.16' INV IN (4")-787.03' o INV OUT=786.61' a �I -t_GRAV I PLAYGROUND / EQUIPMENT (TYP.) x I O max INV=792.53' CB vzfzlc RAM INV OLT=789.40' EX CB FLOW=791.92' - INV: N 05"I=788.32' INV IN (24")=i83.85' X a INV OUT=783.90' WN I I I I a EX PAVED A I I c, PARKING AREA Ilm RIM=789.64' INV IN=786.41' II I I I I NV OUT=784.10, CB FLOW=791.96 INV OUT=/84.95' w N \\ A O 0 PAVED PARKING AREA IL 0 1 \\\ \\ U- - D M m 0 D N h 3 I ami ci ° U) 0 0 0 0 0 00 00 N A 0 P. CONC. VICINITY MAP NOT TO SCALE 1 1 rn LO In 1 w �1 co N °o N 1 1 1 1 JE TAX E 1 1 1 1 1 0 O m0 o t N EP M 0 0 Z (\I � Q Z_ J U � 0 L7 0 0 E Q 0 O •�• !Y O Z � (>7 0) (n Z J N 00 C w �w�00� Z WU)�F_ U ~ Z M Z U) J Y� CO Z O x C) 0_ EL r' FIRM LICENSE C-1891 �N CA�O'�t =o ofESS/0 �y a r�. 011 IpS FNG I NEB xS E M.CAS Q J Z o 0 0 Q 000 a0 U Q m 0 w O 0 Q w Z � LIJ U) = U cn z z0 W D O O 0 o o� Z O 0 0 r- w Q N 04 Z C/) N N N O U w 00 Z COZ 0 w Y O Q w 0 0 0 0 w w LU LU I S. 1 z \` t" \��\ z z Z Z I- 2 O lC) Z� oZZo � M 11 1 O� O w O w w w m I 1\ > V O O w w U 1 w z Fn F 2 Z m 0 11 �1 z w O O w o N 1 1 g a_ w w¢ a y M 1 1 g 0 0 0 Z Z 0 -p 1 1 O w w w � � w R 1 1 U D to D H CQ D 1 11 1 1 O W LU LU 00 W LU m l ° 1 1 Q d �x Icn � 11 I 1 N N N N N N 1 1 LU 04 N N N N N N N a a) 00 Q N N O O N izz � W rn O 0 0 0 0 CROSS O z O ZONI D G 1 r 1 POST m IDEVELOPMENT IiI PLAN I SHEET SWM 21 790 - 790 S89° 46' 59.91 W 276.700' w w PROVIDE CAST IRON BOOT TRANSITION FOR ALL DOWNSPOUT CONNECTIONS TO ROOF LEADERS ALL DOWNSPOUT AND ROOF DRAINAGE PIPING SHALL BE SCH 40 PVC FROM DOWNSPOUT TO STORM DRAINAGE STRUCTURE. UTILIZE TEES, BENDS, WYES, ETC. AS REQUIRED FOR TIE-INS AND ROUTING. PROVIDE CLEANOUTS IN ACCORDANCE WITH NORTH CAROLINA PLUMBING CODE. REFER TO ARCHITECTURAL/PLUMBING PLANS FOR EXACT LOCATIONS OF DOWNSPOUTS AND ROOF LEADERS. WET POND #1 1, PROPERTY INFORMATION: PARCEL ID NUMBER: 6726-01-35-5385 ZONING: RA-3 ACREAGE: 30.00 KEY NOTES PROPERTY OWNER/DEVELOPER: OA NEW BRICK OR CONCRETE CATCH BASIN. NCDOT DCA LEXINGTON PROPERTIES, LLC STANDARD 840.01 OR 840.02. 500 BIESECKER ROAD LEXINGTON, NC 27295 ONEW BRICK OR CONCRETE CATCH BASIN BUILT OVER PHONE: EXISTING LINE. NCDOT STANDARD 840.01 OR 840.02. CONTACT: CONTRACTOR SHALL ADJUST GRATE AND FRAME TO email: ALIGN WITH NEW CURB LINE. ENGINEER: OC NEW CONCRETE 4 SIDED OPEN THROAT CATCH BASIN. NCDOT STANDARD 840.04 WITH NCDOT 840.54. ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 ODNEW CONCRETE FLARED END SECTION. NCDOT PHONE: (336) 765-2377 STANDARD 310.01. CONTACT: STEVE M. CAUSEY, PE OE NEW NYLOPLAST 15" DRAIN BASIN (OR EQUIVALENT) WITH email: scausey@allied-engsurv.com 15" STANDARD H-20 RATED DUCTILE IRON GRATE. CONTRACTOR MAY UTILIZE STANDARD DRAIN BASIN WITH "ADD -A -BRANCH" AS REQUIRED. \ OF NEW CONCRETE DROP INLET. NCDOT STANDARD 840.14. YI #501 y\ TOP:785.00 \ �� INV IN: 778.17 (24") INV OUT: 778.17 (24") \� 117.95' 24" RCP @ 0.90%.� 125.00' 24" RCP @ 0.90%--- 15.25' 24";,,kCP @ 1,02%Yl #502 FES #500 TOP: 185.50 ♦ INV OUT: 777.00 (24") INV IN: 779.23 (24") T_#503 ♦ INV OUT: 779'23 (24") TOT: 785.5 INV IN: 7$0.35 (18") INV OUT: 780.35 (24") \ I ♦ 205. 3'j8" RCP @ 0. 0% I I I ♦ ♦ ♦ FES #400 INV OUT: 770.00 (24") FES #300 ♦ ' INV OUT: 782.00 (36") O ♦ �117.44' 36" RCP (d) . %-I EX C15 TOP: 792.08 783.90 (36") ♦ 82 1' 24" RCP @ ♦ CB #401 TOP: 785.70 INV IN: 771.50 (24") INV OUT: 771.30 (24") POND OUTLET STRUCTURE TOP- 757.80 INV OUT: 753.80 (24") I I 145.00' 24" RCP @ 1.52%- ♦ CB #402 TOP: 785.70 FES #600 INV IN: 774.20 (18 INV OUT: 753.00 (24") INV OUT: 773.70 (24") ♦ 64.09' 24" RCP @ 1.25% 7,71 ♦ 72.24' 15" RCP @ 3.46% 67.72' 18" RCP @ 1.48%- ♦ YI #201 X-TOP: 762.60 CB #403 i INV OUT: 759.50 (15") TOP: 785.50 INV IN: 775.40 (18") ♦ _ O INV OUT: 775.20 (18") ♦ FES #200 INV OUT: 757.00 (15") FES #100 ♦ INV OUT: 783.30 (15") 65.14' 36" RCP @ 1.46% 0 INV ODS7 DS DS DS CB #301 TOP: 788.00 INV IN: 783.17 (36") INV OUT: 782.95 (36"1 DB #409 LL TOP:787.10 INV IN: 783.60 (15") INV OUT: 783.40 (15") 6" D,S D S � DS - _ I� CB #406 I TOP: 786.30 to INV IN: 782.50 (15") I� 16" DS INV OUT: 782.30 (15") I gI I I_ I_ DS DS DS DS - to w O12 L 10 4 co 10" 10" co 10" m I I E 98 5' 15" RCP @ 0.91 %- - /71 If DI #504 TOP: 787.00 INV IN: 782.20 (18") INV OUT: 782.20 (18") N n v p Jill " I I D B #410 E TOP: 787.35 INV OUT: 784.25 (15") CB U- FLOW=791.96' ` INV OUT=784.95' 75.14' 15" RCP @ 0.87% O 253.15' 18" RCP @ 0.90% CB INV OUT=789.40' EX CB FLOW=791.92' INV IN (15")=788.32' INV IN (24") INV OUT=78": CB #404 CB #4,,. 1J TOP: 786.70 TOP: 786.30 0 INV IN: 776.90 (15") INV OUT: 782.30 (15") 82.05 (15") INV IN: 82.05 (15") OA INV OUT: 21.49' 15" RCP 1.16% 21.49' 15" RCP @ 1.16%L � 135.34' 8" RCP 92% A CB #405 TOP: 786.70 FES #101 170.97' 15" RCP @ 1.02% INV IN: 782.05 (15") d u INV OUT: 784.10 (15")_� INV OUT: 778.65 (15'L 80.00' 15" RCP @ 1.01 womowon� M ==on; \TOP:786.05 INV OUT: 782.95 (15") _ - - G G G 0 O1 01 I 15" RCP I, INV=796.51' I G G G G G G G EX. GAS LINE (ASSUMED LOCATION) 50 BIESECKER ROAD z SR #1408 VICINITY MAP NOT TO SCALE 03' DI (EXISTING) (505) // TOP:787.03 a/// INV OUT: 784.48 (18")��� DI GRATE=789.16' INV IN (4")=787.03' o INV OUT=786.61' a nl -aI I �x LLf- x I O GRAPHIC SCALE 25 50 100 ( IN FEET ) 1 inch = 50 ft. M 0 U Z cV � Q w Z_ i J U � 0 0 U E Q 0 O !Y U tYZCIO (.0 0) v .') Z J N O0 C W W w cfl 1. Z WU)(oF_ U F_ Z co Z w0"M 3: w Y� 6C� j Z - x U 0- LL FIRM LICENSE C-1891 'ItIltUttifpf�� CARS 8$�A 01� i ii I N�-�782.7 (I'1 Z Lu 0 U - Q mLu LU 0 0 Q � w = W (n Z C) U Lu ::) I..L O O 0 0 o 0 z O 0 0 L.L Q 0 r- w () N 04 z L7 N N 00 N O U 00 w z Coz 0 w Y O Q w 0 0 0 U w w 0 0 U) U) 0) z z Z z 2 z O z a a L1J J J 0 O Cl) w Ov z U)O u0i ci Ov Ov O0 c� W W Z Z� W U 0 p w U Lu z x z Z aw Fnw Q qt a 0 0 0 0 o 0 0 U u) U) U H 7) u) O w w w 00 w w 0 w o o Q o 0 N �N N N N N N N � O O O O O O Q rn N rn Q N cv rn o 0 0 0 0 o z SITE STORM DRAINAGE PLAN SHEET 200 SWM 3 0 • ` _ rf � say f � ' G r / 9G N\ Np, 252/ 921 Offc$N Boo 5p � / San J say 'c&- s Sag •-,. � �„ Sa% � 8� ST ORM�ATFRF NSF 4F 68' 19, 07'@) NO SURFACE WATERS, WETLANDS, REGULATORY FLOOD ZONES, PROTECTED VEGETATED SETBACKS, OR PROTECTED RIPARIAN BUFFERS ARE LOCATED ON SITE. VERIFIED BY U.S. FISH AND WILDFIRE SERVICE - NATIONAL WETLANDS INVENTORY (SEE NARRATIVE FOR MORE DETAIL). TFMap1tqRy qT q�✓AC COy �T33,6, FiyT TO 66 gpF�MUiVT o�FASFMFb ,pyC/ �N�gSF T SOIL DELINEATION LINE POST DEV. DRAINAGE AREA STORMWATER MAINTENANCE EASEMENT KEY NOTES NEW DITCH SECTION WITH RIP RAP. SEE SWM-2 FOR DIMENSIONS. PROPERTY INFORMATION: PARCEL ID NUMBER: 6726-01-35-5385 ZONING: RA-3 ACREAGE: 30.00 PROPERTY OWNER/DEVELOPER: DCA LEXINGTON PROPERTIES, LLC 500 BIESECKER ROAD LEXINGTON, NC 27295 PHONE: CONTACT: email: ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 CONTACT: STEVE M. CAUSEY, PE email: scausey@allied-engsurv.com CURVE NUMBER CALCULATIONS POST DEVELOPMENT POI 1 TYPE OF AREA SOIL GROUP CN CN SF POI TOTAL AREA SF %POI %CN WEIGHTED CN ONSITE OPEN SPACE FAIR B 68 606,273 1,139,349.00 53.21% 36.2 77 OFFSITE OPEN SPACE FAIR B 69 208,378 18.29% 12.6 ONSITE GRAVEL A 79 1,190 0.10% 0.1 ONSITE GRAVEL B 85 10,811 0.95% 0.8 OFFSITE GRAVEL B 85 1,617 0.14% 0.1 ONSITE IMPERVIOUS A,B,C 98 267,520 23.48% 23.0 FUTURE IMPERVIOUS A,B,C 98 43,560 3.82% 3.7 IMPERVIOUS AREA 28% ACRES 26.16 -7 \/Ir'InIITV RAOP NU I I U SC:ALL M 0 U Z cV w z � J U � 0 0 0 E QO Q� Z - (n Z J N o�p o w w(b0076 Z W U) (.0� ' ~'� Z wZ0M"M 3: ,(3) J Y� Co j oN Z o x 0- FIRM LICENSE C-1891 'scitt,ffi¢,,/ A sj FNG I NEF. 5�� c�E M. CN 'ems c - - 4.00 INV=1b2.B Q U O = DI m GRATE=789.16' O INV IN (4")=787.03' \\�� ui W Z p INV OUT=786.61' A ol < ` C x —� GSA \ \ \ L _ U) PLAY ND ' I �-9 I EQUOU IP ENT (TYP.) �p W O o m 0 o �+�' X__ �\ O Lo o z CB INV=792.53' \ O ��� 770 INV OLT=789.40' RAM CONC'I CcD �\ \NO \\ /Q � Q� � CcB �' � \ �oGm\` > 10 765 ZZ ZZ` / ii�oQ Ex c6 i W , �\\ 0 OHu OHu OA86° 52' 3ao. W x BX 12" W/L W ---� W 00 Cn D Z OHU OHU OHU — W— W N$T,46' 44.090M 247.530' W - WW GRAPHIC SCALE 60 0 30 60 120 rl- w U N Z cn N N 00 N O U 00 Z w CoZ 0 w Y U Iij Q Lu 2 Q EL 0 U 0 w w U) U) 0) z w z z � z p z a w J J o O n z 2 Z O� Z Z U) O C/) Ov Ov Ow c� w w w Q 0 0 0 w U z x z z Fn w w w Q qt a o w w w o o w U LD L D H L2 L2 > > > 0 > > o Q w w N N N N N N N �N 0 O O O O O O Q �z N a) W Q N N 7 O :7 O N I- W a O CDCDO d z SITE DRAINAGE PLAN SHEET 111111 24o SWM 4 ( IN FEET ) 1 inch = 60 ft. EMBANKMENT CONSTRUCTION SHALL BE MONITORED AND COMPACTION TESTED BY ON -SITE GEOTECHNICAL ENGINEER. ON -SITE SOILS MAY BE SUITABLE FOR POND BOTTOM AND EMBANKMENT FILLS. THE CONTRACTOR MAY BE REQUIRED TO OBTAIN SUITABLE SOIL FROM ON -SITE IN AREAS OUTSIDE OF THE POND LIMITS. THE OWNERS GEOTECHNICAL ENGINEER WILL APPROVE SOILS FOR SUITABLITY OF POND AND DAM EMBANKMENT CONSTRUCTION. COMPACTED MATERIAL SHALL HAVE A MAXIMUM PERMEABILITY OF 0.00001 CM/SEC. IF REQUIRED PERMEABILTY LIMITS CANNOT BE MET WITH ON -SITE SOILS, THE OWNER, ENGINEER AND GEOTECHNICAL ENGINEER SHALL DETERMINE A SUITABLE METHOD TO MEET PERMEABILITY REQUIREMENTS. THIS MAY INCLUDE IMPORT OF SOIL MATERIAL FROM OFF -SITE, AMMENDMENT WITH BENTONITE OR INSTALLATION OF IMPERMEABLE LINERS. THE CONTRACTORS BASE BID SHALL ASSUME THAT ON -SITE SOILS CAN BE UTILIZED. IMPORTED MATERIAL, SOIL AMENDMENTS AND IMPERMEABLE LINERS WILL BE CONSIDERED ADDITIONAL COST. 100 YR. PEAK: 759.41- 1 YR 24 HR PEAK: 758.07- PROVIDED WQV ELEVATION: 757.80- REQUIRED WQV ELEVATION: 757.72- NORMAL POOL: 756.00- 6'VEGETATED SHELF (6:1 SLOPE) TOP OF SHELF: 756.25 TOP OF EMBANKMENT 762.00 BOTTOM OF SHELF: 755.75 III= III-11.,, 3•� FOREBAY 15-20% OF MAIN POOL VOLUME Summary of Water Quality Management Management Aspects Pond 9 Required Provided Water Quality Volume (cf) 28,079 29,385 Water Quality Elevation (ft) 757.72 757.8 Water Quality Surface Area (sf) 9,315 13,883 2' TOP WIDTH EARTHEN FOREBAY BAFFLE (SIDESLOPES 2:1) SHWT < ELEV: NOT REQ'D PER MDC 2.00" 0 DRAWD( ORIFICE 751.00 EXISTING SOILS TO BE USED FOR POND BOTTOM AND EMBANKMENT MATERIAL TO HAVE A MAXIMUM PERMEABILITY OF 0.00001 CM/SEC. PROVIDE 8" PRE -CAST HOLE IN OUTLET STRUCTURE FOR SKIMMER DEVICE. FILL ANNULAR VOIDS AROUND SKIMMER WITH NON -SHRINK GROUT. PROVIDE FITTINGS TO TRANSITION TO 6" SKIMMER DURING THE EROSION CONTROL STAGES. 5'x5' Table 4: Sample Operation and Maintenance Previsions for Wet Ponds The enilre Split Trash+debris is present Areas of bare soil and/or The perimeter of the Met pond eroslve gullies have formed The inlet pipe is cloglged if applicable). Remove the trashldebris Reg rade the soil if necessary to t he outlet device remove the qully, plantground cover and water until it is established. Provide lime and a one-time fertiliser application. Unclog the pipe. Dispose of the sediment in a location Floating wetland island (if where it will not cause impacts applicable) to streams cr the SCM. The inlet pipe is cracked or The inlet device otherwise damaged (if Repair or replace the pipe. applicable). Erosion is occurring in the Swale I;if applicable). Sediment has accumulated to a depth greater than the original design depth for sediment storage. The lorebay Erosion has occurred. L;'eeds are present. Regrade the swale if necessary The receiving water and provide erosion control devices such as reinforced turf rnalting or riprap to avoid 'future erosion problems. Search for the source of the sediment and remedy the problem ii possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the SCM. Provide add itionaIerosion protection such as reinforced turf mallinq or nprap if needed to prevent future erosion problems. Removehe weeds. preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Best professional pracl:ices Prune according to best show that pruning is needed to Professional practices. maintain optirreal plant health. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the Plants are dead, diseased or problem and replace plants. The vegetated shelf dying. Provide a one-5m:e fertilizer application to establish the ground cover if a soil lest indicates it isnecessary. Remove the wA9ds. preferably Weeds are present. by hand. If pesticide is used, wipe it on the plants rather than sprayinq. Search for the source of the sediment and remedy the Sediment has accumulated to a problem if possible. Remove depth greater than the original the sediment and dfisperse of it design sediment storage depth. in a Iocativn where it will not cause impacts to streams or the SCM. The main treatment area Algal growth covers over 50".sir Consult a professional to of the area. remove and control the algal growth. Cattails. phragmiLes or other Remove the plants by wiping invasive plants cover 5D% of them with pesticide (do ndl the basin surface. spray). Shrubs have started to grow on Remove shrubs immediately. the embankment. Evidence of muskrat or beaver Consult a professional to The embankman.t activity is present- remove muskrats or beavers and repair any holes or erosion. A tree has staebbd to grow em Cantul a dam eafaly spelcialist. the embankment- to rentiove the tree - An annual inspection by an appropriate professicnal shows Make all needed repairs tha`, the embankment needs immedia'ely. repa ir. Clean out the outlet device and Clogging has occurred. dispose of any sediment in a location where it will not cause impacb to ntraama or the SCM The outlet device is damaged Repair or replace the ou tiet device. "Needs or volunteer trees are Remove the weeds or trees. growing on the mat. The anchor cable is damaged. Restore the anchor cable to its disconnected or missing. design slate. Erosion or other signs of Repair the damage and damage have occurred al the improve the flow dissipation outlet. structure Discharges from the wet pond are causing erosion or Contact the local NCDEQ sedimentation in the receiving Regional 011ice. water. DITCH SCHEDULE (25 YEAR STORM DESIGN) DAVIDSON CHARTER SCHOOL DAVIDSON COUNTY, NORTH CAROLINA August 12, 2022 z=U Z J Z W Q oZ W O LL � W WO w O a <Y_ wO z O W CO � O o orn W= Q LL z z = rn a U O z Q 11�zcoLLJ 0 O z m o0 > z o 0 c~n (AC) (IN/HR) (CFS) (FT/FT) (FT) ("X" : 1) (FT) (FPS) 10 2.31 0.50 1 5 1 7.60 1 8.78 1 11.40% 1 5 1 3 1 0.23 1 6.68 1 RIP RAP D 11 13.16 0.50 5 7.60 50.01 3.00% 5 3 0.76 9.05 RIP RAP D RIP RAP FOR ACCESS TO RISER REST OF WEIR: 757.8 VEGETATED SHELF RASH RACK 755.75- 756.25 r-T (6 FT WIDE) II_III IIIREINFORCED CONCRETE PIPE CLASS III (O-RING) (MIN. 557 LB/FT UNIT WEIGHT) INV: 753.80 10, TOP OF EMBANKMENT 753. " OUTLET BARREL LENGTH = 45 LF SLOPE (@7 1.5% (SQUARE DIM.) \ ANTI -FLOTATION (CONCRETE) REMOVE ORGANIC MATERIAL & ROOT MAT FROM BENEATH EMBANKMENT WET DETENTION BASIN CROSS-SECTION NOT TO SCALE PROPERTY INFORMATION: PARCEL ID NUMBER: 6726-01-35-5385 ZONING: RA-3 ACREAGE: 30.00 PROPERTY OWNER/DEVELOPER: DCA LEXINGTON PROPERTIES, LLC 500 BIESECKER ROAD LEXINGTON, NC 27295 PHONE: CONTACT: email: ENGINEER: ALLIED DESIGN, INC. 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 CONTACT: STEVE M. CAUSEY, PE email: scausey@allied-engsurv.com VICINITY MAP NOT TO SCALE SPECIFICATIONS FOR DETENTION BASIN 1. AREAS UNDER THE EMBANKMENT AND ANY STRUCTURAL WORKS SHALL BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL, ROOTS OR OTHER OBJECTIONABLE MATERIAL. UNLESS OTHERWISE NOTED, TO FACILITATE CLEAN OUT AND RESTORATION, THE BASIN AREA WILL BE CLEARED OF ALL BRUSH AND EXCESS TREES. 2. THE SUITABILITY AND ACCEPTABILITY OF ALL FILL MATERIAL WILL BE DETERMINED BY REGULAR PERIODIC SOIL ANALYSIS AND COMPACTION TEST WHICH SHALL BE MADE BY THE OWNER'S GEOTECHNICAL ENGINEER. TEST FOR SOIL ANALYSIS, MOISTURE CONTENT, AND COMPACTION ARE TO BE CONDUCTED IN ACCORDANCE WITH THE LATEST ASTM STANDARDS. COMPACTION SHALL NOT BE LESS THAN 98% OF THE MAXIMUM DENSITY FOR THE GIVEN EMBANKMENT MATERIAL AS DETERMINED BY THE ASTM D-698 AND NOT ALLOW SEEPAGE THROUGH THE DAM. CONTROLLED FILL FOR EMBANKMENT CONSTRUCTION SHOULD HAVE AT LEAST 12% FINES BY WEIGHT. SOILS WITH UNIFIED SOIL CLASSIFICATION SYSTEM GROUP SYMBOLS OF SM, SC, AND ML ARE SUITABLE FOR USE AS CONTROLLED FILL. SOILS WITH USCS GROUP SYMBOL OF CL WHICH MEET THE RESTRICTIONS FOR LIQUID LIMIT AND PLASTICITY INDEX ARE ALSO SUITABLE FOR USE, UNLESS OTHERWISE INSTRUCTED BY THE GEOTECHNICAL ENGINEER. 3. THE FILL SHALL BE CONSTRUCTED IN 6" LIFTS AND SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF THE FILL SO THAT SMOOTH HORIZONTAL PLANES ARE NOT BUILT INTO THE FILL STRUCTURE. SMOOTH HORIZONTAL PLANES SHALL BE AVOIDED BY SCARIFYING OR THE USE OF SHEEPSFOOT ROLLERS. 4. THE EMBANKMENT SHALL BE CONSTRUCTED TO A MINIMUM ELEVATION 5% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLEMENT WHEN MECHANICAL COMPACTORS ARE USED. 5. POND LINER (SODIUM BENTONITE): SPREAD POWDERED BENTONITE (UNMIXED WITH SOIL) AT A RATE OF 1 POUND PER SQUARE FOOT ACROSS THE BOTTOM OF THE WET POND, UP TO AND INCLUDING ALL OF THE SHELF. COVER BENTONITE WITH 4 INCHES (MIN.) OF TOPSOIL (SHELF) OR 6 INCHES OF SELECT FILL (SLOPES AND BOTTOM). 6. ALL AREAS OF THE BOTTOM, SIDESLOPES AND EMBANKMENTS OF THE POND SHALL HAVE 4" OF TOPSOIL AND COMPACTED IN A MANNER TO ENSURE VEGETATIVE GROWTH. 7. IF THE POND IS CONSTRUCTED IN THE SUMMER OR EARLY FALL MONTHS, IT IS ADVISED TO INSTALL SOD ON THE BOTTOM, SIDE SLOPES, AND DAM EMBANKMENTS TO ENSURE VEGETATIVE COVERAGE AND STABILIZATION. IT IS ADVISED TO INSTALL BMP/SCM PLANTINGS IN THE FALL. GENERAL SEQUENCE OF MAJOR CONSTRUCTION ACTIVITIES 1. CLEAR ONLY AREAS NECESSARY TO INSTALL EROSION CONTROL MEASURES AND INSTALL ALL MEASURES ACCORDING TO THE APPROVED PLANS. 2. INSTALL CONCRETE RISER AND BARREL STRUCTURE (WITH TEMPORARY SKIMMER ASSEMBLY) IN THE LOCATION AND AT THE ELEVATIONS INDICATED ON THE DRAWINGS. INSTALL LEVEL SPREADER AT DOWNSTREAM INVERT OF OUTLET BARREL. 3. RESEED/STABILIZE DISTURBED AREAS IMMEDIATELY AFTER FINISHED GRADES HAVE BEEN ACHIEVED. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED OVER DISTURBED AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL BE LEFT UNDISTURBED FOR AT LEAST 15 DAYS. 4. BEGIN SITE GRADING AND INSTALLATION OF ON -SITE SWALES AND STORM DRAINAGE PIPING SYSTEM. 5. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. 6. VERIFY OR RE-ESTABLISH POND VOLUME BY CLEANING OUT ALL ACCUMULATED SEDIMENT AND DISPOSING OF IT IN AN APPROVED MANNER. PROVIDE AS -BUILT SURVEY OF POND BOTTOM, TOP AND TOE OF SHELF, OUTLET STRUCTURE, WEIR AND DAM TOP. COORDINATE WITH ENGINEER TO VERIFY POND VOLUME PRIOR TO PLANTING PERMANENT WET POND LANDSCAPE MATERIALS. 7. ALL DISTURBED AREAS WITHIN THE POND SHALL BE RE -SEEDED AS REQUIRED. AT THIS TIME REMOVE THE TEMPORARY SKIMMER ASSEMBLY AND CLOSE THE BOTTOM DRAIN IN ORDER TO TRANSITION THE TEMPORARY SEDIMENT BASIN TO THE PERMANENT WET DETENTION POND. 8. INSTALL PERMANENT WET DETENTION POND LANDSCAPING PER THE PLANS AND SPECIFICATIONS DETAILED ON THIS SHEET SEED AND MAT DAM EMBANKMENT IMMEDIATELY AFTER CONSTRUCTION EARTH DAM TO BE COMPACTED TO 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-D698). NO ORGANIC MATERIAL WITHIN DAM EMBANKMENT SAND FILTER DIAPHRAGM - NCDOT 2S SAND 3' - _ CONCRETE -1IIII -III- / HEADWALL DIAPHRAGM 753.00 6" SCH. 80 6" SCH. 80 SOLID PVC PERFORATED PVC 5'Dx5'W CUTOFF TRENCH ALONG ENTIRE LENGTH OF DAM EMBANKMENT NOTES: 1. SEE SCHEDULE FOR DIMENSIONS. 2. INSTALL A FILTER BLANKET OR FILTER FABRIC BETWEEN THE RIPRAP AND SOIL FOUNDATION. 3. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL. PLAN SECTION A -A ch 0 U Z � (V } Q W Z_ U i J ° 0 0 E „ Q J 0 1--o Q 0� 0 O Z .U) z CO co C7 J J 00 N Q� Lu W LO gw co1? -6 ~ W Q Z W (n co ti Fz U) 1 CO Z co co 3: W Y O co N J O U) N Z o x a Q 0 ��=CO LL FIRM LICENSE C-1891 a Z U O Z LU < Q U 0 U a0 a � M W LU W O Q LLI U) = U LU I- LU D O a- ON O o o o U z I..f. O Q 0 Q 0 r1_ W 0 N o z Co U) CN N 00 O m z 1-- m o do = PIPE DIA w Z La = APRON LENGTH Q w 6i W = APRON WIDTH 2 Q do + La i1 0 0 0 d = APRON DEPTH L6" THICK LAYER OF #57 STONE FILTER FABRIC Outlet Pipe Diameter Discharge d50 La W dmax apron thickness NCDOT ri ra in cfs ft ft ft ft ft Class POND 24 9.47 0.50 10.0 12.0 0.8 1.1 B OUTLET STABILIZATION DETAIL NOT TO SCALE Lu Lu � � � � :5 :5 12� U) 12� U) z w rn o o O � W ZO 1-- w_ U) W Z w 0 6 6- z w :70 7E oU O w Uz z [IfO a LU L Q J z OO U O rn w LU 0 L Q J O z U1-- z O cn O w LU L HO U z K Ow w x Q O H O O U :5z U) O w 0 z d 0 rn > > > o > > W Q Q N N N 0 N O N N iz: 0 N O N co 0 N CD N O M 0 N O N N O N O N 0) O N CDON N co N O z WET POND DETAIL SHEET SHEET SWM 5 NOTE: MEASURE CLEARANCE IN FABRICATED FRAME TO VERIFY SIZE PRIOR TO FABRICATING PANELS. FIELD VERIFY STRUCTURE DIMENSIONS PRIOR TO FABRICATION. PROVIDE 1/2" CLEARANCE ALL SIDES. 6" I 5'-0" _ I 6" • • a ad • d a d ° io WELD BARS AT ALL INTERSECTION POINTS 1/2"x1-1/2"ALUMINUM FLAT BAR d e 12"x12"ALUMINUM PLATE WITH LIFT EYE STAINLESS STEEL WEDGE ANCHORS. TYP 3 EACH SIDE PLAN - RISER STRUCTURE NTS I� 8"� F� 5 1 /2'L--i d Q ° a d ° d " d - ° a, as < ° 3 3/4" O" f71N6 RUBBER° ° ° ° GASKET ° NOTE: O-RING PIPE SHALL MEET ASTM C 361 STANDARD SPECIFICATION FOR REINFORCED CONCRETE LOW -HEAD PRESSURE PIPE AND ASTM C 76 STANDARD SPECIFICATIONS FOR REINFORCED CONCRETE CULVERT, STORM DRAIN, AND SEWER PIPE. REINFORCEMENT NOT SHOWN FOR CLARITY. O-RING JOINT PIPE DETAIL NTS 5.0' COLLAR WIDTH 12" COLLAR 1 /f PROJECTION #5 REBAR ANCHORS 4.0' COLLA • • HEIGHT 12" C i 24" RCP 1 12" COLLAR 61 PROJECTION if 1 1 PRECAST BASE SECTION CONCRETE COLLAR ELEVATION NTS 3000 PSI CONCRETE COLLAR PRECAST STRUCTURE WALL + 12" 4" #5 REBAR ANCHORS AT 12" O.C. AROUND PIPE DIAMETER. DRILL 121" 6" INTO PRECAST STRUCTURE - WALL AND SET ANCHORS USING EPDXY GROUT. GROUT INSIDE OF STRUCTURE AROUND PIPE TO FILL ALL 24" RCP VOIDS. BARREL PRECAST BASE SECTION CONCRETE COLLAR SECTION NTS FOOTING OUTLINE I i B ALUMINUM SHO FABRICATED TRASH RACK (WELDED) SEE NOTES. I CONCRETE 1/2"x1-1/2"ALUMINUM FLAT BAR REMOVEABLE VALVE WRENCH WITH HAND WHEEL ON TOP. PROVIDE CHAIN AND LOCK FOR SECURING WRENCH TO TRASH RACK. 24 TOP OF PRECAST STRUCTURE 12"x12"ALUMINUM PLATE WITH LIFT EYE ALUMINUM SHOP FABRICATED TRASH RACK (WELDED) SEE NOTES. 0 N 9 d �d- 3"X3"X1/4" ALUM. ANGLE SIDE AND TOP FRAME NOTES: " TRASH RACK SHALL BE SHOP FABRICATED FROM 1/2"x1-1/2" ALUMINUM BARS • MATERIAL SHALL CONFORM TO ASTM B241 ALLOY 6061T6511 * WELDING ELECTRODE SHALL BE 4043 FILLER METAL, IN ACCORDANCE WITH AWS. • SECURELY FASTEN TRASH RACK TO CONCRETE STRUCTURE TOP WITH THREE STAINLESS STEEL WEDGE ANCHORS EACH SIDE. SECTION B-B NTS 3"x3"x1/4" ALUM. ANGLE SIDE AND TOP FRAME PAD OUTLET STRUCTURE PLAN VIEW NTS /2"IPALUM. BARS 3" O.C. =ACH FACE. WELD AT ALL CONNECTIONS 12"x12" TRASH GUARD & ORIFICE PLATE CLCV/`%I IIJIV VICVV IVIJ ' I12" SECURE STEM GUIDE BRACKET TO A __� A WALL USING EXPANSION ANCHORS VALVE STEM GUIDE OPERATING STEM EXTENSION STEM WITH 2" OPERATING NUT ON TOP ATTACH STEM TO OPERATING NUT TO PREVENT REMOVAL SECTION A -A 8" RESILIENT WEDGE GATE VALVE - M.J. ENDS 12 8" DUCTILE MAX. IRON PIPE CAST -IN -PLACE 6" BASE SECTION MINIMUM DEPTH REQ.'D TO INSTALL ASSEMBLY PROVIDE SUPPORT FOR VALVE SEAL PIPE CONCRETE COLLAR PENETRATION AROUND PIPE USING RUBBER BOOT & STAINLESS STEEL HARDWARE BOTTOM DRAIN VALVE NTS FLANGED END PIPE W/ BAR GRATE BOLTED TO FLANGE CONCRETE C/L PIPE CRADLE. EXTEND 6" OUTLET BELOW BARREL SAND. Ir 4' x 4' x 4" SCHEDULE 80 PVC TEE L----- — —� -- 3' SOLID 4" SCHEDULE 4" SLOTTED SCHEDULE 80 80 PVC PIPE - DRAIN PVC CROSS PIPE - CAP TO GRADE EACH END PLAN VIEW (NTS) FINISHED GRADE NCDOT 2S SAND FILTER 2' MIN. ATTACH ALUM. ANGLE TO RISER STRUCTURE AND BALLAST PAD USING EXPANSION ANCHORS 1/2" DIA. x 3" LONG EXPANSION ANCHOR (TYP) 8" WALL OPENING SECTION A -A NTS BARS 3" O.C. WELD AT ALL )NS 12"x12" TRASH GUARD & ORIFICE PLATE W/ 2.00" 0 DRAWDOWN ORIFICE BOTTOM DRAIN TRASH GUARD NTS FINISHED GRADE FILTER DIAPHRAGM OUTLET BARREL CONCRETE PIPE CRADLE, CONCRETE PIPE CRADLE. EXTEND 6" BELOW SAND. DRAIN TO GRADE EXTEND 6" BELOW SAND. 4" SOLID SCHEDULE PVC PIPE - 6" SCHEDULE PVC N SECTION VIEW (NTS) SLEEVE THROUGH CRADLE SECTION ALONG PIPE ELEV. 760.40 TEMPORARY 2.60' RISER STRUCTURE ELEV. 760.40 12"x12" TRASH TO BE REMOVED AT CONVERSION OF GUARD & ORIFICE SEDIMENT BASIN TO WET POND_ PLATE TEMPORARY 2.60' RISER STRUCTURE �EE THIS SHEET DRAWDOWN SEE THIS SHEET -ATO BE REMOVED AT CONVERSION OF I SEDIMENT BASIN TO WET POND. FOR ALUMINUM I ORIFICE. PLUG ORIFICE UNTIL FOR ALUMINUM TRASH RACK COMPLETED CONVERSION TRASH RACK 4" SLOTTED SCHEDULE 80 PVC CROSS PAD FOR PIPE - CAP BOTH ENDS RISER STRUCTURE FLANGED END PIPE W/ BAR GRATE BOLTED TO FLANGE DETAILS FROM SEDIMENT BASIN TO WET I DETAILS ELEV. 757.80 POND. v ELEV. 757.80 dZ NOTE: 12"X12" TRASH MINIMUM TOP PRECAST OUTLET STRUCTURE, GUARD & ORIFICE RISER SECTION INCLUDING CAST IN PLACE BALLAST PAD PLATE W/ 2.00" 0 HEIGHT SHALL SHALL HAVE A MINIMUM WEIGHT OF 39,180 DRAWDOWN BE 5.00' lbs. (INCLUDING 24" BLOCKOUT, AND 4" ORIFICE. PLUG ORIFICE UNTIL 12"x12" TRASH ORIFICE. CONTRACTOR SHALL SUBMIT COMPLETED CONVERSION GUARD & ORIFICE SHOP DRAWINGS TO ENGINEER FOR FROM SEDIMENT BASIN TO WET APPROVAL PRIOR TO ORDERING POND. PLATE O 2.00" f6 THE STRUCTURE. NORMAL POOL DRAWDOWN Z-*NORMALPOOL ORIFICE ELEV. 756.00 8" WALL OPENING INVERT SLEEVES FOR REBARB PROVIDE STEPS IN ACCORDANCE ELEV. 755.75 PENETRATIONS BY 6" MIN. WALL W/ ASTM-478 CO -POLYMER PRE -CASTER THICHNESS 8" WALL POLYPROPLYENE STEEL 6" MIN. WALL CONCRETE COLLAR OPENING INVERT REINFORCED STEPS 16" O.C. THICHNESS BY CONTRACTOR 5-0" ELEV. 755.75 5'-0" SOLID PRECAST SEE DETAILS HOLE FOR 8" BOTTOM DRAIN CONCRETE BOX. 1, 0„ SHALL BE CORE DRILLED JOINT DESIGN SHALL CONFORM TO WAFFLE STYLE kk IN THE FIELD BY CONTRACTOR. ASTM C-478. JOINT SHALL BE BOX NOT ACCEPTABLE. OMIT REINFORCING THIS AREA. SEALED USING BUTYL RUBBER BLOCK OUT FOR (SEE OFFSET IN PLAN VIEW) 24" RCP SEALANT CONFORMING TO 24" RCP24" RCP BY ASTM-990. PARGE JOINTS INV. 753.8 BARREL PRECASTER INSIDE AND OUT WITH NON- 6' MIN. INV. 751.00 8" DRAIN PIPE &VALVE SHRINK GROUT. BASE VIBRATE CONCRETE SEE DETAIL SECTION TO ELIMINATE VOIDS INVERT FLANGED END PIPE HEIGHT AROUND REBAR (TYP). 753.80 W/ BAR GRATE BOLTED 3000 PSI TO FLANGE CONCRETE 1'-0" 1'-0" • • • • • = 6" SEDIMENT STORAGE • • • • • 10' WIDE x 2'-0" DEEP x VIBRATE 3,000 PSI INV. 750.50 o. no 010' LONG FIELD -PLACED CONCRETE " BALLAST PAD (IN 2 POURS) TO ELIMINATE VOIDS 3" MIN. CLEAR 0/0 0 AROUND REBAR (TYP). 3" MIN. 10' WIDE x 2'-0" DEEP x (TYP) CLEAR 10' LONG FIELD -PLACED (TYP) BALLAST PAD (IN 2 POURS) 1'-6" o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1'"6�� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 #5 GRADE 60 REBAR #5 GRADE 60 REBAR CONTINUOUS CONTINUOUS 12" O.C.E.W, TIE AT 18" SURGE STONE 12" O.C.E.W, TIE AT 18" SURGE STONE ALL LAPS AND STABILIZATION ALL LAPS AND STABILIZATION INTERSECTIONS INTERSECTIONS 10'-0" OUTLET STRUCTURE SECTION A -A NTS 10'-0" OUTLET STRUCTURE SECTION B-B NTS M O 0 Z cV Z_ J U � Of 0 U E Q 0 o O Z 0 (.C> 0) (n Z J N aO6 co C W W w cfl a0 -6 Z LuU) � �' ~ Z c) Z w0"M 3: J Y fl 6C� � N oZ 0 x 0. U 0_ li FIRM LICENSE C-1891 CA RC) 2 = of 4 O� �• F� a r�. Q z (D o zLu 0 Q 0 U a0 U Q � ~ mLuLLI olf 0 Q Lu U) = U Lu cn F--- z Lu mO ::) I..L O O 0 o 0 z O L.L 0 0 Q 0 r— w Q N 04 Z c/) N N N O coZ U00 0 Z w w Y O Q w 0 0 C)0 w w U) U) (0 z z z O z W z a¢ z _j O 0 2 O 0 Z 00 z Of 00 ai O O C/) w O w U 00 z O Ov z O w O w U LLI za z Fn w w x Q qt z a 0WWwo0o U D D D H L D owwwoww 0 ¢ w w FN N N O N O N O N O N O N O QN N � \ W O 0')O O N 0 C:) 0 0 O z OUTLET STRUCTURE DETAIL SHEET� SWM 6 PROPERTY INFORMATION: KC, PARCEL ID NUMBER: 6726-01-35-5385 p MCD€Q Stormwater Design Manual ZONING: RA-3 ACREAGE: 30.00 (D Z 99 JP w < z -- * Wetlands Irt Plant SSelection_ StOC171'1�f01"tCi� Wet Ponds PROPERTY OWNER/DEVELOPER: �hti V p JO DCA LEXINGTON PROPERTIES, LLC �� J5 12� GRAPHIC SCALE 500BIESECKNCROAD LEXINGTON, NC 27295 > p Z U O The interplay between plants, hydrology, and soil ccampositlOn are vital to the water quality PHONE: N Q = p c� 10 20 ao function of stormwater wetlands and wet detention basins. Therefore, It is essential that CONTACT: z� z i •• Q L O selected plant materialsare appropriate for the anticipated conditions. Hydrologic zones email: � SITE � (D •U) � OZ M CO o describe the -degree to which an area is inundated by water. Pliant selection should be z J : co a IN FEET ( ) consistent with anticipated hydrology_ These inundation levels have been divided into four ENGINEER: Q� w w co � � J � o 06 1 inch = 10 ft. zones shown below. The descriptions of these zones in this chapter are meant to depict them p p p ALLIED DESIGN, INC. 4720 KESTER MILL ROAD B/ESECKERRD 0 Z_ Q —, F_ = LLI ti 0 In only the broadest terms. For specific design guidance and recommended plant species. WINSTON-SALEM, N.C. 27103 Z � (� � j Z cc i CO please see the Stormwater Wetland and Wet Detention Basin chapters of this manual_ PHONE: (336) 765-2377 A W w Oco CONTACT: STEVE M. CAUSEY, PE m J Y Qj O O email: scausey@allied-engsurv.com 2� oN Z 0 X a c Deep Pool - open water and permanent deep pools ranges are best colonized by plants �o�` Q t a- U_ with submerged roots. The function of vegetated deep pools areas is to slow flow o velocities and trap sediment, to absorb nutrients in the water column, improve oxidation and create habitatfor wildlife and mosquito predators such as frogs, fish, and dragonfly nymphs during dry times - Shallow Walter - Shallow Water includes all areas that are inundated by the normal pool to a depth up to 9 inches- This zone does became drier during periods of drought_ Shallow water zones, such as littoral shelves should be vegetated with emergent plants and provide some of the best treatment zones in the wetland - Shallow Land - The shallow land zone is the temporary storage volume portion of a Wet Pond or Stormwater Wetland. The primary landscaping objectives for this zone are to stabilize the slopes characteristic of this zone and optimize pollutant removal. Shallow land zones should be planted with wetland vegetation capable of growing in alternating dry and inundated conditions_ Upland - This zone extends above the maximum design water surface elevation (never inundated) and often includes the outermost buffer of a pond or wetland. Plant selections should be made based on soil condition, slope stability, light, ease of (maintenance, and function within the landscape because little or no water inundation will occur_ _ . rrorwerrtu+ NCDEQ Stormwater Design Manual a�nry Plant 'Placement • The type of vegetation shall be restricted on dams and berms that impound water either permanently or temporarily during storm events. This restriction does not apply to cut slopes that form pond banks, only to the top, and front and back embankment slopes of dams and berms_ Trees or woody shrubs shall not be planters on water impounding dams and berms. This helps avoid channeling or piping of impounded water along roots, damage to the integrity of dams and berms should trees topple, and to enable inspection of the SCM. Only non -clumping turf grasses shall be planted on water impounding darns and berms. Non -clumping turf grasses allow for unobstructed visibility of dam and berm slopes for detecting potential) dam safety problems such as animal burrows, slumping, sink holes, or fractures in the berm and reduce the risk of erosion on embankments- • Planting of trees and shrubs should not be located where they would adversely impact inspection and maintenance access pathways, inlet or outlet pipes, or manmade drainage structures such as spillways or flow spreaders. Species with rots that seek water (e.g., willow and poplar), should be avoided within 5+0 feet of pipes or manmade structures. This also allow for future inspection and maintenance activities, and to avoid shading of areas intended to be maintained in grass. • All landscape material, including grass, should be planted in good topsoil_ Native underlying soils may be suitable for planting if amended with sufficient quantities of well -aged compost tilled into the subgrade. Compost used should meet specifications for Grade A compost quality. • Soil in which trees or shrubs are planted may need additional enrichment or additional compost top -dressing depending on the results of soil analysis. Consult a plant nursery, landscape