Loading...
HomeMy WebLinkAbout20150187 Ver 1_Emails_20141117From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Monday, November 17, 2014 12:28 PM To: Burdette, Jennifer a; Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) Actually the surveyor missed the stairs on the east side of the deck, so he's going to go back, and include these along with account for the pre-existing impervious area (concrete slab), Also, waiting on owner to decide on the payment v. planting, and how they intend to access the sliding doors on the west side of the new addition, probably need at least a couple flight of stairs. I'll be in touch, but hope to have the draft application in still today or, later, this week, depending on the surveyor.. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA Bob Zarzecki Wetlands Department Manager Soil • Environmental Consultants, PA From: Burdette, Jennifer a [mailtojennifer,,BuLcLette cden --LgQY Sent: Friday, November 14, 2014 3:43 PM To: Bob Zarzecki; Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) I'm certainly ok with applying for the addition and deck without accounting for the previous structures if the applicant cannot provide documentation of' them. DiffUse flow of an area equal to or greater than the buffer irnpact area is required. if you find that the conditions on site prevent maintenance of diffuse flow then stormwater" treatment would be required. Thanks, Jennifer Jennifer Burdette 401/Buffer Coordinator 401 & Buffer Pen,nitting Unit A Wetlands Branch NCDENR ­ Division of Water 1`�eSOL)rces 161.7 Mail Service Center, Raleigh, NC 27699-1617 (919) 807-6364 phone iennifer.burdette@ncdenr.gov *Email correspondence to andfrorn this address rimy be subject to the North Carolina Public Records Low and rnoy be disclosed to third parties unless the content is exempt by statute or other regulation. * From: Bob Zarzecki [mailto:bzarzecki@sandec.com.] Sent: Friday, November 14, 2014 9:08 AM To: Burdette, Jennifer a; Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) Just wanted to confirm that you are both comfortable with us just applying for the addition and the deck. Also, have you decided what if any stormwater, management you'd like to see for this one? Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Friday, November 07, 2014 8:30 AM To: 'Burdette, Jennifer a'; Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) Jennifer & Anthony, DARAR - l'd like to keep this one on the January WQC meeting date if we can. I Understand it's been bumped up a week to Jarwary'7th and that You need the variarice request by mid-November, HI do everything on my end possible to provide you the package by the end of next week or first of the foHowing week (14tr'or 17tr). I just received the revised Survey plat last week. See attached. I believe that at least a portion of the "addition and deck" shown on this survey had at least some previously existing structure on it, but they haven't been able to clearly depict any. So, my intention is to proceed with a variance for just the "addition and deck". Let me know you thoughts on that and if you're ok with that approach. I still need to confirm with Mrs. Darar that she doesn't need some type of stoop or deck on the northwest side of the addition, because she's showing sliding doors there. She may be able to put some simple steps down to the existing concrete slab, but YOU may see a slight change or addition here. Please let Us know what level of stormwater management YOU would like to see. At this point, they have none shown, and l need to know if that's ok, or if we need to direct the gutters to discharge Outside of the buffer, or install a rain garden/bioretention area, or if you have any other ideas. l'rn not SUre the soils are adequate for inf0tration, l suspect it's a mixture of sand, clay, fill/debris, At this point, we're thinking of Just paying into EEP -for the buffer mitigation, but she rnay be willing to do some plantings /restoration on site, we still need to work that out. Hl schedule a meeting with her next week to try to finaHze these items. It rnay help to come in and meet with you too Jennifer, Maybe the gqr, (:)r 21 or 24t"', to allow us to make any changes to the reqUest over Thanksgiving week to hopefully provide you a final product the week of December 1 st for your submittal on the 8tt'. Let rne know what you think,, (Jennifer ­ Hl send YOU a follow tip email on the (..aura Duncan variance. i don't think we'H be ready to SUbrnit this month.) Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Burdette, Jennifer a [mailtojennifer B.urdeUe@ncdenr.gov] Sent: Thursday, September 25, 2014 2:44 PM To: Bob Zarzecki; Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) Thanks for the update, .Jennifer Burdette 40]./Buffer Coordinatorr 401. & Buffer Permitting Unit Wetlands Branch NCDENR Division of Water Resources 161.7 Mail Service Center Raleigh, NC 27699-3.61.7 (919) 807-6364 phone it!Ln ifer.blLrdette@ncdenf.gov *E'rnoil correspondence to and from this oddi ess may be sr. bject to the North Corolino Public Records I ow and may be disclosed to third porties unle5S the content is exempt by stotute or other regulotion. * From: Bob Zarzecki [DiaiLto:bzarzeck-i a&sandec.com] Sent: Thursday, September 25, 2014 2:20 PM To: Scarbraugh, Anthony; Burdette, Jennifer a Subject: RE: VARIANCE - DARAR (Beaufort Co.) Anflnony & Jennifer: The surveyor is still working with the Darars on the changes to the plans. We'll obviOUsly riot rnake the deadline for the Noverril,:)er WOC rneeting. Please pencil us in for the January meeting. J hope �to have the revised plans to you soon along with a draft application for YOUr review. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Tuesday, -• r- 16, 2014 3:30 • K, To: 'Scarbraugh, Anthony'; Burdette, Jennifer a Subject: RE: VARIANCE - DARAR (Beaufort Co.) Got it, Thanks for the clarification Anthony, Hi emaH the surveyor to make the corrections. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Scarbraugh, Anthony [mailto:anthony.scarbraug.h@jLcdenr.goy] Sent: Tuesday, September 16, 2014 2:54 PM To: Bob Zarzecki; Burdette, Jennifer a Subject: RE: VARIANCE - DARAR (Beaufort Co.) Mr. Zarzecki, According to Steve Trowell with the Division of Coastal Management, the normal water level will be located at the bulkhead, which is the triple pink /purple line as documented within the Notice of Deficiency issued by this Office, Thanks, Anthony Scarbraugh Anthony Scarbraugh Environmental Senior Specialist Washington Regional Office North Carolina Department of Environment and Natural Resources Division of Water Resources — Water Quality Regional Operations Section 943 Washington Square Mail Washington, NC 27889 (2S2) 948-3924 E rnail correspondence to and frorn this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt [".)y statue or other regulation. From: Bob Zarzecki [mailto:bzarzeLk[@sanc1ec,cQrU] Sent: Tuesday, September 16, 2014 2:13 PM To: Burdette, Jennifer a Cc: Scarbraugh, Anthony Subject: RE: VARIANCE - DARAR (Beaufort Co.) i have yet to visit the property myself, Can you approximate where the "seawall" is on the attached exhibit? Is it all the way up at the triple pink/purple Hne? if so, it seerns like that will bring the entire addition work within Zone 1. l'H coordinate this with the surveyor to correct. Thanks!