Loading...
HomeMy WebLinkAboutNC0043176_Application (ATC)_20230110 CITY OF Oil 1887 NORTH CAROLINA ?(Here cammunit� I e Ins y BLACK RIVER WWTP DESIGN-BUILD IMPROVEMENTS DMP PROJECT 210076 DWI Project No. CS370417-07 Design Manual ,e(,' Cili December 2022 I4iv 10 -O soos1111111,E, Oilib, .f- ') , Alt ii-;.• /(37 20590 ,••�,y e'V I N EC-Q' \)",' 1 •••Ift LOI % 1Ce DAVIS • MARTIN • POWELL dffp ENGINEERS & SURVEYORS TAfi LOVING 336-886-4821 • dmp-inc.com • License: F-0245 400 Patetown Rd,Goldsboro, NC 27530 6415 Old Plank Road, High Point, NC 27265 (919)734-8400 I TALOVING.com I License: F-0325 DAVIS • MARTIN • POWELL dffp ENGINEERS & SURVEYORS Table of Contents TAB 1 Request for ATC— City of Dunn Design Summary TAB 2 Application for Authorization to Construct TAB 3 Current NPDES Permit TAB 4 Hydraulic Calculations TAB 5 Process Schematic Clarifier Calculations Chlorine Contact Calculations Clarifier Drain Pump Station Chemical Feed Calculations RECEIVED 10 2023 NCDEQ/o NP p ES DMP 210076 page 2 of 5 CITY OF PUBLIC UTILITIES 101 E Cleveland St • PO Box 1065 • Dunn,North Carolina 28335 (910)892-2948 • CityofDunn.org December 20,2022 Re: City of Dunn,North Carolina Black River WWTP Design-Build Improvements NPDES Permit No.NC0043176 DWI Project CS370417-07 DMP Project210076 NCDEQ Division of Water Resources NPDES Permitting 512 N. Salisbury Street, 9th Floor Raleigh,NC 27604 To whom it may concern: The City of Dunn, North Carolina is requesting an Authorization to Construct for modifications to the Black River WWTP. The purpose of this project is to increase peak flow capacity from the aeration basins to the existing effluent pump station. This will enhance the ability to treat wet weather flows and minimize SSO's that occur in the collection system. This project is one of several projects included in the City's SOC and is being funded in part by the Division of Water Infrastructure. The City's Engineer, Davis • Martin• Powell &Associates, will be submitting all supporting materials, including the ATC application, Design Calculations, Construction Documents, etc. Please direct any technical questions regarding this project to our Engineer. We trust this information is complete and will allow you to issue approval at an early date. We appreciate your assistance in this matter and look forward to hearing from you. Sincerely, Heather Adams Public Utilities Director %there cammuni y Igins! DAVIS • MARTIN • POWELL dmp ENGINEERS & SURVEYORS Design Summary Introduction The City of Dunn. North Carolina owns and operates the 3.75 MGD Black River WWTP. The majority of the WWTP was constructed around 1980, with upgrades to specific processes occurring in the early 1990's, in 2011,and in 2020. This project is limited to replacement/upgrade of existing treatment units and will not result in an increase in average daily permitted capacity. This project is being constructed using the Design-Build contracting method. The WWTP currently has three (3) 60-foot diameter clarifiers. Clarifiers FC-1 and FC-2 are relatively shallow(10 deep)based on current design criteria,while Clarifier FC-3 has a 12 foot depth. Overflow rates are high for the current average flows, and especially peak flows. Clarifiers FC-1 and FC-2 have been renovated within the past 10 years and are in satisfactory condition. Surface Weir Loading Peak Solids Detention Time Overflow Rate Rate Loading Rate (hours) (gpd/ft2) (gpd/linear ft) (Ib/day/ft2) 3.75 MGD Average Flow 442 6631 33 4.1 (All in Service) Ten States Standards 1,000 30,000 35 (Peak Flow based) 7.5 MGD Peak Flow 884 13,263 50 (All in Service) 11.25 MGD Peak Flow 1,326 19,894 66 (All in Service) The mechanism in Clarifier#3 is 27 years old and in need of replacement. This replacement will include enhancements to the existing clarifier such as an energy dissipating inlet well, rapid sludge withdrawal system,and density current baffles to minimize short circuiting and solids carryover. Repairs will be made to the existing concrete structure as needed to extend its longevity. The City proposes to install a fourth 80 foot diameter clarifier. This addition will greatly reduce clarifier loading rates, eliminate backups into the aeration basins, and allow for improved treatment of higher peak flows. A new RAS control structure is proposed for Clarifiers 3 and 4,as well as a drain pump station to assist in dewatering these two basins. A new dual train chlorine contact tank is also proposed, sized for over minutes detention at 11.25 MGD. the existing contact tank will be demolished. No changes to the existing hypochlorite feed system are proposed at this time. DMP 210076 page 3 of 5 DAVIS • MARTIN • POWELL dmp ENGINEERS & SURVEYORS A new chemical feed facility for caustic soda is also proposed to increase pH levels following the aeration basins. It has been designed to use 25% solution to minimize issues with handling caustic in lower temperatures. In addition to the above,a new clarifier flow splitter will be constructed between the aeration basins and the clarifiers. This will help eliminate a hydraulic bottleneck at this location and eliminate backups and overflows of wastewater. In conjunction with process piping upgrades,the City will be able to convey and treat peak flows of 11.25 MGD which will help to minimize SSO's in the collection system. The existing effluent conveyance system,consisting of a triplex pump station and 3 miles of effluent force main will become the limiting factor in overall treatment capacity. The current pump station is limited to about 7.5 MGD due to head conditions. The City has secured ARPA funding for a separate project to install a new force main and increase the capacity of the effluent conveyance system to at least 11.25 MGD. That project is currently under design. The City also has obtained speculative limits for an expansion to 4.9 MGD, and is currently evaluating options for a future expansion the WWTP of up to 6.0 MGD. Conceptually this future expansion could include replacement of clarifiers 1 and 2 with larger 80 foot diameter units. The design of the clarifier flow splitter can accommodate a peak hour flow of up to 18 MGD with future clarifier units. Design Philosophy Detailed design calculations are attached for the hydraulic loading of the clarifiers at current flow conditions. Final Design is considering the future expansions in placement and sizing of structures, process piping, and major equipment selection. Current Future Average Daily Flow 3.75 MGD 4.9 to 6.0 MGD Peak Flow 11.25 MGD 14.7 to 18.0 MGD • Peak Day flow factor of 2.0(7.5 MGD) • Peak Hour flow factor of 3.0 (11.25 MGD). This peaking factor was developed in 2009 Design and Aeration System Replacement Projects • Typical Influent BOD5 and TSS loading of 200 mg/L and Influent Ammonia loading of 20 mg/L has been used in the Aeration Project. During the issuance of the 2010 ATC (also funded by the DWI program), managing peak flows was discussed at length with DWI Staff, including the operation of the 3.0 MGD flow equalization basin, and the need for peak flow hydraulic improvements included in this project. The existing Influent & PTF facilities were designed to convey at least a 11.25 MGD peak hour flow. Influent flow exceeding 7.0 MGD is currently routed to the 3.0 MG Equalization Tank. If the Equalization Tank is filled, Operators adjust the influent pumps to maintain an approximate 7.0 MGD rate to prevent washout of the biological process and internal overflows. The existing collection system surcharges and overflows occur at a low lying manhole (BR8) located just upstream of the WWTP. DMP 210076 page 4 of 5 DAVIS • MARTIN • POWELL dmp ENGINEERS & SURVEYORS Once this project is complete,the allowable process flow can be increased to the effluent pump station's capacity, and when the future effluent conveyance project is complete, the full 11.25 MGD will be available. Flood Considerations The WWTP site is partially located within the 500 and 100 year flood zones. These are shown on the site plan and the tops of the new clarifier and chlorine contact tank are located above the 500 year flood elevation. Standby Power The WWTP has two electrical services with a single 1000 kW generator. The last upgrade project resulted in a total plant load of approximately 793 kW. This project adds approximately 6 kW of motor load, instrumentation &controls, site lighting, and heating for the chemical feed system and emergency shower. The existing generator has adequate capacity for this small increase. DMP 210076 page 5 of 5 State of North Carolina ,.; Department of Environmental Quality Division of Water Resources BWater Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) SECTION 1: INSTRUCTIONS AND INFORMATION A. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete.Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T.0105(b). B. Plans and specifications must be prepared in accordance with 15 NCAC 02H.0100, 15A NCAC 02T, North Carolina General Statute 133-3. North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. 1 C. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. D. Any content changes made to this Form ATC-12-14 shall result in the application package being returned. E. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3-ring binder, with a Section tab for each Section, except the Engineering Plans. F. Check the boxes below to indicate that the information is provided and the requirements are met. G. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. H. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS,etc.unless the project qualifies for a Determination of Minor Construction Activity. For more information,visit the Division of Water Resources web site at:https://deq.nc.gov/about/divisions/water-resources/water- resources-permits/wastewater-branch/npdes-wastewater/authorization-to-construct. J. In addition to this Authorization to Construct,the Applicant should be aware that other permits may be required from other Sections of the Division of Water Resources(for example: reclaimed water facilities permits;Class A or B biosolids residuals permit). SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION A. APPLICANT Applicant's name City of Dunn, NC Signature authority's name per 15A NCAC 02T.0106(b) Heather Adams Signature authority's title Public Utilities Director Complete mailing address P.O. Box 1065, Dunn, NC 28335 Telephone number (910)892-2948 Email address hadams@dunn-nc.org B. PROFESSIONAL ENGINEER Professional Engineer's name Michael L.Slusher Professional Engineer's title Project Manager North Carolina Professional Engineer's License No. 20590 Firm name Davis-Martin-Powell&Associates, Inc. Firm License number F-0245 Complete mailing address 6415 Old Plank Road, High Point, NC 27265 Application for Authorization to Construct Permit(FORM ATC-12-14) Page 1 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) Telephone number 336-886-4821 Email address mslusher@dmp-inc.com C. NPDES PERMIT NPDES Permit number NC0043176 Current Permitted flow(MGD)—include permit 3.75 MGD flow phases if applicable D. PROJECT DESCRIPTION Provide a brief description of the project:This project includes the construction of a new clarifier flow splitter, new final clarifier, rehabilitiation of one existing final clarifier,a chlorine contact tank,a caustic feed system for pH adjustment,a clarifier drain pump station,process piping,electrical,controls,demolition of process piping,demolition of existing chlorine contact tank,and associated site construction. SECTION 3: APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS A. Cover Letter ® The letter must include a request for the Authorization to Construct;the facility NPDES Number; a brief project description that indicates whether the project is a new facility,facility modification,treatment process modification,or facility expansion; the construction timeline;and a list of all items and attachments included in the application package. ® If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design,the letter must include an itemized list of the requirements that are not met. B. NPDES Permit ® Submit Part I of the Final NPDES permit for this facility that includes Part A(Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. C. Special Order by Consent If the facility is subject to any Special Orders by Consent(SOC),submit the applicable SOC. ❑ Not Applicable. D. Finding of No Significant Impact or Record of Decision ❑ Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. ❑ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision. ® Not Applicable. C Engineering Plans ® Per 15A NCAC 02T.0504(c)(1),submit one set of detailed plans that have been signed,sealed and dated by a North Carolina Licensed Professional Engineer. Application for Authorization to Construct Permit(FORM ATC-12-14) Page 2 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) ® Per 21 NCAC 56.1103(a)(6),the name,address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. ® Plans must be labeled as follows: FINAL DRAWING—FOR REVIEW PURPOSES ONLY—NOT RELEASED FOR CONSTRUCTION. ® 1SA NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? ® Yes or ❑ No. If no, provide an explanation: Plans shall include: ® Plans for all applicable disciplines needed for bidding and construction of the proposed project(check as appropriate): ® Civil ❑ Not Applicable O Process Mechanical ❑ Not Applicable O Structural ❑ Not Applicable ® Electrical ❑ Not Applicable 0 Instrumentation/Controls ❑ Not Applicable ❑ Architectural ® Not Applicable ❑ Building Mechanical ® Not Applicable ❑ Building Plumbing ® Not Applicable ® Plan and profile views and associated details of all modified treatment units including piping,valves,and equipment(pumps, blowers, mixers,diffusers,etc.) ® Are any modifications proposed that impact the hydraulic profile of the treatment facility?®Yes or❑ No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. ® Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? ®Yes or❑No. If yes,provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recycle/return,wasting,and chemical feed,with the location of all monitoring and control instruments noted. F. ® Engineering Specifications • Per 15A NCAC 02T.0504(c)(2),submit one set of specifications that have been signed,sealed and dated by a North Carolina Licensed Professional Engineer. ® Specifications must be labeled as follows: FINAL SPECIFICATIONS — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION. Specifications shall include: ® Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ® Structural ❑ Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable Application for Authorization to Construct Permit(FORM ATC-12-14) Page 3 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) ❑ Architectural ® Not Applicable ❑ Building Mechanical ® Not Applicable ❑ Building Plumbing ® Not Applicable ® Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers,etc.),and instrumentation. ® Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines,and performance testing requirements for equipment. ❑ Bid Form for publicly bid projects. G. Construction Sequence Plan ® Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Section 01 52 00 H. Engineering Calculations ® Per 15A NCAC 02T.0504(c)(3),submit one set of engineering calculations that have been signed,sealed and dated by a North Carolina Licensed Professional Engineer;the seal,signature and date shall be placed on the cover sheet of the calculations. For new or expanding facilities and for treatment process modifications that are included in Section 4.C,the calculations shall include at a minimum: • Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. ❑ Influent pollutant loading demonstrating how the design influent characteristics in Section 4.B.2 of this form were determined. ❑ Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.B.2 of this form were determined. ® Hydraulic loading for each treatment unit. ® Sizing criteria for each treatment unit and associated equipment(blowers, mixers, pumps,etc.) ® Total dynamic head(TDH)calculations and system curve analysis for each pump specified that is included in Section 4.C.6. ® Buoyancy calculations for all below grade structures. ® Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. I. Permits ❑ Provide the following information for each permit and/or certification required for this project: Permit/ If Not Issued Provide Not Date Date Certification Status and Expected Permit/Certification Applicable Submitted Approved Number Issuance Date Dam Safety X Soil Erosion and Sediment Control USCOE /Section 404 Permit X Water Quality Certification (401) X Application for Authorization to Construct Permit(FORM ATC-12-14) Page 4 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) USCOE/Section 10 X Stormwater Management Plan X CAMA X NCDOT Encroachment Agreement X Railroad Encroachment Agreement X Other: J. Residuals Management Plan ❑ For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(I) and 15A NCAC 02T .0508;the Plan must include: ❑ A detailed explanation as to how the generated residuals (including trash,sediment and grit)will be collected, handled, processed,stored,treated,and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ❑ If oil,grease,grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed,stored and disposed. ® Not Applicable. Application for Authorization to Construct Permit(FORM ATC-12-14) Page 5 State of North Carolina ,,; Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) SECTION 4: PROJECT INFORMATION A. WASTEWATER TREATMENT PLANT FLOW INFORMATION—COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: Plant Flows Existing Plant Design 3.75 MGD Current NPDES Permit Limit 3.75 MGD Current Annual Average (past 12 months) 1.94 MGD For Past 12 Months: For Past 24 Months: Start Date: 12/1/2021 Start Date: 12/1/2021 End Date: 11/30/2022 End Date: 11/30/2022 Maximum Month 2.92 MGD 5.82 MGD Maximum Day 6.14 MGD 8.55 MGD Peak Hour 11.25 MGD 11.25 MGD Application for Authorization to Construct Permit(FORM ATC-12-14) Page 6 State of North Carolina AID Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) B. WASTEWATER TREATMENT FACILITY DESIGN INFORMATION—COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H.0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1,and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications?®Yes or❑ No. If no,provide justification as to why the requirements are not met,consistent with 15A NCAC 02T.0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design,and the NPDES permit limits for the following parameters: Project Basis of Design Design Influent Design Influent Influent Concentration Load Concentration- (Must be (Must be Current Annual supported by supported by Average Design Effluent g (past Engineering Engineering Concentration and/or NPDES Permit Limits 12 months)if Calculations Calculations Load (monthly average) Parameter Available [Section 3.H]) [Section 3.H]) ammonia Nitrogen mg/L Summer 2.0 mg/L Summer NH3 N) N/A mg/L mg/L lb/day mg/L Winter 4.0 mg/L Winter Biochemical mg/L Summer 12 mg/L Summer Oxygen Demand N/A mg/L mg/L lb/day (BODs) mg/L Winter 18 mg/L Winter Fecal Coliform 200 per 100 mL 200 per 100 mL Nitrate+Nitrite Nitrogen(NO3-N+ mg/L mg/L NO2-N) Total Kjeldahl N/A mg/L Nitrogen mg/L Report only mg/L Total Nitrogen lb/year lb/year N/A mg/L Report Only Total Phosphorus N/A mg/L mg/L lb/day mg/L lb/year lb/year Total Suspended N/A mg/L mg/L lb/day 30 mg/L 30 mg/L Solids(TSS) 3. Based on the"Project Basis of Design" parameters listed above,will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above?®Yes or❑ No. If no,describe how and why the Permit Limits will not be met: Application for Authorization to Construct Permit(FORM ATC-12-14) Page 7 State of North Carolina , ; Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) 4. Per 15A NCAC 02T.0505(I), by-pass and overflow lines are prohibited. Is this condition met by the design?®Yes or❑ No If no,describe the treatment units bypassed,why this is necessary,and where the bypass discharges: 5. Per 15A NCAC 02T.0505(k), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design?❑Yes or® No. If no, provide an explanation:The only pump included is a drain pump used to dewater Clarifier #3 and#4 for preventative maintenance. Provisions to use a portable pump as a backup are included. 6. Per 15A NCAC 02T.0505(I), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions,or dual power supply shall be provided per 15A NCAC 02H.0124(2)(a). Is this condition met by the design? ®Yes or❑ No. If no,provide(as an attachment to this Application)written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks,and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention. 7. Per 15A NCAC 02T.0505(o),a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ®Yes or❑ No. If no,explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T.105(n): 8. Per 15A NCAC 02T.0505(q),the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: The site is enclosed with a security fence. Temporary fencing will be maintained during construction. 9. Is the treatment facility located within the 100-year flood plain? ®Yes or❑ No. If yes,describe how the facility is protected from the 100-year flood: Proposed structure walls are above the 100 year flood elevation C. WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION—COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS 1. PRELIMINARY AND PRIMARY TREATMENT(i.e., physical removal operations and flow equalization): No.of Plan Sheet Specification Calculations Treatment Unit Type Size per Unit Provided? Units Reference Reference (Yes or No) Manual Bar Screen MGD at peak hourly flow Mechanical Bar Screen MGD at peak hourly flow Grit Removal MGD at peak hourly flow Flow Equalization -- gallons Primary Clarifier Circular ft diameter; ft side water depth Primary Clarifier Rectangular square feet; ft side water depth Other Application for Authorization to Construct Permit(FORM ATC-12-14) Page 8 State of North Carolina ,. Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) 2. SECONDARY TREATMENT(BIOLOGICAL REACTORS AND CLARIFIERS)(i.e., biological and chemical processes to remove organics and nutrients) No.of Plan Sheet Specification Calculations Treatment Unit Type Size per Unit Provided? Units Reference Reference (Yes or No) Aerobic Zones/ gallons Tanks Anoxic Zones/ gallons Tanks Anaerobic Zones/Tanks gallons Sequencing Batch Reactor(SBR) gallons Membrane Bioreactor(MBR) -- gallons 60&80 ft diameter; 12-16 ft M200- Secondary Clarifier 4 Circular 46 43 80 Yes side water depth M301 Secondary Clarifier Rectangular square feet; ft side water depth Other 3. TERTIARY TREATMENT No.of Plan Sheet Specification Calculations Treatment Unit Type Size per Unit Provided? Units Reference Reference (Yes or No) Tertiary Clarifier Circular ft diameter; ft side water depth Tertiary Clarifier Rectangular square feet; ft side water depth Tertiary Filter square feet Tertiary Membrane Filtration square feet Post-Treatment Flow Equalization -- gallons Post-Aeration gallons Other 4. DISINFECTION No.of Plan Sheet Specification Calculations Treatment Unit Type Size per Unit Provided? Units Reference Reference (Yes or No) gal/day per bank at Ultraviolet Light (Parallel;in peak hourly flow; number of banks; series) number of lamps/bank Chlorination 2 liquid(Gas; 123,420 gallons of contact M400 46 33 33.41 Yes tablet; liquid) tank/unit Application for Authorization to Construct Permit(FORM ATC-12-14) Page 9 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) Dechlorination (Gas; gallons of contact tablet; liquid) tank/unit 5. RESIDUALS TREATMENT No.of Plan Sheet Specification Calculations Treatment Unit Type Size per Unit Provided? Units Reference Reference (Yes or No) Gravity Thickening square feet; ft side Tank water depth Mechanical Thickening/ dry lb/hour Dewatering Aerobic Digestion gallons Anaerobic Digestion gallons Composting dry lb/hour Drying dry lb/hour Other 6. PUMP SYSTEMS(include influent, intermediate,effluent, major recycles,waste sludge,thickened waste sludge and plant drain pumps) No.of Capacity of Plan Sheet Specification Location Pumps Purpose Type each pump Reference Reference GPM TDH Clarifier Drain 1 Dewatering Clarifier Submersible 360 32 M600 43 2139.08 FC-3& FC-4 7. MIXERS No.of Power of Plan Sheet Specification Location Mixers Purpose Type each( MFixer Reference Reference Application for Authorization to Construct Permit(FORM ATC-12-14) Page 10 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) 8. BLOWERS Capacity of Location No.of Purpose Type each Blower Plan Sheet Specification Blowers (CFM) Reference Reference 9. ODOR CONTROL Location No.of Purpose Type Plan Sheet Specification Units Reference Reference D. SETBACKS—COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES 1. The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T.0506(b) are as follows: Is Minimum Distance Minimum Distance Requirement met by the Setback Parameter Required from Nearest Design?If"No",identify Treatment/Storage Unit Setback Waivers in Item D.2 Below Any habitable residence or place of assembly under separate 100 ft ®Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ®Yes ❑ No Surface waters(streams—intermittent and perennial, perennial 50 ft ®Yes ❑ No waterbodies,and wetlands) Any well with exception of monitoring wells 100 ft ®Yes ❑ No Any property line 50 ft ❑Yes ® No 2. Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ® No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or® No. If no, provide an explanation: A property line setback waiver and permanent easement has been drafted and is being processed. Copies will be provided when available. Application for Authorization to Construct Permit(FORM ATC-12-14) Page 11 State of North Carolina • ,: Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) SECTION 5: APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Professional Engineer's Certification per 15A NCAC 02T.0105: I, Michael L.Slusher , attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) for the Black River WWTP Design-Build Improvements (Facility and Project Name) was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent I with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of myknowledge the proposed design has been g p p g prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.B.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this iplication package. I further understand that the application package may be subject to a future audit by the Division. though certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to$25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: `sus,i,;o!••1,•,,z �%.‘.4 eV C Y• 205S0 I E. c IfitfilfilL:0..11/4Syli,01at Application for Authorization to Construct Permit(FORM ATC-12-14) Page 12 r State of North Carolina a Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT(FORM ATC-12-14) SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant's Certification per 15A NCAC 02T.0106(b): I, Heather Adams, Public Utilites Director, attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) for the Black River WWTP Design-Build Improvements (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T.0120(b),the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon acceptance of the Licensed Professional Engineer's Certification contained in Section 5, and that the Division ay waive the technical review of the plans, specifications, calculations and other supporting documentation provided this application package. I further understand that the application package may be subject to a future audit. I understand that in accordance with General Statutes 143-215.6A and 143-215.6E any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to ceed$10,000, as well as civil penalties up to $25,000 per violation. Signatur Date: API/N41 --- THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES/NPDES By U.S. Postal Service By Courier/Special Delivery: 1617 MAIL SERVICE CENTER 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 707-3644 Application for Authorization to Construct Permit(FORM ATC-12-14) Page 13 Permit NC0043176 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, the City of Dunn is hereby authorized to discharge wastewater from a facility located at the Black River Wastewater Treatment Plant 580 J.W. Edwards Lane Harnett County to receiving waters designated as the Cape Fear River in the Cape Fear River Basin in accordance with effluent limitations,monitoring requirements, and other applicable conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective April 1, 2019. This permit and authorization to discharge shall expire at midnight on September 30, 2023. Signed this day February 22, 2019. cfrt,- �ulPeppeT, ec r c Di ' ion olf Water Resources By the Authority of the Environmental Management Commission Permit NC0043176 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility,whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore,the exclusive authority to operate and discharge from this facility arises under the permit conditions,requirements,terms,and provisions included herein. The City of Dunn is hereby authorized to: 1. Continue to operate and maintain an existing 3.75 MGD wastewater treatment facility consisting of the following components: • Influent pumps • Equalization tanks(3,000,000 gallons) • Automatic bar screens • Aerated grit removal • Influent flow measurement • Aeration basin-4 cells • Three final clarifiers • Chlorination(12%sodium hypochlorite liquid) • Dechlorination(sodium bisulfite liquid) • Dual chlorine contact tanks • Effluent flow meter • Cascade discharge • Sludge handling including Rotary Drum thickener, aerobic sludge digester, aerated sludge holding tank, and sludge drying beds (optional use) This facility is located at the Black River Wastewater Treatment Plant, 580 J.W. Edwards Lane, in Harnett County. 2. Discharge from said treatment works at the location specified on the attached map via Outfall 001 into the Cape Fear River,classified WS-V waters in the Cape Fear River Basin. 2 of 11 Permit NC0043176 PART I A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS [3.75 MGD] [15A NCAC 02B .0400 et seq., 15A NCACO2B .0500 et seq.] Grade IV Biological Water Pollution Control System [15A NCAC 08G.0302] During the period beginning on the effective date of the permit and lasting until expiration,the permittee is authorized to discharge treated municipal wastewater from Outfall 001. Such discharges shall be limited and monitored' by the permittee as specified below: PARAMETER CHARACTERISTICS EFFLUENT LIMITS MONITORING REQUIREMENTS Monthly Weekly Daily Measurement Sample Sample PARAMETER CODE Average Average Maximum Frequency Type 2 Location Flow 50050 3.75 MGD Continuous Recording I or E BOD,5 day,20°C3 C0310 (April 1-October 31) 12.0 mg/L 18.0 mg/L 2/week8 Composite I and E BOD,5 day,20°C3 C0310 (November 1-March 31) 24.0 mg/L 36.0 mg/L 2/weeks Composite I and E Total Suspended Solids3 C0530 30.0 mg/L 45.0 mg/L Daily Composite I and E NH3 as N C0610 (Apr 1-Oct 31) 2.0 mg/L 6.0 mg/L Daily Composite E NH3 as N C0610 (Nov 1-Mar 31) 4.0 mg/L 12.0 mg/L Daily Composite E Dissolved Oxygen 00300 Daily Average?5.0 mg/L Daily Grab E pH 00400 Between 6.0 and 9.0 Standard Units Daily Grab E Temperature°C 00010 Monitor and Report Daily Grab E Fecal Coliform 31616 200/100 mL 400/100 mL (geometric mean) Daily Grab E Total Residual Chlorine' 50060 28 µg/L Daily Grab E TKN 9 (mg/L) 00625 Monitor and Report Monthly9 Composite E NO3-N+NO2-N 9 (mg/L) 00630 Monitor and Report Monthly9 Composite E Total Nitrogen8.9(mg/L) C0600 Monitor and Report Monthly9 Calculated E Total Phosphorus 9(mg/L) C0665 Monitor and Report Monthly9 Composite E Bis(2-Ethylhexyl)pthalate(µg/L) 39100 Monitor and Report Quarterly Composite E Chronic Toxicity6 TGP3B Monitor and Report Quarterly Composite E Pollutant Scan7 NC01 Monitor and Report Footnote 7 Footnote 7 E Dissolved Oxygen (mg/L) 00300 Monitor and Report Variable' Grab U and D Temperature°C 00010 Monitor and Report Variable' Grab U and D Footnotes: 1. The permittee shall submit Discharge Monitoring Reports electronically using NC DWR's eDMR application system. See Special Condition A.(7.). 2. Sample locations I-Influent, E-Effluent, U-Upstream = at NC Highway 217, D-Downstream = approximately 1400 feet below discharge. Upstream and downstream samples shall be grab samples collected 3/week during June,July,August,and September and 1/week during the remainder of the year.Instream sampling requirements are provisionally waived in light of the permittee's participation in the Middle Cape Fear River Basin Association. Should participation in the association cease,all instream sampling requirements are immediately reinstated. 3. The monthly average effluent BOD5 and Total Suspended Solids concentrations shall not exceed 15% of the respective influent value(85%removal). 4. The Division shall consider all effluent total residual chlorine values reported below 50 µg/l to be in compliance . with the permit. However,the permittee shall continue to record and submit all values reported by a North Carolina certified laboratory(including field certified),even if these values fall below 50 µg/l. Footnotes are continued on the next page. 3 of 11 Permit NC0043176 Footnotes continued from A.(1.). 5. For a given wastewater sample,TN=TKN+NO3-N+NO2-N,where TN is Total Nitrogen,TKN is Total Kjeldahl Nitrogen,and NO3-N and NO2-N are Nitrate and Nitrite Nitrogen,respectively. 6. Chronic Toxicity(Ceriodaphnia dubia)P/F at 1%with testing in March,June,September,and December. See Special Condition A. (2.). 7. The permittee shall perform three effluent pollution scans during the term of this permit. See Special Condition A. (3.). 8. Twice per week sampling for BOD must occur on any two non-consecutive days during the calendar week. 9. Per the administrative letter dated January 10,2019,the facility shall sample these parameters at a frequency of weekly from April 1,2019 to December 31,2020.Monitoring for these parameters shall revert to the frequency in this table beginning January 1,2021. There shall be no discharge of floating solids or visible foam in other than trace amounts. 4 of 11 Permit NC0043176 A. (2.) CHRONIC TOXICITY PERMIT LIMIT (QUARTERLY) [15A NCAC 02B.0200] The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant mortality to Ceriodaphnia dubia at an effluent concentration of 1%. The permit holder shall perform at a minimum,quarterly monitoring using test procedures outlined in the "North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure,"Revised December 2010, or subsequent versions or"North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised-December 2010)or subsequent versions. The tests will be performed during the months of March,June, September, and December. These months signify the first month of each three-month toxicity testing quarter assigned to the facility. Effluent sampling for this testing must be obtained during representative effluent discharge and shall be performed at the NPDES permitted final effluent discharge below all treatment processes. If the test procedure performed as the first test of any single quarter results in a failure or ChV below the permit limit,then multiple-concentration testing shall be performed at a minimum,in each of the two following months as described in"North Carolina Phase H Chronic Whole Effluent Toxicity Test Procedure"(Revised-December 2010)or subsequent versions. All toxicity testing results required as part of this permit condition will be entered on the Effluent Discharge Monitoring Form(MR-1)for the months in which tests were performed,using the parameter code TGP3B for the pass/fail results and THP3B for the Chronic Value. Additionally,DWR Form AT-3 (original)is to be sent to the following address: Attention: North Carolina Division of Water Resources Water Sciences Section/Aquatic Toxicology Branch 1621 Mail Service Center Raleigh,NC 27699-1621 Completed Aquatic Toxicity Test Forms shall be filed with the Water Sciences Section no later than 30 days after the end of the reporting period for which the report is made. Test data shall be complete,accurate,include all supporting chemical/physical measurements and all concentration/response data,and be certified by laboratory supervisor and ORC or approved designate signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if chlorine is employed for disinfection of the waste stream. Should there be no discharge of flow from the facility during a month in which toxicity monitoring is required,the permittee will complete the information located at the top of the aquatic toxicity(AT)test form indicating the facility name, permit number,pipe number,county, and the month/year of the report with the notation of"No Flow"in the comment area of the form. The report shall be submitted to the Water Sciences Section at the address cited above Should the permittee fail to monitor during a month in which toxicity monitoring is required,monitoring will be required during the following month. Assessment of toxicity compliance is based on the toxicity testing quarter, which is the three month time interval that begins on the first day of the month in which toxicity testing is required by this permit and continues until the final day of the third month. 5 of 11 Permit NC0043176 Should any test data from this monitoring requirement or tests performed by the North Carolina Division of Water Resources indicate potential impacts to the receiving stream,this permit may be re-opened and modified to include alternate monitoring requirements or limits. NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control organism survival,minimum control organism reproduction, and appropriate environmental controls, shall constitute an invalid test and will require immediate follow-up testing to be completed no later than the last day of the month following the month of the initial monitoring. 6of11 Permit NC0043176 A. (3.) EFFLUENT POLLUTANT SCAN (Municipal POTWs) [G.S. 143-215.1(b)] The permittee shall perform a total of three(3)Effluent Pollutant Scans for all parameters listed below.One scan must be performed in each of the following years: 2020, 2021, and 2022. Analytical methods shall be in accordance with 40 CFR Part 136 and shall be sufficiently sensitive to determine whether parameters are present in concentrations greater than applicable standards and criteria. Samples should be collected with one quarterly toxicity test each year,and must represent seasonal variation[i.e., do not sample in the same quarter every year]. Unless otherwise indicated,metals shall be analyzed as"total recoverable." Ammonia(as N) C0610 1,2-dichloroethane 32103 Bis(2-chloroethoxy)methane 34278 Chlorine(total residual,TRC 50060 Trans-1,2-dichloroethylene 34546 Bis(2-chloroethyl)ether 34273 Dissolved oxygen 00300 1,1-dichloroethylene 34501 Bis(2-chloroisopropyl)ether 34283 Nitrate 00620 1,2-dichloropropane 34541 Bis(2-ethyihexyl)phthalate 39100 Nitrite 00615 1,3-dichloropropylene 77163 4-bromophenyl phenyl ether 34636 Kjeldahl nitrogen 00625 Ethylbenzene 34371 Butyl benzyl phthalate 34292 Oil and grease 00556 Methyl bromide 34413 2-chloronaphthalene 34581 Phosphorus C0665 Methyl chloride 34418 4-chlorophenyl phenyl ether 34641 Total dissolved solids 70295 Methylene chloride 34423 Chrysene 34320 Hardness 00900 1,1,2,2-tetrachloroethane 81549 1)i-n-butyl phthalate 39110 Antimony 01097 Tetrachloroethylene 34475 Di-n-octyl phthalate 34596 Arsenic 01002 Toluene 34010 Dibenzo(a,h)anthracene 34556 Beryllium 01012 1,1,1-trichloroethane 34506 1,2-dichlorobenzene 34536 Cadmium 01027 1,1,2-trichloroethane 34511 1,3-dichlorobenzene 34566 Chromium 01034 Trichloroethylene 39180 1,4-dichlorobenzene 34571 Copper . 01042 Vinyl chloride 39175 3,3-dichlorobenzidine 34631 Lead 01051 Acid-extractable compounds: Diethyl phthalate 34336 Mercury(Method 1631E) COMER P-chloro-m-cresol 34452 Dimethyl phthalate 34341 Nickel 01067 2-chlorophenol 34586 2,4-dinitrotoluene 34611 Selenium 01147 2,4-dichlorophenol 34601 2,6-dinitrotoluene C0626 Silver 01077 2,4-dimethylphenol 34606 1,2-diphenylhydrazine 34346 Thallium 01059 4,6-dinitro-o-cresol 34657 Fluoranthene C0376 Zinc 01092 2,4-dinitrophenol 34616 Fluorene 34381 Cyanide 00720 2-nitrophenol 34591 Hexachlorobenzene C0700 Total phenolic compounds 32730 4-nitrophenol 34646 Hexachlorobutadiene 39702 Volatile organic compounds: Pentachlorophenol 39032 Hexachlorocyclo-pentadiene 34386 Acrolein 34210 Phenol 34694 Hexacltloroethane 34396 Acrylonitrile 34215 2,4,6-trichlorophenol 34621 lndeno(1,2,3-cd)pyrene 34403 Benzene 34030 Base-neutral compounds: Isophorone 34408 Bromoform 32104 Acenaphthene 34205 Naphthalene 34696 Carbon tetrachloride 32102 Acenaphthylene 34200 Nitrobenzene 34447 Chlorobenzene 34301 Anthracene CO220 N-nitrosodi-n-propylamine 34428 Chlorodibromomethane 34306 Benzidine 39120 N-nitrosodimethylamine 34438 • Chloroethane 85811 Benzo(a)anthracene 34526 N-nitrosodiphenylamine 34433 2-chloroethyl vinyl ether 34576 Benzo(a)pyrene 34247 Phenanthrene 34461 Chloroform 32106 3,4 benzofluoranthene 34230 Pyrene 34469 Dichlorobromomethane 32101 ' Benzo(ghi)perylene 34521 1,2,4-trichlorobenzene 34551 1,1-dichloroethane 34496 Benzo(k)fluoranthene 34242 7 of 11 L_ Permit NC0043176 Reporting. Test results shall be reported electronically via eDMR or on DWR Form—DMR-PPA-1 (or on a form approved by the Director)by December 31 1 of each designated sampling year. The report shall be submitted to the following address: NC DEQ/DWR/Central Files,1617 Mail Service Center,Raleigh,North Carolina 27699-1617. Additional Toxicity Testing Requirements for Municipal Permit Renewal. Please note that Municipal facilities that are subject to the Effluent Pollutant Scan requirements listed above are also subject to additional toxicity testing requirements specified in Federal Regulation 40 CFR 122.21(jx5). The US EPA requires four(4)toxicity tests for a test organism other than the test species currently required in this permit. The multiple species tests should be conducted either quarterly for a 12-month period prior to submittal of the permit renewal application,or four tests performed at least annually in the four and one half year period prior to the application. These tests shall be performed for acute or chronic toxicity,whichever is specified in this permit. The multiple species toxicity test results shall be filed with the Aquatic Toxicology Branch at the following address: North Carolina Division of Water Resources Water Sciences Section/Aquatic Toxicology Branch 1621 Mail Service Center Raleigh,North Carolina 27699-1621 Contact the Division's Aquatic Toxicology Branch at 919-743-8401 for guidance on conducting the additional toxicity tests and reporting requirements. Results should also be summarized in Part E(Toxicity Testing Data)of EPA Municipal Application Form 2A,when submitting the permit renewal application to the NPDES Permitting Unit. A. (4.). MERCURY MINIMIZATION PLAN (MMP) [G.S. 143-215.1 (b)] The permittee shall develop and implement a mercury minimization plan during this permit term. The MMP shall be developed within 180 days of the NPDES Permit Effective Date,and shall be available for inspection on-site. A sample MMP was developed through a stakeholder review process and has been placed on the Division website for guidance(https://deo.nc.gov/document/nc-model-mercurv- minimization-plan-dwr-nodes-swp-20130801). The MMP should place emphasis on identification of mercury contributors and goals for reduction. Results shall be summarized and submitted with the next permit renewal. Performance of the Mercury Minimisation Plan will meet the requirements of the TMDL (Total Maximum Daily Load)for mercury approved by USEPA on October 12,2012,unless and until a Waste Load Allocation specific to this facility is developed and this NPDES permit is amended to require further actions to address the Waste Load Allocation. A.(5.) CAPE FEAR RIVER BASINNUTRIENT MONITORING REOPENER [G.S. 143-215.1(b)] Pursuant to N.C. General Statutes Section 143-215.1 and the implementing rules found in the North Carolina Administrative Code at 15A NCAC 2H.0112 (b) (1) and 2H.0114 (a)and Part II sections B-12 and B-13 of this permit, the Director of DWR may reopen this permit to require supplemental nutrient 8ofll Permit NC0043176 monitoring of the discharge. The purpose of the additional monitoring will be to support water quality modeling efforts within the Cape Fear River Basin and shall be consistent with a monitoring plan developed jointly by the Division and affected stakeholders. In addition, the results of water quality modeling may require that additional limits for total nitrogen and total phosphorus be imposed in this permit upon renewal. A. (6.) BIS (2-ETHYLHEXYL)PTHALATE MONITORING AND LIMITS REOPENER [G.S. 143-215.1(b)] Pursuant to N.C. General Statutes Section 143-215.1 and the implementing rules found in the North Carolina Administrative Code at 15A NCAC 2H.0112 (b)(1)and 2H.0114 (a)and Part II sections B-12 and B-13 of this permit,the Director of DWR may reopen this permit to modify monitoring or add effluent limitations for the discharge based on the sample results required by Section A. (1.). A. (7.) ELECTRONIC REPORTING OF MONITORING REPORTS [G.S. 143-215.1(b)] Federal regulations require electronic submittal of all discharge monitoring reports(DMRs) and program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on December 21, 2015. NOTE: This special condition supplements or supersedes the following sections within Part II of this permit (Standard Conditions for NPDES Permits): • Section B. (11.) Signatory Requirements • Section D. (2.) Reporting • Section D.(6.) Records Retention • Section E. (5.) Monitoring Reports 1. Reporting Requirements (Supersedes Section D.(2.) and Section E. (5.)(a)1 The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic Discharge Monitoring Report(eDMR)internet application. Monitoring results obtained during the previous month(s) shall be summarized for each month and submitted electronically using eDMR. The eDMR system allows permitted facilities to enter monitoring data and submit DMRs electronically using the internet. Until such time that the state's eDMR application is compliant with EPA's Cross-Media Electronic Reporting Regulation (CROMERR), permittees will be required to submit all discharge monitoring data to the state electronically using eDMR and will be required to complete the eDMR submission by printing,signing, and submitting one signed original and a copy of the computer printed eDMR to the following address: NC DEQ/Division of Water Resources/Water Quality Permitting Section ATTENTION: Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the facility being physically located in an area where less than 10 percent of the households have broadband access, then a temporary waiver from the NPDES electronic reporting requirements may be granted and 9 of 11 Permit NC0043176 discharge monitoring data may be submitted on paper DMR forms(MR 1, 1.1,2,3)or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the mailing address above. See"How to Request a Waiver from Electronic Reporting"section below. Regardless of the submission method,the first DMR is due on the last day of the month following the issuance of the permit or in the case of a new facility, on the last day of the month following the commencement of discharge. Starting on December 21, 2020, the permittee must electronically report the following compliance monitoring data and reports,when applicable: • Sewer Overflow/Bypass Event Reports; • Pretreatment Program Annual Reports;and • Clean Water Act(CWA)Section 316(b)Annual Reports. The permittee may seek an electronic reporting waiver from the Division (see "How to Request a Waiver from Electronic Reporting"section below). 2. Electronic Submissions In accordance with 40 CFR 122.41(1)(9),the permittee must identify the initial recipient at the time of each electronic submission. The permittee should use the EPA's website resources to identify the initial recipient for the electronic submission. Initial recipient of electronic NPDES information from NPDES-regulated facilities means the entity (EPA or the state authorized by EPA to implement the NPDES program) that is the designated entity for receiving electronic NPDES data[see 40 CFR 127.2(b)]. EPA plans to establish a website that will also link to the appropriate electronic reporting tool for each type of electronic submission and for each state. Instructions on how to access and use the appropriate electronic reporting tool will be available as well. Information on EPA's NPDES Electronic Reporting Rule is found at: https://www.federalregister_gov/documents/2015/10/22/2015-24954/national- pollutant-discharge-elimination-system-npdes-electronic-reporting-rule Electronic submissions must start by the dates listed in the"Reporting Requirements"section above. 