Loading...
HomeMy WebLinkAboutHannah Bridge Year 4 Monitoring ReportBaker, Caroline D From: Davis, Erin B Sent: Tuesday, January 10, 2023 8:34 AM To: Baker, Caroline D Subject: FW: [External] SAW-2015-01799 / EBX-Neuse I, LLC / Neu -Con UMBI / Hannah Bridge Year 4 Monitoring Report Laserfiche Upload: Email DWR#: 20170537 v.1 Doc Date: 12/16/22 Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title From: Haywood, Casey M CIV USARMY CESAW (USA)<Casey.M.Haywood@usace.army.mil> Sent: Friday, December 16, 2022 8:37 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Steve Kichefski <Steven.I.kichefski@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us> Subject: [External] SAW-2015-01799 / EBX-Neuse I, LLC / Neu -Con UMBI / Hannah Bridge Year 4 Monitoring Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, The below referenced Year 4 Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: EBX-Neuse I, LLC Name: Neu -Con UMBI / Hannah Bridge USACE ID: SAW-2015-01799 River Basin: Neuse H UC: 03020201 County: Johnston YEAR 4 CREDIT RELEASE: 5% of the total stream credits: 223.300 stream mitigation units 10% of the total stream restoration and enhancement credits for bankfull verification: 446.500 *RES is not requesting the release of any wetland credits Total Proposed Release is 669.8 stream mitigation units 15-Day Comment Start Date: December 21, 2022 15-Day Comment Deadline: January 05, 2023 45-Day Credit Release Approval Deadline: February 04, 2023 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete and the approval deadline is 30 days after the site visit. Link to Hannah Bridge Year 4 Monitoring Report can be found on RIBITs in the Cyber Repository for the site: https://ribits.ops.usace.army.mil/ords/f?p=107:10:2303344102322::::P10 BANK ID:4413 Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG