Loading...
HomeMy WebLinkAboutNCC200205_NOT Closeout Documents_20230109North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Donnie Club - Phase 1 Cottages River basin: Cape Fear Person financially responsible: Hainoa, LLC - Clint J Tolbert, NC Agent/Dir. of Project #: MOORE-2020-029 Agromoney/Proj Mgr/Do NCC200205 Address: P.O. Box 82545, Lincoln, NE 68501 1. Project Location: Beulah Hill Church Road, West End Pictures: No 2. Weather and soil conditions: Cloudy/partly sunny workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Shane Misner Inspection report: Sent Report 9. Corrective action needed: Title: Facilities Manager Date given/sent: March 24, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: March 18, 2022 Time arriving on site: 2:00 PM Time leaving site: 2:42 PM cc: