Loading...
HomeMy WebLinkAbout20230051 Ver 1_Shoreline Stabilization_20230111Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* hager@lakepermit.com Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 1/10/2023 submitted on: * Owner Information: Name: * Email: * Phone Number: Mailing Address: * NEST HOMES OF THE CAROLINAS hager@lakepermit.com (704)575-2227 (xxx)xxx-xxxx Street Address 4496 Kiser Island Road Address Line 2 City Lake Norman of Catawba Postal / Zip Code 28682 Is there an agent working on the project? * Yes No Agent/Consultant Information State / Province / Region NC Country US Name: * TAMARA HAGER Company Affiliation: * RENEGAR CONSTRUCTION Email: * hager@lakepermit.com Phone Number:* Mailing Address:* (704)575-2227 (xxx)xxx-xxxx Street Address PO BOX 5335 Address Line 2 City State / Province / Region MOORESVILLE NC Postal / Zip Code Country 28117 US A signed and dated copy of the Agent Authorization letter:* NEST HOMES AUTH.pdf 343.67KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* NEST HOMES OF THE CAROLINAS If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Upload Map: NEST HOMES SURVEY.pdf 151.13KB Latitude: * 35.569872 Longitude: *-80.965157 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* NEST HOMES SKETCH.pdf 112.7KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) NEST HOMES.PDF 61.22KB 4. Location of the property (where work is to be conducted) Nearest Town: * TERRELL County:* Catawba Lake/ river/ ocean adjacent to NORMAN/CATAWBA property: Subdivisions name or site address: * LOT 2 ELIZABETH SHERRILL BAILEY SUBDIVISION Include phase/lot number Directions to site: * FROM MARSHALL STEAM STATION TRAVEL KISER ISLAND ROAD 1.9 MILES AND DESTINATION ON LEFT. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * RESIDENTIAL Residential, undeveloped, etc. 6. Property Size .54 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): DREDGE 20X20X10' DEPTH 8. How will the work be done? * From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * 0 (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) NONE BY BARGE Sketch: NEST HOMES SKETCH.pdf 112.7KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name: * NEST HOMES OF THE CAROLINAS Signature: .1+ 5f OAKS OF nig G.dedl1I45 Submittal Date: 1/10/2023 Initial Review Is this accepted into the review process?* -. Yes No Project Number: * 20230051 Version: * 1 Select Reviewer: * Andrew Pitney:eads\ahpitner:andrew.pitner@ncdenr.gov Select Reviewing Office: Mooresville Regional Office - (704) 663-1699 Has payment been received?* No Payment Needed Fee Received Need Fee - send electronic notification What amount is owed?* $240.00 $570.00 pro*f am�lnc# ta�� a v► rtr: :art Pri I Signature Sigratura The appmvat is ,ter the purpoca and daS1gn described in your appllcation. Impacts r1crt indicated In the appllcation is a violation of Zee Buffer Aide.51tespecifie workshouId be provided in the appitWlon. i75A NCAC 02H .0506 and 15A NCAC D2B.Q24,3;8j? rats are not elloNved to be removed from Zone 1 of the Buffer f vilthln 30 ft of the full pond akv tion), uniass approved. Ejimptfon, thosetrazs that are severely undermined along tllti €rnmediafx shoreline an be reran oven. Minimal shepfrg and sloping slangthe immedssashoreiina is a!law-ed. {15A NCAC 02i3.02Q(6j; 9enc—hing, noyi,;Oowed. E6s=s1ve dtsturbance of graund cover. [15A NCAC 02E .024.3 {5j &each as, Impervious oatas, lrnaerAot s s►ralkways, ---tr- are not al lowed fn the buffer uniass specifically approv--d b'! the Qlvfsfon. Thera are limit Ion or, sdi fnr decks. [15A NCAC 02B .117A3 (4) and (6)1 Work 'to be conducb&d from land :rust ir4dlcate an axes xnd indicate arty trams that art to be r-moved. Th9 work corridor should hat described. 1 he approved access c6rridor "H be -,es'tored. ?bgin.#, spoil, constructior, material must be outside the bud-fer_ (3.5A NCAC 02H .3502 .nd 15A NCAC C12B .7243 1A), ; 6i, [$;, 5tormwater carEnct be piped or channeled for d'rect discrssr£s to the 1-,icr_ All COr,6Tr'JCtld storrriww.V discharges must be 9t the natural alevatlon and dlsck-trgad prior to entering the buffer directed ss dlthssa or sheet'Flow st non-wostva vvlocniss to the iOe. flSA PiCAC 023.0243(5y, (5); AOno wlgdgement oy lllac'fttjar. '> + _ Cr..��,�_, ;,e.-ek�t, state that f have boa Irmo ,�ned af#`te Ca�whs Rlparil:n 8ufFer RLle. A,ny vibrk conducted In the b+�i?ar, not specifically stated In the appl';Cstlon a,d approvad key the Olvlafon of Ulster Resources faWit), is a vtoUrUo s end sublectto enforce+neart. Due dillgan. ce wail be taken such that the aonstructfori twill be bulitwithin substantlal compliance and intent ofthe A01 Water Quality Cartiflcatlan and Buffer flutes, the approved plan(s) and spsciftation(s), and othersupportl:rg ��aterials. /1 SfInirture {owner � : C3WV%W: M Cof "wWr[agent: WMAMAM R ME-K&MM&W . 2j +Prf I SIgna Griys T Signature The approval Is for ate purpors .nd deOgn desCpad In your applicirtlom impams nol !ndicatd in the applIzation is a Vol don ofthe Buller Rule- 5i'te speclftc work should be provided to the aaallcatlon. 125A NCAC 02H .0506 a nd 15A NCAC i}2S .0243(ap Tr%W are not allowed to be removed from Zone I of the Buftr (with In30 -? of tha full pond elevaion), unless ipprovod. Exoeption; thosetrees that are severely undarmtnad along the immadiate shoreline can be ramoved. Minimal she pfng and sloping alarigthe Immediate shore0ne 3s afiowa-d- ri=A tdCA.0 028 .0243(5)1 a ent:hIng, grading iln the buff- is, rot allowim. EKcassive dltturtvn= of "�,nd cover. [ISA NCAC 02B .D243 16j1 8eachto, Impervious patios, Ir+npervious wrticways, etc. ere not allowed in the buffar unless sp=cffl caily approved by itha Division. The a are kimImUon on size for de6[ISA NCAC 02B .0W (4) and S51] Work to be conducted from Isnd must indi ate ar, a:ass and Indlcate any trees Vhzt sreto lie removed. The work corridor should be described. The approved ace carAdDf k-21i he restored. Staging, spoil, consti uctler. maierfai must, be outEldnthe buffer_ [ISA NCAE 02H _3502 and 15A NCAC C12S ,024-2 't4,, !6 , {2yj 5tormwate:r caMot be p[pad or cAannaled for direct dlscnarga to the Jaka. AR tondructed stormw..W discharges must be at tshe natural elevstton and dls&erged prior to erUring the bufbr dirreted Is drftuae ar shoat flow at non-eroslva valocFres to t} to lake. EISA IN CAC 028.0243IS), (61; Acknowledgement of Nord ixttor i_ N� _ * C j C-C- -CV". t a htroby stage tLiat I have hae=, tssFo - n ed of the Catawba #Parton 8ufferRuIe. AM work k wnducted in the burg, not spmdFicaiiy stated In the appiiaatlon and approved by the Div clan Of Water Resources (pWR1 r !r t vio lotion and sub}act to en-lbrcernent Due diligence wltl era taicen such that the construcdon wiQ be bu'It wtthIn submits! compliance and intent of the 40! QUWIEy Certii�cstlon and: Buffar Rules, t,`,a approved pian(s) and spseificatlon(s), and othersupgortni materials n r 51IIn2wra lowne: As Jnr.T,jk p. A. D ■ 1tr�idsikdi ' �"0`t�;�9`� T����plta�t7 o.,.,,,..`rnd y�,Y„y . t+�'n+41 ■ y�rrerli,� `r CryA .f"JCCKRS +3T Gasper■ Fvk prfw - t76�1 ��`�� � yt p�tud � 41 e64-70W r.der myvision r'vm "31 and/Or I. Certify that tn'upervaLsionarBGowrl dea in ti ed tiookr—i that this mop r„ey made under mY 149 'ha! the rntic 4f precision is 2a a e� ora�ina Dhgater B9C- pint boon-.._-..--� p g+ al 5tnlutea 6f KO�Lh C rae preocree in 4cc.,t--,ce M'3 l� me e�w of my hand and ved an the A-D. 20—n ft-rtsm 3/)0/22 unAm tih�ry�Mn if�]p •.S-µ■X-A.ZT MWT-a-rar a 2s W. 100' PLQT P A SURVEY oruc A HXT 4496 KISER ISLAND ROAD I„QT ?,1L ZERFJB,.5 HERRJ.I.L.. BAILEY SCALE t" = 5Q' MD..I.Y'AJN CREEK TWSP.. CATAVMA CO., N.C. ACWRED sr: NES` ' 0OMES LAKS NDAMdl4 LOT t GNAN A_ YCDONALD 37061247 4,Q (iWA f"p, 104-BE A 7SSR ISLAND JW, �,sQ'PUBLIC. R/'W) R/W .C= 'n mr, rAscu m A N,L gOff$ w wIr ¢ , p) rOf+ AW :Jwtmm W- o 'w Wpm SJ OeHbf�.Ac rope 4) 1& 01'b w3ctmcxT MAP Ml.1f lm:; ^MT, sj srraUcz slOM pm CATh PSA M-17 Mwmc 0 5, arm To X arEnf040 nrlD scm rcc A___'�>�Y� W=wu oc nc TAX ww no 46+002pi b -La �0_- AtFLd Pqu*/*fnw ft1wrL64) Full Pond/ �INarM �� 5 Plea a;30mx1mate1V gkgtrh F, such Zthe ioliowtn inform this �f�frxIoojv.(a+vvlda dimr,Wons 2 Af1acaaroporad v�tatfon dearfng for each �. ttfon afriP - rep or fl'll to be placed above the Full Pon '• �ratfoR ofrf Locatfon �p Or fill to fae placed below ttre Full P❑nil oMal Water Level elevation ofany proposed d/ Norrr�I Waber i gel elevai n 5- Location ofan structures .,;u h as bt�Tldir�8 . 5. Locatfon ofoon �vatforl or dredging belay retafnfng walls, docks, etc. structlon a=ers cvrrldors a Fuf l Pond/ Normal UlaterLvel elevation FOAM: $Zp .W.ZQZ3 P 2,o x 7&k 10 Dr* Cr Page 3 of 3 -La �0_- AtFLd Pqu*/*fnw ft1wrL64) Full Pond/ �INarM �� 5 Plea a;30mx1mate1V gkgtrh F, such Zthe ioliowtn inform this �f�frxIoojv.(a+vvlda dimr,Wons 2 Af1acaaroporad v�tatfon dearfng for each �. ttfon afriP - rep or fl'll to be placed above the Full Pon '• �ratfoR ofrf Locatfon �p Or fill to fae placed below ttre Full P❑nil oMal Water Level elevation ofany proposed d/ Norrr�I Waber i gel elevai n 5- Location ofan structures .,;u h as bt�Tldir�8 . 5. Locatfon ofoon �vatforl or dredging belay retafnfng walls, docks, etc. structlon a=ers cvrrldors a Fuf l Pond/ Normal UlaterLvel elevation FOAM: $Zp .W.ZQZ3 P 2,o x 7&k 10 Dr* Cr Page 3 of 3