Loading...
HomeMy WebLinkAboutMeadow Spring Site MY4 Report Review and Credit Release RequestBaker, Caroline D From: Davis, Erin B Sent: Tuesday, January 10, 2023 8:33 AM To: Baker, Caroline D Subject: FW: [External] RES Neu -Con UMB, Meadow Spring Site (SAW-2016-01989) Year 4 Annual Monitoring Report Review and Credit Release Request Laserfiche Upload: Email DWR#: 20160980 v.1 Doc Date: 12/16/22 Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title From: Haywood, Casey M CIV USARMY CESAW (USA)<Casey.M.Haywood@usace.army.mil> Sent: Friday, December 16, 2022 9:09 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Steve Kichefski <Steven.1.kichefski@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; kathryn_matthews@fws.gov; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov> Cc: Jamey Mceachran (jmceachran@res.us) <jmceachran@res.us> Subject: [External] RES Neu -Con UMB, Meadow Spring Site (SAW-2016-01989) Year 4 Annual Monitoring Report Review and Credit Release Request CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, The below referenced Year 4 Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: EBX-Neuse I, LLC (RES) Bank Name: RES Neu -Con Umbrella Mitigation Bank Site Name: Meadow Spring USACE ID: SAW-2016-01989 River Basin: Neuse H UC: 03020201 County: Johnston Requested Credit Release: Year 4 Annual Monitoring 5% of the total stream restoration and/or enhancement credits: 272.000 Warm Water Stream Credits 10% of the total stream restoration and enhancement credits for bankfull verification: 544.000 20% of the total wetland restoration and/or enhancement credits: 2.88 Riparian Wetland Credits (15% MY3 scheduled release, in addition to the MY4 5% release) Please note an adaptive management plan addressing four areas of concern was submitted to the IRT in June 2022 and work was completed in August 2022. 15-Day Comment Start Date: December 21, 2022 15-Day Comment Deadline: January 05, 2023 45-Day Credit Release Approval Deadline: February 04, 2023 NOTE: Deadlines will be extended if an on -site meeting is requested. Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:10:14714630509300::::P10 BANK ID:4414 Thank you and please contact me with any questions, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG