Loading...
HomeMy WebLinkAboutMY2 Review Daniels Creek SiteBaker, Caroline D From: Davis, Erin B Sent: Tuesday, January 10, 2023 8:14 AM To: Baker, Caroline D Subject: FW: [External] Notice of Monitoring Year 2 Review / Wildlands Middle Cape Fear UMB - Daniels Creek Site/ SAW-2017-00998/ Harnett Co. Laserfiche Upload: Email DWR#: 20171605 v.1 Doc Date: 12/21/22 Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, December 21, 2022 1:05 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov> Cc: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Mickey Sugg <Mickey.t.sugg@usace.army.mil>; Jason Lorch <jlorch@wildlandseng.com>; Chris Roessler <croessler@wildlandseng.com>; John Hutton <jhutton@wildlandseng.com> Subject: [External] Notice of Monitoring Year 2 Review/ Wildlands Middle Cape Fear UMB - Daniels Creek Site/ SAW- 2017-00998/ Harnett Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (link below). This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate with the IRT and Sponsor to arrange for the on -site meeting. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. Sponsor: Wildlands Engineering Bank Name: Middle Cape Fear Umbrella Mitigation Bank Site Name: Daniels Creek USACE ID: SAW-2017-00998 River Basin: Cape Fear H UC: 03030004 County: Harnett Requested Credit Release: Year 2 Annual Monitoring 10% of the total stream restoration and/or enhancement credits, plus the remainder of the MY1 credit release of 2% for a total request of 1,418.8 Warm Water Stream Credits 10% of the total wetland restoration and/or enhancement credits, plus 10% of the remainder of riparian and non - riparian credits from MY1 for a total of 2.784 Riparian Wetland Credits and 0.078 Non -riparian Wetland Credits 15-Day Comment Start Date: January 3, 2023 15-Day Comment Deadline: January 18, 2023 45-Day Credit Release Approval Deadline: February 17, 2023 Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:10173507464714:::RP,278:P278 BANK ID:4770 Please reach out with questions or concerns. As always, thanks for your participation. Happy Holidays, Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107