Loading...
HomeMy WebLinkAboutSAW-2017-01462_RESYadkin01UMB-Gideon_MY2CreditRelease (2)DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 December 28, 2022 Regulatory Division Action ID No. SAW-2017-01462 Re: MY2 credit release of the RES Yadkin 01 Umbrella Mitigation Banking Instrument and Gideon Mitigation Site Mr. Ryan Medric Resource Environmental Solutions 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 Dear Mr. Medric: This correspondence is in reference to the Monitoring Year 2 (MY2) Report dated August 30, 2022, submitted in support of your request for the fourth credit release for the Gideon Mitigation Site. The Gideon Mitigation Site is part of the RES Yadkin 01 Umbrella Mitigation Bank, located east of the terminus of Ed Nixon Road, approximately ten miles north of Elkin and seven miles west of Dobson in Surry County, North Carolina. The purpose of this letter is to confirm the MY2 release of credits for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank, approved December 4, 2019; and the site -specific Gideon Final Mitigation Plan dated August 2019, ten percent (10%) of the mitigation site's total restoration and enhancement credits shall be available for sale immediately upon completion of the required tasks pursuant to the Mitigation Plan. By copy of this correspondence, we confirm that you have satisfied the above requirements for the MY2 credit release for all parcels within the bank; and 291.13 SMU's constituting 10% of the mitigation site's total restoration and enhancement credits are now available for sale. Including this credit release, 50% of the 2,962 total credits for the Gideon Mitigation Site have now been released, as detailed in the approved final mitigation plan and revised in the As -Built Report. Although the IRT did not visit this site as part of the MY2 evaluation, we have reviewed the Year 2 Monitoring Report and offered the following comments, which should be addressed during next year's monitoring review: Erin Davis (NCDWR) comments: 1. Please include photos of the 2022 headcut repairs in the MY3 report. DWR is concerned that haybale placement on the bank may be only a temporary fix/band-aid. 2. DWR appreciated the level of detail provided in the narrative, CCPV callouts and graphs. DWR is not requesting a site visit. We support the proposed credit release. Todd Tugwell (USACE) comments: 1. I was unable to find the current credit release schedule/timeline or current ledger in your submission. Please be sure to include these documents for all projects in the future as they are critical to our review and tracking of your project. Thank you for your time and cooperation. If you have any questions, please contact Steve Kichefski at (828) 271-7980 extension 4234 or (828)-933-8032 (mobile). Sincerely, Y Todd Tugwell Chief, Mitigation Branch Regulatory Division Electronic Copies Furnished (via email): Erin Davis (NCDWR) Olivia Munzer (NCWRC) Travis Wilson (NCWRC) Byron Hamstead (USFWS) Todd Bowers (USEPA) Renee Gledhill -Earley (NCSHPO) Todd Tugwell (USACE) Kim Browning (USACE) Casey Haywood (USACE) Scott Jones (USACE)