Loading...
HomeMy WebLinkAbout20221494 Ver 1_1 PCN_20230109Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: 10 Permit a Section 404 Permit ❑ Section 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: lc. Has the NWP or GP number been verified by the Corps? ❑ Yes a/ No 1d. Type(s) of approval sought from the DWQ (check all that apply): — Regular ❑ Non-404 Jurisdictional General Permit — Express ❑ Riparian Buffer Authorization /1 401 Water Quality Certification ❑ 401 Water Quality Certification 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: For the record only for Corps Permit: ❑ Yes ' No ❑ Yes a No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes a/ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ' No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ' No 2. Project Information 2a. Name of project: Project Pietryk 2b. County: Rowan 2c. Nearest municipality / town: Salisbury 2d. Subdivision name: not a subdivision 2e. NCDOT only, T.I.P. or state project no: not a DOT project 3. Owner Information 3a. Name(s) on Recorded Deed: Coy and Joyce Wilhelm, Chris and Gina Elliot, and Peter and Carolyn Brown 3b. Deed Book and Page No. 570/ 0582, 1311/ 783 and 1380/ 724 3c. Responsible Party (for LLC if applicable): 3d. Street address: 415 Glover Road, 140 Crescent Heights Drive, and 1465 Peeler Road 3e. City, state, zip: Salisbury, NC 28146 3f. Telephone no.: 704-236-2440 3g. Fax no.: n/a 3h. Email address: curquhart@crowholdings.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Mr. Chris Urquhart 4c. Business name (if applicable): Crow Holdings 4d. Street address: 4064 Colony Rd Suite 405 4e. City, state, zip: Charlotte, NC 28211 4f. Telephone no.: 704-236-2440 4g. Fax no.: 4h. Email address: curquhart@chindustrial.com 5. Agent/Consultant Information (if applicable) 5a. Name: Jennifer L Robertson 5b. Business name (if applicable): Atlas Environmental, Inc. 5c. Street address: 338 S. Sharon Amity Road #411 5d. City, state, zip: Charlotte, NC 28211 5e. Telephone no.: 704-512-1206 5f. Fax no.: no fax 5g. Email address: jrobertson@atlasenvi.com Page 2 of 10 PCN Form — Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 410 003, 410 034, and 406 024 1 b. Site coordinates (in decimal degrees): Latitude: 35.607202° Longitude: - 80.511166° lc. Property size: 42.93 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Town Creek 2b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: Lower Yadkin, 03040103 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Commerical, Farm Land, Heavily Forested, and Residential Development 3b. List the total estimated acreage of all existing wetlands on the property: 0.267 acre wetlands 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 310 linear leet 3d. Explain the purpose of the proposed project: The purpose is to develop an industrial distribution/warehouse logistics center that consists of one building that provides features and flexibility to attract a tenant(s). 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves development of the three parcels into one industrial warehouse with associated infrastructure including trailer parking, employee parking, truck courts, access roads, and one storm water SCM. Typical construction equipment will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? a/ Yes ❑ No ❑ Unknown Comments: AJD was submitted on August 30, 2022 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary ❑Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Jennifer Robertson, Austin Baggarley Agency/Consultant Company: Atlas Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. An AJD was submitted on August 30, 2022 Action ID #: SAW-2022-02024 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes // No Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? /1 Yes ❑ No 6b. If yes, explain. This project will constitute phase II of the overall development. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la. Which 0/ sections were completed below for your project (check all that apply): Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction Corps (404, 10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Seep Yes Corps 0.127 W2 P Fill Seep Yes Corps 0.027 W3 T Land Clearing Seep Yes Corps 0.001 W4 P Fill Seep No Corps 0.011 W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total wetland impacts: 0.165 (P) / 0.001 (T) 2h. Comments: The temporary impacts will be restored once construction is complete. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ — non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Culvert - Corps S2 - Other (Type In) - Corps S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts: 3i. Comments: No impacts to streams are proposed. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts: 4g. Comments: No impacts to open water are proposed. 5. Pond If pond or or Lake Construction lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: No pond contruction is proposed. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer impact number- Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total buffer impacts: 6i. Comments: There are no state regulated stream buffers on site. Page 5 of 10 PCN Form - Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All streams within the review area are propsed to be avoided (310 linear feet of intermittent stream). Two isolated wetlands will also be avoided. A retaining wall will be used to the South of both permanent wetland impacts to prevent downstream impacts. A cross drainage pipe will be installed allowing stormflow to the head of a stream from a Northeast drainage feature. This will allow for complete water retention in a stormwater pond and prevents heavy stormflow into the lower end of the stream. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Numerous steep graded slopes are being used to avoid additional stream and wetland impacts. The temporary wetland impact W3 will be restored after the construction process. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? /1 Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): // DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank fee program Mitigation ►/ Payment to in lieu ❑ Permittee Responsible 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity none Quantity none Quantity none 3c. Comments: none 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: none linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): none square feet 4e. Riparian wetland mitigation requested: none acres 4f. Non -riparian wetland mitigation requested: none acres 4g. Coastal (tidal) wetland mitigation requested: none acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. not applicable Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes // No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 none none 3 (2 for Catawba) none Zone 2 none none 1.5 none 6f. Total buffer mitigation required: none 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). not applicable 6h. Comments: no comments Page 7 of 10 PCN Form — Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes 0 No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? >24% 2b. Does this project require a Stormwater Management Plan? /1 Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: One SCM (storm water BMP) will be constructed. The plan is being approved locally. Stormflow from the Northeast drainage within the project area will be directed to a cross drainage pipe allowing for stormflow to the head of a stream. Stormwater runoff from the concrete parking area will be held in the stormwater pond (SCM). The pond will be constructed with a forebay and littoral shelves. 2e. Who will be responsible for the review of the Stormwater Management Plan? Rowan County 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Rowan County 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ' Phase II NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes /1 No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): ❑ Coastal counties ❑ HQW ❑ ORW ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes /1 No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? 11 Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? /1 Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes / No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? ❑ Yes ❑ No 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: ❑ Yes ❑ No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? ❑ Yes /1 No 2b. Is this an after -the -fact permit application? ❑ Yes /1 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes / No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. sanitary sewer Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes // No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ No Yes 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDENR Natural Heritage Program Map Viewer and GIS Layer; T&E report submitted to FWS; FWS comment letter enclosed; no suitable habitat exists on site; see permit application cover letter 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes /1 No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? https://www.fisheries. noaa.gov/resource/map/essential-fish-habitat-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes a No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC HPO comment letters enclosed; SHPO had no comment 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes /1 No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA floodmaps GIS layer, there is not a FEMA floodplain located on the project site Jennifer L Robertson Applicant/Agent's Printed Name iekv1A40-,, dfas Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) 09/12/2022 Date Page 10 of 10 PCN Form — Version 1.4 January 2009