Loading...
HomeMy WebLinkAbout#5489_2016_0216_JS_FINAL INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5489 Laboratory Name: PPG Industries Fiber Glass Products, Inc. Inspection Type: Field Maintenance Inspector Name(s): Jason Smith Inspection Date: February 16, 2016 Date Report Completed: March 14, 2016 Date Forwarded to Reviewer: March 14, 2016 Reviewed by: Beth Swanson Date Review Completed: March 15, 2016 Cover Letter to use: Insp. Initial Insp. Reg. Insp. No Finding Insp. CP Corrected Insp. Reg. Delay Unit Supervisor/Chemist III: Todd Crawford Date Received: March 18, 2016 Date Forwarded to Admin: March 31, 2016 Date Mailed: March 31, 2016 _____________________________________________________________________ PAT MCCRORY Governor DONALD R. VAN DER VA ART Secretary S. JAY ZIMMERMAN Director Water Sciences Section NC Wastewater/Groundwater Laboratory Certification Branch 1623 Mail Service Center, Raleigh, North Carolina 27699-1623 Location: 4405 Reedy Creek Road, Raleigh, North Carolina 27607 Phone: 919-733-3908 \ FAX: 919-733-6241 Internet: http://deq.nc.gov/about/divisions/water-resources/water-resources-data/water-sciences-home-page/laboratory-certification-branch March 31, 2016 5489 Mr. Richard Young PPG Industries Fiber Glass Products, Inc. 940 Washburn Switch Road Shelby, NC 28150- SUBJECT: North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) Maintenance Inspection Dear Mr. Young: Enclosed is a report for the inspection performed on February 16, 2016, by Jason Smith. Since the Finding(s) cited during the inspection were all corrected prior to the completion of the enclosed report, a response is not required. The staff is commended for taking the initiative in correcting the Findings in such a timely manner. For Certification maintenance, your laboratory must continue to carry out the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by electronic mail, or if you have questions or need additional information, please contact me at (919) 733- 3908 ext. 251. Sincerely, Todd Crawford Technical Assistance & Compliance Specialist NC WW/GW Laboratory Certification Branch Attachment cc: Dana Satterwhite, Jason Smith, Central Files On-Site Inspection Report LABORATORY NAME: PPG Industries Fiber Glass Products, Inc. NPDES PERMIT #: NC0004685 ADDRESS: 940 Washburn Switch Road Shelby, NC 28150 CERTIFICATE #: 5489 DATE OF INSPECTION: February 16, 2016 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Jason Smith LOCAL PERSON(S) CONTACTED: Richard Young, John Littlejohn, Guy O’Connor, Linda Bridges, and Tim Ellis I. INTRODUCTION: This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory Certification (NC WW/GW LC) program to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the analyses and the laboratory is commended for voluntarily maintaining Standard Operating Procedures (SOPs) for all parameters. Proficiency Testing (PT) samples for the 2016 proficiency testing calendar year have not yet been analyzed. The laboratory is reminded that these results must be submitted to this office directly from the vendor by September 30, 2016. Contracted analyses are performed by Pace Analytical Services, Inc. - Huntersville (Certification #12) and Research & Analytical Laboratories (Certification #34). Current Quality Assurance Policies for Field Laboratories and Approved Procedures for the analysis of the facility’s currently certified parameters were provided at the time of the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Documentation Comment: The traceability log did not include the vendor. The Quality Assurance Policies for Field Laboratories document states: All chemicals, reagents, standards and consumables used by the laboratory must have the following information documented: Date Received, Date Opened (in use), Vendor, Lot Number, and Expiration Date. This Requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., a statement that the traceability log was revised to include vendor and put into use on February 24, 2016) was received by email on February 24, 2016. No further response is necessary for this Finding. Page 2 #5489 PPG Industries Fiber Glass Products, Inc. Comment: Instrument identification was not documented on the benchsheet. The NC WW/GW LC Approved Procedure for the Analysis of pH, NC WW/GW LC Approved Procedure for the Analysis of Specific Conductance (Conductivity), NC WW/GW LC Approved Procedure for the Analysis of Dissolved Oxygen, NC WW/GW LC Approved Procedure for the Analysis of Temperature, and NC WW/GW LC Approved Procedure for the Analysis of Total Residual Chlorine documents state: The following must be documented in indelible ink whenever sample analysis is performed: Instrument identification. This Requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., a statement that all benchsheets have been updated to include the instrument serial number and put into use on February 24, 2016) was received by email on February 24, 2016. No further response is necessary for this Finding. Proficiency Testing Recommendation: The laboratory has a new automatic pipettor that will be used for preparation of the Total Residual Chlorine (TRC) Proficiency Testing (PT) sample. It is recommended that the automatic pipettor have its accuracy verified prior to use. The laboratory must verify the automatic pipettor accuracy once every twelve months (preferably shortly before being used for PT preparation). Comment: Preparation of the TRC PT sample was not documented. The NC WW/GW LC Proficiency Testing Requirements document states: PT samples received as ampules must be diluted according to the PT provider’s instructions. The preparation of PT samples must be documented in a traceable log or other traceable format. This Requirement is a new policy that has been implemented by our program since the last inspection. Notification of acceptable corrective action (i.e., a statement that PT sample preparation will be documented and filed with the results beginning with the next PT study and the SOP has been updated to reflect this) was received by email on February 24, 2016. No further response is necessary for this Finding. Comment: The laboratory was not analyzing PT samples in the same manner as environmental samples. Known standards from the PT vendor were analyzed along with the PT samples, but not with environmental samples. The NC WW/GW LC Proficiency Testing Requirements document states: All PT samples are to be analyzed and the results reported in a manner consistent with the routine analysis and reporting requirements of compliance samples and any other samples analyzed according to the requirements of 15A NCAC 2H .0800. Notification of acceptable corrective action (i.e., a statement that known standards from the vendor will be performed annually, but more than 30 days prior to PT sample analysis beginning this year and the SOP was updated to reflect this) was received by email on February 24, 2016. No further response is necessary for this Finding. Comment: The laboratory was not documenting PT sample analyses in the same manner as environmental samples. The NC WW/GW LC Proficiency Testing Requirements document states: All PT sample analyses must be recorded in the daily analysis records as for any environmental sample. This serves as the permanent laboratory record. Notification of acceptable corrective action (i.e., a statement that PT sample analyses will be documented on the daily benchsheets beginning with the next PT study and the SOP was updated to reflect this) was received by email on February 24, 2016. No further response is necessary for this Finding. Temperature – Standard Methods, 2550 B-2000 (Aqueous) Comment: Samples at Outfall 002 were not analyzed within the holding time (immediately). The laboratory was under the impression that samples were to be analyzed within 15 minutes. The Code of Federal Regulations, Title 40, Part 136; Federal Register Vol. 77, No. 97, May 18, 2012; Table II states: Temperature Maximum Holding Time: Analyze. Notification of acceptable corrective action (i.e., a statement that the benchsheet and SOP were updated February 24, 2016 to indicate immediate Page 3 #5489 PPG Industries Fiber Glass Products, Inc. analysis and Temperature samples are now analyzed immediately) was received by email on February 24, 2016. No further response is necessary for this Finding. Total Residual Chlorine – Hach 10014 ULR (Aqueous) Comment: Hach Absorbance check standards were being used for daily meter verification. The NC WW/GW LC Approved Procedure for the Analysis of Total Residual Chlorine states: General absorbance standards (e.g., DR/check) supplied by some manufacturers cannot be used for the check standard. Gel- type standards may be used for this purpose. Notification of acceptable corrective action (i.e., a statement that Hach TRC gel standards were ordered, received, assigned a true value, and will be analyzed each day of sample analysis beginning the next time samples are analyzed) was received by email on March 14, 2016. No further response is necessary for this Finding. Conductivity – Standard Methods, 2510 B-1997 (Aqueous) Comment: The Automatic Temperature Compensator (ATC) has not been verified. The NC WW/GW LC Approved Procedure for the Analysis of Specific Conductance (Conductivity) states: The ATC must be verified annually (i.e., 12 months) at two temperatures by analyzing a standard or sample at 25°C (the temperature that conductivity values are compensated to) and a temperature(s) that brackets the temperature ranges of the environmental samples routinely analyzed. This may require the analysis of a third temperature reading that is > 25°C. Notification of acceptable corrective action (i.e., a statement that the ATC verification will be performed every 12 months and a copy of an acceptable ATC verification performed on March 17, 2016) was received by email on March 11 and 18, 2016. No further response is necessary for this Finding. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing original records (e.g., laboratory benchsheets, logbooks, etc.) and contract lab reports to Discharge Monitoring Reports (DMRs) submitted to th e North Carolina Division of Water Resources. Data were reviewed for May and July, 2015. The following errors were noted: In order to avoid questions of legality, it is recommended that you contact the appropriate Regional Office for guidance as to whether an amended Discharge Monitoring Report will be required. A copy of this report will be made available to the Regional Office. V. CONCLUSIONS: All Findings noted during the inspection were adequately addressed prior to the completion of this report. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Jason Smith Date: March 14, 2016 Report reviewed by: Beth Swanson Date: March 15, 2016 Date Parameter Location Value on Benchsheet Value on DMR 5/12/15 pH Effluent 6.9 S.U. 6.2 S.U. 5/12/15 Dissolved Oxygen Effluent 6.2 mg/L 6.9 mg/L