HomeMy WebLinkAbout#5080_2022_0927_TS_FINAL
NC Department of Environmental Quality | Division of Water Resources | Laboratory Certification Branch
4405 Reedy Creek Road | 1623 Mail Service Center | Raleigh, North Carolina 27699-1623
919-733-3908
November 9, 2022
5080
Mr. Ryan Enoch
Progress Energy Carolinas - Roxboro Steam Electric Plant
1700 Dunnaway Road
Semora, NC 27343-
Subject: North Carolina Wastewater/Groundwater Laboratory Certification Branch (NC
WW/GW LCB) Maintenance Inspection
Dear Mr. Enoch:
Enclosed is a report for the inspection performed on September 27, 2022 by Tonja Springer. I
apologize for the delay in getting this report to you. Where Finding(s) are cited in this report, a
response is required. Within thirty days, please supply this office with a written item for item
description of how these Finding(s) were corrected. Please describe the steps taken to prevent
recurrence and include an implementation date for each corrective action. If the Finding(s) cited
in the enclosed report are not corrected, enforcement actions may be recommended. For
Certification maintenance, your laboratory must continue to carry out the requirements set forth
in 15A NCAC 02H .0800.
A copy of the laboratory’s Certified Parameter List at the time of the audit is attached. This list will
not reflect any changes made during the audit. Copies of the checklists completed during the
inspection may be requested from this office. Thank you for your cooperation during the
inspection. If you have questions or need additional information, please contact me at (919) 733-
3908 Ext. 259.
Sincerely,
Beth Swanson
Technical Assistance & Compliance Specialist
Division of Water Resources
Attachment
cc: Todd Crawford, Tonja Springer, #5080
On-Site Inspection Report
LABORATORY NAME: Progress Energy Carolinas - Roxboro Steam Electric Plant
NPDES PERMIT #: NC0003425
STORMWATER PERMIT #: NCS000581
ADDRESS: 1700 Dunnaway Road
Semora, NC 27343
CERTIFICATE #: 5080
DATE OF INSPECTION: September 27, 2022
TYPE OF INSPECTION: Field Industrial Maintenance
AUDITOR(S): Tonja Springer
LOCAL PERSON(S) CONTACTED:
Kevin Clayton
I. INTRODUCTION:
This laboratory was inspected by a representative of the North Carolina Wastewater/Groundwater Laboratory
Certification Branch (NC WW/GW LCB) to verify its compliance with the requirements of 15A NCAC 02H
.0800 for the analysis of compliance monitoring samples.
II. GENERAL COMMENTS:
The facility is neat and well organized and has all the equipment necessary to perform the analyses. The
analyst was forthcoming and responded well to suggestions from the auditor.
All required Proficiency Testing (PT) Samples have been analyzed for the 2022 PT Calendar Year and the
graded results were 100% acceptable.
The laboratory is reminded that any time changes are made to laboratory procedures, QA/SOP document(s)
must be updated and relevant staff retrained. Staff must acknowledge that they have read and understand
the changes as part of the documented training program. The same requirements apply when changes are
made in response to Findings, Recommendations or Comments listed in this report, to ensure the methods
are being performed as stated, references to methods are accurate, and the QA and/or SOP document(s) is
in agreement with each approved practice, test, analysis, measurement, monitoring procedure or regulatory
requirement being used in the laboratory. In some instances, the laboratory may need to create an SOP to
document how new functions or policies will be implemented. Revisions to the SOP, based on the
Findings, Comments and Recommendations within this report must be submitted to this office by
May 1, 2023.
Page 2
#5080- Progress Energy Carolinas - Roxboro Steam Electric Plant
The laboratory is also reminded that SOPs are intended to describe procedures exactly as they are to be
performed. Use of the word “should” is not appropriate when describing requirements (e.g., Quality Control
(QC) frequency, acceptance criteria, etc.). Evaluate all SOPs for the proper use of the word “should”.
Contracted analyses are performed by Duke Power Company LLC d/b/a Duke Energy Carolinas LLC
(Certification #248) and Pace Analytical Services LLC - Huntersville NC (Certification #12).
The Approved Procedure documents for the analysis of the facility’s currently certified Field Parameters
were provided at the time of the inspection.
III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS:
Documentation
A. Finding: The pH benchsheet is lacking required documentation: the instrument identification.
Requirement: All laboratories shall use printable laboratory benchsheets. Certified Data shall
be traceable to the associated sample analyses and shall consist of: the instrument
identification. Each item shall be recorded each time samples are analyzed. Analyses shall
conform to methodologies found in Subparagraph (a)(1) of this Rule. Ref: 15A NCAC 02H
.0805 (g) (2) (C) .
Comment: The pH calibration is documented on a separate log. The instrument identification
is documented on the pH calibration log but not on the pH benchsheet.
B. Finding: The Turbidity benchsheet is lacking required documentation: the proper units of
measure.
Requirement: All laboratories shall use printable laboratory benchsheets. Certified Data shall
be traceable to the associated sample analyses and shall consist of: the proper units of
measure. Each item shall be recorded each time samples are analyzed. Analyses shall
conform to methodologies found in Subparagraph (a)(1) of this Rule. Ref: 15A NCAC 02H
.0805 (g) (2) (L).
Comment: The units of measure (i.e., NTU) are not documented on the Turbidity benchsheet
for the “Outfall 003-Upstream” and “Outfall 003” result columns.
Proficiency Testing
C. Finding: The laboratory is not documenting PT Sample analyses in the same manner as
routine Compliance Samples.
Requirement: All PT Sample analyses must be recorded in the daily analysis records as for
any Compliance Sample. This serves as the permanent laboratory record. Ref: Proficiency
Testing Requirements, February 19, 2020, Revision 5, Section 3.6.
Requirement: The laboratory shall retain all records necessary to facilitate historical
reconstruction of the analysis and reporting of analytical results for PT Samples. This means
the laboratory must have available and retain for five years [pursuant to 15A NCAC 02H .0805
(a) (7) (E) and (g) (1)] all of the raw data, including benchsheets, instrument printouts and
calibration data, for all PT Sample analyses and the associated QC analyses conducted by
all parameter methods. Ref: Proficiency Testing Requirements, February 19, 2020, Revision
5, Section 4.0.
Page 3
#5080- Progress Energy Carolinas - Roxboro Steam Electric Plant
Requirement: The analysis of Proficiency Testing (PT) Samples is designed to evaluate the
entire process used to routinely analyze and report Compliance Sample results. PT Samples
must be analyzed the same as Compliance Samples. Also, documentation must be made on
the same benchsheets used for Compliance Samples. Ref: NC WW/GW LCB Proficiency
Testing Samples Analyzed and Documented Same as Compliance Samples Policy.
Comment: The PT Samples results are documented on the PT vendor form.
IV. PAPER TRAIL INVESTIGATION:
The paper trail consisted of comparing original records (e.g., laboratory benchsheets, logbooks, etc.) and
contract laboratory reports to Discharge Monitoring Reports submitted to the North Carolina Division of
Water Resources. Data were reviewed for Progress Energy Carolinas - Roxboro Steam Electric Plant
(NPDES permit # NC0003425) for February 2022, March 2022 and May 2022. No transcription errors
were observed. The facility appears to be doing a good job of accurately transcribing data.
V. CONCLUSIONS:
Correcting the above-cited Findings will help this laboratory to produce quality data and meet Certification
requirements. The inspector would like to thank the staff for their assistance during the inspection and
data review process. Please respond to all Findings and include supporting documentation,
implementation dates and steps taken to prevent recurrence for each corrective action.
Report prepared by: Tonja Springer Date: October 26, 2022
Report reviewed by: Tom Halvosa Date: October 31, 2022
Certificate Number:5080
Effective Date:1/1/2022
Expiration Date:12/31/2022
Lab Name:Progress Energy Carolinas - Roxboro Steam Electric Plant
Address:1700 Dunnaway Road
Semora, NC 27343-
North Carolina Wastewater/Groundwater Laboratory Certification
Certified Parameters Listing
Date of Last Amendment:7/13/2020
The above named laboratory, having duly met the requirements of 15A NCAC 2H.0800, is hereby certified for the measurement of the parameters listed below.
CERTIFIED PARAMETERS
INORGANIC
pH
SM 4500 H+B-2011 (Aqueous)
TEMPERATURE
SM 2550 B-2010 (Aqueous)
TURBIDITY
EPA 180.1, Rev. 2.0, 1993 (Aqueous)
SM 2130 B-2011 (Aqueous)
This certification requires maintance of an acceptable quality assurance program, use of approved methodology, and satisfactory performance on evaluation samples. Laboratories are subject to civil penalties and/or decertification for infractions
as set forth in 15A NCAC 2H.0807.