HomeMy WebLinkAbout20150627 Ver 2_NCDNCR Brunswick Town #121-15 Renewal BR_20231207District:
NC Division of Coastal Management
CAMA Major Permit Renewal Request
Major Permit Staff:
A licant information
Applicant
Name:
Project
Address:
NC_
Last
CR
First
s4. P11;1"
Street Address Rd-
CAMA Permit
No:
Agent's Name:
MYjSw' c,iL
V\__
Permit Expiration Date:
add
District Manager.' r field Re Approve? (Initial Appropriate Box)
Request Date:
/z2
Received in Office: 1 ! / l a 2
W,h n 61b2iw R 84 7 9
ZIP Cade
�a(3 ((A2Payrnent$ ] a )
NO
Other Information
DWR Project 16 f O �� USACE Action 50\1O !,VV
No: L� ID No_:
Has substantial
development occurred?
Recommend to Renew?
If Not Approved, provide
Justification:
Staff
Signature:
•szy NO
If Yes,
Explain:
f(tW 1(19
- ,c Dces awe `r vt,\C
Staff
1,1P Date: (ozilizR
- MClroitraDcpartmentiiErmi{reniraeitaIQyao/ . anofcoascatM8eaa mettt:
WashinccOn I314aWashtrigtilitSivare Wagro".Nc caFufhta-27 9 ; 252:946.6481
'C# r ice A.emie 1 Morehead Cit,k Moe*, j . 28551 252ACIEMEZ
North4State
ENVIRONMENTAL
2889 Lowery Si., Winston-Salem, NC 27101 f p. 336.725.2010 I f 336.725.2405
November 28, 2022
NC Division of Coastal Management
c/o Patrick Arnica
127 Cardinal Drive Ext
Wilmington, NC 28405
RE: CAMA State Permit #121-15 — permit extension
On behalf of the North Carolina Department of Natural and Cultural Resources (NCDNCR), we are requesting an
extension of State Permit #121-15. This permit was originally issued on 10/26/2015 for shoreline stabilization at
Brunswick Town/ Fort Anderson State Historic Site (BTFA). The property is located at 8884 St Philip's Rd SE
Winnabow, North Carolina. The property is adjacent the Cape River in Brunswick County. Project implementation has
occurred in a phased approach as it has been dependent upon the funding availability.
Permit History. Permit #121-15 was renewed on 12/10/2020 with an expiration date of 12/31/2022. There have been
several refinements/ modifications related to the NCDNCR's efforts to stabilize the shoreline at BTFA, These
refinements/ modifications include May 1, 20217, May 21, 2018, June 14, 2021, May 18, 2022 and November 10,
2022,
There have not been any changes to the ownership of the adjacent properties.
The project is in compliance with all conditions of the current permit.
Please feel free contact me with any questions or if you need additional information. I can be reached at 919-971-
5641 (direct) or via email at p.todd(a,nsenv.com.
Respectfully submitted,
Phillip Todd, Agent
Enclosures
RECEIVED
NOV 3 0 2022
DCM WILMINGTON, NC
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: dim McKee
Mailing Address: 8884 St. Philip's Rd, SE
Phone Number:
Email Address:
I certify that I have authorized
Winnabow, NC 28479
910-371-6613
jim.mckee@a ncdcr.gov
Phillip Todd, Agent
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: Shoreline Stabilization
at my property located at Brunswick Town/ Fort Anderson
in Brunswick County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
er Information:
ignature
Jim McKee
Print or Type Name
Site Manager
Title
10 11 1 2022
Date
This certification is valid through ! 1
RECEIVED
NOV 302022
DCM W►LMINGTON, NC
Permit Class
NEW
Permit Number
121-15
1
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
hermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to NC Dept. of Natural and Cultural Resources, 8884 St. Phillips Road, Winnabow, NC 27479
Authorizing development in Brunswick County at Cape Fear River at 8884 St. Phillips Rd.,
Winnabow , as requested in the permittee's application dated 6/8/15, including attached
workplan drawings (341 1-34 of 34 all dated 6/8/15;
This permit, issued on October 26, 2015 , is subject to mpiiance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may
,,be subject to fines, imprisonment, or' civil action; or may cause the permit to be null and void.
