HomeMy WebLinkAboutSW3210601_Application_20210609DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
&o- Dg —2,021
V j l 5 2- 7- 16 91
1 SU_)'321 0(o0 1
Applicable Rules:
11 (select all that apply)
❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph Il - Post Construction
❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ Mgmt Plan:
r
State of North Carolina RECRVED
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources JUN 09 2021
STORMWATER MANAGEMENT PERMIT APPLICATION F R-LAND QUALITY
This form may be photocopied for use as an original WATER PERMITTINC
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Custom Plastics Phase I BuildinLy Expansion
2. Location of Project (street address):
1735 Heilig Road
City:Granite Quarry County:Rowan Zip:28072
3. Directions to project (from nearest major intersection):
Heading North on I-85 from Charlotte, Take the iulian Road exit and head southeast. Cross over Old
Concord Road. iulian Road turns into Heilig Road. Site is on the Right.
4. Latitude:350 37 16.65" N Longitude:800 28' 22.47' W of the main entrance to the project.
II. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt
tRenewals with mod Rations also requires SVM-102 - Renewal Application Form
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from
DEMLR requesting a state stormwater management permit application, list the stormwater project number,
if assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
❑NPDES Industrial Stormwater
®Sedimentation/Erosion Control: 4.38 ac of Disturbed Area
❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permiffrosion Control Approval Letter - Rowan County Environmental
Management. Custom Plastics. Permit Dated 11-13-2018.
5. ,Is the project located within 5 miles of a public airport? ❑No ®Yes
If yes, see S.L. 2012-200, Part VI: httl2:/Iportal.ncdenr.org/web/lr/rules-and-regulations
Form SWU-101 Version Oct. 31, 2013 Page 1 of 6
1
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
The Net-hncrease in Impervious area will be treated via a sand filter. The sand filter will treat the equivalent
impervious area from the parking lot at the front of the site.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the Yadkin-Peedee River basil.
4. Total Property Area: 24.61 acres
5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+:24.61 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water
(MHW) line, and coastal wetlands landward fivin the NHW (or MHb'V) line. The resultant project area is used to
calculate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (or MHW) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 34.42 %
9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered
stornavater BMP. For low density and other projects, use I for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drauia e Area 1
Drainage Area _
Drainage Area _
Drainage Area _
Receiving Stream Name
Crane Creek
Stream Class *
C
Stream Index Number *
12-115-(2)
Total Drainage Area (sf)
108,421
On -site Drainage Area (sf)
108,421
Off -site Drainage Area (sf)
0
Proposed bn ervious Area** (sf)
0
Impervious Area** (total)
64.31
Impervious— Surface Area
Drainage Area 1
Drainage Area _
Drainage Area _
Drainage Area _
On -site Buildings/Lots (sf)
0
On -site Streets (sf)
0
On -site Parking (sf)
0
On -site Sidewalks (sf)
0
Other on -site (sf)
0
Future (sf)
Off -site (sf)
Existing BUA*** (sf)
69,728
Total (sf):
69,728
Stream Class and Index Nttrnber can be determined at: http://portal.ncderir.org/zveb/zvdJps/csu/classifications
Imppervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidezvalks, gravel areas, etc.
Forin SWU-101 Version Oct. 31. 2013 Page 3 of 6
'Report only that amount of existing BLIA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BLIA.
11. How was the off -site impervious area listed above determined? Provide documentation. No off site
impervious in drainage area
Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B . 0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wa/ws/su/bmn-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and
Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application
instruction sheet and BMP checklists are available from
http://12ortal.ncdenr.org/web/wq/ws/su/statesw/`forms does. The complete application package should be
submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the
interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://12ortal.ncdenr.org/web/M./`ws/su/statesw/forms-docs.
Itulials
1. Original and one copy of the Stormwater Management Permit Application Form. AIR
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants eJA
Form. (if required as per Part VII below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
http://www.envhelp.org/pages/onestopexpress.htmlforinformaLion on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2
mile radius on the map.
7. Sealed, signed and dated calculations (one copy).
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or N14W line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
Form SWU-101 Version Oct. 31, 2013 Page 4 of 6
for
ow
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
Copy of any applicable soils report with the associated SHWT elevations (Please identify ho
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. hnclude an 8.5"x11" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verifij the SHNT prior
to snbartittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book:—,— t . - Page No:, old i me-C
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e).
The corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
http:/ /www.secretary.state.nc.us/CoMoraLionns/CSearch.aspx
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from httl2:Hj2ortal.ncdenr.org/web/Ir/state-
stornnwater-forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/ or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting EngineenNicholas R. Parker
Consulting Firm: Amicus Partners, PLLC
Mailing Address:7140 Weddi ngton Rd Ste 140
City:Concord State:NC Zip:28027
Phone: (704 ) 573-1621
Email:nnrparker@annicuseng.com
Fax: (704 ) 248-7951
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, itern 2 has been filled ont, complete this
section)
I, (print or lyPe name of person listed in Contact Information, item 2a) , certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Forni SWU-101 Version Oct. 31, 2013 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
Iease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and
submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater
treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility
without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement
action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature: Date:
a Notary Public for the State of , County of
do hereby certify that personally appeared
before me this _ day of
, and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission expires.
X. APPLICANT'S CERTIFICATION
L (print or hjpe name of person listed in Contact Information, item 1a) Elaine Martin
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stormwater rules under 15A, NCAC 2H .1000 and any other applicable state stormwater requirements.
Signature:
Date: - - a-
i, ``t --� ry'k4 ale �c a Notary Public fo/r��the State of M 1 O� , County of
00,_Y�C� r'rw S do hereby certify that if tCA_,rl_o 1 ' (Q���+'1 personally appeared
before me this � day of 0. I and -acknowledge the rexecution of the ap lication for
a stormwater permit. Witness my hand and official seal,
seAX3 uoIssIwwoa hyy
euiioJe0 41ION
Aiunoo snjjugvC
ollcind AJeioN
Notary Public
Cabarrus County
North Carolina to-13 �3
My Commission Expires
SEAL
My commission expires 1 9 - 13 - 20a3
Form SWU-101 Version Oct. 31, 2013 Page 6 of 6