HomeMy WebLinkAboutNCC205470_NOT Closeout Documents_20230109North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Wayne Project: Elroy Commons River basin: Neuse
Person financially responsible: Elroy Commons, LLC — Robert Ivey, Managing Project #: WAYNE-2021-008
Member
Address: 314 NC HWY I I I S, Goldsboro, NC 27534
1. Project Location: Mollie Drive, Goldsboro
Pictures: No
2. Weather and soil conditions: Sunny, warm, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one on site Title:
Inspection report: Sent Report Date given/sent: September 23, 2022
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the
10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a
Notice of Termination (NOT). The NOT is available at: https:Hedocs.deg.nc.gov/Forms/NCG01-Termination. Please
note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: September 22, 2022 Time arriving on site: 1:30 PM Time leaving site: 1:45 PM
cc: