Loading...
HomeMy WebLinkAbout20221494 Ver 1_Additional Wetland impacts to 20221494 Project_20230109Strickland, Bev From: Jennifer Robertson <jrobertson@atlasenvi.com> Sent: Monday, January 9, 2023 9:57 PM To: Hopper, Christopher D CIV (USA); Scheller, Roberto Subject: [External] Peeler Road (SAW-2021-00701 and 22-0814), Pietryk Drive (SAW-2022-00862), and Project Pietryk (SAW-2022-02024 and 22-1494) Attachments: 1 PCN.pdf; 2 Wetland Impact Map.pdf; 3 2022-0908 Innovation Logistics Center Wetland and Stream Impacts.pdf; 4 Project Pietryk DMS Acceptance.pdf; ILC Phase 2 NDEQ 401 Water Quality Certificate 20221494 dated 12.19.22.pdf; 14 Peeler Road DMS Receipt.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Chris/Roberto, These three projects are phases of the same overall project listed in order above — Phase 2 did not require water impacts. Roberto, The 401 that was issued on December 19, 2022 for the final phase missed one wetland impact (W4). See the attached documents that were sent to you and Chris on December 6, 2022. Are you able to revise the 401 to include impact W4? Chris, Do you need anything else to issue the 404 for the Project Pietryk phase? The total wetland impacts for the Project Pietryk phase is 0.165 acre of permanent impacts and 0.001 acre of temporary impact. The total wetland impacts for the first phase were 0.1 acre of permanent impacts and 0.014 acre of temporary impacts. We mitigated for DWR wetland impacts for Phase 1. We will need to mitigate for all wetland impacts now. Summary: 0.265 acre of total permanent wetland impacts (0.53 mitigation credits) (we have already purchased 0.1 credit — see attached DMS receipt). Please let me know what else you need for issuance of the 404. Thank you, Jennifer L Robertson, President ATLAS Environmental, Inc. 338 S. Sharon Amity Road #411 Charlotte, NC 28211 (704) 512-1206 office (828) 712-9205 mobile www.atlasenvi.com Offices in Asheville and Charlotte i