Loading...
HomeMy WebLinkAboutSW6110103_Supplement Form_20110201Permit (to be provided bye w�Q�; WW nT ®RSTORMWATER MANAGEMENT PERMIT APPLICATION FORMh NC®ENR 401 CERTIFICATION APPLICATION FORM o INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak Flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? JSOC, SOF C4 Facility ILI 66362) Jason Sesler (919)325-4777 1/20/2011 Drainage Area #1 85,000.00 ft2 58,400.00 ft2 68.7% % 1.00 in 3.Zu in 5.22 inlhr /s ft'Isec 0.15 ft3/sec -1.60 ft3/sec 4,750.00 ft3 6,991.00 ft3 ft3 ft3 ft3 ft3 ft3 Wagram 0.30 in/hr 235.50 fmsl 3.29 days N/A in N/A ft N/A #57 Stone 04 OK for non -SR waters OK Y (Y or N) OK FES 0 8 2011 i i .° SEAL 3-4177F; llilll'�t1� Fonn SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Trench Elevations Bottom elevation 244.00 fmsl OK Storage/overflow elevation 246.65 fmsl Top elevation 248.63 fmsl Trench Dimensions Length (long dimension) 110.00 ft Width (short dimension) 32.00 ft Height (depth) 4.63 ft OK Additional Information Maximum volume to each inlet into the trench? 0.52 ac-in OK Length of vegetative filter for overflow 60.00 ft OK Number of observation wells 3 OK Distance to structure >15 ft OK Distance from surface waters >100 ft OK Distance from water supply well(s) >100 ft OK Separation from impervious soil layer >2 ft OK Depth of naturally occuring soil above SHWT 8.00 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Captures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided 3rass Channels, Inlets, Vortech (Water Quality) Chambers Form SW401-Infiltration Trench-Rev.4 Parts I. & 11. Design Summary, Page 2 of 2 Permit (to be provided by OWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan n' als Sheet No. {LAOS <56 I os' 1. Plans (1" - 50' or larger) of the entire site showing: C —5-1$ - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Trench dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and PLIVS - Boundaries of drainage easement. c-SOIr c-s t o 2 Partial plan (1" = 30' or larger) and details for the infiltration trench showing: 6-'1 R1 C6) 0S - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and /) I P%9rJ5 -Pretreatment device. 5�03. Section view of the infiltration trench (1" = 20' or larger) showing: -Pretreatment and treatment areas, and G9u4 dOl+9Jt -Inlet and outlet structures. 6-g-06 �f4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. S6q�oJ�/ 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils PLA rlS investigation request form. County soil maps are not an acceptable source of soils information. a 10 ( 6. A construction sequence that shows how the inftlration basin will be protected from sediment until the entire drainage area is stabilized. 6"gL.CS 7. The supporting calculations. q i7AArg 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. N1q 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 1 of 1