professional, or arborist. for site -specific recommendations- • Evergreen trees and trees which produce relatively little leaf -fall are preferred in areas draining to a detention device. Leaf litter has the potential to accumulate in and around outlet devices, which can clog small weirs or orifices. • Trees should be set back so that branches do not extend over the permanent pool of a detention device (to prevent leaf -drop into the water and clogging issues)- • Drought -tolerant species are recommended. CARDINAL FLOWER JOE PYE WEED SWAMP MILKWEED MARSH HIBISCUS/ROSE MALLOW VICINITY MAP NOT TO SCALE NORMALPOOL U VEGETATED LITTORAL SHELF DETAIL GENERALNOTES 1. ALL AREAS OF THE BOTTOM, SIDESLOPES AND EMBANKMENTS OF THE POND SHALL HAVE 4" OF TOPSOIL AND COMPACTED IN A MANNER TO ENSURE VEGETATIVE GROWTH. AS SOON AS THE SLOPES ARE CONSTRUCTED, IMMEDIATELY SEED AND STABILIZE WITH STRAW. WITHIN THE FIRST 90 DAYS, CHECK SLOPES AFTER RAIN EVENTS FOR RUTTING AND SETTLING. STABILIZE AS NEEDED WITH STABILIZATION MATTING (2-YEAR RATED). 2. IF THE POND IS CONSTRUCTED IN THE SUMMER OR EARLY FALL MONTHS, IT IS ADVISED TO INSTALL SOD ON THE BOTTOM, SIDE SLOPES, AND DAM EMBANKMENTS TO ENSURE VEGETATIVE COVERAGE AND STABILIZATION. 3. SHRUBS SHALL NOT BE PLANTED ON FILL EMBANKMENTS THAT IMPOUND WATER, AND SH, NOT BE PLANTED WITHIN 10 FEET OF ANY STORM DRAINAGE STRUCTURE. A TURF GRASS MIX WILL BE PROVIDED OVER ALL DISTURBED AREAS IN ACCORDANCE WITH SEEDING SPECIFICATIONS. 4. POND PLANTS ARE SHOWN SCHEMATICALLY FOR RELATIVE PLACEMENT ABOVE/BELOW THE MIDPOINT ON THE SHELF. REFER TO "PLANT LIST" CHART (THIS SHEET) FOR QUANTITIES. DISTRIBUTE THE PLANTS THROUGHOUT, IN GROUPS OF 3 OR MORE. 5. CONTRACTOR TO PROVIDE OWNER WITH A 2-YEAR (MINIMUM) WARRANTY FOR PLANT MA TE RIAL SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AGAIN AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (-12 MONTHS) TO PREVENT STRANGLING OF PLANTS. PLAN FOR MINIMAL USE OF HERBACIDES, FERTILIZERS, PESTICIDES OR SOIL AMENDMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE OWNER/ENGINEER WITH 'PLACE OF ORIGIN' FOR ALL SPECIES, PRIOR TO ORDERING. MATERIAL SHOULD ORIGINATE WITHIN NORTH CAROLINA, PREFERABLY WITHIN FORSYTH COUNTY OR A NEIGHBORING COUNTY. MDC 11. VEGETATION. The following criteria apply to vegetation in and around the wet pond: (a) The dam structure, including front and back embankment slopes, of the pond shall be vegetated with non-cllurmping turf grass; trees and woody shrubs shall not be @Ilowed , and (b) The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous, native vegetation at a minimum density of 50 plants per 200 square feet of shelf area. Table 3: Plants for Submerged and Partially Submerged Vegetated Shelves Asdepias lnramala Swamp Milkweed Carex teraera Quill sedge Chelone glabra While Turlleheaid + + + + + + + + + + + + + Eupar6nadaJ^rs dubju& Dwarl Jooe Pye Weed + + + + + + + + + + + + + + + + + + + + + + Eupat"ta^s Ii5lubsu-s Joe Pye Weed 30 JP + + + + + + + + + + + Eurlaf&Ad6Jphus rnacdatus Spotted Irurrpe'tweed + + + + + + + + + + + + + + + + Hibksous ooccoileus Scadel rose rnallow + + + + + + * + ++ ++ ++ ++ 137CF Hfbiscus aavr3 a r ea rasema w►� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + K aSfefefttlrya virgrrbca Seashore Mallow +++ +++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + tohelra oar�1Oaks Cardinal flower + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Lobelia elangata Longleaf lobelia LIJr� 5rPfidfrrfCa Great Glue Lobelia WET DETENTION POND 1 PLANT LIST l-s"hynrhos,pora rokarata � 5tarrush whiletop SUBMERGED AND PARTIALLY SUBMERGED PLANTS ALLOWED FOR VEGETATIVE SHELVES (SEE TABLE 3) 695 PLANTS TOTAL Z;;aGC-rlaUmDardwimr Nairrovypiumegrass SIZE AT SYMBOL QUANTITY COMMON NAME BOTANTICAL NAME SPACING SOURCE PLANTING JP 229 JOE PYE WEED EUPATORIUM FISTULOSUM PLUG EVENLY SM 99 SWAMP MILKWEED ASCLEPIAS INCARNATA PLUG MELLOW DISTRIBUTED 2' MH 120 MARSH HIBISCUS HIBISCUS MOSCHEUTOS PLUG MARSH FARM O.C. CF 247 CARDINAL FLOWER LOBELIA CARDINALIS PLUG FIRM LICENSE C-1891 $t1It3t#tit pf10 N CARP f$�� =p O ESS j"0% 0tl ZZ M.Co a Z U o Z LU Iry Q U 0 U O 1: D Im LU W 0 0 Q W Z LU= C� U W Z LU OU O O 0 o o Z O � � 0 Q 0 rl- W U N o Z o CN N 00 N o z U m w z m p LLJ Y U Iii of p U 0 Q� 0-1 LU LU 0_ 0_ U) U) U z U0 0 LU) ZO z Q Q ~O O w J J O O U U a Of Of z z z z U) 0OU OU Ow O LUw w z z 0 0 0 w 0 z Fn F x z w w W W¢ � a :�E 000 ZZ 0 0 0 rn U) U F5 (f) O W W W Cp w w 0 W W o Q W o N N N N N N N N H Q N N N- N 0 Q NN Nn -N � W N0-OON nr` 0 0 0 0 0 O z WET POND LANDSCAPING PLAN SHEET SWM 7