Brunswick Town Historic Site Shoreline Stabilization Project
Unless specifically _altered herein, the offshore living siii, riprap placement and marine mattress
relocation shall be constructed in the accordance with the designs and alignment, depid on the
attached workplan drawings.
The !alignment of the authorized living sill, riprap placement and relocated marine mattress shall be
staked by a representative of the Division of Coastal Management within a maximum of 30 days prior
to the start of construction. Failure to initiate construction within 30.days, or erosion of the shoreline
by adverse weather conditions, shall require the alignment to be restaked by DCM within a maximum
of 30 days prior to the new expected start`of construction.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other Signed by the, authority of the Secretary of DEQ and the
qualified persons within twenty (20) days of the issuing date, .Chairman of the Coastal Resources Commission.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North .Carolina Coastal
Management Program.
Braxton C. Dsh Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of.Permittee
: oao•..... o
NC Dept. o€Naturat& Cultural Resources t Permit No. 121-I5
Page of 3
ADDITIONAL CONDITIONS •
2) This permit does not authorize the backfilling of any of the authorized shoreline stabilization structures:
3) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
The riprap material shall be free from. loose dirt or any pollutant. It shall be of a size sufficient to: prevent
its movement from the approved alignment b}, wave or current action. •
The riprap material shall consist of clean, rock or masonry materials such as, but not limited to granite or
broken concrete.
Each individual offshore sill section shall be marked with a minimum of three yellow reflectors (one at
each end of the section and one in the middle). The reflectors shall extend at least three feet above normal
.high water level•.
Sedimentation and Erosion Control •
In order' to protect Water quality, runoff from construction shall not visibly increase 'the amount of
suspended sediments in adjacent waters.
A ground' cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase :of grading on cut or filled slopes. At a minimum, a- silt fence shall be properly installed
immediately landward of the bulkhead cap immediately following completion of backfilling activities.
General -
7) . In order to protect anadromous fisheries resources in the project area, no in water work shall be permitted
between.'July 1 and October 31 of any year without' the prior approval of the Division of Coasta.1
Management, in consultation with appropriate resource agencies.
8) No vegetated wetlands shall be excavated or filled, even temporarily, without additional authorization
from the Division.
9) The permittee understands and agrees that, if future operations by the United States requires the removal,
relocation, or:other alteration of the structure or work autherized.by this permit, or if 'Tithe opinion of the
Secretary of-the..Army or his authorized representative, said structure or work shall cause unreasonable
obstruction to free navigation: of the navigable watery, the perinittee shall be required, upon due notice from
the Corps of Engineers, to remove- relocate or. alter the structural work or obstructions caused thereby,
without expense to the United States.
10) Approval of the structure was based on a determination that there would be no- obstruction to navigation.
Under conditions existing within the AIWW,.- a possibility exists 'that the authorized structures may be
damaged by wave wash from passing vessels. Issuance of this permit should not be. construed as relieving
the permittee of taking proper steps to ensure the structure will not be damaged by wave wash.
i
NC Dept. of Natural & Cultural Resources Permit No. 121-15
Page 3 of 3
ADDITIONAL CONDITIONS
11) No attempt shall be made by the permittee to prevent the full and free use by the public .of all navigable
waters at or adjacent to the authorized work.
12) This permit shallnot be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation,
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (9.10) 796-7215 prior to the commencement of any
such activity for this. determination. The permittee is further advised that many non -water
dependent activities are not authorized within 3 0 feet of the normal high water level.
NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project
No. 15-0672.
NOTE: The U.S. Army Corps of Engineers assigned the authorized project Action ID No. SAW-2012-
00739.
NOTE: An application processing fee of$400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
ca
0.
PA rct.
18632
Permit
Number/Comments
major renewal fee #121-15 BrCo
Check
amount
0
a
0
0
in-
Check
Number
43884
L.
Z
N
Pinnacle
Bank
Name of
Permit Holder
NCDNCR Brunswick
Town
Check From
North State
Environmental
o
ICS
a
a,
0
12/7/2022
+11,
a
CZ
a
0)
,
'v
it
CC