3. How to Request a Waiver from Electronic Reporting The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an electronic reporting waiver,a permittee must first submit an electronic reporting waiver request to the Division. Requests for temporary electronic reporting waivers must be submitted in writing to the Division for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data and reports. The duration of a temporary waiver shall not exceed 5 years and shall thereupon expire. At such time,monitoring data and reports shall be submitted electronically to the Division unless the permittee re-applies for and is granted a new temporary electronic reporting waiver by the Division. Approved electronic reporting waivers are not transferrable. Only permittees with an approved reporting waiver request may submit monitoring data and reports on paper to the Division for the period that the approved reporting waiver request is effective. 10 of 11 Permit NC0043176 Information on eDMR and the application for a temporary electronic reporting waiver are found on the following web page: http://deq.nc.gov/about/divisions/water-resources/edmr 4. Signatory Requirements [Supplements Section B. 11.( ) (b) and Supersedes Section B. (11.}(d)1 All eDMRs submitted to the permit issuing authority shall be signed by a person described in Part II, Section B. (11.)(a)or by a duly authorized representative of that person as described in Part II, Section B. (11.)(b). A person, and not a position, must be delegated signatory authority for eDMR reporting purposes. For eDMR submissions, the person signing and submitting the DMR must obtain an eDMR user account and login credentials to access the eDMR system. For more information on North Carolina's eDMR system, registering for eDMR and obtaining an eDMR user account,please visit the following web page: http://deq.nc.gov/about/divisions/water-resources/edmr Certification. Any person submitting an electronic DMR using the state's eDMR system shall make the following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED: "1 cert , under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 5. Records Retention [Supplements Section D.(6.)1 The permittee shall retain records of all Discharge Monitoring Reports, including eDMR submissions. These records or copies shall be maintained for a period of at least 3 years from the date of the report. This period may be extended by request of the Director at any time[40 CFR 122.41]. 11 of 11 I � '* •~�v;' � r �-^ � t �-z .fir .. ... � -'•-.� � s ! .i Z :-j I •+s Jr-J 1 rt{� ' 'ice 9 �5 ... /. .: •r- �. 1 x.. ......,: ,,. ....: -.•-,.. ',. .-..;, A-. , ...,.,-.t ,. F,., orr00,:4::i.-__,:;:s...,-.4. _:-.. :,i,,.. '-. ,„,.. ,7-:-.;" 1...- .- --- -;.. 04e, r " ,1 s . ` r 1 .: ,Lt �1ao •ri a.f , I ire. • ::?.I:,-,:,,Tr.., :E '`, :� .p 'tz-4.� P_H-aw . �i sir 17.J \., jA i•, -.•4 •�;;:. i i .1'� v I V. r. , y1II Ad a 'd5 .y,k "' i-' - ='-' ' v ' Outfa11001 • . ' .•j '• .. - x ,yam `1 .. (Rti' -.' � 9. •,slf�: ' lJ •�• O ?�,Y. '. .f �_ � MAP T /� ,.e,, , Alt - _•,� .S ems"✓ t \ ITs.' s s,•"�� . )• �b /'-. �`•� j f' I s., y„f,�_.{.,,, .,, : "'... +i y,,i. j "" tVF1 j ✓' - ma y : .°i J •.` • ,� _ .: :...r,� a `, .•Siq•r r 7-., •,,,..,,,,,... U.--..‹.-77.....::::•:'::::, ez .,:i:.:-:,•2•.:,,..•.:il..,•,::::.,;.:,,,.....:,-,',......4:-•,:;,..,:;:......•:::•:,:!::....,...::::::,,,,..,z,,-.2,:cei...1.:.i...,.ff.,;:.„. / )I;" y ` tf' �« '�s� V 4'y 4\l ;iAf►1�' 'per: \ "';n"� / .! if , , is v c City of Dunn—Black River WWTPII � �" ]' Facility Location ' ate Grid/Quad: F24SW/Erwin Latitude: 35'17'31" •N '- not to scale -, <~ Longitude: 78°41'09"W Receiving Stream:Cape Fear River Drainage Basin: Cape Fear River Stream pass: WS-V sub•Basin; 030615 NPDES Permit No.NC0043176 HUC: 03030004 North Harnett County Davis-Martin-Powell / 1 OF fi LL o Nc./Nc Dunn WWTP DMP 004223.00 updated for 170207 updated for 210076 Printed: 12/23/22 11:39 AM Hydraulic Analysis from PTF to Effluent Pump Station Changes: Replaced the piping between the Aeration Basin and Final Clarifiers to eliminate bottleneck and improve flow. Influent Design Rate 3.75 MGD Current 2,604 GPM Influent Peak Rate MGD 3.00 Peak Factor 7,813 GPM RAS Design/Qa= 100% - MGD 2,604 GPM Scenario 1 ADF: Influent flow=3.75 mgd,all basins in service 1 Peak Day: Influent flow=9.375 mgd,all units in service. Scenario 2 Design for no weirs submerged. Peak Hour:Influent Flow=11.25,Largest unit out of service. Design for no walls overtopped and final clarifier weirs not Scenario 3 submerged Scenario INFL flow= 1 3.75 IMOD GPM 5.78 ft3/s Scenario rAIl Online Manning N Values Concrete Channel 0.0110 Clarifer Flow Distribution Matrix Concrete Pipe 0.0130 Percent of Process Flow DI Pipe 0.0130 FC1 FC2 FC3 FC4 Concrete Channel 0.0130 All Online 20% 20% 20% 40% One 60 Ft Offline 25% 25% 0% 50% DI Pipe-all C Factors 100 Largest Unit Offline 33% 33% 33% 0% Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft START IN Ex Effluent Pump Station Assume max EFFL PS level per plans=156.6 1 3.75 156.09 WS-0 Flow Rate: WS-0,Ex Effl PS Wetwell2,604 Ex Effl PS to Flume Outlet Percent OF TOTAL Q= 100% 2,604 3.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 04 3.75• 0.50 1.18 0.01 Pipe&Fittings(1) 100.00 30.00 46.00 2,604 0.00 1.18 0.01 Pipe&Fittings(2) 100.00 30.00 0.00 2,604 Cl: 0.00 1.18 Pipe Outlet 100.00 30.00 0.00 2,604 3.75 1.00 1.15 WS-1,EFFL Flume Outlet Pipe Invert shout. 156.70 156.14 wS-1 12"Parshall Flume x^`i • 156.78 2,604 3.75 head in flume J HEAD IS EXCESSIVE AT PEAK FLOW-DEMO FLUME AND REPLACE WITH 30"PIPE WS-2,EFFL Flume Inlet 156.14 WS-2 Flume to CCT Outlet Percent OF TOTAL Q= 100% 2,604 3.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 42.00 0.00 2,604 3.75 0.50 0.60 0.00 Pipe&Fittings(1) 100.00 42.00 14.00 2,604 3.75 0.22 0.60 0.00 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 1 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,Rpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Pipe&Fittings(2) 100.00 30.00 90.00 2,604 3.75 1.04 1.18 0.05 Pipe Outlet 100.00 30.00 0.00 2,604 3.75 1.00 1.18 0.02 0.07 WS-3,CCT Outlet 156.21 WS-3 Chlorine Contact Basin Two trains available,level controlled by weir in each basin Total Process Flow 2,604 3.75 CCT in Service 2.00 Flow Each 1,302 1.88 Straight weir w/o end contractions Not Submerged crest elevation 157.75 Length 15.00 MGD GPM H,feet H,inches WS Elev 1.88 1,302 0.15 1.8 157.90 WS-4,CCT Basin 157.90 WS-4 Combine the two FCE pipes in a Box. Control Flow into each CCT by Submerged Gates Flow Each 1,302 1.88 Width,Ft Height,Ft Area,FT2 HL,ft HL,inches Gate Size 3.00 3.00 9.00 0.004 0.1 WS-5,CCT Basin Inlet 157.90 WS-5 Final Clarifier 1 and 2 Path Flow from CCT Inlet to WS-6.1 Percent OF TOTAL Q= 40% 1,042 1.50 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 _ 24.00 0.00 1,042 1.50 0.50 0.74 0.00 Pipe&Fittings(1) 100.00 24.00 60.00 1,042 1.50 0.00 0.74 0.01 Pipe&Fittings(2) 100.00 36.00 125.00 1,042 1.50 2.34 0.33 0.01 Pipe Outlet 100.00 36.00 0.00 1,042 1.50 1.00 0.33 0.00 0.02 WS-6.1,Junction of FC-1,FC-2 Piping 157.93 WS-6.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 2 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 1 Path Percent OF TOTAL Q= 20%J 521 0.75 Pipe Full Flow Assumed C Dian)inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 521 0.7:� 0.50 0.37 Pipe&Fittings(1) 100.00 24.00 34.00 '1 r` 0.40 Pipe&Fittings(2) 100.00 24.00 88.00 0.24 Pipe Outlet 100.00 24.00 0.00 1.00 WS-7.1,FC-1 Effluent Launder Trough Elev 157.62 Depth= 0.31 157.94 WS-7.1 FINAL Clarifier FC-1 Percent OF TOTAL Q= 20% Process Flow 521 0.7 159.83 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 188.50 feet V-notch angle 90 deg Not Submerged Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 0.75 0.92 0.0021 0.06 0.7 159.89 WS-8.1,FC-1 Water Surface 159.89 WS-8.1 Flow from Aeration Splitter to Clarifier Process Flow 521 0.75 RAS 521 0.75 MLSS Flow 1,042 1.50 Pipe Full Flow Assumed C Dian,inch Length,Ft Flow,gpm Flow,MOD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 521 0.75 0.50 0.24 0.00 Pipe&Fittings(1) 100.00 30.00 10.00 521 0.75 0.24 0.00 Pipe&Fittings(2) 100.00 24.00 125.00 521 0.75 0.73 0.37 0.01 Pipe Outlet 100.00 24.00 0.00 521 0.75 1.00 0.37 0.00 0.01 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.1,Splitter Box Outlet 160.15 WS-9.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 3 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow.MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 2 Path Flow from WS-6.1 to FC2 Percent OF TOTAL Q= 20% 521 0.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 521 0.75 0.50 0.37 0.00 Pipe&Fittings(1) 100.00 24.00 34.00 521 0.75 0.20 0.37 0.00 Pipe&Fittings(2) 100.00 24.00 0.00 521 0.75 0.00 0.37 0.00 Pipe Outlet 100.00 24.00 0.00 ,_, 0.75 1.00 0.37 0.00 0.01 WS-7.2,FC-2 Effluent Launder Trough Elev 157.67 Depth= 0.26 157.93 WS-7.2 FINAL Clarifier FC-2 Percent OF TOTAL Q= 20% Process Flow 521 0.75 159.88 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches 565.00 Weir Length 188.50 feet V-notch angle 90 deg Not Submerged WS-8.2,FC-2 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 0.75 0.92 0.0021 0.06 0.7 159.94 159.94 WS-8.2 Flow from Aeration Splitter to Clarifier Process Flow 521 c 7' RAS 521 U.75 MLSS Flow 1,042 1.50 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet I 100.00 30.00 0.00 521 0.75 0.50 0.24 0.00 Pipe&Fittings(1) 100.00 30.00 80.00 521 0.75 0.20 0.24 0.00 Pipe&Fittings(2) 100.00 24.00 85.00 521 0.75 0.53 0.37 0.00 Pipe Outlet 100.00 24.00 0.00 521 0.75 1.00 0.37 0.00 0.01 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.2,Splitter Box Outlet 160.20 W5-9.2 Final Clarifier 3 and 4 Path Flow from CCT Inlet WS-5 to WS-6.3 Percent OF TOTAL Q= 60% 1,563 2.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 1,563 2.25 0.00 0.49 0.00 Pipe&Fittings(1) 100.00 36.00 125.00 1,563 2.25 0.33 0.49 0.01 Pipe&Fittings(2) 100.00 36.00 0.00 1,563 2.25 0.00 0.49 0.00 Pipe Outlet 100.00 36.00 0.00 1,563 2.25 1.00 0.49 0.00 0.01 WS-6.3,Junction of FC-3,FC-4 Effluent Piping 157.91 WS-6.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 4 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 3 Path Percent OF TOTAL Q= 20% 521 0.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 521 0.75 0.50 0.37 0.00 Pipe&Fittings(1) 100.00 24.00 70.00 coil 0.7E 0.40 0.37 0.00 Pipe&Fittings(2) 100.00 24.00 210.00 21 0.75 0.20 0.37 0.01 Pipe Outlet 100.00 36.00 5.00 521 0.75 1.68 0.16 i 0.00 0.02 WS-7.3,FC-3 Effluent Launder Trough Elev 157.59 Depth= 157.93 WS-7.3 FINAL Clarifier FC-3 Percent OF TOTAL Q= 20% Process Flow 521 0.75 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 1805o feet V-notch angle 90 deg Not Submerged WS-8.3,FC-3 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 0.75 0.92 0.0021 0.06 0.7 159.86 159.86 WS-8.3 Flow from Aeration Splitter to Clarifier Process Flow S21 0.75 RAS 521 0.75 MLSS Flow 1,042 1.50 Pipe Full Flow Assumed C Diani inch Length.Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 10.00 521 0.75 0.50 0.24 Pipe&Fittings(1) 100.00 24.00 73.00 521 0.75 0.53 0.37 u.uu Pipe&Fittings(2) 100.00 24.00 44.00 521 0.75 0.20 i 0.37 0.00 Pipe Outlet 100.00 24.00 0.00 521 0.7. 1.00 0.37 0.01 Losses through the Inlet Pipe and Well 0.25 I feet 0.25 WS-9.3,Splitter Box Outlet • 160.12 WS-9.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 5 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 4 Path Flow from W5-6.3 to FC-4 Percent OF TOTAL Q=I 40% 1,042 1.50 Pipe Full Flow Assumed C [plain inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 ci42 1.50 0.50 0.47 0.00 Pipe&Fittings(1) 100.00 30.00 35.00 1,042 1.50 0.00 0.47 0.00 Pipe&Fittings(2) 100.00 30.00 0.00 1,042 1.50 0.66 0.47 0.00 Pipe Outlet 100.00 30.00 0.00 1,042 1.50 0.00 0.47 0.00 0.01 WS-7.4,FC-4 Effluent Launder Trough Elev 1 157.59 Depth= 157.92 WS-7.4 FINAL Clarifier FC-4 Percent OF TOTAL Q= 40% Process Flow 1.50 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 74.67 feet No.of notches Weir Length 2 i4.5 feet V-notch angle 90 deg Not Submerged WS-8.4,FC-4 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 1.50 1.84 0.0041 0.08 0.9 159.88 159.88 WS-8.4 Flow from Aeration Splitter to Clarifier Process Flow 1,042 1.50 RAS 1,042 1.50 MLSS Flow 2,084 3.00 Pipe Full Flow Assumed C Dram inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 1,042 1.5C 0.50 )47 0.00 Pipe&Fittings(1) 100.00 30.00 195.00 1,042 1.50 0.38 0.01 Pipe&Fittings(2) 100.00 30.00 0.00 1,042 1.50 0.00 ., C r'0 Pipe Outlet 100.00 30.00 0.00 1,0-: 1.50 1.00 ,47 Losses through the Clarfier Center Column and Center Well 0.25 feet 0.2 WS-9.4,Splitter Box Outlet 160.14 WS-9.4 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 6 Davis-Martin-Powell Description c Dia inch Length,Ft Flow,Rpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Clarifier Distribution Box Set all weirs at same level,sharp edge with end contractions FC-1 Weir Percent OF TOTAL Q= 20% MLSS Flow 1,042 1.50 WS-10 WS-9 thru_Weir Openings 1.00 1,042 Weir Length 4.00 Upstream Downstream crest elevation 161.00 Weir Head,ft 0.31 161.31 160.15 FC-2 Weir Percent OF TOTAL Q= 20% MLSS Flow 1,042 1.50 thru_Weir Openings 1.00 1,042 Weir Length 4.00 crest elevation 161.00 Weir Head,ft 0.31 161.31 160.20 FC-3 Weir Percent OF TOTAL Q= 20% MLSS Flow 1,042 1.50 thru_Weir Openings 1.00 1,042 Weir Length 4.00 crest elevation 161.00 Weir Head,ft 0.31 161.31 160.12 FC-4 Weir Percent OF TOTAL Q= 40% MLSS Flow 2,084 3 thru_Weir Openings 1.00 2,084 Weir Length 8.00 crest elevation 161.00 Weir Head,ft 0.31 161.31 160.14 WS-10,Clarifier Splitter Inlet Total MLSS Flow 5,209 8 161.31 WS-10 Aeration Basin Effluent Channel Rectangular Channel Losses Width,ft 2.00 160.56 Flow Each AB 1,302 1.88 Flow Depth,ft 0.75 Wetted area,SF 1.50 wetted perimeter,ft 3.50 velocity,ft/s 1.93 headloss,ft/LF 0.0010 times typical Length 28.00 HL,ft 0.028 WS-11,Aeration Effluent Channel 161.34 WS-11 Aeration Basins Add RAS flow to give MLSS FLOW,Ignore Thickener return,no EQ return at high flows WS is controlled by effluent weirs in each of 4 aeration trains Process Flow 2,604 3.75 RAS Flow 2,604 3.75 MLSS Flow 5,209 7.50 AB in Service 4.00 Flow Each AB 1,302 1.88 AB Effluent Weir sharp crested weir,no end contractions AB Effluent Weir is Not Surcharged Length 27.75 162.26 Flow 1,302 1.88 HL= 0.10 164.56 Freeboard(24"+desired)= 26.41 AB Freeboard OK WS-12,Aeration Basin 162.36 WS-12 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 7 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL ft W/S Elev,ft Aeration Splitter Box RAS Returns at this Point AB in Service 4.00 MLSS Flow 5,209 7.50 Flow Each AB 1,302 1.88 C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft JB-1 to AB-3,4 100.00 24.00 0.00 2,604 3.75 0.50 1.85 0.03 to TEE at AB-3,4) 100.00 24.00 140.00 004 3.75 0.80 1.85 0.16 to AB-4 100.00 24.00 20.00 1,302 1.88 1.45 0.92 0.02 sum 0.21 WS-13,Aeration Splitter Box(JB-1) 162.57 WS-13 Preliminary Treatment PTF EFFL Pipe to Aeration Splitter Box(JB-1) C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 2,604 3.75 0.50 0.82 0.01 Yard Piping 100.00 36.00 94.00 2,604 3.75 0.00 0.82 0.01 Pipe Outlet 100.00 36.00 0.00 2,604 3.75 1.00 0.82 0.01 sum 0.03 WS-14,PTF Effluent 162.60 WS-14 Influent parshall flume 24"Throat Parshall 164.14 2,60.. 3.75 flume head,ft u K, ch 163.14 50%of flume Head 164.54 Max Downstream WS for free flowing Flume Flume Flow is free flowing WS-15,Flume Inlet 164.95 WS-15 Rectangular Channel Losses Width,ft 6.00 2,604 3.75 Invert,ft 163.14 Flow Depth,ft 1.81 Wetted area,SF 10.85 wetted perimeter,ft 9.62 velocity,ft/s 0.53 headloss,ft/LF 0.0002 Length 12.00 0.002 WS-16,Flume Channel 164.95 WS-16 Rectangular Channel Losses Width,ft 2.50 2,604 3.75 Invert,ft 153 1 Flow Depth,ft 1.81 Wetted area,SF 4.53 wetted perimeter,ft 6.12 velocity,ft/s 1.28 headloss,ft/LF 0.0010 Length 5.00 0.005 WS-16,Grit Effluent Channel 164.96 WS-17 Grit Collector Grit Effluent Weir sharp crested weir,no end contractions Length,ft 16.00 168.50 2,604 3.75 Weir Head 0.23 ft 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 8 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Weir not submerged WS-18,Grit Collector 168.73 WS-18 Grit inlet&tray headloss per Euteck proposal 2,604 3.75 0.03 WS-19,Inlet to Grit Collector 168.73 WS-19 Mechanical Cleaned Step Screens Note:Always consider 2 screens in service,use manual bypass if one is out Screens in Service 2.00 Flow Each 1,302 1.88 Rectangular Channel Losses: Screen to Grit Inlet Width,ft 2.50 1,302 1.88 166.57 Flow Depth,ft 2.16 Wetted area,SF 5.39 wetted perimeter,ft 6.82 velocity,ft/s 0.54 headloss,ft/LF 0.0002 Length 10.00 0.00 WS-20,Screen discharge 168.73 WS-20 Screen Headloss,30%blinded,7.5 MGD each,min 24"downstream(WesTech) 0.03 feet downstream depth,inches= 25.9 Downstream Depth is OK WS-21,Inlet to Mechanical Screen 168.76 WS-21 Box to Mechanical Screen Channel Rectangular Channel Losses Width,ft 2.50 1,302 1.88 Invert,ft 166.57 Flow Depth,ft 2.19 Wetted area,SF 5.48 wetted perimeter,ft 6.88 velocity,ft/s 0.53 headloss,ft/LF 0.0001 Length 11.00 HL= 0.001 WS-22,PTF influent 168.76 WS-22 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 9 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Dunn WWII New Elevations NAD83?Datum Summary Current W/S Bottom TOP Scenario: WS-0 WS-u,Ex em PS wetwell 156.09 149.69 162.69 3.75 MGD,Influent Flow WS-1 WS-1,EFFL Flume Outlet 156.14 156.70 162.06 All Online WS-2 WS-2,EFFL Flume Inlet 156.14 156.70 162.06 WS-3 WS-3,CCT Outlet 156" 147.75 164.00 WS-4 WS-4,CCT Basin 157 147.75 164.00 WS-5 WS-5,CCT Basin Inlet 157,• 147.75 164.00 WS-6.1 WS-6.1,Junction of FC-1,FC-2 Piping 157, 153.25 166.00 WS-7.1 WS-7.1,FC-1 Effluent Launder 157.- 158.37 162.66 WS-8.1 WS-8.1,FC-1 Water Surface 159> 147.83 162.66 WS-9.1 WS-9.1,Splitter Box Outlet 160': 148.06 164.56 WS-10 WS-10,Clarifier Splitter Inlet 161 148.06 164.56 WS-11 WS-11,Aeration Effluent Channel 161 . 148.06 164.56 WS-12 WS-12,Aeration Basin 162 r 148.06 164.56 WS-13 WS-13,Aeration Splitter Box(1B-1) 162- 158.56 167.56 WS-14 WS-14,PTF Effluent 162,i 161.57 171.57 WS-15 WS-15,Flume Inlet 164 r 161.57 171.57 WS-16 WS-16,Flume Channel 164 161.57 171.57 WS-17 WS-16,Grit Effluent Channel 164- 161.57 171.57 WS-18 WS-18,Grit Collector 168 166.57 172.57 WS-19 WS-19,Inlet to Grit Collector 168 " 166.57 172.57 WS-20 WS-20,Screen discharge 168• 166.57 172.57 WS-21 WS-21,Inlet to Mechanical Screen 168- 166.57 172.57 WS-22 WS-22,PTF influent 168_ 166.57 172.57 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 10 f-- .Ate 14 ake All cnk Davis-Martin-Powell Dunn WWTP DMP 004223.00 updated for 170207 updated for 210076 Printed: 12/23/22 11:40 AM Hydraulic Analysis from PTF to Effluent Pump Station Changes: Replaced the piping between the Aeration Basin and Final Clarifiers to eliminate bottleneck and improve flow. Influent Design Rate 3.75 MGD Current 2,604 GPM Influent Peak Rate 11.25 MGD 3.00 Peak Factor 7,813 GPM RAS Design/Qa= 100% 3.75 MGD 2,604 GPM Scenario 1 ADF: Influent flow=3.75 mgd,all basins in service Peak Day: Influent flow=9.375 mgd,all units in service. Scenario 2 Design for no weirs submerged. Peak Hour:Influent Flow=11.25,Largest unit out of service. Design for no walls overtopped and final clarifier weirs not Scenario 3 submerged Scenario INFL flow= I 11.25 IMGD 7,813 GPM I I I ft3/s Scenario All Online Manning N Values Concrete Channel 0.0110 Clarifer Flow Distribution Matrix Concrete Pipe 0.0130 Percent of Process Flow DI Pipe 0.0130 FC1 FC2 FC3 FC4 Concrete Channel 0.0130 All Online 20% 20% 20% 40% One 60 Ft Offline 25% 25% 0% 50% DI Pipe-all C Factors 100 Largest Unit Offline 33% 33% 33% 0% Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL ft W/S Elev,ft START IN Ex Effluent Pump Station .Assume max EFFL PS level per plans=156.6 WS-0,Ex Effl PS Wetwell Flow Rate: 7,813 11.25 156.09 WS-0 Ex Effl PS to Flume Outlet Percent OF TOTAL Q= 100% 7,813 11.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 _ 30.00 0.00 7,813 11.25 0.50 3.55 0.10 Pipe&Fittings(1) 100.00 30.00 46.00 7,813 11.25 0.00 3.55 0.10 Pipe&Fittings(2) 100.00 30.00 0.00 7,813 11.25 0.00 3.55 0.00 Pipe Outlet 100.00 30.00 0.00 7,813 11.25 1.00 3.55 0.20 0.39 WS-1,EFFL Flume Outlet Pipe Invert shoul. 156.70 156.48 WS-1 12"Parshall Flume 156.78 7,813 11.25 head in flume 2.62 HEAD IS EXCESSIVE AT PEAK FLOW-DEMO FLUME AND REPLACE WITH 30"PIPE WS-2,EFFL Flume Inlet 156.48 WS-2 Flume to CCT Outlet Percent OF TOTAL Q= 100% 7,813 11.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 42.00 0.00 7,813 11.25 0.50 1.81 0.03 Pipe&Fittings(1) 100.00 42.00 14.00 7,813 11.25 0.22 1.81 0.02 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 1 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,Rpm Flow,MGD K Vel,ft/s HL ft W/S Elev,ft Pipe&Fittings(2) 100.00 30.00 90.00 7,813 11.25 1.04 3.55 0.39 Pipe Outlet 100.00 30.00 0.00 7,813 11.25 1.00 3.55 0.20 0.6's WS-3,CCT Outlet 157.11 WS-3 Chlorine Contact Basin Two trains available,level controlled by weir in each basin Total Process Flow 7,813 11.25 CCT in Service 2.00 Flow Each 3,907 5.63 Straight weir w/o end contractions Not Submerged crest elevation 157.75 Length 15.00 MGD GPM H,feet H,inches WS Elev 5.63 3,907 0.31 3.7 158.06 WS-4,CCT Basin 158.06 WS-4 Combine the two FCE pipes in a Box. Control Flow into each CCT by Submerged Gates Flow Each 3,907 5.63 Width,Ft Height,Ft Area,FT2 HL,ft HL,inches Gate Size 3.00 3.00 9.00 0.039 0.5 WS-5,CCT Basin Inlet 158.10 WS-5 Final Clarifier 1 and 2 Path Flow from CCT Inlet to WS-6.1 Percent OF TOTAL Q= 40% 3,125 4.50 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 3,125 4.50 0.50 2.22 0.04 Pipe&Fittings(1) 100.00 24.00 60.00 3,125 4.50 0.00 2.22 0.07 Pipe&Fittings(2) 100.00 36.00 125.00 3,125 4.50 2.34 0.99 0.06 Pipe Outlet 100.00 36.00 0.00 3,125 4.50 1.00 0.99 0.02 0.18 WS-6.1,Junction of FC-1,FC-2 Piping 158.28 W5-6.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 2 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 1 Path Percent OF TOTAL Q= 20% 1,563 2.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 1,563 0.50 1.11 0.01 Pipe&Fittings(1) 100.00 24.00 34.00 1,563 0.40 0.02 Pipe&Fittings(2) 100.00 24.00 88.00 t 563 0.24 0.03 Pipe Outlet 100.00 24.00 0.00 53 1.00 n.02 WS-7.1,FC-1 Effluent Launder Trough Elev 157.62 Depth=1 158.36 ,WS-7.1 FINAL Clarifier FC-1 Percent OF TOTAL Q= 20% Process Flow 1,56 159.83 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches 565.0, Weir Length 188.50 feet V-notch angle 90 deg Not Submerged Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 2.25 2.77 0.0062 0.09 1.1 159.92 WS-8.1,FC-1 Water Surface 159.92 W5-8.1 Flow from Aeration Splitter to Clarifier Process Flow 1,563 2.25 RAS 521 0.75 MLSS Flow 2,084 3.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 2.25 0.50 0.71 0.00 Pipe&Fittings(1) 100.00 30.00 10.00 2.25 0.71 0.00 Pipe&Fittings(2) 100.00 24.00 125.00 1,563 2.25 0.73 1.11 0.05 Pipe Outlet 100.00 24.00 0.00 1563 2.25 1.00 1.11 0.02 0.08 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.1,Splitter Box Outlet 160.25 WS-9.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 3 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 2 Path Flow from WS-6.1 to FC2 Percent OF TOTAL Q= 20% 1,563 2.25 Pipe Full Flow Assumed C Diem inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 1,563 2.25 0.50 1.11 0.01 Pipe&Fittings(1) 100.00 24.00 34.00 1,563 2.25 0.20 1.11 0.01 Pipe&Fittings(2) 100.00 24.00 0.00 1,563 2.25 0.00 1.11 0.00 Pipe Outlet 100.00 24.00 0.00 1,563 2.25 1.00 1.11 0.02 0.04 WS-7.2,FC-2 Effluent Launder Trough Elev 157.67 Depth= 0.65 158.32 W5-7.2 FINAL Clarifier FC-2 Percent OF TOTAL Q= 20% Process Flow 1,563 2.25 159.88 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches 565.00 Weir Length 188.50 feet V-notch angle 90 deg Not Submerged WS-8.2,FC-2 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 2.25 2.77 0.0062 0.09 1.1 159.97 159.97 WS-8.2 Flow from Aeration Splitter to Clarifier Process Flow 1,563 2.25 RAS 521 0.75 MLSS Flow 2,084 3.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 1,563 2.25 0.50 0.71 0.00 Pipe&Fittings(1) 100.00 30.00 80.00 1,563 2.25 0.20 0.71 0.01 Pipe&Fittings(2) 100.00 24.00 85.00 1,563 2.25 0.53 1.11 0.04 ' Pipe Outlet 100.00 24.00 0.00 1,563 2.25 1.00 1.11 0.02 0.07 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.2,Splitter Box Outlet 160.29 WS-9.2 Final Clarifier 3 and 4 Path Flow from CCT Inlet WS-5 to WS-6.3 Percent OF TOTAL Q= 60% 4,688 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MOD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 4,688 6.75 0.00 1.48 0.00 Pipe&Fittings(1) 100.00 36.00 125.00 4,688 6.75 0.33 1.48 0.05 Pipe&Fittings(2) 100.00 36.00 0.00 4,688 6.75 0.00 1.48 0.00 Pipe Outlet 100.00 36.00 0.00 4,688 6.75 1.00 1.48 0.03 0.09 WS-6.3,Junction of FC-3,FC-4 Effluent Piping 158.19 WS-6.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 4 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL ft W/S Elev,ft Final Clarifier 3 Path Percent OF TOTAL Q= 20% ,63 2.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 > 0.50 1.11 0.01 Pipe&Fittings(1) 100.00 24.00 70.00 1,563 0.40 1.11 0.03 Pipe&Fittings(2) 100.00 24.00 210.00 1,563 0.20 1.11 0.07 Pipe Outlet 100.00 36.00 5.00 1,56', 1.68 0.49 0.01 0.12 WS-7.3,FC-3 Effluent Launder Trough Elev 157.59 Depth= 158.31 WS-7.3 FINAL Clarifier FC-3 Percent OF TOTAL Q= 20% Process Flow 1,563 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 188.50 feet V-notch angle 90 deg Not Submerged WS-8.3,FC-3 Water Surface Flow,MOD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 2.25 2.77 0.0062 0.09 1.1 159.89 159.89 WS-8.3 Flow from Aeration Splitter to Clarifier Process Flow 1,563 2.25 RAS 521 0.75 MLSS Flow 2,084 3.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 10.00 0.50 0.01 Pipe&Fittings(1) 100.00 24.00 73.00 1,56< 0.53 1.11 0.03 Pipe&Fittings(2) 100.00 24.00 44.00 1,563 0.20 1.11 0.02 Pipe Outlet 100.00 24.00 0.00 1,563 1.00 1.11 0.02 0.08 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.3,Splitter Box Outlet 160.22 WS-9.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 5 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,Rpm Flow,MGD K Vel,ft/s HI.ft W/S Elev,ft Final Clarifier 4 Path Flow from WS-6.3 to FC-4 Percent OF TOTAL Q= 40% 3,125 4.50 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 3,125 4.50 0.50 1.42 0.02 Pipe&Fittings(1) 100.00 30.00 35.00 3,125 4.50 0.00 1.42 0.01 Pipe&Fittings(2) 100.00 30.00 0.00 3,125 4.50 0.66 1.42 0.02 Pipe Outlet 100.00 30.00 0.00 3,125 4.50 0.00 1.42 0.00 0.05 WS-7.4,FC-4 Effluent Launder Trough Elev 157.59 Depth= 0.65 158.24 WS-7.4 FINAL Clarifier FC-4 Percent OF TOTAL Q= 40% Process Flow 3,125 4.50 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 74.67 feet No.of notches 469.00 Weir Length 234.57 feet V-notch angle 90 deg Not Submerged WS-8.4,FC-4 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 4.50 5.53 0.0123 0.12 1.4 159.92 159.92 WS-8.4 Flow from Aeration Splitter to Clarifier Process Flow 3,125 4.50 RAS 1,042 1.50 MLSS Flow 4,167 6.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 3,125 4.50 0.50 1.42 0.02 Pipe&Fittings(1) 100.00 30.00 195.00 3,125 4.50 0.38 1.42 0.09 Pipe&Fittings(2) 100.00 30.00 0.00 3,125 4.50 0.00 1.42 0.00 Pipe Outlet 100.00 30.00 0.00 3,125 4.50 1.00 1.42 0.03 0.14 Losses through the Clarfier Center Column and Center Well 0.25 feet 0.25 WS-9.4,Splitter Box Outlet 160.31 WS-9.4 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 6 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Clarifier Distribution Box Set all weirs at same level,sharp edge with end contractions FC-1 Weir Percent OF TOTAL Q= 20% MLSS Flow 2,084 3.00 WS-10 WS-9 thru_Weir Openings 1.00 2,084 Weir Length 4.00 Upstream Downstream crest elevation 161.00 Weir Head,ft 0.50 161.50 160.25 FC-2 Weir Percent OF TOTAL Q= 20% MLSS Flow 2,084 3.00 thru_Weir Openings 1.00 2,084 Weir Length 4.00 crest elevation 161.00 Weir Head,ft 0.50 161.50 160.29 FC-3 Weir Percent OF TOTAL Q= 20% MLSS Flow 2,084 thru_Weir Openings 1.00 2,084 Weir Length 4.00 crest elevation 161.00 Weir Head,ft 0.50 161.50 160.22 FC-4 Weir Percent OF TOTAL Q= 40% MLSS Flow 4,167 thru_Weir Openings 1.00 4,167 Weir Length 8.00 crest elevation 161.00 Weir Head,ft 0.49 161.49 160.31 WS-10,Clarifier Splitter Inlet Total MLSS Flow 10,418 15 161.50 WS-10 Aeration Basin Effluent Channel Rectangular Channel Losses Width,ft 2.00 160.56 Flow Each AB 2,604 3.75 Flow Depth,ft 0.94 Wetted area,SF 1.88 wetted perimeter,ft 3.88 velocity,ft/s 3.09 headloss,ft/LF 0.0010 times typical Length 28.00 HL,ft 0.028 WS-11,Aeration Effluent Channel 161.53 WS-11 Aeration Basins Add RAS flow to give MLSS FLOW,Ignore Thickener return,no EQ return at high flows WS is controlled by effluent weirs in each of 4 aeration trains Process Flow 7,813 11.25 RAS Flow 2,604 3.75 MLSS Flow 10,418 15.00 AB in Service 4.00 Flow Each AB 2,604 3.75 AB Effluent Weir sharp crested weir,no end contractions AB Effluent Weir is Not Surcharged Length 27.75 162.26 Flow 2,604 3.75 HL= 0.16 164.56 Freeboard(24"+desired)= 25.71 AB Freeboard OK WS-12,Aeration Basin 162.42 WS-12 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 7 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Aeration Splitter Box RAS Returns at this Point AB in Service 4.00 MLSS Flow 10,418 15.00 Flow Each AB 2,604 3.75 C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft JB-1 to AB-3,4 100.00 24.00 0.00 5,209 7.50 0.50 3.69 0.11 to TEE at AB-3,4) 100.00 24.00 140.00 5,209 7.50 0.80 3.69 0.58 to AB-4 100.00 24.00 20.00 2,604 3.75 1.45 1.85 0.09 sum 0.78 WS-13,Aeration Splitter Box(1B-1) 163.20 WS-13 Preliminary Treatment PTF EFFL Pipe to Aeration Splitter Box(JB-1) C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 7,813 11.25 0.50 2.46 0.05 Yard Piping 100.00 36.00 94.00 7,813 11.25 0.00 2.46 0.08 Pipe Outlet 100.00 36.00 0.00 7,813 11.25 1.00 2.46 0.09 sum 0.22 WS-14,PTF Effluent 163.42 WS-14 Influent parshall flume 24"Throat Parshall 164.14 7,813 11.25 flume head,ft 1.65 ch 163.14 50%of flume Head 164.96 Max Downstream WS for free flowing Flume Flume Flow is free flowing WS-15,Flume Inlet 165.79 WS-15 Rectangular Channel Losses Width,ft 6.00 7,813 11.25 Invert,ft 163.14 Flow Depth,ft 2.65 Wetted area,SF 15.89 wetted perimeter,ft 11.30 velocity,ft/s 1.10 headloss,ft/LF 0.0002 Length 12.00 0.002 WS-16,Flume Channel 165.79 WS-16 Rectangular Channel Losses Width,ft 2.50 7,813 11.25 Invert,ft 163.14 Flow Depth,ft 2.65 Wetted area,SF 6.62 wetted perimeter,ft 7.80 velocity,ft/s 2.63 headloss,ft/LF 0.0010 Length 5.00 0.005 WS-16,Grit Effluent Channel 165.80 WS-17 Grit Collector Grit Effluent Weir sharp crested weir,no end contractions Length,ft 16.00 168.50 7,813 11.25 Weir Head 0.47 ft 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 8 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Weir not submerges WS-18,Grit Collector 168.97 WS-18 Grit inlet&tray headloss per Euteck proposal 7,813 11.25 WS-19,Inlet to Grit Collector 168.97 wS-19 Mechanical Cleaned Step Screens Note:Always consider 2 screens in service,use manual bypass if one is out Screens in Service 2.00 Flow Each 3,907 5.63 Rectangular Channel Losses: Screen to Grit Inlet Width,ft 2.50 3,907 5.63 166.57 Flow Depth,ft 2.40 Wetted area,SF 6.01 wetted perimeter,ft 7.31 velocity,ft/s 1.45 headloss,ft/LF 0.0002 Length 10.00 WS-20,Screen discharge 168.98 WS-20 Screen Headloss,30%blinded,7.5 MGD each,min 24"downstream(WesTech) 0.49 feet downstream depth,inches= 28.9 Downstream Depth is OK WS-21,Inlet to Mechanical Screen 169.46 WS-21 Box to Mechanical Screen Channel Rectangular Channel Losses Width,ft 2.50 3,907 5.63 Invert,ft 166.57 Flow Depth,ft 2.89 Wetted area,SF 7.23 wetted perimeter,ft 8.29 velocity,ft/s 1.20 headloss,ft/LF 0.0001 Length 11.00 HL= WS-22,PTF influent 169.46 WS-22 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 9 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Dunn WWII New Elevations NAD83?Datum Summary Current W/S Bottom TOP Scenario: WS-0 WS-0,Ex Effl PS Wetwell 156.09 149.69 162.69 11.25 MGD,Influent Flow WS-1 WS-1,EFFL Flume Outlet 156.48 156.70 162.06 All Online WS-2 WS-2,EFFL Flume Inlet 156.48 156.70 162.06 WS-3 WS-3,CCT Outlet 157.11 147.75 164.00 WS-4 WS-4,CCT Basin 158.0f• 147.75 164.00 WS-5 WS-5,CCT Basin Inlet 158.1( 147.75 164.00 WS-6.1 WS-6.1,Junction of FC-1,FC-2 Piping 158.2i 153.25 166.00 WS-7.1 WS-7.1,FC-1 Effluent Launder 158.3 158.37 162.66 WS-8.1 WS-8.1,FC-1 Water Surface 159.9, 147.83 162.66 WS-9.1 WS-9.1,Splitter Box Outlet 160.2 148.06 164.56 WS-10 WS-10,Clarifier Splitter Inlet 161.5( 148.06 164.56 WS-11 WS-11,Aeration Effluent Channel 161.5 148.06 164.56 WS-12 WS-12,Aeration Basin 162.a., 148.06 164.56 WS-13 WS-13,Aeration Splitter Box(18-1) 1632 158.56 167.56 WS-14 WS-14,PTF Effluent 163.4. 161.57 171.57 WS-15 WS-15,Flume Inlet 165 7 161.57 171.57 WS-16 WS-16,Flume Channel 165. 161.57 171.57 WS-17 WS-16,Grit Effluent Channel 165.8E 161.57 171.57 WS-18 WS-18,Grit Collector 168.9 166.57 172.57 WS-19 WS-19,Inlet to Grit Collector 168.9; 166.57 172.57 WS-20 WS-20,Screen discharge 168.98 166.57 172.57 WS-21 WS-21,Inlet to Mechanical Screen 169.4i 166.57 172.57 WS-22 WS-22,PTF influent 169.48 166.57 172.57 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 10 Davis-Martin-Powell 16*/4- . I)N 1T 0.P. Dunn WWTP DMP 004223.00 updated for 170207 updated for 210076 Printed: 12/23/22 11:40 AM Hydraulic Analysis from PTF to Effluent Pump Station Changes: Replaced the piping between the Aeration Basin and Final Clarifiers to eliminate bottleneck and improve flow. Influent Design Rate 3.75 MGD Current 2,604 GPM Influent Peak Rate 11.2_ MGD 3.00 Peak Factor 7,813 GPM RAS Design/Qa= 100% 3.75 MGD 2,604 GPM Scenario 1 ADF: Influent flow=3.75 mgd,all basins in service Peak Day: Influent flow=9.375 mgd,all units in service. Scenario 2 Design for no weirs submerged. Peak Hour.:Influent Flow=11.25,Largest unit out of service. Design for no walls overtopped and final clarifier weirs not Scenario 3 submerged Scenario INFL flow= I 11.25 I MGD GPM ft3/s Scenario Largest Unit Offline Manning N Values Concrete Channel 0.0110 Clarifer Flow Distribution Matrix Concrete Pipe 0.0130 Percent of Process Flow DI Pipe 0.0130 FC1 FC2 FC3 FC4 Concrete Channel 0.0130 All Online 20% 20% 20% 40% One 60 Ft Offline 25% 25% 0% 50% DI Pipe-all C Factors 100 Largest Unit Offline 33% 33% 33% 0% Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Flev,ft START IN Ex Effluent Pump Station Assume max EFFL PS level per plans=156.6 i WS-0,Ex Effl PS Wetwell Flow Rate: 7,813 11.25 156.09 WS-0 Ex Effl PS to Flume Outlet Percent OF TOTAL Q= 100% 7,813 11.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 7,813 11.25 0.50 0.10 Pipe&Fittings(1) 100.00 30.00 46.00 7,813 11.25 0.00 0.10 Pipe&Fittings(2) 100.00 30.00 0.00 7,813 11.25 0.00 0.00 Pipe Outlet 100.00 30.00 0.00 7,813 11.25 1.00 3.55 0.20 0.39 WS-1,EFFL Flume Outlet Pipe Invert shout. 156.70 156.48 WS-1 12"Parshall Flume 156.78 7,813 11.25 head in flume HEAD IS EXCESSIVE AT PEAK FLOW-DEMO FLUME AND REPLACE WITH 30"PIPE WS-2,EFFL Flume Inlet 156.48 WS-2 Flume to CCT Outlet Percent OF TOTAL Q= 100% 7,813 11.25 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 42.00 0.00 .!3 11.25 0.50 1.81 0.03 Pipe&Fittings(1) 100.00 42.00 14.00 7,813 11.25 0.22 1.81 0.02 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 1 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/5 Elev,ft Pipe&Fittings(2) 100.00 30.00 90.00 7,813 11.25 1.04 3.55 0.39 Pipe Outlet 100.00 30.00 0.00 7.R13 11.25 1.00 3.55 0.20 0 63 WS-3,CCT Outlet 157.11 WS-3 Chlorine Contact Basin Two trains available,level controlled by weir in each basin Total Process Flow CCT in Service 1.00 Flow Each z5 Straight weir w/o end contractions Not Submerged crest elevation 157.75 Length 15.00 MGD GPM H,feet H,inches WS Elev 11.25 7,813 0.50 5.9 158.25 WS-4,CCT Basin 158.25 wS-4 Combine the two FCE pipes in a Box. Control Flow into each CCT by Submerged Gates Flow Each 7,813 11.25 Width,Ft Height,Ft Area,FT2 HL,ft HL,inches Gate Size 3.00 3.00 9.00 0.156 1.9 W5-5,CCT Basin Inlet 158.40 w5-5 Final Clarifier 1 and 2 Path Flow from CCT Inlet to WS-6.1 Percent OF TOTAL Q= 67% 5,209 7.50 Pipe Full Flow Assumed C Diam mch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 5,209 7.50 0.50 3 r=" P 1 Pipe&Fittings(1) 100.00 24.00 60.00 5,209 7.50 0.00 Pipe&Fittings(2) 100.00 36.00 125.00 5,209 7.50 2.34 Pipe Outlet 100.00 36.00 0.00 79 7.5 1.00 WS-6.1,Junction of FC-1,FC-2 Piping 158.88 WS-6.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 2 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 1 Path Percent OF TOTAL Q= 33% 2,604 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 2,604 3.75 0.50 1.85 0.03 Pipe&Fittings(1) 100.00 24.00 34.00 2,604 7; 0.40 1.85 (, Pipe&Fittings(2) 100.00 24.00 88.00 ?rill 0.24 1.85 Pipe Outlet 100.00 24.00 0.00 3.75 1.00 1.85 WS-7.1,FC-1 Effluent Launder Trough Elev 157.62 Depth= 1.471 159.09 W5-7.1 FINAL Clarifier FC-1 Percent OF TOTAL Q= 33% Process Flow 2,604 159.83 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 188.50 feet V-notch angle 90 deg Not Submerged Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 3.75 4.61 0.0103 0.11 1.3 159.94 WS-8.1,FC-1 Water Surface 159.94 WS-8.1 Flow from Aeration Splitter to Clarifier Process Flow 2,604 3.75 RAS 868 1.25 MLSS Flow 3,473 5.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 2,604 3.75 0.50 1.18 0.01 Pipe&Fittings(1) 100.00 30.00 10.00 2,604 3.75 1.18 0.00 Pipe&Fittings(2) 100.00 24.00 125.00 3.75 0.73 1.85 0.14 Pipe Outlet 100.00 24.00 0.00 3.75 1.00 1.85 0.05 0.21 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.1,Splitter Box Outlet 160.40 WS-9.1 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 3 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 2 Path Flow from WS-6.1 to FC2 Percent OF TOTAL Q= 33% 2,604 3.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 2,604 3.75 0.50 1.85 Pipe&Fittings(1) 100.00 24.00 34.00 2,604 3.75 0.20 - Pipe&Fittings(2) 100.00 24.00 0.00 2,604 3.75 0.00 c.c. Pipe Outlet 100.00 24.00 0.00 2,604 3.75 1.00 1.85 i_ 0.12 WS-7.2,FC-2 Effluent Launder Trough Elev 157.67 Depth= 1.32 158.99 W5-7.2 FINAL Clarifier FC-2 Percent OF TOTAL Q= 33% Process Flow 2,604 3.75 159.88 bottom v-notch Weir Spacing 4.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 188.50 feet V-notch angle 90 deg Not Submerged WS-8.2,FC-2 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 3.75 4.61 0.0103 0.11 1.3 159.99 159.99 WS-8.2 Flow from Aeration Splitter to Clarifier Process Flow 2,604 3.75 RAS 868 1.25 MLSS Flow 3,473 5.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 2,604 3.75 0.50 t.18 0.01 Pipe&Fittings(1) 100.00 30.00 80.00 2,604 3.75 0.20 I l.18 0.03 Pipe&Fittings(2) 100.00 24.00 85.00 2,604 3.75 0.53 1.85 0.10 Pipe Outlet 100.00 24.00 0.00 2,604 3.75 1.00 1.85 0.05 0.19 Losses through the Inlet Pipe and Well 0.25 feet 0.25 WS-9.2,Splitter Box Outlet 160.43 WS-9.2 Final Clarifier 3 and 4 Path Flow from CCT Inlet WS-5 to WS-6.3 Percent OF TOTAL Q= 33% 2,604 3.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 3.75 0.00 0.82 0.00 Pipe&Fittings(1) 100.00 36.00 125.00 2,sc i 3.75 0.33 0.82 0.02 Pipe&Fittings(2) 100.00 36.00 0.00 2,604 3.75 0.00 0.82 0.00 Pipe Outlet 100.00 36.00 0.00 2,604 3.75 1.00 0.82 0.01 0.03 WS-6.3,Junction of FC-3,FC-4 Effluent Piping 158.43 WS-6.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 4 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Final Clarifier 3 Path Percent OF TOTAL Q= 33% 3.75 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 24.00 0.00 3.75 0.50 1.85 0.03 Pipe&Fittings(1) 100.00 24.00 70.00 2,604 3.75 0.40 1.85 0.08 Pipe&Fittings(2) 100.00 24.00 210.00 2,604 3.75 0.20 1.85 0.19 Pipe Outlet 100.00 36.00 5.00 2,604 3.75 1.68 0.82 0.02 0.31 WS-7.3,FC-3 Effluent Launder Trough Elev 157.59 Depth= 158.74 WS-7.3 FINAL Clarifier FC-3 Percent OF TOTAL Q= 33% Process Flow 2,604 3 75 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 60.00 feet No.of notches Weir Length 188.50 feet V-notch angle 90 deg Not Submerged WS-8.3,FC-3 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow 3.75 4.61 0.0103 0.11 1.3 159.91 159.91 WS-8.3 Flow from Aeration Splitter to Clarifier Process Flow 2,604 3.75 RAS 868 1.25 MLSS Flow 3,473 5.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 10.00 2,60 3.75 0.50 0.01 Pipe&Fittings(1) 100.00 24.00 73.00 2,60 3.7t 0.53 i_85 0.09 Pipe&Fittings(2) 100.00 24.00 44.00 2,60 0.20 1.3, Pipe Outlet 100.00 24.00 0.00 '" 1.00 i.8 Losses through the Inlet Pipe and Well 0.25 feet WS-9.3,Splitter Box Outlet 160.36 WS-9.3 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 5 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL ft W/S Elev,ft Final Clarifier 4 Path Flow from WS-6.3 to FC-4 Percent OF TOTAL Q= 0% 0 0.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 0 0.00 0.50 0.00 0.00 Pipe&Fittings(1) 100.00 30.00 35.00 0 0.00 0.00 0.00 0.00 Pipe&Fittings(2) 100.00 30.00 0.00 0 0.00 0.66 0.00 0.00 Pipe Outlet 100.00 30.00 0.00 0 0.00 0.00 0.00 0.00 0.00 WS-7.4,FC-4 Effluent Launder Trough Elev 157.59 Depth= 0.84 158.43 WS-7.4 FINAL Clarifier FC-4 Percent OF TOTAL Q= 0% Process Flow 0 0.00 159.80 bottom v-notch Weir Spacing 6.00 inch,typ Weir Diameter 74.67 feet No.of notches 469.00 Weir Length 234.57 feet V-notch angle 90 deg Not Submerged WS-8.4,FC-4 Water Surface Flow,MGD gpm/notch CFS/Notch H,feet H,inches W/S elev Use Process Flow - - - - 159.80 159.80 WS-8.4 Flow from Aeration Splitter to Clarifier Process Flow 0 0.00 RAS 0 0.00 MLSS Flow 0 0.00 Pipe Full Flow Assumed C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 30.00 0.00 0 0.00 0.50 0.00 0.00 Pipe&Fittings(1) 100.00 30.00 195.00 0 0.00 0.38 0.00 0.00 Pipe&Fittings(2) 100.00 30.00 0.00 0 0.00 0.00 0.00 0.00 Pipe Outlet 100.00 30.00 0.00 0 0.00 1.00 0.00 0.00 0.00 Losses through the Clarfier Center Column and Center Well 0.25 feet .i.2 WS-9.4,Splitter Box Outlet 160.05 WS-9.4 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 6 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Clarifier Distribution Box Set all weirs at same level,sharp edge with end contractions FC-1 Weir Percent OF TOTAL Q= 33% MLSS Flow 3,473 5.00 WS-10 WS-9 thru_Weir Openings 1.00 3,473 Weir Length 4.00 Upstream Downstream crest elevation 161.00 Weir Head,ft 0.71 161.71 160.40 FC-2 Weir Percent OF TOTAL Q= 33% MLSS Flow 3,473 5.00 thru_Weir Openings 1.00 3,473 Weir Length 4.00 crest elevation 161.00 Weir Head,ft 0.71 161.71 160.43 FC-3 Weir Percent OF TOTAL Q= 33% MLSS Flow 3,473 5.00 thru_Weir Openings 1.00 3,473 Weir Length 4.00 crest elevation 161.00 I Weir Head,ft 0.71 161.71 160.36 FC-4 Weir Percent OF TOTAL Q= 0% MISS Flow 0 0.00 thru_Weir Openings 1.00 0 Weir Length 8.00 crest elevation 161.00 I Weir Head,ft 0.00 161.00 160.05 WS-10,Clarifier Splitter Inlet Total MLSS Flow 10,418 15 161.71 WS-10 Aeration Basin Effluent Channel Rectangular Channel Losses Width,ft 2.00 160.56 Flow Each AB 3,473 5.00 Flow Depth,ft 1.15 Wetted area,SF 2.30 wetted perimeter,ft 4.30 velocity,ft/s 3.36 headloss,ft/LF 0.0010 times typical Length 28.00 HL,ft 0.028 W5-11,Aeration Effluent Channel 161.74 WS-11 Aeration Basins Add RAS flow to give MLSS FLOW,Ignore Thickener return,no EQ return at high flows WS is controlled by effluent weirs in each of 4 aeration trains Process Flow 7,813 11.25 RAS Flow 2,604 3.75 MLSS Flow 10,418 15.00 AB in Service 3.00 Flow Each AB 3,473 5.00 AB Effluent Weir sharp crested weir,no end contractions AB Effluent Weir is Not Surcharged Length 27.75 162.26 Flow 3,473 5.00 HL= 0.19 164.56 Freeboard(24'+desired)= 25.31 AB Freeboard OK WS-12,Aeration Basin 162.45 WS-12 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 7 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Aeration Splitter Box RAS Returns at this Point AB in Service 3.00 MLSS Flow 10,418 15.00 Flow Each AB 3,473 5.00 C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft 113-1 to AB-3,4 100.00 24.00 0.00 6,945 10.00 0.50 4.93 0.19 to TEE at AB-3,4) 100.00 24.00 140.00 6,945 10.00 0.80 4.93 1.00 to AB-4 100.00 24.00 20.00 3,473 5.00 1.45 2.46 0.16 sum 1.35 WS-13,Aeration Splitter Box(JB-1) 163.81 WS-13 Preliminary Treatment PTF EFFL Pipe to Aeration Splitter Box(1B-1) C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 36.00 0.00 7,813 11.25 0.50 0.05 Yard Piping 100.00 36.00 94.00 7,813 11.25 0.00 0.08 Pipe Outlet 100.00 36.00 0.00 7,813 11.25 1.00 2.46 0.09 sum 0.22 WS-14,PTF Effluent 164.03 WS-14 Influent parshall flume 24"Throat Parshall 164.14 7,813 11.25 flume head,ft 1.65 ch 163.14 50%of flume Head 164.96 Max Downstream WS for free flowing Flume Flume Flow is free flowing WS-15,Flume Inlet 165.79 WS-15 Rectangular Channel Losses Width,ft 6.00 7,813 11.25 Invert,ft 163.14 Flow Depth,ft 2.65 Wetted area,SF 15.89 wetted perimeter,ft 11.30 velocity,ft/s 1.10 headloss,ft/LF 0.0002 Length 12.00 0.002 WS-16,Flume Channel 165.79 WS-16 Rectangular Channel Losses Width,ft 2.50 7,813 11.25 Invert,ft 163.14 Flow Depth,ft 2.65 Wetted area,SF 6.62 wetted perimeter,ft 7.80 velocity,ft/s 2.63 headloss,ft/LF 0.0010 Length 5.00 0.005 WS-16,Grit Effluent Channel 165.80 WS-17 Grit Collector Grit Effluent Weir sharp crested weir,no end contractions Length,ft 16.00 168.50 7,813 11.25 Weir Head 0.47 ft 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 8 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Weir not submerged WS-18,Grit Collector 168.97 WS-18 Grit inlet&tray headloss per Euteck proposal 7,813 11.25 0.49 WS-19,Inlet to Grit Collector 168.97 WS-19 Mechanical Cleaned Step Screens Note:Always consider 2 screens in service,use manual bypass if one is out Screens in Service 2.00 Flow Each 3,907 5.63 Rectangular Channel Losses: Screen to Grit Inlet Width,ft 2.50 3,907 5.63 166.57 Flow Depth,ft 2.40 Wetted area,SF 6.01 wetted perimeter,ft 7.31 velocity,ft/s 1.45 headloss,ft/LF 0.0002 Length 10.00 0.00 WS-20,Screen discharge 168.98 WS-20 Screen Headloss,30%blinded,7.5 MGD each,min 24"downstream(WesTech) 0.49 feet downstream depth,inches= 28.9 Downstream Depth is OK WS-21,Inlet to Mechanical Screen 169.46 W5-21 Box to Mechanical Screen Channel Rectangular Channel Losses Width,ft 2.50 3,907 5.63 Invert,ft 166.57 Flow Depth,ft 2.89 Wetted area,SF 7.23 wetted perimeter,ft 8.29 velocity,ft/s 1.20 headloss,ft/LF 0.0001 Length 11.00 HL= 0.001 WS-22,PTF influent 169.46 W5-22 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 9 Davis-Martin-Powell Description C Dia inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft W/S Elev,ft Dunn WWTf New Elevations NAD83?Datum Summary Current W/S Bottom TOP Scenario: WS-0 WS-0,Ex Effl PS Wetwell 156.09 149.69_ 162.69 11.25 MGD,Influent Flow WS-1 WS-1,EFFL Flume Outlet 156.48 156.70_ 162.06 Largest Unit Offline WS-2 WS-2,EFFL Flume Inlet 156.48 156.70 162.06 WS-3 WS-3,CCT Outlet 157.11 147.75 164.00 WS-4 WS-4,CCT Basin 158.25 147.75 164.00 WS-5 WS-5,CCT Basin Inlet 158.40 147.75 164.00 WS-6.1 WS-6.1,Junction of FC-1,FC-2 Piping 158.88 153.25 166.00 WS-7.1 WS-7.1,FC-1 Effluent Launder 159.09 158.37 162.66 WS-8.1 WS-8.1,FC-1 Water Surface 159.94 147.83 162.66 WS-9.1 WS-9.1,Splitter Box Outlet 160.40 148.06 164.56 WS-10 WS-10,Clarifier Splitter Inlet 161.71 148.06 164.56 WS-11 WS-11,Aeration Effluent Channel 161.74 148.06 164.56 WS-12 WS-12,Aeration Basin 162.45 148.06 164.56 WS-13 WS-13,Aeration Splitter Box(1B-1) 163.81 158.56 167.56 WS-14 WS-14,PTF Effluent 164.03 _ 161.57 171.57 WS-15 WS-15,Flume Inlet 165.79 161.57 171.57 WS-16 WS-16,Flume Channel 165.79 161.57 171.57 WS-17 WS-16,Grit Effluent Channel 165.80 161.57_ 171.57 WS-18 WS-18,Grit Collector 168.97 166.57 172.57 WS-19 WS-19,Inlet to Grit Collector 168.97 166.57 172.57 WS-20 WS-20,Screen discharge 168.98 166.57 172.57 WS-21 WS-21,Inlet to Mechanical Screen 169.46 166.57 172.57 WS-22 WS-22,PTF inflGent 169.46 166.57 172.57 210076 Dunn WWTP Hydraulic_Profile.xlsx 210076 Page 10 IINFLUENT IPS-1,2,3,4 PP STATUMION T T if 12" EQ DRAIN PLANT DRAINS ,+, PTF v 24' IPS FM JI; r - i"I BS-1 MANUAL SCREEN ( BS-2 I DUMPSTER ( I SCn o �SWP-2 �- I nv""ISWP-11-- --r---�-- r -- >� I a (---il 'FLOWlv MG EQ TANK EEC TWELL v i q04110� _J GRIT WASHER GRIT I GRIT MOV --(H COLLECTOR F-t-- CL SNAILR 12" EQFM ( ( 11 �� I GC-1 GS-1 L O M J GP-1 36" PTE �M MOV ( 8" FROM RDT AJ --E---------------------• 12" EQ RETURN 10 E RAS I 24' 4 4 4 4 in AB #1 AB #2 AB #3 AB 14 ix oAB-1 000000 000000 000000 00000• CAUSTICAB-2 M A AB-3 MP-5 MOV MP-6 —g B H l I 6"_WAS o M MOV M j 24"ML a r N 30"ML 24'Ml `� * SCUM, TYP w FC-3 — FC-4 " FC-2 — FC-1 — SI v, Y Y v Y Y}- ri7 t}-04 I �S 0 I I--��----�-�- — I i —J 24"FCE )� 24' FCE LEGEND lLV V RAS AB AERATION BLOWER HYPOCHLORITE I') PUMPS DSB DIGESTER BLOWER N MP-3 >> I B B I RAS-1,2,3 FC FINAL CLARIFIER o_ MP-4 M FLOW METER 3 [ CT1 CCT-2 RPZ BACKFLOW PREVENTER MP METERING PUMP 0 BISULFITE MOV MOTORIZED VALVE o << MP-1 N VALVE/GATE N MP-2 EFFLUENT MP PROCESS FLOW TA 1J Q Q a STATION t t EPS-1,2,3 SLUDGE FLOW Li s Z MO — DRAIN/RETURN FLOW 20" EFFUENT FM Q) PUMP ENGINEERING FIGURE 2-1 drni—p LAND PLANNING DUNN WWTP SURVEYING PROCESS SCHEMATIC Dunn NC Black River WWTP DMP 210076 Clarifier Loading Summary Current Operating Conditions. 3 each 60 ft diameter Average Flow Peak Flow 3.75 MGD 7.50 MGD Surface Overflow (gpd/SF) 442 884 Weir Loading (gpd/SF) 13,263 After this project: 3 each 60 ft diameter, 180 ft diameter Average Flow Peak Flow 3.75 MGD 11.25 MGD Surface Overflow(gpd/SF) 278 833 Weir Loading (gpd/SF) 13,773 After this project: Multiple 80 ft diameter Average Flow Peak Flow 5-6 MGD 15-18 MGD Surface Overflow (gpd/SF) 335 1,005 Weir Loading(gpd/SF) 20,000 Davis•Martin•Powell Dunn Black River WWTP Clarifier&CCT Project Printed: 12/23/2022 210076 Enter data in the these cells only MLS Jul 11,2022 GENERAL AVERAGE DESIGN FLOW 3.75 3,750,000 GPD 2,604 GPM PEAK FACTOR 3.0 PEAK DESIGN FLOW 11,250,000 GPD 7,813 GPM FINAL CLARIFIERS Clarifer Flow Distribution Matrix Percent of Process Flow FC1 FC2 FC3 FC4 All Online 20% 20% 20% 40% One 60 Ft Offline 0% 25% 25% 50% One 80 Ft Offline 33% 33% 33% 0% Scenario All Online Number of Units 4.00 ea MLSS 3,500 mg/L 10 States Criteria Conventional/Nitrification Overflow Rates Design Q 400.0 GPD/sq ft Peak Hour Q 1,000.0 GPD/sq ft Weir Loading Peak Hour Q 30,000.0 gpd/LF Solids Loading Peak Hour Q 35.0 lb/sf/day FC-1 Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 265 AVERAGE 3,979 Weir length 188.5 ft PEAK 796 PEAK 11,937 SWD 10.0 ft Eff Volume 211,492 gallons Solids loading rate Pounds/day Rate Percent of Flow 20% AVERAGE 21,893 7.74 lb/sf/day Qa 750,000 GPD PEAK 65,678 23.23 lb/sf/day Qp 2,250,000 GPD Detention at Qa Detention time 406 minutes,or 6.8 hours FC-2 Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 265 AVERAGE 3,979 Weir length 188.5 ft PEAK 796 PEAK 11,937 SWD 10.0 ft Eff Volume 211,492 gallons Solids loading rate Pounds/day Rate Percent of Flow 20% AVERAGE 21,893 7.74 lb/sf/day Qa 750,000 GPD PEAK 65,678 23.23 lb/sf/day Qp 2,250,000 GPD Detention at Qa Detention time 406 minutes,or 6.8 hours P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xisx Clarifiers Page 1 of 4 Davis•Martin•Powell FC-3 REFURBISHED Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 265 AVERAGE 3,979 Weir length 188.5 ft PEAK 796 PEAK 11,937 SWD 12.0 ft Eff Volume 253,790 gallons Solids loading rate Pounds/day Rate Percent of Flow 20% AVERAGE 21,893 7.74 lb/sf/day Qa 750,000 GPD PEAK 65,678 23.23 lb/sf/day Qp 2,250,000 GPD Detention at Qa Detention time 487 minutes,or 8.1 hours Hydraulics Weir Elevation 159.80 bottom v-notch Weir Diameter 60.0 feet Weir Length 188.5 feet Weir Spacing 6.0 inches,typ Number notches 376 each V-notch angle 90.0 deg Flow(mgd) gpm/notch H,feet H,inches W/S elev Qmin,all in service 0.30 0.44 0.04 0.52 159.84 Qa,all in service 0.75 1.11 0.06 0.75 159.86 Qp,all in service 2.25 3.32 0.10 1.17 159.90 Qp,80 ft out of servic 3.75 5.53 0.12 1.43 159.92 Influent/Riser Velocity Envirex Recommends ft/s Min 0.50 Max 3.00 Peak 4.00 Evaluate at 100%RAS 3.75 MGD Qmin,all in service Qa,all in service Op,all in service Qp,80 ft out of service Process Flow,MGD 0.30 0.75 2.25 3.75 RAS,MGD 0.30 0.75 0.75 Units online 1.00 1.00 1.00 1.00 r{ Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Max Flow Velocity 24 0.60 0.30 1.50 0.74 3.00 1.48 4.99 2.46 30 0.60 0.19 1.50 0.47 3.00 0.95 4.99 1.57 36 0.60 0.13 1.50 0.33 3.00 0.66 4.99 1.09 Use 24"clarifier influent lines from splitter to center column(match existing) Sludge Drawoff Velocity RAS(%of Qa) 50% 75% 100% 150% RAS,MGD 1.88 2.81 3.75 5.63 Percent this Unit 20% 20% 20% 20% Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Peak Flow Velocity 8 0.38 1.66 0.56 2.50 0.75 3.33 1.13 4.99 10 0.38 1.06 0.56 1.60 0.75 2.13 1.13 3.19 12 0.38 0.74 0.56 1.11 0.75 1.48 1.13 2.22 Use Ex 10"RAS Line P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 2 of 4 Davis•Martin•Powell FC-4 NEW Wall dia 80.00 ft Area 5,026.5 sf Check OVERFLOW RATE Check weir loading Weir Diameter 75.0 ft AVERAGE 298 AVERAGE 6,366 Weir length 235.6 ft PEAK 895 PEAK 19,099 SWD 16.0 ft Eff Volume 601,577 gallons Solids loading rate Pounds/day Rate Percent of Flow 40% AVERAGE 43,785 8.71 lb/sf/day Qa 1,500,000 GPD PEAK 131,355 26.13 lb/sf/day Qp 4,500,000 GPD Detention at Qa Detention time 578 minutes,or 9.6 hours Total Flows 3,750,000 GPD 11,250,000 GPD Hydraulics Weir Elevation 159.80 bottom v-notch 1.0 i Weir Diameter 75.0 feet Weir Length 235.6 feet Weir Spacing 6.0 inches,typ Number notches 471 each V-notch angle 90.0 deg Flow(mgd) gpm/notch H,feet H,inches W/S elev Qmin,all in service 0.60 0.88 0.06 0.69 159.86 Qa, all in service 1.50 2.21 0.08 0.99 159.88 Qp, all in service 4.50 6.64 0.13 1.54 159.93 Qp,one 60 ft offline 5.63 8.29 0.14 1.69 159.94 Influent/Riser Velocity Envirex Recommends ft/s Min 0.50 Max 3.00 Peak 4.00 Evaluate at 100%RAS 3.75 MGD Qmin,all in service Qa, all in service Qp, all in service Op,one 60 ft offline Process Flow,MGD 0.60 1.50 4.50 5.63 RAS,MGD 0.60 1.50 1.88 1.88 Units online 1.00 1.00 1.00 1.00 Dia Min Flow Velocity Min Flow Velocity Average Flow Velocity Max Flow Velocity 24 1.20 0.59 3.00 1.48 6.38 3.14 7.50 3.70 30 1.20 0.38 3.00 0.95 6.38 2.01 7.50 2.37 36 1.20 0.26 3.00 0.66 6.38 1.40 7.50 1.64 Use 30"clarifier influent lines from splitter to center column,for Future Conditions Sludge Drawoff Velocity 50% 75% 100% 150% I RAS,MGD 1.88 2.81 3.75 5.63 Percent this Unit 40% 40% 40% 40% Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Peak Flow Velocity 12 0.75 1.48 1.13 2.22 1.50 2.96 2.25 4.44 16 0.75 0.83 1.13 1.25 1.50 1.66 2.25 2.50 18 0.75 0.66 1.13 0.99 1.50 1.31 2.25 1.97 Use 16"RAS Line to Telescoping Valve Pit P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 3 of 4 Davis•Martin•Powell RAS CONTROL BOX Use telescoping valves for FC-3 and FC-4 RAS control Provide Weir Plate for Flow Measurement with Ultrasonic Meter Max RAS Flow 3.60 1 MGD <Future Capacity,1 80 Ft offline,150%RAS Rate> C Diam inch Length,Ft Flow,gpm Flow,MGD K Vel,ft/s HL,ft Pipe inlet 100.00 16.00 1.00 2,500 3.60 0.50 3.99 0.13 Horizontal 100.00 16.00 60.00 2,500 3.60 0.30 3.99 0.40 Vertical 100.00 16.00 21.00 2,500 3.60 0.00 3.99 0.11 Pipe Outlet 100.00 16.00 1.00 2,500 3.60 1.00 I 3.99 0.25 sum 0.90 Clarifier Weir Elev 159.80 Suction Header Losses 1.00 ft,Max,per Vendor Piping Losses 0.90 Safety Factor 0.50 ft Telescoping valve drop 2.40 ft,below Clarifier weir Min TV Level 157.40 v-notch weir plate for measurement calculation Weir Notch Elev I 156.00 f Flow,MGD gpm CFS H,feet H,inches W/S elev 3.60 2,500 5.5692 1 1.38 16.5 ,1.38 P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 4 of 4 Davis•Martin•Powell Dunn Black River WWTP Clarifier&CCT Project Printed: 12/23/2022 210076 Enter data in the these cells only MLS Jul 11,2022 GENERAL AVERAGE DESIGN FLOW 3.75 3,750,000 GPD 2,604 GPM PEAK FACTOR 3.0 PEAK DESIGN FLOW 11,250,000 GPD 7,813 GPM FINAL CLARIFIERS Clarifer Flow Distribution Matrix Percent of Process Flow FC1 FC2 FC3 FC4 All Online 20% 20% 20% 40% One 60 Ft Offline 0% 25% 25% 50% One 80 Ft Offline 33% 33% 33% 0% Scenario One 80 Ft Offline Number of Units 4.00 ea MLSS 3,500 mg/L 10 States Criteria Conventional/Nitrification Overflow Rates Design Q 400.0 GPD/sq ft Peak Hour Q 1,000.0 GPD/sq ft Weir Loading Peak Hour Q 30,000.0 gpd/LF Solids Loading Peak Hour Q 35.0 lb/sf/day FC-1 Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 442 AVERAGE 6,631 Weir length 188.5 ft PEAK 1,326 PEAK 19,894 SWD 10.0 ft Eff Volume 211,492 gallons Solids loading rate Pounds/day Rate Percent of Flow 33% AVERAGE 36,488 12.90 lb/sf/day Qa 1,250,000 GPD PEAK 109,463 38.71 lb/sf/day Qp 3,750,000 GPD Detention at Qa Detention time 244 minutes,or 4.1 hours FC-2 Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 442 AVERAGE 6,631 Weir length 188.5 ft PEAK 1,326 PEAK 19,894 SWD 10.0 ft Eff Volume 211,492 gallons Solids loading rate Pounds/day Rate Percent of Flow 33% AVERAGE 36,488 12.90 lb/sf/day Qa 1,250,000 GPD PEAK 109,463 38.71 lb/sf/day Op 3,750,000 GPD Detention at Qa Detention time 244 minutes,or 4.1 hours P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 1 of 4 Davis•Martin•Powell FC-3 REFURBISHED Wall dia 60.00 ft Area 2,827.4 sf Check OVERFLOW RATE Check weir loading Weir Diameter 60.0 ft AVERAGE 442 AVERAGE 6,631 Weir length 188.5 ft PEAK 1,326 PEAK 19,894 SWD 12.0 ft Eff Volume 253,790 gallons Solids loading rate Pounds/day Rate Percent of Flow 33% AVERAGE 36,488 12.90 lb/sf/day Qa 1,250,000 GPD PEAK 109,463 38.71 lb/sf/day Qp 3,750,000 GPD Detention at Qa Detention time 292 minutes,or 4.9 hours Hydraulics Weir Elevation 159.80 bottom v-notch Weir Diameter 60.0 feet Weir Length 188.5 feet ' Weir Spacing 6.0 inches,typ Number notches 376 each V-notch angle 90.0 deg Flow(mgd) gpm/notch H,feet H,inches W/S elev Qmin,all in service 0.30 0.44 0.04 0.52 159.84 Qa,all in service 0.75 1.11 0.06 0.75 159.86 Qp,all in service 2.25 3.32 0.10 1.17 159.90 Qp,80 ft out of servic 3.75 5.53 0.12 1.43 159.92 Influent/Riser Velocity Envirex Recommends ft/s Min 0.50 Max 3.00 Peak 4.00 Evaluate at 100%RAS 3.75 MGD Qmin,all in service , Qa,all in service Qp,all in service Qp,80 ft out of service Process Flow,MGD 0.30 0.75 2.25 3.75 RAS,MGD 0.30 0.75 0.75 1.24 Units online 1.00 1.00 1.00 1.00 I Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Max Flow Velocity 24 0.60 0.30 1.50 0.74 3.00 1.48 4.99 2.46 1 30 0.60 0.19 1.50 0.47 3.00 0.95 4.99 1.57 36 0.60 0.13 1.50 0.33 3.00 0.66 4.99 1.09 Use 24"clarifier influent lines from splitter to center column(match existing) Sludge Drawoff Velocity RAS(%of Qa) 50% 75% 100% 150% RAS,MGD 1.88 2.81 3.75 5.63 Percent this Unit 33% 33% 33% 33% Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Peak Flow Velocity 8 0.63 2.77 0.94 4.16 1.25 5.55 1.88 8.32 10 0.63 1.77 0.94 2.66 1.25 3.55 1.88 5.32 12 0.63 1.23 I 0.94 1.85 1.25 2.46 1.88 3.70 Use Ex 10"RAS Line P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 2 of 4 Davis•Martin•Powell FC-4 NEW Wall dia 80.00 ft Area 5,026.5 sf Check OVERFLOW RATE Check weir loading Weir Diameter 75.0 ft AVERAGE - AVERAGE - Weir length 235.6 ft PEAK - PEAK SWD 16.0 ft Eff Volume 601,577 gallons Solids loading rate Pounds/day Rate Percent of Flow 0% AVERAGE - - lb/sf/day Qa - GPD PEAK - - lb/sf/day Qp - GPD Detention at Qa Detention time #DIV/0! minutes,or #DIV/0! hours Total Flows 3,750,000 GPD 11,250,000 GPD Hydraulics Weir Elevation 159.80 bottom v-notch 1.0 Weir Diameter 75.0 feet Weir Length 235.6 feet Weir Spacing 6.0 inches,typ Number notches 471 each V-notch angle 90.0 deg Flow(mgd) gpm/notch H,feet H,inches W/S elev Qmin,all in service 0.60 0.88 0.06 0.69 159.86 Qa, all in service 1.50 2.21 0.08 0.99 159.88 Qp, all in service 4.50 6.64 0.13 1.54 159.93 Qp,one 60 ft offline 5.63 8.29 0.14 1.69 159.94 Influent/Riser Velocity Envirex Recommends ft/s Min 0.50 Max 3.00 Peak 4.00 Evaluate at 100%RAS 3.75 MGD Qmin,all in service Qa, all in service Op, all in service Qp,one 60 ft offline Process Flow,MGD 0.60 1.50 4.50 5.63 RAS,MGD 0.60 1.50 1.88 1.88 Units online 1.00 1.00 1.00 1.00 Dia Min Flow Velocity Min Flow Velocity Average Flow Velocity Max Flow Velocity 24 1.20 0.59 3.00 1.48 6.38 3.14 7.50 3.70 30 1.20 0.38 3.00 0.95 6.38 2.01 7.50 2.37 36 1.20 0.26 3.00 0.66 6.38 1.40 7.50 1.64 Use 30"clarifier influent lines from splitter to center column,for Future Conditions Sludge Drawoff Velocity 50% 75°/ 100% 150% RAS,MGD 1.88 2.81 3.75 5.63 Percent this Unit 0% 0% 0% 0% Dia Min Flow Velocity Average Flow Velocity Max Flow Velocity Peak Flow Velocity 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Use 16"RAS Line to Telescoping Valve Pit P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Clarifiers Page 3 of 4 Davis•Martin•Powell Dunn Black River WWTP Clarifier&CCT Project 210076 Enter data in the these cells only MLS Jul 11,2022 GENERAL AVERAGE DESIGN FLOW 3.75 3,750,000 GPD Rev March 2021 2,604.17 GPM PEAK FACTOR 3.0 PEAK DESIGN FLOW 11,250,000 GPD 7,813 GPM Standards Review 10 States:15 minutes at Peak Flow Peak Volume 117,188 gal Additional Volume Needed: 67,869 gal Length/Width Ratio: Provide baffling or complete mixing M&E recommends 10:1 to 40:1 EX CCT EVALUATION Length 40.00 ft 47 Width 9.58 ft L/W 4.9 :1.0 water depth,min 8.60 ft Volume,each side 3,297 CF Peak Flow MGD_ Detention Time Volume,each side 24,659 gal 11.250 _ 3.15 Volume,combined 49,318 gal 11.250 6.31 REPLACEMENT CCT 2 Trains Provided Peak Flow, Length, Width, Min Depth, Volume, Total Volume, Detention, MGD Ft Ft Ft CF gal minutes 3.75 50 16.5 10.0 8,250 123,420 47.36 11.25 50 16.5 10.0 8,250 123,420 15.79 15.00 50 16.5 10.0 8,250 123,420 11.84 18.00 50 16.5 10.0 8,250 123,420 9.87 Dechlorination Bisulfite added in the Effluent FM onsite Detention Time: 30 seconds at peak flow,complete mix in pipe Follow with aeration for DO boost Reaction time with free or combined chlorine usually takes 15-20 seconds Needs high turbulance to completely mix P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx CCT Page 1 of 1 Davis• Martin • Powell Dunn Black River WWTP Clarifier&CCT Project 210076 Enter data in the these cells only MLS Aug 22,2022 DRAIN PUMP STATION FOR FC-3 and FC-4 Currently dewater all 3 clarifiers via the RAS pump station. FC-3 cannot be fully emptied due to depth FC-4 is even deeper, so recommend construction a new simplex drain pump station(MH)for it and FC-3 Staff can use one of the portable sewage pumps if the simplex pump fails. Return flow into the Claifier Splitter Structure, so be mindful about pumping rate. Approx 5 feet can be drained down more rapidly via RAS telescoping valve, as influent flow conditions allow If entire volume is pumped: Time to Empty, hrs FC-3 Volume 253,790 gallons 11.7 FC-4 Volume 601,577 gallons 27.8 Q pump 361.00 gpm = 0.52 MGD Pump Off Elev 136.00 ft 135.5 Splitter Discharge Elev 164.50 ft Static 28.50 ft HL, est 13.00 ft Calc HL plus 20%safety factor TDH 41.50 Pump Efficiency 69% WILO Approximate HP 5.48 7.5 HP 3 Phase P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx Drain PumpSta Page 1 of 1 Station Description: Black River WWTP-Drain Pump Station(DMP 210076) December 11,2022 Wetwell Operating Elevation: 155.00 Enter Wetwell Data Below INPUT DATA IN BLUE ONLY Pump Reference Datum: 135.00 Available Atmospheric Head: 33.70 at 160 Ft NOTE: FOR DEWATERING FC-3 AND FC-4. OPERATE ONLY WITH FC DRAIN VALVE OPEN. Vapor Pressure: 1.00 Available NPSH Safety Factor: 3.00 Current Design Flow= 100,000 GPD Flow Units Used: GPM Future Design Flow= 780,000 GPD Conversion Factor to GPM: 1.00 FM Velocity Peaking Factor= 1.00 Flow: 361 GPM 4.10 If flow> 2,000 GPM 0.52 MGD pumps on 2 Curve Data: manually enter data Head,Feet Flow MGD One Pump at One Pump at WILO FA10.51E gpm Pump Off Level Start Level 0 0.00 28.5 9.5 48.0 90 0.13 30.0 11.0 44.0 181 0.26 32.0 13.0 39.0 271 0.39 36.0 _ 17.0 35.0 361 0.52 42.0 23.0 32.0 451 0.65 49.0 30.0 29.0 542 0.78 57.0 39.0 25.0 Calculated Heads: Feet Psi System Curve Points(manual entry) Suction Static Head: 20.00 8.66 gpm TDH,ft. Discharge Static Head: 29.50 12.77 gpm TDH,ft. Total Dynamic Suction Head: 19.34 8.37 gpm TDH,ft. Total Dynamic Discharge Head: 42.17 18.26 gpm TDH,ft. NPSH Available: 49.04 21.23 gpm TDH,ft. gpm TDH,ft. Total Dynamic Head: 22.83 9.88 gpm TDH,ft. gpm TDH,ft. Piping System Data: gpm TDH,ft. Suction: Descrip.: C Dia Length Flow K Vel HeadLoss Notes: pump intake 120.00 4.00 0.00 361 0.50 9.22 0.66 submersible pump inlet n/a 120.00 4.00 0.00 361 0.00 9.22 0.00 n/a 120.00 4.00 0.00 361 0.00 9.22 0.00 n/a 120.00 4.00 0.00 361 0.00 9.22 0.00 n/a 120.00 4.00 0.00 361 0.00 9.22 0.00 Total Suction Head Loss: 0.66 Discharge: Descrip.: C Dia Length Flow K Vel HeadLoss 90(pump base) 120.00 4.00 2.00 361 0.30 9.22 0.57 4"pump to 6"discharge flange Vertical pipe 120.00 4.00 25.00 361 0.30 9.22 2.62 and 90 Check Valve 120.00 4.00 8.00 361 2.00 9.22 3.35 and horiz pipe thru vault Plug Valve 120.00 4.00 1.00 361 0.30 9.22 0.49 Expansion 120.00 6.00 1.00 361 1.09 4.10 0.30 4 to 6 expansion Bypass Run Tee 120.00 6.00 3.00 361 0.30 4.10 0.12 Tee to bypass connection 120.00 6.00 3.00 361 0.30 4.10 0.12 120.00 6.00 7.00 361 0.30 4.10 0.17 120.00 6.00 3.00 361 0.30 4.10 0.12 120.00 6.00 6.00 361 0.20 4.10 0.13 Total Discharge Head Loss: 7.97 Pump Discharge Hydraulic Grade 177.17 P.1202112100761Calculations1210076 Drain PS Heads2.xlsx Current Page 1 Force Main: Force Main to Aeration Basin Splitter Box Description Bypass Tee Station 0+00 Splitter Box C 120.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 gth 282 Summed L - 282 282 282 282 282 282 282 282 282 282 282 282 282 Flow 361 361 361 361 361 361 361 361 361 361 361 361 361 K 1.90 0.30 2.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Dn Elev 160.00 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 Velocity 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 4.10 Headloss 4.06 0.08 0.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Dn HGL 169.20 165.14 165.06 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 164.50 FM Hd(Ft) 9.20 0.64 0.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FM P(psi) 3.98 0.28 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Notes: Cycle time calculation: Motor Sizing: Des_: ow Ra -. N A gp.,• • • gp Eff,pump 70% Eff,motor 90% in .,.. • 1 gpm • = #1 . u out • • - gpm min HP= 3.30 (per Pumping Unit) .. ••one e•. '•.: - • Pum. Selection: p. •.off ee•. '•.: - •• 1,• , able we •• foo . : ga , WILO FA10.51E e be --.on&o - . • ga • Impeller Size: Conditions mi . • 360 GPM 1042 GPM pu mi 53 ftTDH 62 ftTDH tal cy ' e: I mi 1755 RPM cles ur: I (p d be 2 an Motor HP=7.5 Dist,ft Elev Vol,gal Time,min Top Slab= 164.00 Notes: Wetwell will equalize with clarifer when drain valve opens,so 27.82 4,084 #DIV/0! filling cycle time is caluculted in Design Notes R1.xlsx DRAIN PUMP tab Invert in= 136.18 Enable 136.18 0.18 26 0.1 pumping Pump Off= 136.00 1 1.00 146.8 Submerg= 135.00 0.50 Slab TOC= 134.50 29.50 P:120 2 112 1 00 761Calculationsl210076 Drain PS Heads2.xlsx Current Page 2 SYSTEM CURVE Black River WWTP Clarifier Drain Pump 60.0 fOne Pump at Pump Off Level One Pump at Start Level 50.0 WILD FA10.51E 40.0 ~ 30.0 • 20.0 - 10.0 0.0 0 0 0 0 0 0 0 N M to Cp GPM P:\202""---076\Calculations\210076 Drain PS Heads2.xlsx Davis•Martin•Powell Dunn Black River WWTP Clarifier&CCT Project 210076 Enter data in the these cells only M LS Aug 22,2022 GENERAL AVERAGE DESIGN FLOW 3.75 3,750,000 GPD Rev March 2021 2,604.17 GPM PEAK FACTOR 3.0 PEAK DESIGN FLOW 11,250,000 GPD 7,813 GPM REQUIREMENTS NPDES Requires pH of 6 to 9 units at discharge Metcalf&Eddy Nitrification destroys alkalinity at ratio of 1 mg/L ammonia=7.14 mg/L alkalinity CaCO3 to prevent nitrification from being inhibited,maintain at least 50 mg/L alkalinity recommended pH range for nitrification is 7.2 to 9.0 CRITERIA City's Current Vendor was contacted for information WaterGuard Currently supplies Dunn with Water/Wastewater chemicals Caustic can be shipped at 50%and 25%strength 50%Caustic begins to solidify(freeze)at approx 54 deg F. Can make delivery difficult too. 25%Caustic begins to solidify(freeze)at approx 32 deg F. Truckload capacity(full)is 45,000 lbs of chemical,or 3800 to 4400 gallons Sept 2022 pricing$6.00 for 50%and$3.00 for 25%solution Less than truckload) 50%Delivery: Full Tanker$3.27/gal Small Bulk$6.10/gal 25%Delivery: Full Tanker$1.50/gal Small Bulk$2.67/gal City made decision to switch to Caustic Soda(NaOH)liquid feed to reduce manpower needed to feed bagged soda ash DOSAGE CALCS Operators currently use a max or 800 lb of dry soda ash per day with peak flow of 7.5 MGD Establish current usage as baseline in pounds Na20 Soda Ash 58% Na20(weight) Sodium Oxide 464 lb Na20 per day Pounds Soda Ash per MGD 107 LB Soda Ash/MGD Caustic solution delivered at 50% 25% by weight density 12.8 10.7 lb/gallon Sodium Oxide 38% 19% Na20(weight) Alkalinity 4.86 2.03 lb Na20 per gallon gpd Caustic Required 95 228 gallons per day gpd Caustic per MGD 13 30 gpd/MGD Truckload volume 3,800 3,800 gallons(minimum in full tanker) Evaluate at Flow of 3.75 6.00 11.25 15.00 18.00 LB Soda Ash(dry) 400 640 1,200 1,600 1,920 50%Caustic,gpd 48 76 143 191 229 30 day Supply,gallons 1,431 2,289 25%Caustic,gpd 114 183 342 456 548 30 day Supply,gallons 3,424 5,478 P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx CHEMICAL_pH Page 1 of 2 Davis•Martin•Powell Advantages of 25%Solution Lower freeze point,generally not a problem for delivery or storage in Dunn's climate Onsite dilution requires more equipment and caution,it generates heat up to 140d F Onsite dilution requires Steel Tank to handle heat generated. Tank must be over 12,000 gallons (or multiple tanks provided)due to water volume required for dilution to 25%solution. Materials compatibility is an bigger issue with 50%solution II� Provide Bulk Storage for 25%Caustic Only 4,500 gallons,Max delivery 2,000 gallons,reserve before refill 6,500 gallon,minimum tank size Use Poly Processing,Snyder,or equal Metering Pumps Use skid mounted duplex pumps Blue White Peristaltic Pumps preferred Minimum ADF PEAK DAY Flow,gpd 30 114 342 Dose Factor 0.80 1.00 1.20 Desired Flow,gpd 24 114 411 Desired Flow,gph 1.01 4.75 17.12 Use Blue-White M3 or equal peristaltic metering pump Chemical Compatibility Use: Carbon Steel,304L SS,316L SS,Monel,Hastelloy polyethylene,polypropylene,PVC,CPVC Schedule 40 Black iron or mild steel pipe Use quarter turn ball valves,Stainless Steel,Alloy20 Teflon,EPDM Avoid: PVC glue with silica filler Aluminum,copper,zinc,lead,brass,bronze Viton,Nitrile(Buna N) Chemical Containment Provide a concrete structure to house the bulk tank and feed um skid pump Inside Dimensions 16.0 ft long 22.0 ft wide 2,633.0 gal/VFt Size for max tank size: 7,000.0 gallons Depth of spill volume: 2.7 Ft,or 31.9 inches Allow for 6"rain event Method ignores the sloped floor volume below tank bottom P:\2021\210076\Calculations\210076 WWTP Design Notes R1.xlsx CHEMICAL_pH Page 2 of 2 Blue-White Engineering and Technical Data aiiiissisiiiimm M3 FLEXFLO® Peristaltic Metering Pump M3 doh . Features > 5"touchscreen color LCD display 480411.r.:••.'t" > User-friendly configurations > Self priming peristaltic metering pump delivers smooth chemical feed ki I' >Tube Failure Detection (TFD)system senses tube failure li• • > Inputs include: 4-20mA, Pulse Inputs, Industrial Protocols, Remote AV 5 4' Start/Stop Video link: O► ® c0. C E NEMA 4X Highlights Flow range Pressures Turndown ratio .0002 - 33.3 GPH 125 PSI 10,000 : 1 .0007 - 126 LPH (8.6 bar) Exclusive Motor Warranty Tube Failure Detection Brushless DC 5 Years (TFD) Motor Control Methods ;ontrol Manual 4-20mA Remote Pulse Frequency Ethernet/ Modbus Alarm ID rt:'� El Profibus lirTr t _+ __lethods Control Input Start/Stop Input Input IP TCP/IP Outputs ,:: i•�i.-1. Jr" M3 • • • . • . . • • 1 r',* F •For more help and information regarding M3,please visit www.blue-white.com or scan this QR code. Engineering Specifications M3 9 9 P 125 psig (8.6 bar) Maximum Working Pressure(excluding pump tubes) NOTE: See individual pump tube assembly maximum pressure ratings. 185°F(85°C) Maximum Fluid Temperature(excluding pump tubes) NOTE: See individual pump tube assembly max.temperature ratings. Maximum Viscosity 12,000 Centipoise Maximum Suction Lift 30 ft. Water,0 psig (9.14 m, 0 bar) Ambient Operating Temperature 14°F to 115°F(-10°C to 46 °C) Ambient Storage Temperature -40°F to 158°F(-40°C to 70°C) 115VAC/60Hz, 1ph(2.0Amp Maximum) 230VAC/60Hz, 1ph (1.0 Amp Maximum) Operating Voltage 220VAC/50Hz, 1ph (1.0 Amp Maximum) 240VAC/50Hz, 1ph (1.0 Amp Maximum) 230VAC/50Hz, 1ph (1.0 Amp Maximum) 115V60Hz= NEMA 5/15(USA) 230V60Hz= NEMA 6/15(USA) Power Cord Options 220V50Hz=CEE 7NI1 (EU) 240V50Hz=AS 3112(Australia/New Zealand) 230V50Hz=BS 1363/A(UK) Motor Brushless DC, 1/4 hp Motor Speed Adjustment Range 10,000:1 (0.01%- 100% motor speed)Max RPM = 125 0.1%increments> 1%motor speed and < 100% Motor Speed Adjustment Resolution 0.01%increments< 1%motor speed Display 5"touchscreen color LCD, UV resistant. Display Languages English, Spanish, French,German, and Portuguese selectable Maximum Overall Dimensions 8-1/4"W x 11-3/4"H x 13-1/4"D(20.9W x 29.8H x 34.5D cm) Product Weight 25.41b. (11.5 Kg) Security Programmable 6-digit password Approximate Shipping Weight 30 lb. (13.6 Kg) Enclosure NEMA 4X(IP66), Polyester powder coated aluminum &Noryl RoHS Compliant Yes Standards cETLus, CE, NSF61 g C Dimensions 1 Dim Inch z Dim Z cm I1 /ri A A 11-3/4" D 26.5 E 0 r B 8-1/4" 20.9 E 4-1/4" 10.8 - C 13-1/2" 34.5 2 - D Model Number Matrix FLEXFLO® Model Number FLEXFLO®Peristaltic metering pump Power Cord (operating voltage user selectable 115V/240 Vac 50/60Hz) 115V/60Hz, power cord NEMA 5/15 plug(US) 240V/50HZ, power cord AS 3112 plug(AU/New Zealand) 230V/60Hz,power cord NEMA 6/15 plug(US) 230V/50HZ,power cord BS 1363/A plug(UK) 220V/50HZ,power cord CEE 7NI1 plug(EU) No Power Cord Inlet/Outlet Connection Size, Connection Type, Connection Material S 3/8"OD x 1/4"ID Tube Compression Fitting, Natural PVDF(Kynar) M 1/2"Male NPT Fitting, Natural PVDF(Kynar) B 1/2"Hose Barb, Natural PVDF(Kynar),available for ND, NEE, NGG,NKL and G2G only C 1/2"-3/4"Tri-clamp connections, Natural PVDF(Kynar),available for ND,NEE,NGG,NKL and G2G only Q Quick Disconnect, Natural PVDF(Kynar),available for ND, NEE, NGG, NKL and G2G only. (valves sold seperately) MB 1/2"Male BSPT Fitting, Natural PVDF(Kynar) Pump Tube Material, Pump Tube Size, Output Range ND Flex-A-Prene®.075 ID 1 .0002-2.10 GPH 1 125 PSI NEE Flex-A-Prene®.093 ID 1 .0004-4.76 GPH 1 110 PSI NGG Flex-A-Prene®.187 ID 1 .0019-19.02 GPH 1 110 PSI NHL Flex-A-Prene®.250 ID I .0017-17.4 GPH 165 PSI NK Flex-A-Prene®.375 ID 1.0033-33.3 GPH 1 125 PSI • NKL Flex-A-Prene®.375 ID 1 .0033-33.3 GPH 130 PSI GE Flex-A-Thane®.125 ID I .0004-4.60 GPH 165 PSI GG Flex-A-Thane®.187 ID I .0010-10.1 GPH 165 PSI G2G Flex-A-Thane®.187 ID 1 .002-18.23 GPH 165 PSI GH Flex-A-Thane®.312 ID 1 .0024-24.9 GPH 1 65 PSI GK Flex-A-Thane®.375 ID 1 .0028-28.5 GPH 165 PSI TH Flex-A-Chem®.250 ID 1 .0015-15.06 GPH 150 PSI TK Flex-A-Chem®.375 ID 1 .0028-28.5 GPH 1 50 PSI Options (leave this blank for standard model with left facing pump head inlet/outlet) IIIIRight facing pump head,input/output(Left facing fluid input/output is standard) Down facing pump head, input/output(Left facing fluid input/output is standard) M3 S I 2 4 - S ND R Sample Model Number Accessories 1/4"x 3/8""S" Fitting *`' 1/2"Hose Barb"B" Fitting . 1/2"MNPT"M"Fitting _...'� • KIT-PSM Quick Disconnects KIT-M12 Wall Mount Bracket,HPDPE TWO M12 CABLES-9.8 ft. 'KIT-QSV FKM 0-RINGS "KIT-QBV FKM 0-RINGS `KIT-QMV FKM 0-RINGS `KIT-QSE EP 0-RINGS "KIT-QBE EP 0-RINGS "KIT-QME EP 0-RINGS "KIT-M12-3 THREE M12 CABLES P.N.85000-157 M3 REV 4 20221003 M3 is sold and serviced exclusively by highly skilled,factory authorized technicians. 4 9 ISO 9001:2015 Qualrt 5300 Business Drive, Huntington Beach,CA 92649 MADE IN THE TEL 714-893-8529 1 FAX 714-894-9492 I www.blue-white.com 1 sales@blue-white.com CERTIFIED ,,,,y USA Materials of Construction M3 Non-wetted Components: Wetted Components: Enclosure:413 Aluminum(Polyester powder coated)& Noryl Pump Tube Assembly: Pump Head:Valox®(PBT)thermoplastic Tubing: Flex-A-Prene®,Flex-A-Chem®or Flex-A-Thane® Pump Head Cover: Polycarbonate Adapter Fittings: PVDF Permanently lubricated sealed motor shaft support ball bearing. Ancillary Items Not Included (sold separately): Injection Fitting, Foot Valve/Strainer, Suction Tubing/Pipe, Cover Screws: Stainless steel, polypropylene cap Discharge Tubing/Pipe, Quick Disconnect Valves, or Roller Assembly: Communications Wire/Cable. Rotor:Valox®(PBT) Rollers: Nylon Roller Bearings: SS Ball bearings Motor Shaft: Chrome plated steel TFD System Sensor: Hastelloy C-276 Power Cord: 3 conductor, SJTW-A water-resistant Tube Installation Tool: GF nylon Mounting Brackets and Hardware: 316 Stainless steel Output Specifications Feed Rate Max Max Max Speed Pressure Temperature Tube Material/Size GPH LPH ML/Min RPM PSI(bar) °F(°C) Flex-A-Prene®M3 Tube Pumps .0002-2.10 .0007-7.92 .0132-132 125 125(8.6) 185(85) ND .0017-17.4 .0066-65.6 .11 -1097 125 65(4.5) 185(85) NHL .0033-33.3 .0126- 126 .21 -2100 125 125(8.6) 185(85) NK .0033-33.3 .0126- 126 .21 -2100 125 30(2.1) 185(85) NKL .0004-4.76 .0018- 18.0 .03-300 125 110(7.6) 185(85) NEE .0019-19.02 .0072-72.0 .12- 1200 125 110(7.6) 185(85) NGG Flex-A-Chem®M3 Tube Pumps .0015-15.06 .0057-57.0 .0950-950 125 50(3.4) 130(54) TH .0028-28.5 .0108-108 .18- 1800 125 50(3.4) 130(54) TK Flex-A-Thane®M3 Tube Pumps .0004-4.60 .0017-17.4 .0290-290 125 65(4.5) 130(54) GE .0010- 10.1 .0038-38.4 .0637-637 125 65(4.5) 130(54) GG .0024-24.9 .0094-94.2 .1570-1570 125 65(4.5) 130(54) GH .0028-28.5 .0108-108 .1800-1800 125 65(4.5) 130(54) GK .002-18.23 .007-69.0 .115-1150 125 65(4.5) 130(54) G2G 3 WATER GUARD, INC 1903 HERRING AVENUE (800) 872-7665 POST OFFICE BOX 2226 (252) 237-5205 ImILSON, NC 27894 FAX:(252) 237-7028 TECHNICAL BULLETIN - SODIUM HYDROXIDE SODIUM HYDROXIDE is a colorless liquid which is relatively viscous or "syrup-like" in high concentra- tions. Also known as Caustic Soda, this thick solution is most commonly available in concentrations of 50% and 25%. The most significant difference between these concentrations is 25% freezes at 32°F ° while 50% begins freezing at 52°F. Caustic Soda is corrosive and can burn and damage eyes, skin, mucous membranes and any other ex- posed tissue. If inhaled, irritation of the respiratory system may occur with coughing and breathing diffi- culty. Though unlikely to occur during occupational use, ingestion of large quantities may be fatal. Sodium Hydroxide is the principal strong base used in the chemical industry. Sodium Hydroxide is also available as a white solid, available in pellets, flakes, or granules. In bulk it is most often handled as an aqueous solution, as solutions are less expensive and easier to handle. It is used to drive for chemical reactions and also for the neutralization of acidic materials. REGISTRATIONS National Sanitation Foundation: Water Guard's Sodium Hydroxide is NSF/ANSI 60 certified for use in drinking water systems for pH ad- justment purposes. Its maximum use level should not exceed 100mg/L. ANALYSIS SPECIFICATION Concentration 50% 25% Sodium Hydroxide (NaOH) 49.0-51.0% 24.5-25.5% Sodium Oxide (Na20) 38.0-39.5% 19.0-19.75% Sodium Carbonate (Na2CO3) 0.4% max. 0.22% max. Sodium Chloride (NaCI) 100 ppm max. 50 ppm max. Sodium Chlorate (NaCI03) 65 ppm max. 32.5 ppm max Sodium Sulfate (Na2SO4) 40 ppm max. 20 ppm max. Iron (Fe) 5 ppm max. 2.5 ppm max. PHYSICAL AND CHEMICAL PROPERTIES Concentration 50% 25% Freezing Point 12°C (54°F) 0° C (32° F) Specific Gravity 1.53 1.28 Density(Ib./gal. at 15.6°C) 12.76 10.69 Solubility in H2O Complete Complete SODA SOLVAY®LIGHT I Light Soda Ash LIOrigin Europe Chemical name: Sodium carbonate/Soda ash 0 CAS—N° 497-19-8 a) EINECS—N° 207-838-8 Q EC—N° 011-005-00-2 tC5 a--, CLP Classification:H319 Causes serious eye COirritation 0 JChemical formula Na2CO3 OMolecular weight 106 0 Physical properties 0 s_ Q Appearance: CI— White powder QDensity in kg/dm3 2,533 Melting point°C 851 O Solubility in water at 20°C 214 C/ ) in g/1000g pH(1%in water) 11,26 7 �t W a a =' IE�t<,1 i as y.a a Y� I.. �'‘ F dt wig 1 r/ir ; 7;- - /E*7 . - - - ➢ Applications Glass Industry—Raw Material for melting Chemical Industry—Production of sodium derivatives Detergents—Alkaline support Metallurgical processes—Desulfurization of pig iron—Raw material for melting, ... Flue gas treatment—Removal of acidic components ➢ Transport/Packaging Bulk:wagon, truck, ship Packaging:plastic bags, bulk bags Some applications of this product may be regulated or restricted by national or international standards(e.g.food additives,feeding stuff,water treatment, the cosmetic or pharmaceutical industry,etc).The buyer and eventual user,in his sole and entire liability,shall respect those standards,orders of any relevant authority,and all existing patents and intellectual properties rights;and shall comply with the laws and the regulations applicable to our products and/or to his activity.The buyer and the eventual user must independently determine the suitability of this product for any particular purpose and its manner of use. SOLVAY CHEMICALS INTERNATIONAL Specification SPE-C 05.19.10 Rue du Prince Albert,44 B-1050 Brussels Date 01/2011 I Ed./Issue I 01 Typical analytical values Europe 1 Chemical analysis 0 Na2CO3 (Na2O) * 99,5% (58,2%) J NaCI 0,15% 4--• Na2SO4 0,01 -0,02% CD CO CaO 32-60ppm a) MgO 40-78ppm (/) QFe2O3 3- 10 ppm CO Loss on drying * 0,1 -0,6% CIO 0 J Free flowing density 0,53-0,57 kg/dm3 U OGranulometry -o (l) >2 mm 0,2- 1,2% 0 Q > 1 mm 0,5--2,3 >0,5 mm 12-40% 13 <0,125 mm 1,6-3,0% 3 m 0 CO <0,063 mm 0,2 1,0 o/o Specification Chemical analysis Na2CO3 (Na2O) * >_98%(57,3%) NaCI 5 0,5% Na2SO4 5 0,04% CaO <_ 150ppm 1 MgO <_ 150 ppm Fe2O3 <_30 ppm Loss on drying* <_ 1,5 Free flowing density >_0,48 kg/dm3 50,67 kg/dm3 '(*)Ex works or after drying(2 hrs at 250°C) Granulometry > 1 mm 5 5% >0,25 mm 5 25% <0,125 mm <_90% <0,063 mm 5 60% List of analytical methods see:ANA-C 40 00 00 JULY 2000 The information contained in this document is given in good faith and by way of information at the time of printing.As the potential uses of our products are many and outside our control,each user is responsible for asking us for information on planned applications,as we cannot be held liable on the basis of general information.The buyer is required to monitor and respect,in his sole liability,the conditions under which our products are stored and used in his territory,to provide all required information to the user,and to respect all existing patents and all regulations applicable to our products and to his activity. SOLVAY CHEMICALS INTERNATIONAL Specification SPE-C 05.19.10 Rue du Prince Albert,44 B-1050 Brussels Date 01/2011 I Ed./Issue 101