HomeMy WebLinkAbout#672_2016_0719_BS_FINAL
INSPECTION REPORT ROUTING SHEET
To be attached to all inspection reports in-house only.
Laboratory Cert. #: 672
Laboratory Name: Piedmont Triad Regional Water Authority
Inspection Type: Technical Assistance
Inspector Name(s): Beth Swanson
Inspection Date: 7/19/2016
Date Report Completed: 7/21/2016
Date Forwarded to Reviewer: 7/22/2016
Reviewed by: Nick Jones
Date Review Completed: 7/22/2016
Cover Letter to use: Insp. Initial Insp. Reg.
Insp. No Finding Insp. CP
Corrected Insp. Reg. Delay
Unit Supervisor/Chemist III: Gary Francies
Date Received: 7/22/2016
Date Forwarded to Admin: 7/27/2016
Date Mailed:
_____________________________________________________________________
Special Mailing Instructions:
On-Site Inspection Report
LABORATORY NAME: Piedmont Triad Regional Water Authority
NPDES PERMIT #: NC0087866
ADDRESS: 7297 Adams Farm Rd
Randleman, NC 27317
CERTIFICATE #: 672
DATE OF INSPECTION: July 19, 2016
TYPE OF INSPECTION: Technical Assistance
AUDITOR(S): Beth Swanson
LOCAL PERSON(S) CONTACTED: Kimberlie Temple
I. INTRODUCTION:
This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater
Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A
NCAC 2H .0800 for the analysis of environmental samples.
II. GENERAL COMMENTS:
Ms. Kimberlie Temple accepted the offer of technical assistance after getting two unacceptable results
on Suspended Residue Proficiency Testing (PT) samples. The laboratory was given the opportunity to
analyze two consecutive quick response PTs with acceptable results in lieu of decertification.
During the technical assistance visit, one PT and a discharge sample were analyzed in front of the
auditor. The other PT was analyzed the following day and both PTs were within acceptance limits.
Suspended Residue was the only parameter reviewed and nothing was revealed as the cause of the
unacceptable results.
The laboratory submitted their Standard Operating Procedure (SOP) document in advance of the
inspection. This document was reviewed and editorial revision requirements and recommendations
were made by this program outside of this formal report process. Although subsequent revisions were
not requested to be submitted, they must be completed by July 21, 2017.
III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
No Findings were noted.
IV. PAPER TRAIL INVESTIGATION:
No paper trail was conducted due to the nature of the inspection.
V. CONCLUSIONS:
No Findings were noted during the inspection. The inspector would like to thank the staff for their
assistance. No response is required.
Report prepared by: Beth Swanson Date: July 21, 2016
Report reviewed by: Nick Jones Date: July 22, 2016