Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
660030_Add-Info Response_20230103
Smithfield 6 Good food.1ZesP0VL'S lug. PO Box 856 Warsaw, NC 28398 January 3, 2023 Ms. Christine Lawson Water Quality Permitting Section Animal Feeding Operations Program 1636 Mail Service Center Raleigh, NC 27699-1636 Re: Additional Information Request Application No. ADS660030 Farms 27-30 Washington County Dear Ms. Lawson: Smithfield Hog Production appreciates your review of our application for permit under the Digester General Permit. In response to your October 17, 2022 request for additional information; we are submitting the included responses to your questions. I have included your original questions in bold and our responses are below each question This package is being submitted for permit plan approval by NCDWR for the proposed covered lagoon digesters. The following items are included in this package: Updated CAWMP o Updated Nutrient Management Plan o Updated Irrigation Plan o Odor Control Checklist o Insect Control Checklist o Mortality Management Checklist o Emergency Action Plan 2022 Sludge Survey Updated Engineering Drawings Thank you for taking the time to review this project. Please contact meat (910) 293-3434 orjolmstead@smithfield.com if you have any questions or need additional information. Sincerely, Jason E. Olmstead, P.E. Engineering Project Manager • Page 2 January 3, 2023 1. Freeboard — NC NRCS Standard 366 —Anaerobic Digester requires a minimum of 2 feet of freeboard in the covered digester. Please provide clarification that both digesters meet minimum freeboard requirements. "Provide a minimum of 2 feet of freeboard above the digester design water surface; if rainfall is included in determining the operating volume, only 1 foot of freeboard is required. The digester storage volume does not need to account for rainfall for completely covered digesters." Per the NRCS 366 Anerobic Digester standard rainfall was included in determining the operational volume of the digesters. The NOAA Atlas 14 30yr normal rainfall data for the area was used to determine the 25-year, 24-hour rainfall on the digester. With this data the operational volume for the digester designs at this site are based on 12-inches of structural freeboard plus 7-inches for the 25- year, 24-hour rainfall event to determine the 19-inches of freeboard for the digesters. This allows the covered lagoon digester at farm 8527 to operate with the existing freeboard. For proposed digester at farm 8529 this allows the top of dike and freeboard to be the same as the exiting lagoons. This allows equalization of the lagoons if necessary, during large storm events, which mitigates risk. 2. Stormwater Outlet — Please provide a typical detail for outlet for stormwater removed from digester covers. Please also indicate stormwater outlet location(s) for each digester. The stormwater removal outlet locations have been added to the site plan(s) and a detail of the outlet added to construction plan set. 3. Biogas Use as a Renewable Energy Resource — Please provide information for the intended onsite and/or offsite use of the biogas. Please include expected timeline regarding completion of digester system and utilization of gas as a renewable energy resource. The biogas produced at the site will be cleaned on -site to pipeline quality and trucked to a natural gas pipeline insertion point off -site to be used as renewable natural gas. The anticipated digester completion is Q2 2023 with utilization of the gas in Q4 2023. 4. Gas Generation Estimate — Please submit an estimate for the daily volume of biogas to be generated by the proposed Digester. The estimated total annual RNG generated at this facility is 52,840 dekatherms. The annual average daily RNG produced from each digester would be +/-72 dekatherms (50 scfm) 5. Emergency Flare — Please provide location/identification for the emergency flare(s). An emergency vent/flare connection location has been added to the site plans along with an updated detail. The plan is to us a mobile/moveable "candle stick" flare that will be kept on -site for use on an as needed basis for both digesters. 6. Slam Gate/Secondary Containment — Please indicate location of new slam gates/secondary containment associated with proposed digesters, if applicable. Per the site visit discussion, a secondary containment with valve has been added at the Farm 8529 digester adjacent to the level control station. 7. Influent/Effluent Sampling — Please indicate location for sampling of influent to and effluent from each digester. At Farm 8529 the influent sample(s) will be taken at the farm lift station(s) and the Effluent sample at the digester level control station. At Farm 8527 the influent sample(s) will be taken from the gravity pipeline clean -out nearest the digester and the Effluent sample at the digester level control station. • Page 3 January 3, 2023 8. Odor Control Checklist — The Odor Control Checklist was not included in the application. Please provide as a required component of the CAWMP. Please use the updated form, attached. See attached Swine Odor Control Checklist. 9. Insect Control Checklist — The Insect Control Checklist was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Insect Control Checklist 10. Mortality Management Checklist — The Mortality Management Checklist was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Mortality Management Checklist 11. Emergency Action Plan — The Emergency Action Plan was not included in the application. Please provide as a required component of the CAWMP. See attached Swine Emergency Action Plan 12. Sludge Survey — Please provide a copy of the most recent sludge survey for the existing Primary Lagoon at Farm 27 (proposed Digester Cell 1). See attached sludge survey for 2022. It is planned that approximately 2-3 feet of sludge from the 8527 primary will be removed and transferred into the new digester at Farm 8529. After transfer a new sludge survey will be preformed for the 8527 primary. 13. Land application — Fields A, B, C, D, and E meet land application setback requirements; however, these fields are near the road/neighbors. Please provide any information regarding additional BMPs (example hose -drag vs travelling gun) in these areas used to improve protections and further reduce risk of off -site impacts. Land application BMP's: • Fields A & B: Land Application by Airway application • Fields C & D: Land Application by Airway application • Field E: Land Application by Airway application 14. Air Quality Permitting — Please provide general information regarding any Air Quality permits, and/or applicability determinations regarding this project. Please provide information about if applications have been filed, permits (if issued), and/or results of an applicability determination. A determination of non -applicability was issued by NCDAQ on February 22,2022. Applicability Determination No. 3758. 4L iz f Y ■ 0 z E 0 0 u 0 m 0 E m c Ln E L m UL ton f i c CU c Lij LA z 0 Or LA z CL u 0 m c ao m tu 0 0 c z 0 cu CL �M L M uj rq en CL r5 46-0 #..o lLn _ c 0 r■,� Qj C C -Qj C 0 0 > E z CL m cu di E Lin cu I-j or -.� 0 E to o a U 0 C _ LA A- �y 0 o E -V � -0o u .� ,... V. 4W C cu E E 0 m 0 E 0 0 un Q > C: u M 44 aL u 0 m CL 0 0 4-do CL C. ( m u "R rig -M LA to M Q) c OL c LA 13 -0 0 tm W C M U M m 0 0 m C .-0 ir- W, Cl -0 : W m LL 4.# 0 CL aj 6. C OL �- M CL CL wpi 0 6't z 0 u a E LU CL > CL = - M CL o m � w i - CL E L& CL 4 o o CL I 14 .:3 U Li r m V w 10 �-# j 0 V I LA 4-f la -4 0 F� E E aj 4 a aj 4 tj d v u +-A r- 4 cl A-1 CL OL m CL 7 CT r � c CU cr r r4 41 "t f". r� f r� re 01 r.) cu 0 � C M m QO Qj oa M ■ i iY 0 E AMP -0 M w c . �,. �■■� 4 ,,w,, 0 Qo CA rN E u C 4, 0 to }a C) 16mo C El z UL( 42 LiJ 0 0 ILA �0 Cc 0 c 0 m b -. C CL E 0 Q 0 0 ai tn 4 E 0 u 0 W E 0 r o 14 rd si �L) m F u t r. 0 4 0 KC u La c 70 0 MP �.+ 4ko V) 1 C`` o E o I Ln CL C: C 6w cu c Z w _w CL E 0 c ro w .4-4 imi F U c 0 101" E 0 PC 13 ro ch Ln Lu 0 at CL CL UD CL u 0 � f } 0 z �M E 0 u 0 WO 0 1 4..P c c m �:l jo. cu m u w CL LM W z. V E E O U 0 E 0 c �0 0 L ou E . m o m 6" CJ cl 4' M QU ""0#� 4..1 swn 4*-0 m kA -0 eo C CL c -0 CL 0 4W m ra u Qu m M ro m M&M E cu Ch- CIL t� cl c E u eo Uri 0 0 %.. L- 0 0 2 LA � m tu 0 M P%,. m u Ln qJ C — aj Cl.J 0 LM %, 4+ 4 4 . W 0 q , M u+ C cu 0cu '- 0 •— o C vs C CL 06. M -0 C IA� � •� c D m + 4-0 C E 4ma 0 Fj 0 D ui oLA M-- CL 0 a UG LU u wn cc 0 0 0 0 I z LM D 0 Lek rN Lai 0 x CL CL CL w tu i" U% m m M C: 0 cu w a :au u m m -= C E E 3. r �C m m 0 t � cu LM 0 -0 -D . r 7 tcAll M LA N LA m L. 0 m ra `w,01 4--* %Do= �cu iJ 6n -a -+ Ln *NJ C cn 0 0 c ..Emft cu 0 m > > c Qj � % `C c c m 4-a 'a C. 0 z a co m CL 0 0 di tin m 0 cu tj 0 Z ra CL E E 0 0 0 .0 Li 0 Aj F ' �1 40 0 D $ ■ Cr Nn 00 Gj 0 _� D WOW LA o El IZ 9 LA LAJ tin 1 0 0: 10 4 0 o 4 # M c Ma 0 w -E C C o 4 �+ �f j u C m N co 40 Fes, 0 c 0 0 0 ` !a 4. CL mayy a ea m c c V ! i m m m LM F. to w a CY tr c cr m m r m W f� c _ 0 a 0 E w r a T w C � = u M i p C o 0 = `— 4) :3 r fu 0 0 %n UL 701 M MINNOW LOW m 0: dt .9 0 KINLOILMINI E E un LO 0 E z m w c 2 0 du 0 0 Lij z LA Ln 0 c CU 0 00 Z 6n Z x w 0 cu InL r� 0 4-0 6w 0 0 0 c D Mus L LJ ot CL CL u 0 2 LM 0 U. 4.0 0 0 40 . r.r u m 4 f� CL v 400 13 0 E t� i c 0 0 0 CL 2 im 4) L A cu mmir u LM 7� . S c - L m o rmmd F � C i LW 41 r i 0 L. f C 0 W E E 0 :3 c �u m m w 0 EL w CL twD di M �A m o ra CL M 0 0 0 L I �v a = ri � 0 cr. i C c 13 LJ .� c w� L- CT m cl El CID 0 0 t; 6n LOO) 3: ro 0 C) 0 aj c 0 6-0 ii E u u m Ln 0 4 ! 0 4.0 LA m rl c m 0 LM 0 awo �E 0 9 m c 4j c a . 0 co cu m i! 0 4=IF 0 13 m QJ a 0 _D u CL � U � c a 13 . M 0 cu 6, CL _U kA M Qj � 4 M� _ u 72 0 CL y o aft' u cl a. s `may■ � � 0 co 3: "M 0 LA c Ln c G r' w c 03 0 RL 13 6b m C momp i r C) o _— cu 0 _O 0tka CL tv to M 0 Ld re CL 0 f� r U0 C 0 0 C W Et E E ej . LA aj C C Q 0 E U E ep .0 L _E cm r V .� m CL u E �I rN Ln LLI Q. C6 vil r z 0 boa 0 a � 0 Z E CL ■ u u 0 u 0 E L I.Ir LA t; L! Au CL G E E D V CL 0 im 0 z z 0 z 0 j CL L•. 0 tba 12 w0 0 a c u 0 0 fa CL T i r. to 0 6.. a m O Ln 0 ..� 0 i� a f i LA 0 0 13 r i� �..� OL c LA vv m L i ap 0 Ob mop" 0 0 M w 0 E I E 4-0 -w-w OL CL C c LJ LM 0 0 c c c m 0 CL m 4 i � r c) C i won& ro k • L �f CL dkPf+ OU OL c ou N VWW 0 *-m c :2 CIL kA 3 f C OL C • i E u *-o ` L L ❑ ❑ o 4*0 61 E c -INN- -a c 4u Of f *a CA O L. 4-1 Qj cu cu 0 D CLJ yc � i cu 6r di Fil 000 ai 0 LA aj Qv QJ 0 hmd M c 79 0 OL LA 4609 Q) C. CIL LA L. T ro E c 4. c wd CU• 0 4h -C _ C) L. 0 a c C 00 � i ■ i i Cr y � � r M cu tio 1 =1 + _ ! r M 0 z F. Cl CL 1 OL c cu k� 0& m C Lp c Cl 1: i I IF, Ve Ln CD 0 0 LM LA Cj D 13 10 Lei E l ■ cu 0 fa 3 Z CL cu mo V u CL cl _ OL OL w u a 0 00 Z ' A aj cu c Z M to 1 0. - 2 j c i W X 0 rA Ln i uj 0 w CL ICL an w mo CL A 0 z 0 0 LdL 0 f *■ CL Qj kA r� J 0 0 40 E w " ln1 3 0 LA Qj Ix 0 c Y � u z to ba 00 z Qj w 1 1 �r �■■I r �`■■IR • F fe ro co m C C: c c cu ro u i 1-- 0 C 00 o C40 r� m ad im.. 7 E AU 8 D cr v Cc VI c u E ■cu CU 0 LA v c 0 -M M 10 aj � �iA c E M M r 0 2 W C C m 0 0 a n _ �r fp",w a 0 r c: ` o� Y 7 ■ cu 40 VI L 1 on $ 00 I CN4&-1 �■■� iNO CD f%j a La L" o n� DO LU '' `` `` 6R L" wu uj 0 w (U dwo L { m &d& LA z w z r 0 00 m ra v c &MO LA z u z 0 to m 41--1 LA 6 T z Li z I� r4 c ■i Y z U z 1go- c 0 i � 1 0 0 CL W ■ ~ u 6w (U 0 4ppomp LA. 4 1 0 cu 7 lu m 0 r cu 0 0 to C M c j m q: 2 c C to 0 0 &-# 5 im c r �J � a m ri ca FAF j oz 5 r -dwo coo to W. 1 40 Ld 0111111111111' j6■ .M� Sol m OU. mep, T rr A 2 0 c E 0 _ MM El 0 M � A a MEN �i x 2 w th w 6+ a cz u -.A E r: E ►a 0 C OM i r ,,t 4jj Now hhm r tj w F I u upp :o Aq 6 i vy Y, 4j L 0 4* I� C %ft+ PLA PN Pm PPMot iM r# i Ji po Aw Lo to P9 y �rl 1�1 �M cr �J �J 00 OM 2 ti . AD r3 +� t.� r# ',3 #.J it IN" OIL c iI F 6 Ell i r 1 7 � y Cho y VF- +R i !✓ �! r- Ld f on IEmp 0 LW 0 PM e4A Ift* Ilbn Pnmary n . 0 Veer — ftaroerntiie r 26. ZO I Mortality Management Methods lWicate which method(s) will be rmplemenled. When selectingmultiple meihWs indc,ate a prrmary versus secondmry opts.: Methods other than those listed must be approved by the State Vetennanan. �ondarf Routine Mortality Banal three feet beneath the surface of the ground wrthrn 24 hours of knowfedge of anirnal death, The burial must be at fast 300 Feet from any fbwing stream or public body of water (G S.106-403). The bottom of the budal pd should he at least one foot above the seasonal high water table. Attach banal location map and pion Landfill at municipal solid waste facility permuted by NC DEQ under GS 15A NCAC 13B 0200. 10 Rendering at a rendenng plant licensed under G S 106-168 l Complete incineration according to 42 h1CAC 52C 0102. composting system approved and permitted by the NC Department of Agnculture & Con- sumer Services Veterinary i sion (attach copy of permit). If compost is distributed off -farm, additional requirements must he met and a permit is required from NC DE . In the case of dead poultry only, plactng In a disposal pit of a size and design approvedby the epar rent of Aciric ufture & Consumer S a 10 - 4 * 0)� Any method which, in the profes!5iu gal opinion of the State I etennana . would make possible the salvage of part of a dead anima: s value wrthout endangering human or animal health (Written approval by the State V t rinanan must be attached). Mays Mortality Plan Mass mortality plans are required for farms covered by an t PDES permit. Thee plans are also recommended for all animal operations This plan ou`lirie farrin-specrfic moftality mares agement methods to be used for mass mortality. The D Vetennary Do von sup- porls a variety of emergency mortality dose sa, options contact the Di ion for quidance., catastrophic mortality disposal plan is part of the facility's P and is activated when numbers f dead animals exceed normal mortality rates as specrfied by the Slate Velerinarian . • Bunal mist be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance • Mass banal sites are subject to additional permit conditions (refer to facildy's animal waste management system permit) ■ In the event of imminent threat of a disease emergency, the State Vetennanan may enact addiWnal t parary p edures or measures for, disposal accard:ng to G S 106-399 4 0/ 17 Signature of Farm'QwnerJManagei ` f Date Signature of Technical Specialtst Date 04 so oft go 40 WOW r F 4 � do qlp •• , . r A 0 CD Aj4 ap x C7 c� TAM. kL dp i M QI -WOO t.l. NNW • —EEL t f K r �y 4 1 t r r Id f i 11 i 7 i W� 4 k f r v p * I,� i . r I a r � ry • + mom It - h h IPILdp —. _ir qL N : f i .AL- - `} L 6 # ' )ywrj' { + rep `f r 4 ab x*Jw * �� i P i � f * r APk r rt t 4 # 4p IL too � L fir• � � v' , i� a IF 1 14 ti a v CD CL h � y L IL A4 JL- i • 0 4 rlp r do b * 46 i i or 4. v I 4 Idr or. 0 rF 0� 46 — 4 ri &Oeo = F' p A w w 0 110 16 Ml A* %I� ff le I URF� Steven W. Trier Mr. R. O. Britt Murphy -Brown LLC 434 East Main Street PO Box 434 Waverly, office North Carolina Department of Agriculture and Consumer Services VA 23890 804-834-2109 Swine Fenn 911 Address: Farm #29 422 Barrow Trail Garysburg, NC 27831 Northampton County Composter Permit # 13 - 1013 Dear Mr. Britt: Veterinary Division January 16, 2015 Swine Farm 911 Address: Harm #30 (Composter Location) 732 Barrow Trail Garysburg, NC 27831 Northampton County Composter Permit # 15 - 1012 Swine. Farm 911 Address: Farm 428 298 Gilt Lane Garysburg, NC 27831 Northampton County Composter Permit t1 15 - 1014 Rt Douglas Mocker, DVM Swine Farm 911 Address: Farm 427 684 Gift Lane Garysburg, NC 27831 Northampton County Composter Permit # 15 VV 1015 Pursuant to N C A C 5 2C.0102, your request to compost swine morality an your premises at 732 Barrow Trail, Garysburg, NC'I'n Northampton County is approved, The approval is gTanted under the following conditions and stipulations: 1. AID North Carnfina solid waste, air, water quality, and other applicable regulations mint be met in siting and operation of the system 2. only poultry or swine are to be processed in this facility; NO bovine, caprine, ovim or Gervid species shall be processed 3. Mortality to be processed shall originate only from the identified premises and the finished product is used safely on agricultural operations owned, operated, or leased, by the permitce Q. The final product of the process must be stared, treated and utilized in accordance with all federal, state, and local laws, regulations, and pe it requirements; the final product shad not be sold S. Temperatures steal[ be within MRCS guidelines to reach a minimum of 131 degrees F witt�m S days of filling the unit and amain at least at 131 degrecs F for a minimum of S consecutive days to maintain the composting process and reduce pathogen load 6. Dyad animals arc not to be removed from composting until -till flesh, intcmal organs, and ether soft 4; tissue erc fully decomposed 7. The proposed facility shell have the following g]jnimum setback requirements: 1030 Mail Servlca Cenlac, Rplalph, North Carzl no 27699•1030 0 (919) 733-7601 M Equol QppcnunAy Affrrnsilyd Ad Ion Emaioyir • 100-foot buffer betwccn all property lines and compost tUcas • 100-foot buffer between all wells and compost areas, except for monitoring wills • 504oul buffer between perennial streams/rivers and compost areas S. A copy o!`the pe it, plans, and operationel reports shad be inwntaincd ari site and be available ul)an request by NCDA&CS, Vcterinary Division personnel 9.6 The facility and operational regards shall be available for annual inspection by Veterinary If Ir Division personnel and shyl bc sent to the Veterinary Division upon request 10. Opemficnal reports shah include temperature monitoring during init"lal facility se.art-up and follow- up records that contain either 10 days/monfli or annul laboratory results of pathogen load testing I L An application for e pellil't modification shall be required for char��cs in Facility ownership, an increasein facifity capacity, or any oUier changes from the stipulations of this permit 12. in the event that movement of carcasses from the premises of origin to the compost facility on another premiscs is specifically permitted by NCDA&CS, die owner must comply with condiUnns in GS 106-168.8 (5) and (6) followed by licensed renderers: 'The carcasses must he transported within 24 hours of death in a leak-proo!`vessel or vehicle with a cover, to prevent spread of disease by flips or other agents during the transportation. Friar to movement from the premises of origin, the vessel or leak -proof container or vehicle containing die caresses must be disinfected following loading of carcasses, to prevent the 5piC8d of disease, Following unlond1ng at the compvs#tr, the vehicle or vessel must be cleaned and disinfected prior to leaving the compasier prernises. The person loading and transporting the carcasses must wear ribber boots and suitable protective clothing. The bets must be disinfected prior to entering the premises with carcasses to be moved, as well as after unloading carcasses at the compost facility, prior to leaving Oiat premises or cntcrin� a public �rca. Contaminated protecti�� clothir�b must be discarded or removed and safely disposcd of to prevent carrying disease orgaausms away from the farm of origin or the compost facility. 13. The Veterinary DIvision must be irmmediately riatified of any complicating issues involving animal disease or enVtronmenW concerns 14MThe State Velc6narian reserves the right to cancel this permit if A specific concem for controlling animal disease arises, or if any of the aforementioned conditions are not met. This document shah in no circumstances be'lnteMreled as an endorsement of any specific manufacturer or type of mar#,ality management system by the State Velefinan'an aiid the Office of die State Veterinarian does nvt approve or disapprove the technical or perf ance standards for specific makes or designs of equipment. *Additional requirements and regulations will apply from DENR, Division of Solid Waste Management if application for off -farm dispositioni of composted r�}atcrial s requested(see G.S. 13DA-309.29 and 15A NCAC 13B, Section. 1400 Sincerely, i A Dr. Carol Woodlicf, DVM Interim Director of Animal Health Program slLi vesto ck c: Dr. R. Douglas Mecke..%. State Veterinarian Dr. Sarah .Meson, Director, AHP-Poultry �r 9 -7 -30 3 60 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTENSION SERVICE (GES) 919-791-4200 911 252-534-2591 252-534-2591 252-534-2831 31 SI This plan will he implemented in the event that wastes from your operation are leaking, overflowing of gunning off site. You should not wait until wastes reach surface waters or heave your property to consider that you have a roble Yo should make every eff.-ort to ensure that this does not happen. This P:an should be posted in an accessible location for all employees at the facility. The following are some action items you should take. Stop the release ofwastes. Depending on the situation, this may or may not be possible. Suggested respon5ea to some possible problems are listed below, A. Lagoa overflow - passible solutions are; a) Add soil to berm to increase elevation of dam. by Pump wastes to fields at an acceptable rate. c} Stop all flaw to the lagoon immediately. d} Call a pumping contractor. ej Make sure no surface water is entering lagoon. Runoff from waste application field-acfions in ludw. a) Immedlately stop waste. applicaton. b) Create temporary diversion to contain waste* C) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runt. e) Evaluate the application rates for the fielft where runoff occurred. C. Leakage from the waste pipes and sprInklers - action Include: 8 Stop recycle pump. b Stop i ation pump. C) Close valves to eliminate finer d's ar e. d Repair all leaks pr1or to restarting pumps. D. Leakage from flush systems, houses, solid saparaiors -action include: a} Stop recycle pump. bj Stop irrigation pump. c) Make pure siphon occurs. dj Stop all flow in the house, flush systems, or solid separators. E. Lpakage from base or sldewa"I of lagoon often this is seepage as apposed to flowing leaks - poss(ble acation: �) Did a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If hales are caused by burrowing animals, trap or remove anlmals and fill holes and compact with e clay type soli. t) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 1 1 19r2ao8 3 2 Assess the extent of the spill and note any obv:ous damages. a Did the waste reach surface waters? b. Approximately how much was released and for what duratioO c Any damage rotes, such as employes injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface wa1ers7 f Could a future rain event pause the spill to reach surface waters? g Are potable water wills in danger (either on or off the property)? h How much reached aurlace waters? Contact appropnate agencies. Dudng normal business hours call your DWO regional oboe; Phone , After hours, emergencyn urnberg 1) 7 _ 94. Your phone call should include, your name, facility number* telephone number, the details of the incident from item 2 above, the ey.act location of the facility, the location or direction of the movement of the spill, weather and grind condihons. The correchve measures that have been under taken, and the seriousness of the s 1tuado r . b. If the spUl I -eaves property or eaters surface wafers, call local EMS phone nu m be.r.. . Instruct EMS to contact kcal Health Department Contactd. E's hone number, local S D office phone n u m beA and the local NRCS office for advice I technical assistance phone number, 4. if none o If the above works call 11 c>r the Sheriffs Department and explain your problem to therm and ask the person to contact the proper agencies for cu` A Contact the contractor of your claice to begin repair or problem to minimize offsite damage a- Contractors Name- b. Contractors Address. d. c . Contractors Phone.. Munphy Brows LL R i Bob,.856. Warsaw, NC 28398 (9110 44 ConLact the technical specialist rho certified the lagoon (NRCS, ons lting Engineer-, etc.) . Name, r i esterbee b.. Phone. 1 i 533Q 7 implement procedures as advised by DV1Jp and techndcai assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 1008 Smithfield CJood food. �RespoKsib[8 Sonar Sludge Survey Reporting Form Farm or Permit Number: Lagoon I.D. Number: Person taking measurements: Date of Measurements: Methods/Devices used for measurement of: Number of measurement data points: Staff Sonar Distance from the present liquid level to the top of sludge: A. Start Pump Level: B. Stop Pump Level: C. Current Freeboard Level: D. 1/2 Treatment Level: E. Average Sludge Level: If pump intake level is <2.5 ft a plan of action is required. If value for E is greater than D then sludge levels are in Compliance. AWS660030 If value for E is equal to or less than D then a Plan of Action is required. Volume of sludge to be removed to reach compliance Completed by: Dylan Carden Print Name Retention: 5 years SignajAfre 8527 12/8/2022 -340 .3:304eet 19.08 inches 60.00 inches 73 inches 111.96 inches 112.60 inches N/A feet In Compliance Gallons In Compliance Dry Tons I Z/19��L Date Original: 5/21/19 **********New Lagoon Started************** 3632.641 7736.293 1.3 Date 3632.64 7736.295 1.2 Lagoon 3632.64 7736.296 1.4 Freeboard 3632.64 7736.298 1.4 Dist. To Sludge 3632.639 7736.299 1.4 Pump Intake 3632.639 7736.299 1.3 3632.638 7736.302 1.3 3632.638 7736.304 1.1 3632.637 7736.305 1.2 3632.637 7736.307 1.2 3632.637 7736.308 1.1 3632.637 7736.308 1.5 3632.636 7736.31 3.2 3632.636 7736.312 1.3 3632.636 7736.313 1.7 3632.635 7736.314 1.5 3632.635 7736.315 1.6 3632.635 7736.315 1.6 3632.633 7736.316 1.5 3632.633 7736.316 1 3632.632 7736.317 1 3632.631 7736.318 1.1 3632.631 7736.318 1.4 3632.631 7736.318 1.4 3632.63 7736.319 1 3632.63 7736.321 1.3 3632.63 7736.322 1.4 3632.63 7736.323 1.5 3632.629 7736.324 1.5 3632.629 7736.325 1.3 3632.628 7736.325 1.2 3632.628 7736.326 1.3 3632.627 7736.326 1.3 3632.626 7736.326 1.5 3632.626 7736.326 1.2 3632.626 7736.326 1.7 3632.625 7736.324 1.1 3632.625 7736.323 1.3 3632.625 7736.322 1.2 3632.625 7736.322 1.2 3632.625 7736.32 1.2 3632.625 7736.319 1.1 3632.625 7736.319 1.2 3632.626 7736.317 1.2 3632.626 7736.317 1.2 3632.626 7736.316 3.8 12/8/2022 27p 73 inches 2.803550296 0.5 3.30355 N/A 3632.626 7736.315 3.8 3632.626 7736.314 3.7 3632.626 7736.313 4.7 3632.626 7736.312 4.2 3632.626 7736.311 3.6 3632.626 7736.31 4.1 3632.626 7736.309 3 3632.626 7736.308 1.7 3632.626 7736.307 4.1 3632.626 7736.307 3.5 3632.627 7736.306 3.4 3632.627 7736.305 3.9 3632.627 7736.304 4.4 3632.627 7736.304 4.3 3632.627 7736.303 3.1 3632.627 7736.301 3.8 3632.627 7736.301 4.1 3632.627 7736.3 3.5 3632.627 7736.299 3.8 3632.627 7736.299 2.4 3632.627 7736.298 4.4 3632.627 7736.298 4.4 3632.627 7736.298 4.4 3632.627 7736.297 4.5 3632.627 7736.297 4.5 3632.628 7736.297 4.1 3632.628 7736.296 4.1 3632.628 7736.296 3.7 3632.628 7736.296 4.3 3632.628 7736.295 3.8 3632.628 7736.295 3.4 3632.628 7736.294 5 3632.628 7736.294 3.6 3632.629 7736.294 2.9 3632.629 7736.293 4.4 3632.629 7736.293 4.2 3632.63 7736.292 3.5 3632.63 7736.291 3.9 3632.63 7736.29 3.8 3632.63 7736.29 3.3 3632.629 7736.288 2.7 3632.629 7736.287 4.5 3632.629 7736.286 3.8 3632.628 7736.285 1.1 3632.628 7736.284 4 3632.627 7736.284 3.8 3632.627 7736.283 3.4 3632.626 7736.283 1.1 3632.625 7736.282 1.1 3632.625 7736.282 1.3 3632.624 7736.282 2.9 3632.623 7736.282 3.4 3632.622 7736.282 3.8 3632.621 7736.283 4.1 3632.62 7736.283 1.5 3632.62 7736.283 3.4 3632.619 7736.283 3.3 3632.619 7736.283 3.5 3632.617 7736.282 1.3 3632.617 7736.281 1.2 3632.617 7736.281 3.8 3632.617 7736.28 3.2 3632.616 7736.279 3.2 3632.615 7736.279 3.6 3632.614 7736.279 3.7 3632.613 7736.28 3.7 3632.613 7736.28 3.2 3632.613 7736.28 3.8 3632.612 7736.282 4.2 3632.611 7736.282 3.2 3632.611 7736.283 3.1 3632.611 7736.284 3.2 3632.61 7736.285 3.5 3632.61 7736.286 4.1 3632.609 7736.287 4.3 3632.609 7736.287 3.9 3632.609 7736.288 3.9 3632.609 7736.288 3.2 3632.608 7736.29 3.6 3632.608 7736.29 3.5 3632.608 7736.291 4.2 3632.608 7736.291 4.2 3632.608 7736.293 4.2 3632.608 7736.294 4.8 3632.608 7736.294 3.8 3632.608 7736.295 3.2 3632.608 7736.297 3.2 3632.608 7736.298 3.9 3632.608 7736.299 4.5 3632.608 7736.299 1.3 3632.607 7736.301 1.3 3632.607 7736.301 1.6 3632.607 7736.302 1 3632.607 7736.303 2.8 3632.606 7736.305 2.8 3632.606 7736.306 2.8 3632.606 7736.307 2.9 3632.606 7736.307 3.2 3632.606 7736.308 2.5 3632.605 7736.309 2.6 3632.605 7736.31 2.5 3632.604 7736.311 2.2 3632.604 7736.312 2.5 3632.604 7736.313 1.6 3632.603 7736.314 1.5 3632.603 7736.315 1.5 3632.602 7736.315 1.2 3632.602 7736.316 2.9 3632.601 7736.317 3.5 3632.6 7736.318 3.7 3632.6 7736.319 3.6 3632.599 7736.319 3.5 3632.598 7736.32 3.5 3632.598 7736.321 3.6 3632.597 7736.321 2.5 3632.596 7736.321 4 3632.595 7736.321 3.7 3632.595 7736.321 3.4 3632.594 7736.321 2.9 3632.593 7736.321 3.3 3632.592 7736.321 3.5 3632.591 7736.321 3.3 3632.59 7736.321 4.3 3632.59 7736.321 1.3 3632.589 7736.321 1.8 3632.588 7736.321 1.3 3632.587 7736.32 1.4 3632.587 7736.32 1.5 3632.586 7736.319 1.4 3632.585 7736.318 1.2 3632.585 7736.318 1.4 3632.584 7736.317 1.5 3632.584 7736.316 1.5 3632.584 7736.315 1.6 3632.583 7736.314 1.6 3632.583 7736.313 1.1 3632.583 7736.312 1 3632.583 7736.311 3.8 3632.583 7736.31 3.2 3632.583 7736.309 3.4 3632.583 7736.308 3.5 3632.583 7736.307 3.1 3632.583 7736.306 4.3 3632.583 7736.305 1.2 3632.582 7736.304 3.4 3632.582 7736.303 3.4 3632.582 7736.302 3.3 3632.582 7736.301 3.8 3632.581 7736.3 3.8 3632.581 7736.299 4 3632.581 7736.298 4.9 3632.58 7736.297 5.4 3632.58 7736.297 6 3632.58 7736.296 3.8 3632.58 7736.295 3.8 3632.58 7736.294 3.8 3632.58 7736.294 5.4 3632.581 7736.293 5.4 3632.582 7736.293 3.3 3632.582 7736.293 4 3632.583 7736.293 3.3 3632.584 7736.292 3.3 3632.585 7736.292 3.8 3632.585 7736.292 3 3632.586 7736.292 4 3632.587 7736.293 3.6 3632.587 7736.293 3.7 3632.588 7736.293 1.1 3632.589 7736.294 1.2 3632.589 7736.294 1.1 3632.59 7736.294 3.2 3632.59 7736.295 3.6 3632.591 7736.296 1.3 3632.592 7736.296 1.3 3632.593 7736.297 1.4 3632.594 7736.297 1.3 3632.595 7736.297 1.2 3632.595 7736.296 1.6 3632.596 7736.296 1.4 3632.597 7736.296 1 3632.597 7736.296 1.1 3632.598 7736.296 3.7 3632.599 7736.296 3.2 3632.6 7736.296 3.4 3632.6 7736.297 3.8 3632.601 7736.297 3.7 3632.602 7736.297 3.5 3632.603 7736.297 3.5 3632.603 7736.297 3.5 3632.604 7736.297 1.1 3632.605 7736.298 1.3 3632.605 7736.298 3.6 3632.606 7736.298 3.6 3632.606 7736.298 3.7 3632.607 7736.298 4.5 3632.607 7736.298 3.4 3632.608 7736.298 3.8 3632.608 7736.298 4.4 3632.609 7736.298 4.4 3632.609 7736.298 4 3632.61 7736.298 3.1 3632.61 7736.298 4.2 3632.611 7736.298 3.5 3632.612 7736.298 4.1 3632.612 7736.298 3.5 3632.613 7736.298 3.4 3632.614 7736.298 3 3632.614 7736.298 1 3632.615 7736.298 1.5 3632.615 7736.298 1 3632.616 7736.298 3 3632.617 7736.298 3.5 3632.617 7736.298 3 3632.618 7736.298 3.3 3632.618 7736.298 3.9 3632.619 7736.298 3.5 3632.619 7736.298 3.3 3632.62 7736.298 3.5 3632.62 7736.298 3.5 3632.621 7736.298 5 3632.621 7736.298 4.6 3632.621 7736.298 2.9 3632.622 7736.298 3.5 3632.622 7736.298 3.7 3632.623 7736.297 3.8 3632.623 7736.297 5 3632.624 7736.297 3.7 3632.624 7736.297 3.5 3632.625 7736.297 4.5 3632.625 7736.297 4 3632.625 7736.297 3.2 3632.626 7736.297 4.6 3632.626 7736.297 3.2 3632.626 7736.297 4.1 3632.626 7736.296 3.4 3632.626 7736.296 3.4 3632.627 7736.295 3.4 3632.627 7736.295 0 3632.627 7736.295 0 3632.627 7736.295 0 3632.627 7736.294 0 3632.627 7736.294 0 3632.627 7736.294 3.4 3632.627 7736.294 0 3632.628 7736.294 4 3632.628 7736.294 4.4 3632.628 7736.294 4.8 3632.629 7736.294 5.4 3632.629 7736.293 3.7 3632.63 7736.293 3.7 3632.631 7736.292 1.2 3632.631 7736.291 1.2 3632.632 7736.291 4.3 3632.633 7736.292 3.9 3632.633 7736.292 3.3 3632.634 7736.292 3.6 3632.634 7736.292 4.3 3632.635 7736.292 4.4 3632.635 7736.292 3.4 3632.635 7736.292 4.1 3632.636 7736.293 3 3632.636 7736.293 3.4 3632.637 7736.293 3.4 3632.638 7736.293 3.7 3632.638 7736.293 1.4 3632.639 7736.293 1.4 3632.64 7736.293 1.1 3632.64 7736.292 1.4 3632.641 7736.291 1.2 3632.641 7736.29 1.4 3632.641 7736.289 1.5 3632.641 7736.288 1.3 3632.641 7736.287 1.4 3632.642 7736.286 1.3 3632.642 7736.285 1.6 3632.642 7736.284 1.5 3632.642 7736.283 1.6 3632.642 7736.282 1.4 3632.642 7736.282 1.5 3632.642 7736.281 1.2 3632.642 7736.28 1.3 3632.642 7736.28 1.2 3632.643 7736.28 1.8 3632.643 7736.28 1.6 3632.643 7736.28 3.9 3632.644 7736.28 3.9 3632.644 7736.28 1.3 3632.644 7736.28 1.1 3632.645 7736.28 1 3632.645 7736.28 1 3632.646 7736.28 1.1 3632.646 7736.279 5.3 Facility Number: 66-0030 Grower: Gaston Farm 8527 Primary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 1 of 12 ANAEROBIC DIGESTER DESIGN FARM INFORMATION Farm Population: Nursery: Wean to Finish: Finishing: Farrow to weanling: Farrow to feeder: Farrow to finish: Boars: 25 Yr. / 24 Hr Storm Event Recycle Flush Water Volume: DIGESTER INFORMATION Is Digester Designed as an Irregular Shape? (YIN) ------------ Y Was This Facility Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- Freeboard:------------------- 0 24642 Hd. 0 0 0 0 0 6.7 In. 126.00 Ft. 1.0 Ft. Side Slopes: ------------------- 3 :1 (H:V) 495.0 Ft. 377.0 Ft. Top of Dike Elevation: ---------------- Depth 136.30 Ft. Finished Bottom Elevation: BOTTOM E 14.76 Ft. 121.54 Ft. Start Pump Elevation: ---------------- 19.08 In. 134.71 Ft. Stop Pump Elevation: ---------------- 27.00 In. 134.05 Ft. Top of Sludge Elevation: ---------------- 135.6 In. 125.00 Ft. DIGESTER VOLUMES REQUIRED VOL. Storm Temp= 105174 (Cu.Ft.) Temporary = 0 (Cu.Ft.) Operational = 1355310 (Cu.Ft.) Permanent Sludge 0 (Cu.Ft.) Total Volume = 1,460,484 (Cu.Ft.) Lagoon Surface Area: (Inside TOD) DESIGN VOLUMES 106,292 (Cu.Ft.) 117,129 (Cu.Ft.) 1,412,312 (Cu.Ft.) 407,593 (Cu.Ft.) 2,043,327 (Cu.Ft.) % REQ'D. 101.06% 8.64% 104.21 % 139.91 % 188,372 S.F. Smithfield Nog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 aci ity Number: 66-0030 Grower: Gaston Farm 8527 Primary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 2 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ©Cu. Ft. DIGESTER STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT} Cumul. Vol. (Cu. FT 123.54 128,451 214,515 124.00 130,937 59,659 274,174 125.00 135,900 133,419 407,593 126.00 140,368 138,134 545,727 127.00 144,850 142,609 688,336 128.00 149,437 147,143 835,479 129.00 154,114 151,775 987,255 130.00 158,548 156,331 1,143,585 131.00 162,667 160.607 1,304,193 132.00 166,821 164,744 1,468,936 133.00 171,033 168,927 1,637,863 134.00 175,304 173,169 1,811,032 135.00 179,634 177,469 1,988,501 136.00 185,875 182,754 2,171,255 136.30 188,372 56,137 2,227,392 These volumes were calculated using the vertical average end area method TOTAL REQD VOL 1,460,484 CF CUMULATIVE VOL. ZONE VOL. 139.91% END PUMP = = = = 134.05 FT 1,819,905 CF TR'MT 1,412,312 104.21 % START PUMP = =: 134.71 FT 1,937,035 CF TEMP 117,129 8.64% MAX STORAGE = 135.30 FT 2,043,327 CF STORM 106,292 101.06% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Gaston Farm econ ary Designed y: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 3 of 12 WASTE STORAGE POND DESIGN 2nd STAGE FARM INFORMATION Farm Population: Nursery: ------------------- 0 Wean to Finish: ------------------- 24642 Hd. Finishing: ------------------- 0 Farrow to weanling:------------------- 0 Farrow to feeder: ------------------- 0 Farrow to finish: ------------------- 0 Boars: ------------------- 0 Storage Period: ------------------- 180 Days 25 Yr. / 24 Hr Storm Event ------------------- 6.7 In. "Heavy Rain" Factor Not Applicable Even if Value Shown Rainfall in Excess of Evaporation ------------------- 7 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 STORAGE INFORMATION Is Storage Pond Designed as an Irregular Shape? (Y/N)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 126.00 Ft. Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0 Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 0.0 contour areas see shPPt d of 12... 0.0 Top of Dike Elevation: ---------------- Depth 136.30 Ft. Finished Bottom Elevation: BOTTOM E 13.76 Ft. 122.54 Ft. Start Pump Elevation: ---------------- 19.08 In. 134.71 Ft. Stop Pump Elevation: ---------------- 99.6 In. 128.00 Ft. CHECK PUMPING ELEVATIONSM STORAGE VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D. Storm Stor = 50487 (Cu.Ft.) 50,486 (Cu.Ft.) 100.00% Temporary = 744788 (Cu.Ft.) 507,711 (Cu.Ft.) 68.17% Permanent = 0 (Cu.Ft.) 374,446 (Cu.Ft.) Total Volume = 795,275 (Cu.Ft.) 932,642 (Cu.Ft.) 117.27% 90 Temporary Storage Volume Elevation = 130.31 Ft. 1 71.90 In. Lagoon Surface Area: (Inside TOD)------------------- 90,424 S.F Smithfield Hog Production Engineering P.O. Box 856 ,Warsaw, NC 28398 (910) 293-3434 Grower: Gaston Farm 8527 Secondary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 Countv: Northamr)on, NC Sheet 4 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ®Cu. Ft. STORAGE POND STAGE -AREA VOLUMES Contour Elevation (FT.) Area (SF) Incr. Vol. (Cu. FT 124.54 54,226 125.00 56,421 25,449 126.00 60,919 58,670 127.00 64,448 62,683 128.00 67,055 65,751 129.00 69,537 68,296 130.00 72,056 70,796 131.00 74,618 73,337 132.00 77,224 75,921 133.00 79,873 78,549 134.00 82,565 81,219 135.00 85,301 83,933 136.00 89,002 87,152 136.30 90,424 26,914 Cumul. Vol. (Cu. FTC 161,892 187,341 246,011 308,695 374,446 442,741 513,538 586,875 662,796 741,344 822,563 906,497 993,649 1,020,563 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 1,460,484 CF CUMULATIVE VOL. ZONE VOL. 117.27% END PUMP = = = = 128.00 FT 374,446 CF TR'MT 374,446 START PUMP = =: 134.71 FT 882,156 CF TEMP 507,711 68.17% MAX STORAGE = 135.30 FT 932,642 CF STORM 50,486 100.00% Smithfield Nog Production Engineering P.O. Sox 856 ,Warsaw, NC 28398 (910) 293-3434 Grower: Gaston Farm 8527 Primary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 5 of 12 MINIMUM REQUIRED VOLUME CALCULATIONS DIGESTER Permanent Storage: Required Treatment Volume: Animal ype Capacity (cu.ft. hd) = Total Nursery 0 1.00 0 Wean to Finish 24,642 55.00 1,355,310 Finishing 0 32.00 0 Farrow to weanling 0 1.00 0 Farrow to feeder 0 1.00 1 0 Farrow to finish 0 1.00 0 Boars 0 1.00 0 Total Required Treatment Volume (cu. ft.)= 1,355,310 Sludge Storage Volume: Animal Type Capacity ALW (cu. t.11b) = Total Nursery 0 30 0.00 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.00 0 Total Required Sludge Storage Volume (cu. ft.)= No Storm Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (188372 sq.ft + 0 sq.ft.) * 6.7 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= No "Heavy Rain" Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (188372 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = (for Extended Periods of Chronic Rainfall) N 105,174 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= 105,174 (CU.FT) Total Required Permanent Storage (Treatment + Sludge) = 1,355,310 (CU.FT) TOTAL REQUIRED DIGESTER VOLUME = 1460484 (CU.FT.) Production 0 10) 293-3434 Grower: Gaston Farm 8527 Secondary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01 /03/23 County: Northampon, NC Sheet 6 of 12 Temporary Storage Volume: Manure Production: IA-pimal Type Capacity Sto. Period=Total Nursery 0 0 0.30 Wean to Finish 24,642 180 1.17 !'10 Finishing 0 180 1.37 Farrow to weanling 0 0 4.39 Farrow to feeder 0 0 5.30 1 0 Farrow to finish 0 0 114.38 1 0 Boars 0 0 1 4.06 0 Total Manure Production (gals.)= 5,176,463 Total Manure Production (cu.ft.)= 692,040 Excess Fresh Water: jAnimal TypeCapacity' to. Period I ota Nursery 0 0 0.00 0 Wean to Finish 24,642 180 0.00 0 Finishing 0 180 0.00 0 Farrow to weanling 0 0 0.00 0 Farrow to feeder 0 1 0 0.00 0 Farrow to finish 0 0 0.00 0 Boars 0 0 0.00 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (cu.ft.)= Smithfield Hog 0 0 (910) 293-3434 Grower: Gaston Farm 8527 Secondary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 7 of 12 Temporary Storage Volume: Cont. Rainfall in Excess of Evaporation: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (0.0 sq.ft. + 90424 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 52,747 Storm Storage: Only in Waste Storage Pond since digester is covered Vol.=(Waste Storage Pond Area + Additional Drainage Are * 25Yr./24Hr Storm(in.)/12in./ft. Vol.= (0.0 sq.ft. + 90424 sq.ft. + 0 sq.ft.) * 6.7 in. /12 Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 50,487 "Heavy Rain" Storage: Only in Waste Storage Pond when required since digester is covered Vol.=(Waste Storage Pond Area + Additional Drainage Area) * = Heavy Rain Factor(in) / 12in./ft. Vol.= (0.0 sq.ft. + 90424 sq.ft. + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage)= Total Required Permanent Storage (Treatment + Sludge) _ 50,487 (CU.FT) 744,788 (CU.FT) 0 (CU.FT) TOTAL REQUIRED 2nd STAGE VOLUME = 795275 (CU.FT.) LVA 10) 293-3434 0 Grower: Gaston Farm 8527 Primary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 8 of 12 DIGESTER DESIGN SUMMARY Top of Dike Elevation ------------------- 136.30 FT. Top of 25Yr. / 24Hr. Storm Storage 135.30 FT. Start Pump Elevation ------------------- 134.71 FT. End Pump Elevation ------------------- 134.05 FT. Top of Sludge Storage ------------------- 125.00 FT. Seasonal High Watertable Elev------------------- 126.00 FT. Finished Bottom Elevation ------------------- 121.54 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 188,372 SF Freeboard Depth Zone Depths: TOTAL DESIGN VOLUME = 2043327 (CU.FT.) Treatment / Sludge Storage Zone Depth Temporary Storage Zone Depth Freeboard Depth Total Digester Depth Smithfield Hog Production 1.00 FT. 12.5 FT. 0.7 FT. 1.6 FT. 14.8 FT. Grower: Gaston Farm 8527 Secondary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01 /03/23 County: Northampon, NC Sheet 9 of 12 STORAGE POND DESIGN SUMMARY 2nd STAGE Top of Dike Elevation ------------------- 136.30 FT. Emergency Spillway Crest Elevation ------------------- Not Applicable Top of 25Yr. / 24Hr. Storm Storage ------------------- 135.30 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 134.71 FT. End Pump Elevation ------------------- 128.00 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev------------------- 126.00 FT. Finished Bottom Elevation ------------------- 122.54 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 90,424 SF Freeboard Depth Temporary Storage Period Zone Depths: 1.00 FT. 180 Days TOTAL DESIGN VOLUME = 932642 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 5.5 FT. Temporary Storage Zone Depth ----------- 6.7 FT. Freeboard / Storm Storage Zone Depth ----------- 1.6 FT. Total Storage Pond Depth ----------- 13.8 FT. Smithfield Hop Production Enqineerinq P.O. Box 856, Warsaw NC 28398 (910) 293-3434 M N M O (V ow�T- U) o W o ❑ o O O i m - M co H Co m U) N � != Y � U � ❑U r LO o CM -- CD O M r II LO N r c CO II c> > w I I LO r w H II J J W > W N r U) W II � W W J W II W p J W W Q Z O W (D J Z W Y F- ❑ W O U) O Q 0 O a O Z w O > U- W W m � j O a LL 00 a O Q W _ W z a w `n 0 o a Z N H LL cm E L a � CN rn N LO 00 U 00 CO Z > LL r" o- >+ E M r 4 0co m Q) c/> > II J r II O m O C7a3:z w a J w 2 IL IL C of o 0 o Fa- z C7 Q U 0 w M M M a) N O e-- co M M co N U c>3 i co O m M N OCV 0 LLI U) O O / / W o N co ..c U) H m fn _ U) N � C Y � U � Iv - �U ti I G ao O d o ch M II II LO W M W W cV N II II J W J W II y J w W Q of w W O o O a O Q O w w a 'L O w w a w 00 o LL a Z a U) O O Z N H LL �I M c 0 0 N U N W Ln co U / 0o N Z / c L.�'Qo > o CD LL CL X >' E M 00 0 m0 N > II W T- II co C7d3:Z IL � w � � IL d a, Z a L I_ 0 W 0 Q U co M M M N O co M co N U 3 ca i co a co 0 m Grower: Gaston Farm 8527 Primary Designed By: JEO Address: PO Box 1240 Checked By: DSE Waverly, VA 23890 Date: 01/03/23 County: Northampon, NC Sheet 12 of 12 This Anerobic Digester is designed in accordance with the North Carolina Natural Resources Conservation Service PRACTICE STANDARD 366- ANEROBIC DIGESTER, revised in September, 2018. The Waste Storage Pond is designed in accordance with the North Carolina Natural Resources Convservation Service PRACTICE STANDARD 313- WASTE STORAGE FACILITY, revised in December, 2017 DESIGNED: DATE: 01 /03/2023 COMMENTS: The lagoon has been designed as an irregular shape. Actual contour areas taken from the lagoon design are used to calculate the surface area and storage volume characteristics of the lagoon. This approach ensures that rainfall capture on the lagoon is fully accounted for and that storage volumes calculated represent actual conditions. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Facility Number: 66-0030 Grower: Gaston Farm 8529 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 Countv: Bladen Sheet 1 of 12 ANAEROBIC DIGESTER DESIGN FARM INFORMATION Farm Population: Nursery: ------------------- 0 Wean to Finish: ------------------- 24642 Hd. Finishing: ------------------- 0 Farrow to weanling: 0 Farrow to feeder: ------------------- 0 Farrow to finish: ------------------- 0 Boars: ------------------- 0 25 Yr. / 24 Hr Storm Event ------------------- 6.7 In. Recycle Flush Water Volume: ------------------- u DIGESTER INFORMATION Is Digester Designed as an Irregular Shape? (Y/N)------------ Y Was This Facility Built Prior to 9/96? (Y/N)------------ N Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 128.50 Ft. Structural Freeboard: ------------------- 1.0 Ft. Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 630.0 Ft. contour areas see shPPt 2 of 7... 260.0 Ft. Top of Dike Elevation: ---------------- Depth 139.50 Ft. Finished Bottom Elevation: ---------------- 17.50 Ft. 122.00 Ft. Start Pump Elevation: ---------------- 19.08 In. 137.91 Ft. Stop Pump Elevation: ---------------- 26.00 In. 137.33 Ft. Permanent Sludge Elevation: ---------------- 156 In. 126.50 Ft. DIGESTER VOLUMES REQUIRED VOL. DESIGN VOLUMES % REQ'D. Freeboard = 91455 (Cu.Ft.) 93,047 (Cu.Ft.) 101.74% Temporary = 0 (Cu.Ft.) 88,439 (Cu.Ft.) 6.53% Operational = 1355310 (Cu.Ft.) 1,362,086 (Cu.Ft.) 100.50% Sludge = 0 (Cu.Ft.) 282,436 (Cu.Ft.) Total Volume = 1,355,310 (Cu.Ft.) 1,826,008 (Cu.Ft.) 134.73% Lagoon Surface Area: (Inside TOD) 163,800 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Facility um ber: 66- 03 Grower: Gaston Farm 8529 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 County: Bladen Sheet 2 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. DIGESTER STAGE -AREA VOLUMES Contour Elevation (FT.) Area I� Incr. Vol. (Cu. FT) Cumul. Vol. Cu. FT 122.00 0 0 123.00 21,621 10,811 10,811 124.00 67,509 44,565 55,376 125.00 93,934 80,721 136,097 126.00 98,271 96,102 232,199 127.00 102,675 100,473 332,672 128.00 107,151 104,913 437,585 129.00 111,699 109,425 547,010 130.00 116,319 114,009 661,019 131.00 121,011 118,665 779,684 132.00 125,775 123,393 903,077 133.00 130,611 128,193 1,031,270 134.00 135,519 133,065 1,164,335 135.00 140,499 138,009 1,302,344 136.00 145,551 143,025 1,445,369 137.00 150,675 148,113 1,593,482 138.00 155,871 153,273 1,746,755 139.00 161,139 158,505 1,905,260 139.50 163,800 81,235 1,986,495 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 1,355,310 CF CUMULATIVE VOL. ZONE VOL. 134.73% END PUMP = = = = 137.33 FT 1,644,522 CF TR'MT 1,362,086 0.00% START PUMP = = : 137.91 FT 1,732,961 CF TEMP 88,439 100.50% MAX STORAGE = 138.50 FT 1,826,008 CF STORM 93,047 6.53% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 rower: Gaston Farm 8029 Primary Designed By: JEU Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 County: Bladen Sheet 3 of 12 WASTE STORAGE POND DESIGN 2nd STAGE FARM INFORMATION Farm Pouulation: Nursery: ------------------- 0 Wean to Finish: ------------------- 24642 Hd. Finishing: ------------------- 0 Farrow to weanling:------------------- 0 Farrow to feeder: ------------------- 0 Farrow to finish: ------------------- 0 Boars: ------------------- 0 Storage Period: ------------------- Days 100 Yr. / 24 Hr Storm Event ------------------- 6.7 In. "Heavy Rain" Factor Not Applicable Even if Value Shown 0 Rainfall in Excess of Evaporation ------------------- 7 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 STORAGE INFORMATION Is Storage Pond Designed as an Irregular Shape? (Y/N)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 128.50 Ft. Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0 Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 0.0 contour areas see shPP+ ? of 7... 0.0 Top of Dike Elevation: ---------------- Depth 137.59 Ft. Finished Bottom Elevation: BOTTOM E 12.21 Ft. 125.38 Ft. Start Pump Elevation: ---------------- 19.08 In. 136.00 Ft. Stop Pump Elevation: ---------------- 82.2 In. 130.74 Ft. CHECK PUMPING ELEVATIONSM STORAGE VOLUME REQUIRED VOL. DESIGN VOLUMES Storm Stor = 103298 (Cu.Ft.) 106,408 (Cu.Ft.) Temporary = 1254587 (Cu.Ft.) 880,644 (Cu.Ft.) Permanent = 0 (Cu.Ft.) 722,102 (Cu.Ft.) Total Volume = 1,357,884 (Cu.Ft.) 1,709,154 (Cu.Ft.) 90 Temporary Storage Volume Elevation = 132.68 Ft. Lagoon Surface Area: (Inside TOD) % REQ'D. 103.01 % 70.19% 125.87% 58.97 In. 185,011 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Gaston Farm 8029 Primary Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 County: Bladen Sheet 4 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. STORAGE POND STAGE -AREA VOLUMES Contour Elevation (FT.) Area (SF) Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT} 126.82 130,259 159,165 127.00 131,631 23,570 182,735 128.00 139,002 135,317 318,052 129.00 145,150 142,076 460,128 130.00 150,997 148,074 608,201 131.00 156,842 153,920 762,121 132.00 162,100 159,471 921,592 133.00 166,206 164,153 1,085,745 134.00 170,284 168,245 1,253,990 135.00 174,384 172,334 1,426,325 136.00 178,459 176,421 1,602, 746 13 7.00 182,248 180,303 1,783,099 137.82 185,011 150,576 1,933,675 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 1,355,310 CF CUMULATIVE VOL. ZONE VOL. 125.87% END PUMP = = = = 130.74 FT 722,102 CF TR'MT 722,102 START PUMP = =: 136.00 FT 1,602,746 CF TEMP 880,644 70.19% MAX STORAGE = 136.59 FT 1,709,154 CF STORM 106,408 103.01% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Gaston Farm 8029 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 County: Bladen Sheet 5 of 12 MINIMUM REQUIRED VOLUME CALCULATIONS DIGESTER Permanent Storage: Required Treatment Volume: Animal Type Capacity (cu.ft./hd) = Total Nursery 0 1.00 0 Wean to Finish 24,642 55.00 1,355,310 Finishing 0 55.00 0 Farrow to weanling 0 0.67 0 Farrow to feeder 0 0.67 0 Farrow to finish 0 1.00 0 Boars 0 0.50 0 Total Required Treatment Volume (cu. ft.)= 1,355,310 Sludge Storage Volume: Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 0.25 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 0.17 0 Farrow to feeder 0 522 0.17 0 Farrow to finish 0 1,417 0.25 0 Boars 0 400 0.25 0 Total Required Sludge Storage Volume (cu. ft.)= No Storm Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * 100Yr./24Hr. Storm(in) / 12in./ft. Vol.= (163800 sq.ft + 0 sq.ft.) * 6.7 in. /12 in./ft. Total Required Volume for 100Yr./24Hr. Storm Event (cu.ft)= No "Heavy Rain" Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (163800 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) _ (for Extended Periods of Chronic Rainfall) Total Required Storm Storage (100Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Permanent Storage (Treatment + Sludge) _ 0 91,455 91,455 (CU.FT) 1,355,310 (CU.FT) TOTAL REQUIRED DIGESTER VOLUME = 1446765 (CU.FT.) Warsaw NC 28398 9 0 Grower: Gaston Farm 8029 Primary Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 Countv: Bladen Sheet 6 of 12 Temporary Storage Volume: Manure Production: nima ypeCapacity to. Period = Total Nursery 0 0 0.30 0 Wean to Finish 24,642 180 1.17 5,176,299 Finishing 0 180 1.40 0 Farrow to weanling 0 0 4.30 0 Farrow to feeder 1 0 0 4.50 0 Farrow to finish 0 0 13.50 0 Boars 0 0 1 4.00 0 Excess Fresh Water: Smithfield Hog Total Manure Production (gals.)= 5,176,299 Total Manure Production (cu.ft.)= 692,019 Animal Type Capacity Sto. Period I ota Nursery 0 0 0.20 0 Wean to Finish 24,642 180 0.77 3,400,744 Finishing 0 180 0.90 0 Farrow to weanling 0 0 2.90 0 Farrow to feeder 0 0 3.50 1 0 Farrow to finish 0 0 9.50 1 0 Boars 0 0 2.70 1 0 Total Fresh Water Excess (gals.)= 3,400,744 Total Fresh Water Excess (cu.ft.)= 454,645 W 10 Grower: Gaston Farm 8029 Primary Address: PO Box 759 Rose Hill, NC 28458 County: Bladen Temporary Stora a Volume: Cont. Designed By: JEO Checked By: DSE Date: Sheet 7 of 12 01 /03/23 Rainfall in Excess of Evaporation: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (0.0 sq.ft. + 185011 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 107,923 Storm Storage: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area - * 100Yr./24Hr Storm(in.)/12in./ft. Vol.= (0.0 sq.ft. + 185011 sq.ft. + 0 sq.ft.) * 6.7 in. Total Required Volume for 100Yr./24Hr. Storm Event (cu.ft)= 103,298 "Heavy Rain" Storage: Only in Waste Storage Pond when required since digester is covered =(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Heavy Rain Factor(in) / 12in Vol.= (0.0 sq.ft. + 185011 sq.ft. + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (100Yr. / 24Hr. Storm + 'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage)= Total Required Permanent Storage (Treatment + Sludge) _ 103,298 (CU.FT) 1,254,587 (CU.FT) 0 (CU.FT) TOTAL REQUIRED 2nd STAGE VOLUME=1357884 (CU.FT.) 0 Grower: Gaston Farm 8029 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 Countv: Bladen Sheet 8 of 12 Top of Dike Elevation Top of 25Yr. / 241-1r. Storm Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Freeboard Depth Zone Depths: DIGESTER DESIGN SUMMARY TOTAL DESIGN VOLUME = 1781723 (CU.FT.) Treatment / Sludge Storage Zone Depth Temporary Storage Zone Depth Freeboard Depth Total Digester Depth Smithfield Hog Production 139.50 FT. 138.50 FT. 137.75 FT. 137.25 FT. 126.50 FT. 128.50 FT. 124.00 FT. 630.00 FT. 260.00 FT. 3.0:1 H:V 163,800 SF 1.00 FT 13.3 FT. 0.5 FT. 1.8 FT. 15.5 FT. 1 Grower: Gaston Farm 8029 Primary Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 Countv: Bladen Sheet 9 of 12 STORAGE POND DESIGN SUMMARY 2nd STAGE Top of Dike Elevation ------------------- 137.59 FT. Emergency Spillway Crest Elevation ------------------- Not Applicable Top of 100Yr. / 24Hr. Storm Storage ------------------- 136.59 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 135.98 FT. End Pump Elevation ------------------- 130.74 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev.------------------- 128.50 FT. Finished Bottom Elevation ------------------- 125.38 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 185,011 SF Freeboard Depth ------------------- 1.00 FT. Temporary Storage Period ------------------- 180 Days Zone Depths: TOTAL DESIGN VOLUME = 1709154 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 5.4 FT. Temporary Storage Zone Depth ----------- 5.2 FT. Freeboard / Storm Storage Zone Depth ----------- 1.6 FT. Total Storage Pond Depth ----------- 12.2 FT. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 CM N M O N O � Ow U) p O OD N N � cu t 0 co E— in CO U � C Y � U .0 � U U - ❑U Lrj LO N cM -- O V II N O lLO II � > LU O W M T- W II J J W w co LU II � LU w J W II InJ w w Q Z O W U LU J LU LU0U) � � ❑ w 0 w O U- O U) a O t- w > a LL W O H O Q co ❑ uJ O a w 00 O w _ w z ~ 0 w O O a z N L- �I LL 0 rn L N O O co N U z M N L� ti 0 O = m N -0 � IIco J j O O w II Cr)a- wmIL J w C d a, a F a L C: w U Q U U) IQ co m M Co N U c� i LO co O m LOW CM N C—M o N O � W OW U) p o ❑ i OD N (6 C m .0 (n C � Y U) _ U — N � — �U rn -I G ui O O IL rn � n II M W M W W � N II II W W II 0 W W H W U J w w Q w w Z W Y 0 O0 O O 0- 2 > tL O U) LL w m O w O n- O IL a. w Z d O O O z N H IL �I m E a 0 rn L N 0 CDN co U U Z ti LL M O X O O 2 O m II f u � (a O O w 0n.�m a J w — a � L � _a a 0 Q U � w M V. M co 0) N O e- I co M co N U 3 c� i LO co O m rz 10 Grower: Gaston Farm 8029 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/03/23 County: Bladen Sheet 12 of 12 This Anerobic Digester is designed in accordance with the North Carolina Natural Resources Conservation Service PRACTICE STANDARD 366- ANEROBIC DIGESTER, revised in September, 2018. The Waste Storage Pond is designed in accordance with the North Carolina Natural Resources Convservation Service PRACTICE STANDARD 313- WASTE STORAGE FACILITY, revised in December, 2017 DESIGNED: C7(�— DATE: 01 /03/2023 COMMENTS: The lagoon has been designed as an irregular shape. Actual contour areas taken from the lagoon design are used to calculate the surface area and storage volume characteristics of the lagoon. This approach ensures that rainfall capture on the lagoon is fully accounted for and that storage volumes calculated represent actual conditions. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 75 a N N 0 E .o ON -SITE BIO-GAS COMPRESSOR STATION I - 3,240LF - 8-INCH HDPE DR17 EFFLUENT/RECYCLE TRANSFER LINE FROM FARM 27 DIGESTER TO FARM 28 PRIMARY FARM 28 4,000LF - 12-INCH HDPE DR17 EXISTING PRIMARY LAGOON INFLUENT TRANSFER LINE - 7 FROM FARM 28 LS28-1 TO FARM 27 DIGESTER Ir-----1i' r- — I I I \ 50OLF - 12-INCH GRAVITYPIPE DUALy WALL CPP / 9 X 10LF - 12-INCH GRAVITY PIPE BARN CONNECTIONS I I I _ FROM BARNS TO FARM 28 LS28-1 r -— --- I FARM 28• —JJ EXISTING SECONDARY LAGOON / I APPROXIMATE LOCATION I J / i `, — \ OF FIELD BOUNDARY IR 3,800LF - 8-INCH HDPE DR17 INFLUENT TRANSFER LINE #1 FROM FARM 30 LS30-1 TO FARM 29 DIGESTER u 4,200LF - 8-INCH HDPE DR17 INFLUENT TRANSFER LINE #2 FROM FARM 30 LS30-2 TO FARM 29 DIGESTER I � P I I I `` oeea II 680LF - 12-INCH GRAVITY PIPE DUAL WALL CPP 9 X 10LF - 12-INCH GRAVITY PIPE BARN CONNECTIONS FROM BARNS TO FARM 30 LS30-1 50 EXISTING CONTOUR e0 FINISHED CONTOUR —« DISCHARGE PIPE - FORCEMAIN << G DISCHARGE PIPE - GRAVITY W/CLEANOUT s° STORMWATER PIPE W/CATCH BASIN MINIMUM BUILDING / LAGOON SETBACK LINE SWALE / DIVERSION P1, ..., L1, ..., 01, ... PAD, OFFSET STAKEOUT POINTS CQ, POWER POLE —`—EEE—E— POWER LINE __o„__o„__°„__°„__o„__o„__o„_ POWER LINE - EXISTING AERIAL — °E °E °E — °E — POWER LINE - PROPOSED AERIAL RIPRAP EROSION PROTECTION STORM WATER PIPE FENCELINE ® CONTROL POINT FP ) FP — EXISTING FLUSH PIPE/W CLEANOUT O POWER PANEL Q FLUSH PIPE 10000 DISCHARGE DRAINAGE 100.00 INLET SPOT ELEVATIONS CONTROL POINTS S/W PIPE DETAILS DISCHARGE PIPE DETAILS APPROXIMATE LOCATION OF PROPERTY LINE PER STATE GIS PARCEL DATA F 4,000LF - 8-INCH HDPE DR17 PIVOT r \ IRRIGATION / \ °` PIVOT � �_; .✓ '�,.... \ �i IOE �; > EXISTING PRIMARY LAGOON �E �E o L r._1 FARM 29 I I I I _ 11 II I I PROPOSED DIGESTER OE I III cc, � �I IL lar FARM 29 EXISTING SECONDARY LAGOON NEW ELECTRIC SERVICE POWER 1 TO FARM 27 IRRIGATION PIVOT 1 1 --- 111 RIGATION PIVOT FARM 27 PROPOSED DIGESTER CELL 2 (EXISTING SECONDARY LAGOON) FARM 27 PROPOSED DIGESTER CELL 1 (EXISTING PRIMARY LAGOON) l� / EXISTING FIELD / 1 PH ELECTRIC SERVICE ' BOUNDARY POWER TO BE REMOVED / IRRIGATION 1 EXISTING q, . 1PH ELECTRIC SERVICE POWERPROPOSED 3PH ELECTRIC SERVICE UPGRADE IRRIGATION PIVOT B10 GAS LINE FROM FARM TO GAS UPGRADE STATION 1,10OLF - 8-INCH HDPE DR17 INFLUENT TRANSFER LINE #4 '< i � ,t , \� FROM FARM 29 LS29=2 TO FARM 29 DIGESTER 44 60OLF - 8-INCH HDPE DR17 INFLUENT TRANSFER LINE #3 F ���� �► _. �F, I FROM FARM 29 LS29-1 TO FARM 29 DIGESTER \ Iell • .':`"...: �; \ - I FARM 29 FARM 30 I EXISTING SECONDARY LAGOON FARM 30 FROM F I 1 FLOOD HAZARD AREA PER FEMA GIS DATA I I I I 300 150 0 300 SCALE: 1 INCH=300 FEET WAVERLY FARMS 27-30 0 0 J Q4 Ow �w 0 n•� WAVERLY FARMS 27-30 C-100 WAV rel tj ------►- v V ✓'— `�-•-tis••J ./1 O o+<,/W �\ `yf �._`..�-1 0 '�� v/`o. G __ N ,.� �, �,� LEGEND r---------- p'- _ — --- — --- — e )p �—� •� ' f �_ —�j- --�_� --- —tom ------ c --•� � � � �' � f � V �.` / \a�^Z- ����� -1._ �\��_ o.. ° so EXISTING CONTOUR I J - � r -- eo FINISHED CONTOUR /So I rk___ - — �— DISCHARGE PIPE FORCEMAIN I I --- -- I 1 ° 0 - I !I a ----� I kI I _ 1 I «�« DISCHARGE PIPE - GRAVITY W/CLEANOUT I i . I— -o , J ❑ STORMWATER PIPE W/CATCH BASIN`v9. '• d I ----- --- MINIMUM BUILDING /LAGOON SETBACK LINE I g 1 -- Ico Q - �., -IC, o SWALE / DIVERSION I 1 I -- ° I I I I II1,111� `Z Ior, I I o _ P1, ..., L1, ..., 01, ... PAD, OFFSET STAKEOUT POINTS _ II _-- ° �• . ,.l "`�� yjl/\ �► \ \v) • I ^ f1r I I ---� I _ , `•� I! I � I I Y o � �� ✓- I � I IIII If POWER POLE `'-� �" - I . p `-`1`l `f \ I I t✓ �, c�1 • I--- 0 I —E—E—E—E—E— POWER LINE I y I © ��/''�" 1���0''� • • 1 I ��- �� I ° I1 I I I °r T� I I III � � °B � - � —..,., .� � � ,,� I � � I o I �► I POWER LINE -EXISTING AERIAL I I • ,_ � I I �I „�• L!v-��"`-�-- „�^ � � •;�'\ 1 �,< � � ._ � - I I I° n o °r I / I _ I � 4 I I ► I --'`z -� --� ��.II°�' r--J��-. �\ �z ...� /� �- � r•., I ..� --=�- � — �--I � I I I � I I II POWER LINE PROPOSED AERIAL `� � o _ //l o .f1` '�• 51 I I I I /Ir--� fj a i �— . /� `f-� I f - RIPRAP EROSION PROTECTION I ; I , I 1 ____- I ��` b c-- _-------- -J r \ t� ` rl/ ' STORM WATER PIPE D EFENCELINE1*0 I �•`o' ,/ / --a`= ---1--`��-"'�--- -- 4` .� � �����. a l CONTROL POINT 1 1. 9 .o �/' / ✓� \ -k' l 5 FP FP EXISTING FLUSH PIPE/W CLEANOUT I �• -•'� o �. _ _ I —- '� I °� ° I �, ) UI 1 o \ �--_ �� �� OO POWER PANEL / g `t5 0FLUSH PIPE I / Q/ o fl o 10g0 DISCHARGE DRAINAGE Li/ �,1 . /� a \ I ? I 0 1 �� ^•ti �, 100.00 INLET SPOT I.R.S ELEVATIONS CONTROL POINTS �l I � s-- , ..f - 1 S/W PIPE DETAILS I _ /� ICD DISCHARGE PIPE DETAILSWIN k-ri • _ �, r / / o i� .�. . l I� b a ' L r;?,IIf / , \� r „� 1 � e C� . . � y, �' � � � � �'. �^--- • ._,�- - r--___.. / � ,�i web. . < ° ° �� �l � ,4 � ✓� .� �/ /1�, .� � / -'�� v -J`-'Q � a i �/ 1 �" �---... .•'� \ � . fir__/ -"'� � � � • I �� � �{ \ o o - � -��` A:5 � ' --•-- , �y /� �j III ► 1 v _ e o -- , f o `� IN I IIII I • `� ` - =\ _off � I -- � � II III • � � I a e fi --�_ � � \- -� f� / o � � II ° � • ---� pI - e I v I Ir --- �-'•- 4 I I III I 2I I 1 __ Y-'s a - ° / o I �� J--� -- - --^~--` •� -fo. Ia On , —_ I i !4 �� M7-»--..._,.., / �Qj� � I �, yam---.1(�- �•'.-� f g, Al M,. • ! \ � � F Ike__ I �� t\ °� ° ram` — �. F >'`"� \ �, 1 - p[}7 • �-s�'z N. I — I I ���� -,� 1• � ° � , � � � \ F � >> 2 / / �.✓-� J .'•--rt. "'� J ✓ ! I � e " L { \ � „/ e e e • ^rL.. I I III 1 I ./ } --• r .E t� OE I \ �I _— I � v` � �•M4-» •� '\N o\-/1ST ,./ --- d I I I I I j I �� 'aJs O o \ � ��' �! � o I J� f_ -�� / � �Y �� � � , � � � o ••,' v lln b __-- I I J _ II I, { 1 �o I _ — l I » dj ur I— �-•� o 7. ' I � I - - �� � .,�- it � � �, �, 1 � � I � �---t�, �I I � � , I `,-.�J� a ! • �, Nil ';;,e5o Jp �`"" % ► - o I I� J r - rOE (� � • ° o O a ( `w � \` �, " (/ � : �, • �j�\\ � tLj e 1 0 � . \\�.�- — = (r_, _ , I � y � I .: _ - �'I ' a .� ° �-�; o .°,off l,-/ 1 �, S _ �'-`'-"`--'l�J��`-_� / \ � ~`� �,•—� � 9 ��`� \ Q� —.. ------ - Ili 1 ° I � i /, . n - ° cu o .� T j/ _\� / °.. >e°pt• p �•� --� a v I . II iq_—_ �� NI I y �_ � \ � �^"�. db Al o" •�' � \ �--- ` J � �- Ir� r-- Ty111 I III � ail , o _ -1 � �9 L �� D.r,.~,•� ,.,,n��� - •�� •-�\ �1-•- �I ,h I � I `� � _ _ I �� � -i I .... -�"- S L _ /� e �' � ^ j c�, 77 � � �� ^'- � ✓ � � �-,�-�,�`."- . rv° vim' ^-t .r �' �-�,. .� ,��� � • ��,.. FARM TOPOGRAPHIC PLAN a E O O w �I w w t-N O • 0 200 100 0 200 iiiiiiii SCALE: 1 INCH=200 FEET WAVERLY FARMS 27-30 C-100A WAVERLY FARMS 27-30 75 d co N N 0 n3 E .o LEGEND 50 EXISTING CONTOUR 50 FINISHED CONTOUR « DISCHARGE PIPE - FORCEMAIN «e« DISCHARGE PIPE - GRAVITY W/CLEANOUT so STORMWATER PIPE W/CATCH BASIN -------- MINIMUM BUILDING / LAGOON SETBACK LINE SWALE / DIVERSION P1, ..., L1, ..., 01, ... PAD, OFFSET STAKEOUT POINTS POWER POLE -`-`-`-`- POWER LINE __o„__o„__o„__o„__o„_ POWER LINE - EXISTING AERIAL 0E °E POWER LINE - PROPOSED AERIAL RIPRAP EROSION PROTECTION STORM WATER PIPE J FENCELINE O CONTROL POINT FP FP EXISTING FLUSH PIPE/W CLEANOUT OO POWER PANEL DQ FLUSH PIPE 10@00 DISCHARGE DRAINAGE 100.00 INLET SPOT ELEVATIONS CONTROL POINTS S/W PIPE DETAILS DISCHARGE PIPE DETAILS DIGESTER DATA TABLE PRIMARY LENGTH (FT) 495 WIDTH (FT) 377 TOP OF DIKE (FT) 136.6 BOTTOM ELEV (FT) 121.54 SURFACE AREA 188,372 SF WASTE STORAGE LAGOON TABLE SECONDARY TOP OF DIKE (FT) 136.3 START PUMP (FT) 134.71 STOP PUMP (FT) 130.80 - -�� ,------ 1 1 EXISTING BUILDIN I I I I FF EL = 139.37 INV EL=136.94(100. 1) I I I ` VY•'� ------- --- -- EXISTING BUILDIN I - I I -� FF EL = 139.19 I I FARM 27 - EXISTING I / INV EL = 136.65 (100.22) I I I -i SECONDARY LAGOON I 1 EL = 136.30 (99.48) \ � 3,240LF - 8-INCH HDPE DR17 �^� �- ` ,I \ EFFLUENT/RECYCLE TRANSFER LINE J I I ------ LEVEL CONTROL STATION FROM FARM 27 DIGESTER TO FARM 28 PRIMARY EXISTING B IL NG _ REMOVE EXISTING CROSS -OVER PIPES J I STORMWATER REMOVAL PUMP. FIF EL NV EL= 1136J(100.26) I I I I i SEE OUTLET DETAIL SHEET C503 IivV o" P� = 96.48 EXISTING FLUSH PIPE TO BE J 1 I I CAPPED AND/OR REMOVED , I ui I I ° I REMOVE EXISTING PIPE - I I I GAS VENT PIPE �r, EXISTING BUI DING I INV 12" = 34.32 97.89 ( ) ` SEE DETAIL SHEET C503 ILFF I --X X --I , I � INV EL = 1 L \ / NV EL = 1 6.38 (99.95) L- \ \` 160LF - 12-INCH GRAVITY PIPE DUAL WALL CPP I REPLACE EXISTING 8" WITH I / �\ / MINIMUM PIPE SLOPE 0.25/0 � �-1 PROPOSED 12 PIPE I I 2 X 10LF - 12-INCH GRAVITY PIPE BARN CONNECTIONS �- I I I INV. ELEV. = 134.5• --I V_V ------------------W J �I EXISTING BUILDING I I° FF EL = 138UI (101.98) 1 I NV EL = 136.13 (99.70) 1 v ( o I 1 _t t f i 1 �(r�----------�--------- i n� J I I ------------- _-- �_ I I EXISTING FLUSH PIPE TO BE I _ CAPPED AND/OR REMOVED ° I I I 1 II I I . `- - --- AR 27 -EXISTING �-------------------- I I , - X X PfTfMARY LAGOON �0 EL = 136.30 99.48 EXISTING BUILDING I , ` EXISTING BUILDING I I I ( ) I FF EL - 141.22 (140.94) I � I FF EL = 138.55 (101.75) 1 I I INV EL = 137.31 (137.03) I I I INV EL = 135.83 (99.40) --� I ° 80LF - 8-INCH GRAVITY PIPE DUAL WALL CPP v MINIMUM PIPE SLOPE 0.25% I I 2 X 10LF - 8-INCH GRAVITY PIPE BARN CONNECTIONS 1 I ' I0 I EXISTING 8" PIPE \ I 1 \ I I II INV ELEV. = 134.82 I - - OFFICE I I 1 I / EXISTING, EXISETL IN= G B D(FFEL-3 30157) Ito I I I I 9. PRO COVERED LAGOON 5.76 33) FARM 27 - PROPOSEDREPLACE EXISTING 8" WITH 80LF - 12-INCH GRAVITY PIPE DUAL WALL CPPPOSED 12" PIPE - I INV. ELEV. - 134.5 TOD EL - 136.3 I� ' MINIMUM PIPE SLOPE 0.25% �' I 10LF - 8-INCH GRAVITY PIPE BARN CONNECTIONS _ - J X X a1 I I i I EXISTING BUIL�ING 1 I ° - ^ ` FF EL = 137.86 101.19) 1 / 7 I EXISTING FLUSH PIPES TO BE INV EL - 135.42 (98.99) 1 a CAPPED AND/OR REMOVED I I 1 I ------------- �� INV 12" = 134.12 (97.43) % 1 II---------- x- INV. EXISTING 12" PIPE -------- I I � ISTING 12" PI I -'; 1 � x- I II I � I - 13630 V. = 1.1 1 �I I I ELEV. .ELE3590 EXISTING BUILDING RELOCATE RECYCLE PUMPS � ' - FF EL = 1135.3 (98.80) �, I TO SECONDARY. ail INV EL = 135.30 (98.87) I I° II I I 20LF - 12-INCH GRAVITY PIPE DUAL WALL CPP r \ MINIMUM PIPE SLOPE 0.25% \ 10LF - 8-INCH GRAVITY PIPE BARN CONNECTIONS \ �0 STORMWATER REMOVAL PUMP. SEE OUTLET DETAIL SHEET C503 ) / BIOGAS �. �bN °E OF- / BLOWER SKID l ONE GAS VENT/FLARE °. \-- / ` r CONNECTION DETAIL SHEET C503 Jj i a , , :t , /C9 0 SITE LAYOUT PLAN F27_ O O O � � �I w O Q z O n•� 0 0 60 30 0 60 SCALE: 1 INCH=60 FEET WAVERLY FARMS 27-30 C-101 I Cr_CKIn WAVERLY FARMS 27-30 a N N 0 m E 50 EXISTING CONTOUR 50 FINISHED CONTOUR DISCHARGE PIPE - FORCEMAIN -«�-«- DISCHARGE PIPE - GRAVITY W/CLEANOUT s \s°\ Cam- STORMWATER PIPE W/CATCH BASIN MINIMUM BUILDING / LAGOON SETBACK LINE SWALE / DIVERSION P1, ..., L1, ..., 01, FP FP - PROVi PAD, OFFSET STAKEOUT POINTS POWER POLE POWER LINE POWER LINE - EXISTING AERIAL POWER LINE - PROPOSED AERIAL RIPRAP EROSION PROTECTION STORM WATER PIPE FENCELINE CONTROL POINT EXISTING FLUSH PIPE/W CLEANOUT POWER PANEL FLUSH PIPE DISCHARGE DRAINAGE INLET SPOT ELEVATIONS CONTROL POINTS S/W PIPE DETAILS DISCHARGE PIPE DETAILS 5+00 GRAVITY HEADER PIPE / FROM BARNS TO LS 8528- " CPP/PVC LIFT STATION LS-8528-1(PROPOSEll INSIDE DIM. = 6.00 FT X 8.00 FT RIM EL = 164.00 BOT. EL. = 154.00 SEE DETAIL 7 SHEET C501 GRAVITY PIPELIPR 12" DR17 HDPE TO DIGESTER LIFT STATION OVERFLOW GRAVITY PIPELINE �J 12" DR17 HDPE TO L8528 PRIMARY -- ---------- WASTE STORAGE LAGOON TABLE PRIMARY TOP OF DIKE (FT) 161.81 START PUMP (FT) 160.22 STOP PUMP (FT) 152.08 SECONDARY TOP OF DIKE (FT) 161.81 START PUMP (FT) 160.22 STOP PUMP (FT) 150.11 I rr� J I L - - - - - - - - - - - - - - - I.�T, - r-------------------- ------ %I I -----. -_-- - - - --- I 4,000LF - 12-INCH HDPE DR17 INFLUENT TRANSFER LINE ISTING BUILDING I I I FROM FARM 28 LS28-2 TO FARM 27 DIGESTER * I EXISTING BUILDING I O f EL _163.82 (102.14) I I \ PROPOSED 12" PIPE SEE PROFILE SHEET C301 INV EL- 161.77 (100.09) --_- I M I FF EL = 1162.0 (100.6) I L_-__� ___--____-- I I I INV. EL-I=V. = 157.9+ R I INV EL = 162.06 (100.38) I - - � \ L- - - - - - - - - - - - - - - - - - - - - -- (( I ---------------- EXISTING BUILDING I I I 50OLF - 12-INCH GRAVITY PIPE DUAL WALL CPP L MINIMUM PIPE SLOPE 0.25% .(.) I III I'I y d \ I I I I LII INV EL= 161.77 (100.09) i I 5 X 10LF - 12-INCH GRAVITY PIPE BARN CONNECTIONS I I 1 I I I �T -/Q ---I I I FROM BARNS TO FARM 28 LS28-1 f ° EXISTING 12" PIPE o / ------ --- I I I V�I--------- I I BIG BARN T n EXISTING BUILDING I I \ I iNV EL = 159.9± I \ O I �� FF EL = 163.81 (102.06) I \ I I OFFICE I I I I INV EL= 161.76 (100.01) I I \ EXISTING 12 PIPE JL--------------- I \ EXISTI G BUILDING / I �-_� I I BIG BARN I I -- I FF EL = 166.63 I `I I \ I INV EL - 160.2± FARM 28 - EXISTING I EL:-162.72 I (I /v\ I✓ i I I (FIELD VERIFY) PRIMARY LAGOON I i I TOD EL = 161.81 (100.01) « I--------- O I II EXISTING BUILDING I I I 1 I 1 LII FF EL = 163.78 (101.97) L--_----INV EL_161.74 (99_93) ----- I I I 1 I . 3,240LF - 8-INCH HDPE DR17 t EFFLUENT TRANSFER LINE II l' "_ * 1i I ------ I I - ; FROM FARM 27 LC27-1 TO FARM 28 PRIMARY I 1 r I --- I \- EXISTING BUILDING / I l \ I LII 1 FF EL _163Ul (102.1�8) L i PR E7 12" PIPE O O O �O O O O ) INV EL- 161.67 (100.14)I I INV. ELEV. = 159.2± - �-�1 11 L-------------------� F-IEI_i7 VERIFY) I I I L-J \ r EXISTING 6 PVC CROSSOVER PIPE I I \ I1EXISTING BUILDING\ I I I INV EL = 159.50 (98.13) \ FF EL = 163.64 (102.09)L INV EL= 161.60 (100.05)- , T _ I i � I ------------ --- - I - EXISTING BUILDIN FF EL _ 163.73 (102 07) I I \ - �` I I LI • INV EL= 161.69 (10 .03) 1 I-------- �- I I r l EXISTINGBUIL ING I FARM 28 -EXISTING I I FF EL = 163.63 ( 1.95) �� I I LI I ti INV EL= 161.59 (9 I I I SECONDARY LAGOON I I f TOD EL = 161.81 (100.01) II o I I I JI I I I 1, 1. I I I I EXISTING BUILDING j I l 1 LII FF EL = 163.82 1102.14N INV EL= 161.71 (100.03) I 1 I I I I \ \ I L-------------------J ' ° 1 � - //jo c _ . Z / L s 0 1 Z SITE LAYOUT PLAN F28 11 60 30 0 60 SCALE: 1 INCH=60 FEET WAVERLY FARMS 27-30 C-102 7 -------------------------------------- INSTALL ELECTRI POWER PANEL I � W/ NEW SERVI INSTALL TRANSFER PUMP o 2x 10HP 1 PH PUMPS I 1 I / / FM3-» FM3 > I LIFT STATION F29-1 PROPOSED ° MAX. CAP. = 3,160 GAL m ��° INSIDE DIA. = 7.00 FT RIM EL. = 141.00 1-RANSFER PIPELINE #3 �BOT. EL. = 131.00 " DR17 HDPE SEE DETAIL SHEET C501 TO DIGESTER I ; — FM1- WASTE STORAGE LAGOON TABLE DIGESTER DATA TABLE PRIMARY TOP OF DIKE (FT) 139.5 LENGTH (FT) 630 START PUMP (FT) 136.0 WIDTH (FT) 260 STOP PUMP (FT) 130.74 TOP OF DIKE (FT) 139.5 SECONDARY BOTTOM ELEV (FT) 123 - 125 TOP OF DIKE (FT) 139.5 "V" BOTTOM ELEV (FT) 122 - 124 START PUMP (FT) 136.0 SURFACE AREA 163,800 SF STOP PUMP (FT) 122.29 1 Tp FMB r . _ i Z FM »�� L� NEW HEADER _ I Fro;z FM -» FM1-»�FM1-> � \ � / ��P / FM2-»�-- FM2-» M2_»— FM1-» � FM1-» GRAVITY PIPELINE a� I \\ FM2-»—_„=_„� 12" CPP/PVC �\ I I ° / C1/ C�� Fnn2 FM1-»—� / TA = / O� OE / FM2-» " ==� � OE U��— F � IFM7-»� F . M2-» — \ i mj �-FNn1_» FM1-» FNI1-» FM1-» FM1-?% '• FM2-» FM2-» — FNI2-» — FMt-»- FM2-» FM2-»—� I Tq ___-----e \ OE \ 0 / w i OE OE OE — OE m OE OE 2i2a / I \ j _ OH _ _ \ ' FARM 29 -EXISTING \ FOVERFLOW PIPE 8" DR17 HDPE I / I \ °N— —oH °� � 1� `, SECONDARY I —OH-- CONNECT TO EXISTING I I 1 \ of / �p ® l L I (( \ CONTAINMENT J I / GRAVITY PIPE TO LAGOON= ° r \ \ I /J — \/----0P— ——\ II I II \ •� n 1I �II I I I L — _—II I -- _— I -� -_--I -- — —I —,III I �IIIIII \ �\ � iI l �pS/-- �o �� �i �— \—\�— �/�/_� \`�— 1J_I1 I1I— _ — _--,—_�I I I— II � _ -IIII II�L� I `r eII lIF/ �MI_I4L -_»_________ _ �L-- I II \ V✓VIv 1, _I \11 \1 ° =L� FM4-FM4-» FM4-» —Tr:4» FM4 > FM3-» FM3 FM3-» FM3- FM3-» FM3-» FM3 (POSED 12n PI ELEV.=134.PE PROPOSED 12" PILL I ± INV. ELEV. — --- - - - - — — — — — - - - - — - - - — — — EXISTING 12" PIPE INV EL=135.8--------- ------ — ——— --- 4EXIETING B1LDIN FF401�05) INV EL (94_FM4- ,I II II I II I I I I n Il,III I IIIII II I �I I- ` I I II __------I-1\—, —✓ __=—_11-3_�----I—._.8—_ —» PAO---- I FM4-» EXISTING 12"PIP -------- (FIELDVERIFY EXISTINGB27�ON4 FFEL 140( .09)II 3-9 INV E13598 (99.) I II II I _ 760LF 12-INCH GRAVITY PIPE DUAL L WALL CPP MINIMUM PIPE SLOPE 0.25% E INGBULD1NG 9 X 10LF - 12-INCH GRAVITY PIPE BARN CONNECTIONS I I I I I I I II I I L ' `IY' 0 TRANSFER PIPELINE = 142.2I5 (I41.93) p F�EL 8" DR17 HDPE m INi EL=138.04(13993) FROM BARNS TO FARM 28 LS28-1 I _ITO DIGESTER W PIPE 81DR17 HDPE ISTI=N�BUILDING E5(1PULL-PLUG BARN HEADER PIPE CONNECTTOEXISTING ° C5 FXFE03,95) 9,/ EXTEND GRAVITY PIPE TO LS 29-2 RAVITY PIPE TO LAGOON m INV EL 12 CPP/PVC FARM 29 EXISTING O` MI !I PRIMARY LACz OWN �. FP TOD EL = 139.5 -f (STING 12" PI I I FYINSTALL ELECTRIC POWER T—IN—B—UIBUILDING EXISGLD VERI4. ) EL W/ NEW SERVICE DROP .91(99.74)LIFTSATIONF29-2 PROPOSED I MAX. () I I II II I I1 I' II / CAP. = 2,300 GAL INSIDE DIA. = 7.00 FT � I a JNSTALL TRANSFER PUMP RIM EL = 143.00 BOT. EL. = 133.00 1x 20HP 3PH PUMP SEE DETAIL SHEET C501 OE — OE OE I EXISTIN BU'I G 1 OE I FF EL = 140.25 003. 7) 1 II I \ OE / I INV EL = 135.96 (99 " PIPE -- --- _ � I I � I o I I I XISTING 12 I � r I � o V cL = 135.3 (97.87) Lu c n_ I I\ I I I I IELD VERIFY) 1 EXISTING 12" PIPE ° ► �— -- EXISTINGB WING JI I II INV EL = 135.03 (97.67) J I OE I / "-_ -� `= II _ FFEL=140.2 (10968) I V I (FIELD VERIFY) OE I _INV EL = 13 8 (99.68) _ J II LEGEND J II UAJ VtNI/1-LAKt CONNECTION SEE DETAIL SHEET C503 OE BIOGAS BLOWER SKID STORMWATER REMOVAL PUMP. SEE OUTLET DETAIL SHEET C503 TP I II I Tp im II v FARM 29 - PROPOSED DIGESTER -1.2% TOD EL,,,,: 139.5 I I GAS VENT PIPE SEE DETAIL SHEET C503 I �' u•'�1 EXISTING CONTOUR \\ j — — - 1 � / GAS VENT PIPE so FINISHED CONTOUR -� I I I I tJ EXISTING BUILDING ' I 1 \ SEE DETAIL SHEET C503 I I I I CROSS-01ER 6 PVC F EL = 140.17 (103.79) « « DISCHARGE PIPE - FORCEMAIN�EL=135.88(99.50) _� � INV EL = 135.32 (97.57) «� DISCHARGE PIPE - GRAVITY W/CLEANOUT 1 STORMWATER PIPE W/CATCH BASIN --,_ --------- I I I_ S LING 1 MINIMUM BUILDING / LAGOON SETBACK LINE EXISTING 8.09) FARM 29 - EXISTING�SLGBUILDING 104.03) (FIELD VERIFY) FF E=\140 (SWALE / DIVERSION INV EL 6.(99.74) SECOfaRY LAGOON0 _ I / - P1, PAD, OFFSET STAKEOUT POINTS —� _ I ---� aP I I _ I _ I � POWER POLE�Gj I LEVEL CONTROL STATION —EEEEE— POWER LINE I III __-- I I _ LI, 1 r STORMWATER REMOVAL PUMP. so SEE OUTLET DETAIL SHEET C503 I I _ _ _ I f , BUILDINGPOWER LINE - EXISTING AERIAL I✓EXI F�TLING1FL40.2 1(903.8I _ FARM 29 -PROPOSED 13 57) POWER LINE - PROPOSED AERIAL / SECONDARY j.► \ j \ f \ I _ _ _ — — �J T 1 CONTAINMENT W/ VALVE / RIPRAP EROSION PROTECTION�- s„ STORM WATER PIPE I .. \ \ •1 \ �/ I _ — / FENCELINE CONTROL POINT FP FP EXISTING FLUSH PIPE/W CLEANOUT 4y� -•+• "•�' •' « OO POWER PANEL ,�'"."� ` ' -- /// / / \ .•. OD FLUSH PIPE �`.NAA `•°� 1, �, b ` , 1., /— 10g0 DISCHARGE DRAINAGE .� R,�►' i \ \ 'i� �'�► �� V. OF 100.00 INLET SPOT ELEVATIONS CONTROL POINTS SITE LAYOUT PLAN F29 S/W PIPE DETAILS DISCHARGE PIPE DETAILS 60 30 0 60 SCALE: 1 INCH=60 FEET WAV 0 O Q4 O 0 0 0 WAVERLY FARMS 27-30 C-103 , WAV 7 M N N 0 N m a) E O 0) - - - - - - - - - - - - - - ` - - - - - - - - - - - - - - - - G `#09- G--G--G-� -G--G+�1DG- __ _ o< 4� TRANSFER PIPELINE #11 I _ / , G 37�+l� - G - - G (�-36±OQ - - G - - G + G - q4+ / \ 8 DR17 HDPE - G- - G - _ WLL_ _ I -r- --�� 4,000LF - 8-INCH HDPE DR17 - -3� - ° - -' 3i+0(� - o - -- o - - TODIGESTER % *3T+O�o--o--o--o INFLUENT TRANSFER LINE #2 �� \ / L- 30 r00� A I - MFROM FARM 30 LS30-2 TO FARM 29 DIGESTER 31800LF - 8-INCH HDPE DR17 / I \ - OH - - °H - ° - OH- H- a - - - > �; INFLUENT TRANSFER LINE #1 \ I I ` I I �� I I °�� °- ° - - H - off _ - - -- z I� FROM FARM 30 LS30-1 TO FARM 29 DIGESTER -i INSTALL ELECTRIC I 1 _,II I I I � OH- =i POWER PANEL °< N l ?° ® T I I I � OH - - OH-- W/ NEW SERVICE DROP FM1 "FMzFM1 I - \ off- ` �LSTALL TRANSFER PUMP S-FM2 �x 15HP 3PH PUMPS I �/ I / FM �vh/' I FM1->> FM1-»FM1-» o FM2` - `rO�_S M2-» FM1-» I I \ Q II FM2-»-� FM2-. > I 1ROPOSED 12" PIPE LIFT STATION LS-8530-1 (PROPOSED) INV. ELEV. = 161.� 9) MAX. CAP. = 33160 GAL LL I I I \ - / I �' ► 1 INSIDE DIA. = 7.OG FT RIM EL. = 166.5E I I I j N�_�-I BOT. EL. = 156.50 o I - � �g ` .�-�._- :_� ., �, �_. .- -`-�_ � � ------ � � � SEE DETAIL_ SHEET C501176 J I I » - >> I - OE OE O I �-'� r PROPOSED LOWER BARNS HEADER PIPE W GRAVITY PIPE TO LS-8530-2 I a I .......... I I PROPOSED 12" GRAVITY / m/ I I OVERFLOW TO L8530 PRIMARY /I > U- PROPOSED ; ELEV. 16151 28+00 -ram f \ \ 27+00 71 ...ia..... ` { I ► I I_ o >> I _ _ l EXISTING BUILDING 165.80 (99.60) 1 ( Y ------------------------------------- Ir-j FF EL m INV EL = 163.55 (97.35) - /-1------------------ ---� \.�\\\ I{ I I U i \ r-----iT- i I O I I FM ->'-FM2"»- _ I I 1� 4 1 - I i I i I i m I v o _ -. m p - -� 1 I I1 _ ( I I I 4. m N RANSFER PIPELINE #2 �I -------------7 I I I -- I EXISTING 12 PIPE I 1 1 I DR17 HDPE I \ I 1 LL I /' INV EL - 161.3± I I I 1 0 DIGESTER I I I I EXISTING BUILDING JI I 1 p i FF EL = 165.98 (99.79) I > 1 \ m I I INV EL=163.55 (97.36) � mL- I LL INSTALL TRANSFER PU I I I I I J ry LL 1 /� I\� EXISTING BUILDING k20HP 3PH PUMP I I I FF EL = 167.90 (167.610 --___ I I I I V EL = 163.63 (163.7) O O _ T 1 u i I I I m TTML ELECTRIC I I I 1 I POWER PANEL EXISTING BUILDING I ( t 1 1 I I W/ NEW SERVICE FFEL=166.02(99.85) 1 J 1 I I I I I I � It \ I m 6013 I I t] I EL = 163�73 (9 DROP INV 1 o 1 I I I I ( 1 \ \ I X 30BLDG2 m CONNECT EXISTING 12" ----- GRAVITY FLUSH PIPE TO EXISTING 12" PIP coo OW530 TATION OVERFLOW INV EL = 163+� PRIMARY I I I o" nn I Q I Lll EXISTING BUILDING 1 FF EL = 165.89 (99.69) J LL`o , \ I I ? INV EL = 163.62 (97.42)_-�_ Iip I I \ I LIFT STATION LS- 530-2 (PROPOSE MAX. CAP. = 2,300 GAL INSIDE DIA. = 7.00 FT I EXISTING 12" PIPE I I I EXISTING BUILDING 1 II, FARM 30 - EXISTING I PULL -PLUG BARN HEADER PIPE RIM EL = 168.50 / FFEL=165.89(99.69) 1 I I EXTEND GRAVITY PIPE TO LS 30 2 BOT. EL. = 158.50 I INV EL = 16 + I �- -I INV EL= 163.49 (97.29) t I { J PRIMARY LAGOON _-- 12" CPP/PVC SEE DETAA&HEET C5 I I fll -- 1----- ® I TOD EL = 163.73 (99.99) 660LF - 12-INCH GRAVITY PIPE DUAL WALL CPP i MINIMUM PIPE SLOPE 0.25% I I \\ I I 1 1 I I I I 9 X 1OLF - 12-INCH GRAVITY PIPE BARN CONNECTIONS L EXISTING BUILDING I I � I FROM BARNS TO FARM 30 LS-8530-1 FF EL = 165.70 (91 9.34) I I I I \ \ I fl t INV EL=163.58 (97.22)), � � ► I � I l r�l I I _ � I CROSS OVER 6" PVC LEGEND 1 I I 1 EXISTING BUILDING l 1 1 I I �� FF EL J I a I 1 INV EL = 160.45 (98.13) FARM 30 -EXISTING -1 = 3.62 (97. 0) I SECONDARY LAGOON I 1� I I � o t INV EL 16 TOD EL = 163.73 (99.99) 50 EXISTING CONTOUR 50FINISHED CONTOUR j I I I a C, I I I I DISCHARGE PIPE - FORCEMAIN «�« DISCHARGE PIPE - GRAVITY W/CLEANOUT ( EXISTINGBUILDIN(99.57)G I I I I 1 I I I�"�1 FF EL = 165.76 l 1 t INV EL=163�51 (97.32__� LL,�w� II ) l STORMWATER PIPE W/CATCH BASIN I I / I PROPOSED 12" PIPE ' I - I --------- MINIMUM BUILDING /LAGOON SETBACK LINE , I � INV. ELEV. 163.5+ � I SWALE /DIVERSION I I I �: 1 r 0 PAD, OFFSET STAKEOUT POINTS EXISTING BUILDING 1' _ _ - 4,000LF - 8-INCH HDPE DR17 rQ, POWER POLE I FF EL = 1163.6 (9 4) 1 I -: _� I _ f I INV EL=163.65(�45) o - _ � � EFFLUENT/RECYCLE TRANSFER LINE FROM FARM 29 DIGESTER TO FARM 30 PRIMARY POWER LINE - POWER LINE - EXISTING AERIAL << °E °E POWER LINE - PROPOSED AERIAL \ TP RIPRAP EROSION PROTECTION_.- TP f J r STORM WATER PIPE FENCELINE l ® CONTROL POINT \ _ j FP FP EXISTING FLUSH PIPE/W CLEANOUT OO POWER PANEL 0 FLUSH PIPE \ 1 \ y �-_ 10g0 DISCHARGE DRAINAGE 100.00 INLET SPOT l ELEVATIONS CONTROL POINTS S/W PIPE DETAILS DISCHARGE PIPE DETAILS SITE LAYOUT PLAN F30_ WASTE STORAGE LAGOON TABLE PRIMARY TOP OF DIKE (FT) 163.73 START PUMP (FT) 162.14 STOP PUMP (FT) 152.00 SECONDARY TOP OF DIKE (FT) 163.73 START PUMP (FT) 162.14 STOP PUMP (FT) 149.73 60 30 0 60 SCALE: 1 INCH=60 FEET 0 0 0 WAVERLY FARMS 27-30 C-104 WAV M N N 0 N m E _o 0) 3 r-- 242'-0" / -� — �� - — — ------ - - -------_- I I — ------ -- I �I I� I I I I I I I I I I I I I �co c I I I I �1 � I I I I I c I I I � I I I I c I I FARM 27 -EXISTING SECONDARY LAGOON TOD EL=136.30 (99.48) GAS VENT PIPE SEE DETAIL SHEET C503 I I � STORMWATER REMOVAL PUMP. SEE OUTLET DETAIL SHEET C503 IIIIIIIIIII� III R PIPE I i i I IN_ V6"PVC = 96.48 I I I II I I I I I I dd —r dd 11 I I II I I I I I I j I I I I I I I I 40 LF - DECANT PIPE I I I 1 12" DR17 HDPE PIPE 40 LF - DECANT PIPE I I I I I I I I MIN. PIPE SLOPE 0.25% 12" DR17 HDPE PIPE I I I i INV. @LAGOON 130 MIN. PIPE SLOPE 0.25% I I I I I 1 I I I I I I I I I I I �IIIIIIIII 495'-0" COVER LENGHT 495'-0" 120 LF - SLUDG 12" DR17 HDPE PI INV. @ SLOPE = 124 FARM 27 - PROPOSED COVERED LAGOON TOD EL = 136.3 FARM 27 - EXISTING PRIMARY LAGOON TOD EL = 136.30 (99.48) 100 LF - MIXING PIPE 8" DR17 HDPE PIPE INV @ SLOPE EL=124 INV. @ LAGOON - 134 j I 1 REPLACE EXISTING 8" WITH I I PROPOSED 12" PIPE I I jl I I I INV. ELEV. = 134.5 I I I I — — — — — — - I I I I II I I �_----- ------ . _ — — --- -J REMOVE EXIS — as— — --as= I _ / / dd dd dd dd — ;2 I I 1 I j I NOTES: 1. PROVIDE TURNDOWNS ON ALL GRAVITY PIPES. TOP OF PIPE SHALL BE MINIMUM 1 FT BELOW OPERATING LEVEL. 2. COVER INSPECTION PORTS MINIMUM 4. SEE SHEET C502. jl I Li INV 12" = 134.32(9 _ 60'-0" — 50'-0" I-105'-0" 4T-0�� 35 0 �y— LEVEL CONTROL STATION — I I — LEVEL CONTROL BOX 7'OX10' - PRE -CAST RIM EL = 137.0 DETAIL SHEET C� v I I SD 30 v v 30 30 —30 x dd — 30 30 30 120 LF - SLUDGE REMOVAL PIPE 8" DR17 HDPE PIPE INV. @ SLOPE = 124 GAS VENT PIPE SEE DETAIL SHEET C503 120 LF - SLUDGE REMOVAL PIPE 12" DR17 HDPE PIPE INV. @ SLOPE = 124 co co II I I I I I II �I I I I II I I I I I II I I I IRELOCATE RECYCLE PUMPS I TO SECONDIM I I It I I I I II I I 120 LF - SLUDGE REMOVAL PI I I 8" DR17 HDPE PIPE I I kV. @ SLOPE = 124 II I I I 0 G m 0 STORMWATER REMOVAL PUMP. SEE OUTLET DETAIL SHEET C503 GAS VENT/FLARE CONNECTION SEE DETAIL SHEET C503 II00 I I/ I I x BIOGAS BLOWER SKID „ n q+oo / REPLACE EXISTING 8 MIXING OUTLET PROPOSED 12" PIPE 6" DR17 HDPE PIPE I EXISTING 8" PIPE INV. ELEV. = 134.5 INV EL = 133.5 I I I I o INV. ELEV. = 13�� 1 I I� ----— — — — — — — — - --_ 0 — I MIXING DRY WELL 6'OX6' - PRE -CAST RIM EL = 137 SEE DETAIL SHEET C5 PROPOSED 12" PIPE INV. ELEV. = 135.5 a dd —/ --------- I I I I , I F x — ! 80'-0" — 74'-0" - — 33'-0" — — 33'-0" _ 94'-0" — 7XpO — — — — — — — — — — — — ---------------------------------- — --- — — — — — — SD — — SD — — SD — — SD — — SD — — SD —SD--SD--SD--SD — SD — SD — — SD — SD — — : I —SD--SD— S — SD �I 30 30 30 30 30 a4 30 30 30 J30 30 30 30 30 I \ /� 5° -30 --� _ ---- ---- —I---_ / o o + c\I p� x / I � dd dd f FP ----- i i---------i i----------i i- - - - - - - - - - I I I I I I I I SITE LAYOUT PLAN FARM 27 DIGESTER �LG?N�VN 30 15 0 30 SCALE: 1 INCH=30 FEET DIGESTER DATA TABLE ASSOCIATED HEAD 24,644 LOADING RATE PER HEAD 55 CF LENGTH 495 Ft WIDTH 377 Ft TOP OF DIKE 136.30 BOTTOM ELEV 121.54 FREEBOARD ELEV 135.30 START PUMP ELEV 134.55 STOP PUMP ELEV 134.05 VOLUME @ START PUMP 2,119,703 CF REQUIRED VOLUME 1,355,310 CF SURFACE AREA 186,615 SF 9 w of � o a o � � W O ocn N �t T I z 0 Ln 0 ui w w � w G - NMI WAVERLY FARMS 27-30 C-105 rol M N N O N m E _o 0) DIGESTER DATA TABLE ASSOCIATED HEAD 24,642 LOADING RATE PER HEAD 55 CF LENGTH 630 WIDTH 260 TOP OF DIKE 139.5 BOTTOM ELEV 123 - 125 ' V BOTTOM ELEV 122 - 124 FREEBOARD ELEV 138.5 START PUMP ELEV 137.75 STOP PUMP ELEV 137.25 VOLUME @ START PUMP 1,542,141 CF REQUIRED VOLUME 15355)310 CF SURFACE AREA 163,800 SF EARTHWORK CALCULATION DATA METHOD USED: TIN CUT FILL DIGESTER ROUGH GRADE 23,200 22,300 SWALE ROUGH GRADE 0 0 FINISHED GRADE BACKFILL 4,200 1,200 TOTAL 27,400 23,500 NET FILL REQUIRED -3,900 1. ALL QUANTITIES ARE IN CUBIC YARDS, AND FILL VOLUMES HAVE BEEN ADJUSTED BY 15%. 2. FINISHED GRADE BACKFILL INCLUDES MATERIAL USED TO CREATE PROPER DRAINAGE, DIKE ELEVATIONS, AND GRADES AFTER WORK IS COMPLETE. 3. BORROW AREA WILL BE LOCATED ON -SITE. ,�I,I�N9NN 30 15 0 30 7777 SCALE: 1 INCH=30 FEET 1 U J GAS VENT/FLARE �- ( WAVERLY FARMS 27-30 / ( \j \/ CONNECTION cV N SEE DETAIL SHEET C503 \C1 ' < �_ 1, 110 0 l 1743o I o 50 14 Q GAS VENT PIPE 135 SEE DETAIL SHEET C503 Q UE UE UE UE / E \ UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE 1 139 S m I 71 �I a � v 357 135 I O I17I 9X�o -tN 130 130 \ o 00 \ \ GAS VENT PIPE I BIOGAS ��'S �� fv --� \ �- ,1i SEE DETAIL SHEET C503 BLOWER SKID m oIJ co O F \ Q N w J<o > O a -c-as -0.4 '� II I w J STORMWATER REMOVAL PUMP. N Lij Q 1,1 ''1 Q -P 11 -- 1� - CD SEE OUTLET DETAIL SHEET C503 ` f \� I M N r`- \ �- `\ O / STORMWATER REMOVAL PUMP. M Q ~ M SEE OUTLET DETAIL SHEET C503 coV- to N 12 N 1 CNI rr LEVEL CONTROL STATION I W O 130 130 o O Q4 EW- —� — --- ---_ — - ----- - - 4_> FM4->> --_— �� i a5 FM3-» —�v13- FM3-» FM3-» FM3-» FM3-» _ ----------- 9 � 60' 0" '�-—100'-0"=------ - ---- 184' 0"�� Ln z o SITE LAYOUT PLAN FARM 29 DIGESTER w wW _17 I \ / I � \ i / I TRANSFER #1 FROM FARM 30 LS-8530-2 - 8" DR17 HDPE PIPE INV EL = 137.0 80 LF -SLUDGE REMOVAL 80 LF - SLUDGE REM I 120 LF - SLUDGE REMOVAL PIPE PROPOSED BAFFLE 12" DR17 HDPE PIPE INV. @SLOPE = 12" DR17 HDPE PIPS 8" DR17 HDPE PIPE 245 FT TOP LENGTH IV. @ SLOPE = 127.5 I INV. @ SLOPE = 127.5 SEE DETAIL 5 SHEET C502 EXTEND TO TOE ONLY EXTEND TO TOE ONLY I 100 LF - MIXING PIPE TRANSFER #2 FROM FARM 30 LS-8530-1 - 8" DR17 HDPE PIPE I 8" DR17 HDPE PIPE INV EL = 137.0 I INV @ SLOPE EL=126.5 INSTALL MIXING 3PUMPS \ 7.5HP PUMP MIXING DRY WELL TRANSFER #4 FROM FARM 29 6'OX6' - PRE -CAST LS-8529-2 - 8" DR17 HDPE PIPE TRANSFER #3 FROM FARM 29 MIXING OUTLET RIM EL = 140.5 INV EL = 137.0 LS-8529-1 - 8" DR17 HDPE PIPE 6" DR17 HDPE PIPE SEE DETAIL SHEET C502 INV EL = 137.0 INV EL = 136.5 1 1 FARM 29 PIPE PENETRATION PLAN Cl 06 SCALE: NTS 24 LF - DECANT PIPE 12" DR17 HDPE PIPE INV. = 133.5 LEVEL CONTROL BOX 6'OX8' - PRE -CAST RIM EL = 140.5 SEE DETAIL SHEET C504 340 LF - DECANT PIPE 12" DR17 HDPE PIPE INV. @ TANK = 137.5 MIN. 0.25% SLOPE - _2�D end C) 0 %4� 1%��C> WAVERLY FARMS 27-30 C-106 1w . � I � ->— & ., - .. - .e,: Z-. - i— •yt. IRRIGATION - PIVOT w .4'.., oils w FTWIW' WAVERLY FARMS 27-30 75 N N O (a E O 0) N 0 N z CD W w 0 0' w U) LU CD �w TRI-BAR TRASH SCREEN IAICI I ICAIT If�l\/ r IIVr LUEN I IIV V. I� FLUSH PIPE FROM BARNS I MANHOLE PIPE BOOT OR LINK -SEAL LS-475-S-316-17 SEE DETAIL THIS SHEET DR17 HDPE TO PRIMARY LAGOONS "E" OVERFLOW INV. z O z w > w a ►9 o/ U- w w > O • S °S m I f° ° ° S 8'-0.0" Q Qo S S FLOAT TREE FLOAT CONTROL CORDS MANHOLE PIPE BOOT - 8" SDR-35 OR LINK -SEAL LS-475-S-316-12 SEE DETAIL THIS SHEET LIFT STATION PUMP 6" DISCHARGE CONNECTION SEE TABLE THIS SHEET (OR APPROVED EQUAL) 6" CHECK VALVE - BACK FLOW PREVENTION BALL / GATE VALVE IZ-r6" 6"/8" PIPE INCREASER i i PIPE TO DIGESTER - 8" x 8" TEE CONNECTING PUMP PIPING TO 8" FORCE MAIN S (OPTIONAL) • LIFT STATION PUMP LSEE "HARGE CONNECTION BLE THIS SHEET PROVED EQUAL) CONTROLPANEL LIFT STATION - PLAN VIEW C501 SCALE: NTS CONTROL PANEL LEVEL CONTROL PUMP STATION - PLAN VIEW C501 SCALE: NTS LEVEL CONTROL PUMP STATIONS ID LC-8527-1 LC-8529-1 FINISHED GRADE -0'-6" -0'-6" RIM: 0'-0" 0'-0" INVERT I N : -6'-0" -6'-0" OVERFLOW INV. OUT: -2'-6" -2'-6" OVERFLOW RISER EL: N/A N/A BOT. OF WELL: -10'-0" -8'-0" DEPTH OF WELL: 10'-01, 8'-0" DESIGN FLOW: 500-700 gpm 500-700 gpm TOTAL DYNAMIC HEAD: 40-60 FT 40-60 FT PUMP HORSEPOWER: 20 hp 20 hp PUMP SPEED (RPM): ELECTRICAL SUPPLY: 220V 220V ELECTRICAL FREQUENCY: 60 Hz 60 Hz IMPELLER DIAMETER: MOTOR TYPE: SELECTED PUMP: GEA-HOULE GEA-HOULE PUMP MODEL: 4" HIGH PRESSURE 4" HIGH PRESSURE SHAFT LENGTH 8 8 110V WEATHERPROOF CONVENIENCE OUTLET ELECTRICAL DISCONNECT CONTROL PANEL "A" RIM EL o ° MIN. 6'° FLOAT MIN.18" CONTROLCORDS NATURAL GROUND ° d HIGH o 0 0 WATER TRI -BAR ALARM TRASH SCREEN d ° LAG PUMP ON a, "E" OVERFLOW INV. Q LEAD PUMP ON d d° . d "F" INFLUENT INV. MANHOLE PIPE ° PUMP OFF/ BOOT OR MIXER ON/OFF LINK -SEAL LS-475-S-316-12 ° SEE DETAIL °4. SHEET C502 ° "B" SUMP EL ° . • d d d QUICK DISCONNECT LIFT STATION PUMP 6" DISCHARGE CONNECTION SEE TABLE THIS SHEET (OR APPROVED EQUAL) LIFT STATION - CROSS SECTION VIEW C501 SCALE: NTS BOXE VALVE BOX SEE DETAIL 1 THIS SHEET LEVEL CONTROL PUMP STATION - CROSS SECTION VIEW C501 SCALE: NTS TRI-BAR TRASH SCREEN 'IF" INFLUENT NN CVT INV. FLUSH PIPE FROM BARNS 12" CPP DW MANHOLE PIPE BOOT OR LINK -SEAL LS-475-S-316-17 SEE DETAIL THIS SHEET of • ° ` • S . S ° ° ° S °S 8'-0.011 CD S } •S 0 "E" OVERFLOW INV.IJ A FI r 0 X m EFFLUENT INV. _ "F" - 1' TO DIGESTER 12" HDPE PIPE MANHOLE PIPE BOOT OR LINK -SEAL LS-475-S-316-17 SEE DETAIL THIS SHEET 12" CCP DW / HDPE DR-17 MANHOLE PIPE BOOT OR LINK -SEAL LS-475-S-316-12 SEE DETAIL THIS SHEET FLOW-THRU LIFT STATION - PLAN VIEW C501 SCALE: NTS NATURAL GROUND LIFT STATION/OVERFLOW PREVENTION PIPE SCHEMATIC RIM MIN. 6" O RFLOW INV. PIPE FROM BARNS MIN. PIPE SLOPE INFLUENT INV. 8" PIPE 0.5%" t- 12" PIPE 0.25% NATURAL GROUND MIN. BOTTOM/SUMP OVERFLOW RISER !u TOP OF DIKE INV. @ FREEBOARD EXISTING LAGOON LIFT STATION - CROSS SECTION VIEW C501 SCALE: NTS 12' RIM R17 HDPE ,SLOPE 2'x3' ANCHOR TRENCH FOR LINER/COVER "A" TOP OF DIKE WATER LEVEL INVERT MIN. 3' BELOW OPERATING LEVEL DIGESTER BOT. LEVEL CONTROL PUMP STATION - LEVEL CONTROL PIPE C501 SCALE: NTS PROPOSED LIFT STATIONS ID LS-8528-1 LS-8529-1 LS-8529-2 LS-8530-1 LS-8530-2 TYPE LIFT STATION LIFT STATION LIFT STATION LIFT STATION LIFT STATION A - RIM ELEV 164.00 141.00 143 166.5 168.5 B - SUMP ELEV 154.00 131.00 133 156.5 158.5 C- LxW OR DIAMETER 6'x8' (ALT 7'D) 6'x8' (ALT 7'D) 6'x8' (ALT 7'D) 6'x8' (ALT 7'D) 6'x8' (ALT 7'D) D - DEPTH 10.00 10.00 10.00 10.00 10.00 E- OVERFLOW INV PIPE: 161 RISER: N/A PIPE: 138 RISER: 140 PIPE: 140 RISER: 142 PIPE: 163.5 RISER: 165.5 PIPE: 165.5 RISER: 167.5 F- INFLUENT INV W: 158 ± S:134 ± W: 137 ± S: 161.5 ± W: 163 ± PUMP STOP N/A 133.00 135.00 158.50 160.50 LEAD PUMP START N/A 138.00 140 163.5 165.5 LAG PUMP START N/A 139 N/A 164.5 N/A HIGH WATER ALARM N/A 139.75 141.75 165.25 167.25 PUMP TYPE N/A 2x GEA-4" HOG GEA-4" HIGH PRESSURE 2X GEA-4" HIGH PRESSURE GEA-4" HIGH PRESSURE PUMP Hp N/A 7.5 20 20 20 PUMP SHAFT, FT N/A 10 10 10 10 O A�W w?A WAVERLY FARMS 27-30 C-501 WAV a co N N 0 N m CD E _o 3 N 0 N fn .E a) z cn w 0 ry w w c� w NATURAL GROUND MIN. 12" 12' "B" RIM EL ° "E" BOTTOM ELECTRICAL DISCONNECT CONTROL PANEL SAFETY RAILING ALTERNATING STAIRS RIM ELEV i 0 2'x3' ANCHOR TRENCH FOR LINER/COVER 6" DR17 HDPE EXTEND OUT "A" TOP OF DIKE INTO LAGOON FLOAT AT OR SLIGHTLY ABOVE WATER LEVEL WATER LEVEL 6" 45° ELBOW "D" EFFLUENT INV. 6" DR17 HDPE PIPE DIGESTER 1 1 MIXING WELL - EFFLUENT PIPE C502 SCALE: NTS a a e o d 0 10 d f a d 110V WEATHERPROOF CONVENIENCE OUTLET a a (SEE SITE PLAN) DRY WELL SUBMERSIBLE PUMP SEE NOTES THIS SHEET. (OR APPROVED EQUAL) 6" GATE VALVE MANHOLE PIPE BOOT - 8" DR-17 OR LINK -SEAL LS-475-S-316-12 SEE DETAIL THIS SHEET 6" DR17 HDPE TO DIGESTER — f 8" DR17 HDPE FROM DIGESTER 8" GATE VALVE I MANHOLE PIPE BOOT - 8" DR-17 OR LINK -SEAL LS-475-S-316-12 SEE DETAIL THIS SHEET MIXING WELL - CROSS SECTION VIEW C502 SCALE: NTS BIO-GAS COLLECTION PIPE 2'x3' ANCHOR TRENCH 3'x3'X3' BAFFLE ANCHOR BALLAST PIPE 80 MIL HDPE RUB SHEET \ PUNCTURE PREVENTION 1/2" POLYPROPYLENE ROPE SECURED IN TRENCH `M 3:1 SLOP POOL LEVEL ° MIN.12" "B" RIM EL NATURAL GROUND 12' 2'x3' ANCHOR TRENCH FOR LINER/COVER "A" TOP OF DIKE WATER LEVEL TIE WRAP AN 12" PIPE FOR SUPPORT "C" INFLUENT PIPE INV. MIN. 2' BELOW OPERATING LEVEL 8" DR17 HDPE PIPE 8" DR17 HDPE TOP OF PIPE THRU BERM TO BE BELOW PERMANENT WATER LEVEL. AT END OF PIPE PROVIDE SUPPORT/ANCHOR TO REST ON THE BOTTOM/SLUDGE LAYER 2 1 MIXING WELL - INFLUENT PIPE C502 SCALE: NTS MIXING WELL COVERED LAGOON/ NEW DIGESTER "A" TOP OF DIKE -0'-6" "B" RIM: 0'-0" "C" INFLUENT INV: 8" PIPE -6'-6" "D" EFFLUENT INV: 6" PIPE -5'-0" "E" BOT. OF WELL: -7'-0" DEPTH OF WELL: 7'-0" DESIGN FLOW: 1000 gpm TOTAL DYNAMIC HEAD: 20Ft PUMP HORSEPOWER: 7.5 hp PUMP SPEED (RPM): ELECTRICAL SUPPLY: 220V ELECTRICAL FREQUENCY: 60 Hz IMPELLER DIAMETER: MOTOR TYPE: SELECTED PUMP: FLYGT PUMP MODEL: NT 3127 SHAFT LENGTH 80 MIL HDPE COVER FLOTATION COLLAR POLYETHYLENE FOAM IN SEALED POCKET 5 1 BAFFLE - UNDERFLOW DETAIL C502 SCALE: NTS BALLAST CHAIN INSIDE CHAIN POCKET 2'x3' ANCHOR TRENCH DIGESTER ry w CO w 0 0 O w a 0 6" DR-17 - MANHOLE PIPE BOOT = OR LINK -SEAL LS-475-S-316-17 SEE DETAIL THIS SHEET 0 DRY WELL SUBMERSIBLE PUMP ° ° °d ° FLYGT NT3127. SEE NOTES THIS ° °d ° ° ° SHEET. 44, (OR APPROVED EQUAL) A 6" GATE VAL E d a ° d d a MANHOLE PIPE BOOT - 8" DR-17 ° ° ° OR LINK -SEAL LS-475-S-316-12 d ° ° SEE DETAIL THIS SHEET ° o ° ° o ° 1 ° f8" DR17 HDPE FROM DIGESTER a io d 0 0 BOT. ° d " d 8" GATE VALVE ° a ° d ° ° d ° ° ° d d ° ° ° ° ° d a ° ° ° ° A4. ° d ALTERNATING STAIRS CONTROL PANEL SAFETY YELLOW 3 MIXING WELL - PLAN VIEW C502 SCALE: NTS 6" HDPE FLANGE CAP EXTRUSION WELD �` / '—' ,� 80 MIL HDPE CAP STRIP 80 MIL HDPE COVER COVER - INSPECTION PORT C502 SCALE: NTS n•� 0 • 0 0 C> WAVERLY FARMS 27-30 C-502 WAV a M N N 0 N m fn E -o 7 N CD N a) -0 Cn LU r) w L LI U) LU 0 w 60-MIL THICK X 12" WIDE HDPE PIPE STRAPS WELDED TO BASE LINER, LOCATED ON 10-FT. CENTERS HDPE CORRUGATED SLOTTED BIOGAS 60-MIL HDPE PIPE (THIS PIPE IS TYPICAL AROUND BASE LINER ENTIRE PERIMETER OF LAGOON) MATERIAL 80-MIL HDPE FLOATING COVER MATERIAL 6" O HDPE MOLDED 900 ELBOW 6"0 HDPE FLANGE ADAPTER S.S. HARDWARE POLYPRO COATED BACKING RINGS T VENT CONDENSATE �\ REMOVAL PIPE W/ BALL VALVE Smithfield �ood food. --RespoKsibN8o 6" 0 HDPE FLANGE ADAPTER 6" 0 HDPE FLANGE ADAPTER CONNECT TO BIOGAS SKID OR VENT/FLARE SYSTEM 6" O PVC \ LEVER -OPERATED BUTTERFLY VALVE WITH VITON SEATS 6" O PVC LEVER -OPERATED BUTTERFLY VALVE WITH VITON SEATS 6" 0 HDPE FLANGE ADAPTER THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. RNG DIGESTER MASTER DETAILS DIGESTER BIOGAS CONNECTION DETAIL 'NsDRAWN BY: JOLMSTEAD SCALE. N.T.S. COUNTY:. DATE: 2022.og•16 STATE: NC, VA SHEET., C514 C:\Users\jolmstead\Smithfield Foods, Inc\SHP Engineering - AutoCAD - AutoCAD\03 Details\RNG-Digesters\C510 - Digester Anchor Trench Detail.dwg jolmstead 10/28/2022 3:06 PM M 80 MIL HDPE COVER COMPACTED SOIL LINER MATERIAL / / / B IO-GAS / COLLECTION PIPE / -III- I °Q�%IIIII 11 El I_ ^� / 1=1// EXISTING SOIL LINER I VERIFY EXISTING SOIL SUITABLE FOR GAS CONTAINMENT 2' 3' B I O-GAS COMPACTED COLLECTION PIPE SOIL LINER MATERIAL d 11 I IE1 I IE1 I � - M 80 MIL HDPE COVER I I —III —III I / —III—III Smithfield Good food. "ZespoKsibl8° :III=,1 EXISTING SOIL LINER VERIFY EXISTING SOIL SUITABLE FOR GAS CONTAINMENT 2' 3' THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. RNG DIGESTER MASTER DETAILS ANCHOR TRENCH - EXISTING SOIL LINER VISIONS: DROWN BY: JOLMSTEAD SCALE: N.T.S. COUNTSS . DATE: 2o22.og.16 STATE: NC, VA SHEET:C51oB W1 - Pipe Outlet To Flat Area No Well —Defined Channel 2 PLAN La = SECTION A -A NOTES: 1. THE ROCK RIPRAP SHALL MEET NCDOT REQUIREMENTS FOR CLASS "B" RIP RAP (100 LBS./FT3) OR AS DESIGNATED BY ENGINEER. 2. APRON WIDTH "W1" SHALL BE AT LEAST 2 TIMES THE CULVERT PIPE DIAMETER. APRON WIDTH W2 SHALL BE AT LEAST TO "LA" PLUS THE PIPE DIAMETER. 3. ROCK THICKNESS'IT" SHALL BE AT LEAST 1.5 TIMES THE RIP RAP D,00 SIZE. 4. APRON LENGTH "LA" AND ROCK RIP RAP SHALL BE SIZED ACCORDING TO ENGINEERS SPECIFICATIONS, MINIMUM "LA' = 4 X I'D" FT. 6. T= 15" CLASS "I" RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS 7. T= 12" CLASS "B" RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS Smithfield �ooA took Responib18" THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. RNG DIGESTER MASTER RAIN WATER OUTLET DETAILS DRAWNBYI JOLMSTEAD SCALE: N.T.S. COUNTY:. DATE: 2o22.oq.16 STATE: NC, VA SHEET: C512 C\Users\jolmstead\Smithfield Foods, Inc\SHP Engineering - AutoCAD - AutoCADk03 Details\RNG-Digesters\C510 - Digester Anchor Trench Detail.dwg jolmstead 10/28/2022 306 PM 80 MIL HDPE COVER / FUSION / WEDGE / WELD NEW COVER / TO NEW 60 MIL / HDPE LINER TAB / BIO-GAS COLLECTION PIPE 80 MIL HDPE COVER 60 MIL HDPE TAB PLACE 6-INCHES OF SOIL MATERIAL ON TOP OF LINER PRIOR TO COVER INSTALL //% i I —I I1=1I1- ��'' 80 MIL HDPE COVER FOLD OVER FUSION / WEDGE WELD INTO ANCHOR TRENCH AND COMPACT BIO-GAS BACKFILL TO GRADE COLLECTION PIPE 80 MIL HDPE COVER 60 MIL HDPE TAB co L — — I 2' I 3' Smithfield Good food. --RespoKS N8° THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. RNG DIGESTER MASTER DETAILS ANCHOR TRENCH - NEW CONSTRUCTION SIONS: DRAWN BYr JOLMSTEAD SCALE: N.T.S. COUNTY:. DATE: 2022.og.i6 STATE: NC, VA SHEET: C5 r1•__ /�..11 _1 T_ 111_II r\_I'__J /�L ____I T= SECTION A -A NOTES: 1. THE ROCK RIPRAP SHALL MEET NCDOT REQUIREMENTS FOR CLASS "B" RIP RAP (100 LBS./FT3) OR AS DESIGNATED BY ENGINEER. 2. APRON WIDTH "W1" SHALL BE AT LEAST 1 TIMES THE CULVERT PIPE DIAMETER. APRON WIDTH W2 SHALL BE AT LEAST "LA" PLUS THE PIPE DIAMETER. 3. ROCK THICKNESS 'IT" SHALL BE AT LEAST 1.5 TIMES THE RIP RAP D100 SIZE. 4. APRON LENGTH "LA" AND ROCK RIP RAP SHALL BE SIZED ACCORDING TO ENGINEERS SPECIFICATIONS, MINIMUM "LA" = 4 X I'D" FT. 5. H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) 6. T= 15" CLASS "I" RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS 7. T= 12" CLASS "B" RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS Smithfield Good food.--RmP0Ksib[8° THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. RNG DIGESTER MASTER RAIN WATER OUTLET DETAIL DRAWN BY: JOLMSTEAD SCALE; N.T.S. COUNTY:. DATE: 2022.og.16 STATE: NC, VA SIIEET:C5izA THE IDEAS, DESIGNS, AND DRAWINGS REPRESENTED HERE ARE THE SOLE PROPERTY OF SMITHFIELD. REPRODUCTION OR USE, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT AUTHORIZATION FROM SMITHFIELD HOG PRODUCTION ENGINEERING GROUP IS PROHIBITED. 9'-11.91, 7' 3' 5' P =�, I - PUMP POWECONTROL R COVER RAIN WATER TOP OUTSIDE OF DIKE fBACK EDGE OF ANCHOR TRENCH EDGE OF COVER TOP INSIDE OF DIKE COVER BALLAST PIPE Smithfield RNG DIGESTER MASTER DETAILS COVER RAIN WATER PUMP STATION LAYOUT �f J � DATE DRAWN BY: JOLMSTEADREVISIONS SCALE: N.T.S. ODA food /�0WpL COUNTY:. DATE: 2022.09.16 STATE: NC, VA SHEET: C513 n•� WAVERLY FARMS 27-30 C-503 a N N O Lo E O 0) N O N U z CD W W Q W H U) W U O Ln c c 0 U 7 c 0 U 0 Q U c L c� 0 N O N O c� ti N E m T N co ca E m u- N O N c 0) c c c m E U O WAVERLY FARMS 27-30 0 COVER p OVERFLOW PREVENTION RIM > TOD LOWEST DOOR WHERE APPLICABLE T.O.D. - BARN ELV. = A POOL LEVEL POOL LEVEL RIM EL > A NATURAL GROUND DIGESTER EXISTING LAGOON SYSTEM O O 12"CPP 8DPE DR17 HDPE BOT. DECANT PIPE MIN. 12" HDPE BOT. (VARIES) INV. = TOD - 6'-0" LEVEL CONTROL STATION BOT. BOT. LIFT STATION O � U 1 SYSTEM FLOW DIAGRAM C504 SCALE: NTS I O O COVER 0 z O w ~ w RIM > TOD T.O.D w � SLUDGE REMOVAL PIPE 8" OR 12" DR17 HDPE PIPE w EXTENT TO ABOVE TOD 2'x3' ANCHOR TRENCH FOR LINER/COVER o \ POOL LEVEL NATURAL GROUND ^� q �O TOP OF DIKE DIGESTER W N WATER LEVEL o Q � N O O � � W 8" OR 12" DR17 HDPE PIPE � q q 8" TO 12" DR17 HDPE SECURE TO CONCRETE ANCHORS TO PREVENT FLOATATION ABOVE WATER LEVEL DIGESTER BOT. od �0 MIXING STATION BOT. 0 BOT. SUCTION PIPE INV. �3� SLUDGE REMOVAL PIPE DIAGRAM MIN. 1' OFF BOTTOM C504 SCALE: NTS MIXING SYSTEM DIAGRAM C504 SCALE: NTS 0 ?A lk%lc�l WAVERLY FARMS 27-30 C-504