Loading...
HomeMy WebLinkAboutNCC200638_NOT Closeout Documents_20230106North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Donnie Club - Phase 2 Cottages River basin: Cape Fear Person financially responsible: Hainoa, LLC - Clint J Tolbert, NC Agent/Dir. of Project #: MOORE-2020-034 Agromoney/Proj Mgr/Do NCC200638 Address: P.O. Box 82545, Lincoln, NE 68501 1. Project Location: Beulah Hill Church Road, West End Pictures: No 2. Weather and soil conditions: sunny/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Shane Misner Title: Director of Facility Operations Inspection report: Sent Report Date given/sent: January 03, 2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: December 30, 2022 Time arriving on site: 11:33 AM Time leaving site: 11:56 AM cc: