Loading...
HomeMy WebLinkAboutNC0044423_Fact Sheet_20230109DENR/DWQ EXPEDITED FACT SHEET - NPDES PERMIT DEVELOPMENT NPDES Permit: NCO044423 2022 Renewal This form must be completed by Permit Writers for all expedited permits which do not require full Fact Sheets. Expedited permits are generally simple 100% domestics (e.g., schools, mobile home parks, etc.) that can be administratively renewed with minor changes but can include facilities with more complex issues (Special Conditions, 303(d) listed water, toxicity testing, instream monitoring, compliance concerns). Facility and Stream Information Applicant/ Facility Name: Appalachian State University / App State WTP Applicant Address: 265 Dale Street, Boone, NC 28608 Facility Address: 800 Rainbow Trail Road, Boone, NC 28608 Facility Class Permit Status: Grade I Physical Chemical PC WPCS I Renewal Permitted Flow (as built) N/A - WTP Type of Waste 100% Industrial - filter backwash Receiving Stream Norris Branch Reservoir Stream Class / ID WS-II;Tr;HQW;CA / 10-9-7- 1 River Basin New River Subbasin 05-07-01 HUC 050500010202 USGSToo C12NW Boone 7Q10 S W cfs 0 0 to lake 30Q2 cfs - Avg. Stream Flow (cfs) - IWC (%) sum/win 100 / 100 County Watauga Regional Office WSRO Basic Information for Expedited Permit Renewal Permit Writer / Date Bradley Bennett / October 18, 2022 Does permit need daily max NH3 limits? No Does permit need TRC limits lan ua e? Yes - Already in permit Does permit have toxicity testing? Yes Does permit have Special Conditions? Yes - Tox & Schedule of Compliance Cu & Zn Does permit have instream monitoring? Yes - Turbidity, DO, Temp & Hardness Stream on 303 d List? For w/parameter? No - Mercury statewide issue only Any compliance concerns? See Compliance Discussion Any modifications since last permit? None in the application, propose connection to Town of Boone New expiration date: March 31, 2026 FACILITY OVERVIEW: The facility is a water treatment plant with a discharge of filter backwash from a low pressure membrane technology (US Filter Memcor).. The plant currently has a design potable flowrate of 2 MGD and a monthly average discharge of 0.26 MGD (when discharging). Water and wastewater treatment consists of: • Raw water pre -chlorinated • Low pressure membrane filtration • Small portion of water is backwashed • Backwash treated with Sodium Thiosulfate • Stored until suitable for discharge Discharge occurs two to four times a month. And last for a couple of hours. APPLICATION The application submitted was Short Form C - WTP. This application was submitted in September of 2020 prior to the requirement for submittal of the new EPA forms. DWR has accepted the application for the renewal given the timing and ongoing adjustments that have now led to the permittee working to remove their discharge by taking it to the Town of Boone. The application included documentation related to the permittees efforts in developing a Corrective Action Plan (CAP) for meeting limits for Cu and Zn effective January 21, 2021. The permittee argued that their data showed that their treatment process was a net remover of Cu and Zn and discharging a lower mass of metals back to the reservoir. The permittee also questioned the inclusion of turbidity limits in the previous permit since the water body is not shown as impaired for turbidity. The permittee asked for removal of the limits for these three parameters. The application did not indicate any changes in the facility or treatment since the last renewal of the permit. The WTP obtains source water from Norris Branch Reservoir and pre -chlorinates the water prior to membrane filtration. A small portion of the water is backwashed and is treated with sodium thiosulfate to start oxidation of the chlorine residual. Water then flows to a containment facility until suitable for discharge. Daily raw water withdrawal for the year before the application was shown as 233,400 gallons with average daily wastewater of 12,000 gallons. This is indicated as being discharged 2-3 times monthly for a duration of 2 hours. INSPECTION The most recent NPDES inspection occurred on November 12, 2021 and was in response to the renewal process, ongoing issues with limit violations and discussions with the permittee concerning the renewal. Regional staff conducted a site inspection of the treatment facility and also looked at potential locations the permittee and their consultant were considering for relocation of their discharge point and discussed other alternatives for compliance. At the time of the inspection the permittee was considering five (5) potential options, three (3) treatment options and two (2) options to relocate the discharge out of the reservoir. Regional Office staff noted a recent installation of a turbidity meter in the reservoir and recent sludge removal in the settling basin (this hadn't been done in a while). The region staff also discussed sampling protocol with the permittee as it appeared there was not a consistent SOP and samples were being taken in the settling basin rather than at the discharge point. Regional staff also visited a potential new outfall location at Howards Creek. COMPLIANCE: During the permit cycle this facility has had three (3) NODS and twenty-nine (29) NOVs. The violations have been largely for Copper, Zinc and Turbidity issues. Nine (9) of these notices turned into enforcement actions over the permit cycle. Total assessed amount during the permit cycle was $7,050.52 with $6,118.75 in penalties. It appears that one case from February 2022 may still have a balance due. The permittee continues to have ongoing issues especially with meeting the Copper permit limit. The Division could have likely assessed for more violations over the past year. Due to the ongoing process with the permit renewal and the permittee's efforts to removed their discharge the Division has used enforcement discretion at this time. MONITORING DATA REVIEW: Parameter Units Max Avg Permit Limit Comment, Flow (MGD) 0 0.261 0.143 N/A WTP, no flow limit Turbidity - Upstream 0.4 10.3 1.57 - Turbidity - Effluent 0.8 36.4 8.73 :510 30% of values > 10 Temp (C) - Upstream 2 25 14.75 Temp (C) - Effluent 2 25 14.32 - DO (mg/L)- Upstream 5.6 11.1 8.15 - DO (mg/L)- Effluent 2.3 11.2 6.89 >_ 6 8 values < 6 but all prior to Feb 2018 Conductivity (umhos/cm) 46 632 259 TRC (µg/L) 0.5 50 25 28 DM Nearly Y2 values > 28 but only one >50 Hardness (mg/L)- Upstr. 8.23 20.7 15.76 - Hardness (mg/L)-Effluent 0.005 56.9 19.52 - Total Cu (µg/L) 0 98.5 10.85 32 DM and 34 MA Exceedances Total Zn (µg/L) 0 744 43.42 15 DM and 15 MA Exceedances Total Ar (µg/L) 0 10 0.54 No Reasonable Potential Total Dissolved Solids m L 54 323 160 Salinity (mg/L) 0.02 1.88 0.23 pH (su) 6 9 N/A >-6 and <-9 MA -Monthly Average DM - Daily Max QA -Quarterly Average DA - Daily Average An Avg - Annual Avg. Summer -April -Oct Winter - Nov - March The data reviewed for the renewal is from March 2017 through June 2022. REVIEW OF PERMIT LIMITS. PARAMETERS OF INTEREST AND RPA ANALYSIS: Several parameters were reported in eDMR over the permit cycle with different units of measure than expected. The cover letter for the draft permit will note this and ask the permittee to assure that values reported are consistent with the units of measure in the permit. Flow - The facility discharges two to three times per month. Maximum discharge noted is 0.26 MGD. The maximum monthly average flow for the most recent three years is 0.217MGD. As noted in the WTP Permitting Guidance, this flow was used in the RPA analysis. Turbidity - The facility has had ongoing issues with turbidity values above the allowed 10 NTU. The frequency of the violations does show as decreasing over the last two years of the permit cycle. There is no indication, however, of efforts to reduce the levels. Dissolved Oxygen - DO levels less than 6 have all occurred prior to February 2018. Total Residual Chlorine - Around 30% of the values for TRC have been above the 28µg/L limit, but only one value has been at the 50 compliance level. Total Copper - Over thirty (30) daily max and monthly average limits have been violated over the last permit cycle. As noted under the inspection section, the regional office staff have talked with ASU about metals issues including adjusting their sampling protocol, but this has not changed the results and has now led to ASU working to connect their discharge to the Town of Boone. RPA evaluations using the most recent data continue to show reasonable potential for impacts form Cu levels and maintain the effluent limits for Cu at 4.0 µg/L monthly average and 5.2 µg/L daily max. Total Zinc - Fifteen (15) daily max and monthly average limits have been violated over the last permit cycle. As noted under the inspection section, the regional office staff have talked with ASU about metals issues including adjusting their sampling protocol, but this has not changed the results and has now led to ASU working to connect their discharge to the Town of Boone. RPA evaluations using the most recent data continue to show reasonable potential for impacts from Zn levels and maintain the effluent limits for Zn at 63 µg/L for monthly average and daily max. Total Arsenic - There were no monitoring violations for As during the permit cycle. RPA evaluations using the most recent data do not show reasonable potential for impact from As. The expected values for As are shown to be well below 1/z the allowable values. Arsenic monitoring has been removed from the proposed permit. Metals (Cu and Zn) - See discussion below for information on compliance with the metals' limits under the permit renewal. DISCUSSION OF PERMIT RENEWAL REVIEW Review of monitoring data and discussions with the Winston-Salem Regional Office revealed issues with the facility in meeting their permit limits for turbidity, Cu and Zn. As noted in the application discussion above, the permittee did not address potential efforts to meet the limits but instead provided information indicating that the facility was removing metals and that the turbidity limits did not apply. The permittee also questioned the use of the Division's RPA analysis for lake discharges, specifically with respect to treating those discharges as going to zero flow. This is the Division policy for lake discharges unless the permittee has developed a dilution model to provide additional information. The following outlines a timeline of information in the review process that has included multiple modification requests (all attached in the Appendix of this Fact Sheet) sent in by the permittee and their consultant as the Division's review has been ongoing. April 2021- The permittee's engineer contacted the RO in April 2021 and indicted that the facility was looking at alternatives to move their outfall out of Norris Branch Reservoir. Currently the discharge location is back into the lake in close proximity to the location of the raw water withdrawal for the WTP. May 4, 2021- Division Central Office and Regional Office staff had a conference call with the permittee and their engineering staff from Dewberry. ASU's main issue in the meeting was to discuss the possibility for moving their outfall below the reservoir to discharge into Norris Branch. DWR indicated a willingness to consider this approach but also noted that ASU needs to continue to look at alternatives that will involve treatment necessary to meet the limits for Cu, Zn and turbidity. While the move of the outfall location may help the process some, it is still likely that the limits will still be applicable. Even though ASU may be removing pollutants, their discharge back to the lake shows the potential to impact water quality and the permit conditions will reflect this. July 7, 2021- ASU submitted a Modification request to their application. The modification outlined two (2) potential options to route the discharge below the dam to Norris Branch and also two (2) treatment options - Ion Exchange and Reverse Osmosis. This modification request had received USGS low flow estimates for the location below the dam, but the USGS evaluation did not consider the impacts of the dam being in place. Division staff met with ASU staff and their consultants on September 21, 2021 and noted the concern for their discharge location really being a zero flow stream. ASU's engineering staff indicated that there was no low flow from the dam and the only flow was from overflow from the spill way. This overflow joins Norris Branch below the proposed re -location of the outfall. This option will still result in discharge to a zero -flow stream and have the same limits as discharge in the lake. Division staff summarized our discussion with the permittee and provided an email to the consultant September 28, 2021. This included encouragement for ASU to look at treatment options in addition to new locations. Division was advised that the permittee wanted to review additional alternatives and would provide another modification. October 12, 2021- DWR Winston-Salem Regional Office staff conducted a site visit at the ASU WTP. This is discussed above under Inspections. Division staff advised ASU staff on the need for changes to sampling location and protocol and also where advised that ASU was looking at another potential discharge location on Howards Creek near the University's backup water supply. This option for discharge would involve use of infrastructure currently used for emergency raw water intake and could require information and approval from the Public Water Supply staff. This was relayed to the permittee's consultant in a November 5, 2021 email. December 16, 2021 - ASU's consultant provided information on another alternative to supplement the flow in Norris Branch by pumping water from Howards Creek continuously to provide base flow. The Division's approach to evaluating low flow in a stream segment is based on natural conditions so the proposed alternative was not acceptable for additional review. February 16, 2022 - ASU submitted a renewal modification that considered alternatives for Ion Exchange treatment, Relocation of the discharge to a lower section of Norris Branch and Relocation of the Discharge to Howards Creek. ASU requested the alternative to relocate the discharge to Howards Creek. This option involved the use of the existing backup water supply infrastructure to also handle discharge of the backwash and CIP wastewater discharge. PWS staff was involve in the discussions with ASU and DWR staff to assure that there would be no concerns with the dual use of the infrastructure. DWR and PWS staff discussed this option in a conference call on June 21, 2022, and it appeared that the option could work with appropriate 0&M procedures to assure proper operation of the infrastructure. August 17, 2022 - as DWR staff where reviewing the most recent submittal and had raised additional questions about the pumped discharge to Howards Creek, ASU's consultant responded that ASU had decided to work to eliminate their discharge by tying into the Town of Boone's WWTP. Division staff asked for an official request from ASU. October 3, 2022 - ASU provided an updated renewal application modification outlining options to relocate the discharge to Norris Branch or Howards Creek and added the option of discharging to the Town of Boone. This modification requested pursuit of the option to tie into the Town of Boone. The Division agrees with the permittee's option to pursue connection to the Town of Boone. Given these efforts are under way, and look to be a good alternative, the Division (central office and regional office staff) feels that it is appropriate to reissue the permit with the Cu and Zn limits in the permit but not effective for the first two years. A compliance schedule has been added to the permit [Section A. (3.)] for ASU to either connect to the Town of Boone or comply with the permit limits. The schedule will allow ASU two years from the effective date of the permit to connect. After that time the permit limits for Cu and Zn will go back in place with the outfall at the current location and the permittee will be expected to comply the limits. The permit also requires an annual report on the status for connection to the Town or compliance with the permit limits for Cu and Zn in the first two years of the permit. FILE HISTORY REVIEW SUMMARY 1984 Waste Load Allocation (WLA) - Established for an established system designed for 0.24 MGD discharge with stream flows of: 7Q10(S) - 0.1, 7Q10(W) - 0.2 and 30Q2 - 0.3 cfs. Limits established as Monthly Average: Flow (MGD) Permitted Settleable Solids ml L TSS m L TRC µ L pH 0.24 0.1 30 3.6 6 to 9 The WLA also noted that turbidity shall not exceed 10 NTU. This WLA is noted as an original allocation but notes show that the WTP is existing. This package also includes the 1995 Staff report for permit renewal March 6, 1986 - Authorization to Construct (ATC) for addition of an alum sludge thickening tank along with piping pumps, etc. April 2, 2001 - Permit Renewal - First permit in the file. Contained Monthly Average / Daily Max limits as specified below: Flow (MGD) TSR m L Settleable Solids ml L pH N/A 30 45 0.1 0.2 6 to 9 Discharge also not to cause instream Turbidity to exceed 10 NTUs. The permit included effluent monitoring for Iron, Aluminum TRC and upstream monitoring for Turbidity. • February 3, 2006 - Letter indicating that installation of a new microfiltration and membrane technology treatment system would not require permit changes. • March 1, 2006 - Permit Renewal - Included a daily max limit of 28µg/L for TRC to become effective October 1, 2007. • September 28, 2007 Engineer's Certification for installation of a dechlorination system using sodium sulfite. • May 10, 2011 - Permit Renewal - This renewal made changes consistent with the 2009 Water Treatment Plant Permitting Strategy. This resulted in limits just for pH and TRC (28) and effluent monitoring for: Turbidity, Temperature, DO, Salinity, Conductivity, Dissolved Solids, Arsenic, Copper, Zinc, Iron, Ammonia Nitrogen and Chronic WET. February 14, 2017 - Permit Renewal - This permit renewal evaluated the data from the parameter changes in the last renewal. This resulted in the removal of monitoring for Chlorine, Total Iron and Ammonia Nitrogen. Permit limits were added for Turbidity, Dissolved Solids, Cu and Zn. The permit allowed a compliance schedule for meeting the Cu and Zn limits and also required completion of a Corrective Action Plan (CAP) for actions to meet the Cu and Zn limits. The permit also modified the WET testing requirements from Chronic to Acute and added Hardness monitoring consistent with requirements under the updated metals standards. The permit added the eDMR requirements to the permit. The permit issuance letter noted that the facility did not qualify for coverage under the NCG59 permit due to the classification of the water body (WS-II, HQW, Tr). Another significant discussion in this renewal was that the facility's discharge to a reservoir precluded them being granted any instream dilution in the RPA analysis unless the permittee completed a dilution study. April 5, 2019 - Permit Modification - This modification granted the permittee's request to extend the compliance period for turbidity by adding it to the compliance schedule for Cu and Zn. March 29, 2019 - Permittee submitted information for their Corrective Action Plan as required in the permit. PROPOSED PERMIT CHANGES: • Updated eDMR requirements to be consistent with final EPA rule. • Added regulatory citations throughout permit as needed. • The permit language in the Supplement to Permit Cover Sheet has been updated to better describe the treatment system. • eDMR Codes for Turbidity and Total Dissolved Solids have been corrected in the Effluent Limitations table. • Units of measurement have been included for all parameters in the Effluent Limitations table to help assure that data is submitted in the correct units. • Arsenic monitoring has been removed from the permit as discussed in the review of As values above. • A new Footnote #5 has been added to address Cu and Zn limits not being effective for the first two years and to refer to the Schedule of Compliance in Section A. (3.). • Section A. (3.) has been changed to a Schedule of Compliance for Cu and Zn. PROPOSED SCHEDULE FOR PERMIT ISSUANCE: Draft Permit to Public Notice: November 8, 2022 Permit Scheduled Effective Date: February 1, 2023 STATE CONTACT: If you have questions concerning the above or the attached documents, please contact Bradley Bennett at bradley.bennett@ncdenr.gov. . Bennett, Bradley From: Bennett, Bradley Sent: Monday, January 9, 2023 10:29 AM To: Gryder, Daniel Cc: Dudley, Leigh -Ann Subject: Final Issuance of Renewed NPDES Permit for ASU WTP - NC0044423 Attachments: NC0044423_Final Permit and Cover Ltr Signed_2023.pdf Mr. Gryder, The Division has finalized the permit renewal for the Appalachian State University WTP — NC0044423. The final permit is attached with this email. This permit will become effective March 1, 2023. Please continue to abide by your existing permit until that time. Please note the new conditions in the permit from your previous permit and be prepared to meet these requirements on the effective date. If you have questions about any of the conditions in the permit, please let me know and we can arrange a time to discuss. Our regional office staff will be available to you as you work through the process of connecting your discharge to the Town of Boone. Thanks for all of your help in the renewal process. Please respond to this email to verify that you received the attached permit and that you can download, open, print and save the file for your records. m Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Email: bradley.bennett@ncdenr.gov Email correspondence to and from this address may be subject to public records laws 1 STATE OF NORTH CAROLINA WATAUGA COUNTY , DEQ - DIVISION OF WATER RESOURCES 1617 Mail Service Ctr Raleigh, NC 276991617 AFFIDAVIT OF PUBLICATION Before the undersigned, a Notary Public of said County and State, duly commissioned, qualif ' d, ndautho d by w to administer oaths, personally appeared who being first duly sworn, deposes and says: that he (she) is an employee of ADAMS PUBLISHING GROUP, LLC, engaged in the publication of a newspaper known as Watauga Democrat, published in the city of BOONE in said County and State, that he (she) is authorized to make this affidavit and sworn statement; that the notice or other legal advertisement, a true copy of which is attached hereto, was published in Watauga Democrat, a newspaper meeting all of the requirements and qualifications of Secti m I-597 of the General Statues of North Carolina on the following dates: NPDES Wastewater Permit NCO044423 11/16/22 P.O. BOX 1815, BOONE, NC 28607 828-264-6397 This 17th Oay of November, 2022 Signature of person making affidavit to Ond subscPbed before rrle on this /177thnday ^offNNovember, 2022 Public Notice North Carolina Environmental Management 1617 Mail Service Center Raleigh, NC 27699-1617 Notice of Intent to Issue a NPDES Wastewater Permit NCO044423 The North Carolina Environmental Management Commission proposes to issue a NPDES wastewater discharge permit to the person(s) listed below. Written comments re- garding the proposed permit will be accepted until 30 days after the publish date of this notice. The Director of the NC Division of Water Resources (DWR) may hold a public hearing should there be -,a significant degree of oublic lniprpcfr'1A1 rnail corn- ments and/or information re- quests to DWR at the above address. Interested persons may visit the DWR at 512 N. Salisbury Street, Raleigh, NC 27604 to review the information on file. Additional information on NPDES permits and this notice may be found on our website: http !/deg nc gov/about/divi sions/water-resources/water-re- sources-permits/wastewater-bra nch/odes-wastewater/publ Ic notices or by calling (919) 707- 3601. Appalachian State University, [265 Dale Street; Boone, NC 286081 has re- quested renewal of NPDES per- mit NCO044423 for the Appalachian State University WTP, located in Watauga County. This permitted facility discharges treated filter back- wash wastewater to Norris Branch Reservoir, a class WS- Il;Tr;HQW;CA; water in the New River Basin. Some of the pa- rameters in the permit are water quality limited. This discharge may affect future allocations in this segment of Norris Branch. �11rt.�ih1��1 ti�C�IC�/Y Not Public My Commission expires: Bennett, Bradley From: Kirby, Ben Sent: Wednesday, November 16, 2022 11:24 AM To: Bennett, Bradley; Hudson, Eric Subject: RE: Draft Permit for Appalachian State University WTP - NC0044423 Attachments: NC0044423_PWS Memo_2022 Signed.pdf I attached the signed memo. Thanks, Ben Kirby, E.I. (he/him/his) Assistant Regional Engineer, Winston-Salem Regional Office Division of Water Resources, Public Water Supply Section North Carolina Department of Environmental Quality Office: (336) 776-9668 1 Cell: (336) 403-1090 ben. kirby(a ncdenr.gov 450 West Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 I 01� Q E Q �� 0-�5 Ernair coat spandence to and from Ws address is vkybd to the Monk Csm6na Pubffc Rpmnds taw and may bs cUscfoaedin IWd Vies_ From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Tuesday, November 8, 2022 8:15 AM To: Kirby, Ben <ben.kirby@ncdenr.gov>; Hudson, Eric <eric.hudson@ncdenr.gov> Subject: Draft Permit for Appalachian State University WTP - NC0044423 Ben and Eric Attached is the draft permit for the App State WTP (NC0044423). They have decided that they are going to move towards connecting this discharge to the Town of Boone. The permit gives them a compliance schedule of two years to get this done before their metals limits will go back into effect. Please review and let us know your thoughts on this one. The draft permit, PWS memo and Fact Sheet are attached for your review. The Fact Sheet is pretty large so if it doesn't come through properly let me know I can give you access to it through Laserfiche instead. Ben — not sure how much you were involved earlier on this one but at one point they were talking about discharging to another stream segment by using existing infrastructure for their secondary water supply. This is no longer the option they are looking to use. There is discussion about this in the Fact Sheet but if you need to discuss let me know and we can set up a conference call. Let me know if you have any concerns. Thanks m Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley. bennett(@ncdenr.gov z:f::fD E w , w, I iwio ='M EniaW coffesponcterica to ancf ftvn Mr-s address is €u t fo Me MANh Cgm6na PabAc F?.oG"ds Lam ard may be J!scased b third perfres. ROY COOPER 0G R Lrn or EIIZABETH S. &SER S-ei r?'W e RICHARU E_ ROCER5. JR. i rrr. Sa MEMORANDUM NORT+i CA RCLI Ali. Aff mr9mervaf QuaMy November 8, 2022 To: Eric Hudson and Ben Kirby NC DEQ / DWR / Public Water Supply Winston- Salem Regional Office From: Bradley Bennett BB Compliance and Expedited Permitting Unit Subject: Review of Draft NPDES Permit NCO044423 Appalachian State University WTP Watauga County Please indicate below your agency's position or viewpoint on the draft permit and return this form by December 8, 2022. If you have any questions on the draft permit, please contact me via e-mail [bradley.bennett@ncdenr.gov]. RESPONSE: (Check one) Fv-1Concur with the issuance of this permit provided the facility is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. F-1 Concurs with issuance of the above permit, provided the following conditions are met: 1-1 Opposes the issuance of the above permit, based on reasons stated below, or attached: Signed �; Date: 11/16/2022 opor honk [arnllrbr UrW1mrrr of Ln;v-enmemal QualIrr I LwyI5k 1 of Vpp r r HtsNffars 511 hkrmh .9"FAi 0 Mi rr1 I iW Mad Srrrkd Cm iri GArklk MipnH CaAAi MYN 1617 Bennett, Bradley From: Daniel Gryder <gryderde@appstate.edu> Sent: Tuesday, November 8, 2022 12:59 PM To: Bennett, Bradley Cc: Dudley, Leigh -Ann Subject: Re: [External] Draft NPDES Permit - Appalachian State University WTP - NC0044423 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mr. Bennett, Thank you for reaching out. We have received this email and the draft file is functional. I am sending this over my boss and our general council for review. I will be in touch shortly. Thanks, Daniel Gryder On Tue, Nov 8, 2022 at 8:01 AM Bennett, Bradley <bradley.bennett@ncdenr.gov> wrote: Mr. Gryder, Attached is a copy of your draft permit for renewal of your NPDES discharge permit for the Appalachian State University WTP (NC0044423). This draft permit will be going to public notice in a local paper later this week and will be out for comment for thirty days. Please review the draft and let us know if you have any comments. Based on the latest information from you we have drafted the permit with a compliance schedule that will give you up to two years to complete your connection to the Town of Boone. During that two year timeframe your limits for Cu and Zn will not be in effect. You will have to continue to monitor for these parameters. Please note that after two years the limits will become effective so if the connection to the Town is not achieved you should be working to assure that you can comply with the limits at that time. You should review the attached letter and permit for additional information on the process. Please respond to this email to verify that you received the attached document, can read the file, and print and download it for your use. If you have any questions, please contact me through this email. We can set up a conference call if needed. Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley. ben nett @ncdenr.gov 0 z--:�fD- E I:. i.nr"; i41F� --m**W dolt+ Eniad couospencrence to ano kum ors dress is €u t Fo ffia Madh Caru&w PablOc Raimrds Low arad may be r!sdbsed to 'bird partres. Bennett, Bradley From: Carpenter, Sydney Sent: Monday, October 24, 2022 12:16 PM To: Bennett, Bradley Subject: RE: Permit Draft for Review - ASU WTP NCO044423 Hey Bradley, Here are my comments for the draft permit for ASU WTP. They were mostly just minor typos I had some trouble with accessing OneDrive services on Friday, so I'm sorry to get these comments back to you this week instead of last week! -Expiration date font size needs to be fixed -Renewal app date should be Oct 2, 2025 -Supplement to Cover Sheet doesn't provide the normal list of facility components; however it looks like the previous version of the permit didn't either. If you have this information, maybe flesh it out a bit more? Otherwise, it highlights the most important parts, so it's not a huge issue. -On the factsheet, the facility summary states monthly avg discharge is .62 MGD, not .26 MGD -On the factsheet, there's a typo under Application section, says "wad" instead of "was" -Some very minor typos in the section that summarizes the renewal review and modification requests. I would maybe give it an extra comb -through if you have the time. Otherwise, looks good! Seems like this permit was a handful, so great job! Thanks, Sydney Carpenter (she/her) Environmental Specialist I Compliance and Expedited Permitting Unit Division of Water Resources N.C. Department of Environmental Quality Office: 919-707-3712 sydney.carp enterPncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Tuesday, October 18, 2022 3:10 PM To: Carpenter, Sydney <sydney.carpenter@ncdenr.gov> Subject: Permit Draft for Review - ASU WTP NCO044423 Hey Sydney, Congratulations and Welcome Back! A really nice welcome back isn't it that I am sending you a permit to review. The link is below. One thing to point out I guess is that these guys went through a series of modification requests to their application. In the folder I have included the original application and then all the modification requests are in an Appendix in the Fact Sheet. M NC0044423 - ASU WTP Thanks m Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley.ben nett at7.ncdenr.gov Ema# com—z ence fe and trem Ois atOeess rs sLtjed to the Abrbh Carv)f re PuWk Records Low and m py be dtsc ed fo tf ffd perms Bennett, Bradley From: Moore, Cindy Sent: Friday, October 21, 2022 8:54 AM To: Bennett, Bradley Subject: RE: Draft Permit for Review - ASU WTP - NCO044423 All looks good but can we add the email address for emailing the reports on page 4 under the A.2.?, ATForms.ATB@ncdenr.gov thx From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Wednesday, October 19, 2022 11:25 AM To: Moore, Cindy <cindy.a.moore@ncdenr.gov> Subject: Draft Permit for Review - ASU WTP - NCO044423 Hey Cindy, Here is a draft permit for Appalachian State University WTP — NC0044423. I don't know if you have anyone else you want to look at this, but if so, let me know. Thanks Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley.ben nett()ncdenr.gov Emu# coff*,V�once re and from Ibis address rs subjed to tt�e f brt CercWaa Pr rbdre cords Law -arid mom be disc used to MKd pars Bennett, Bradley From: Bennett, Bradley Sent: Wednesday, October 19, 2022 11:47 AM To: Lowery, Patricia; Graznak, Jenny Subject: RE: Draft Permit for ASU WTP - NC0044423 Thanks! Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley.ben nett(c)ncdenr.gov QE Emu# cony *,V�ence fe and from Ns address rs suhffld io tt�e Ab& CeraYna FILVrc cords Low -arid moy be drscfosed fo thwd par>ns From: Lowery, Patricia <tricia.lowery@ncdenr.gov> Sent: Wednesday, October 19, 2022 11:46 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: RE: Draft Permit for ASU WTP - NC0044423 I've reviewed the fact sheet and draft — everything looks good and will sign off once Jenny has reviewed as well. I will schedule another visit to review SOP for sampling (to ensure one is written and being followed), meet new ORC, and gather any updates. I will try to schedule this once permit becomes effective. My goal is to conduct follow up inspections annually during the 2-year compliance schedule. Additionally, the Town of Boone is due a CEI in May 2023. Only a small typo found on pg 4 of fact sheet (in red): 'October 12, 2021 — DWR Winston-Salem Regional Office staff conducted a site visit at the ASU WTP. This is discussed above under Inspections. Division staff advised ASU staff on the need for changes to sampling location and protocol and also were advised that ASU was looking at another potential discharge location on Howards Creek near the University's backup water supply. This option for discharge would involve use of infrastructure currently used for emergency raw water intake and could require information from the Public Water Supply staff. This was relayed to the permittee's consultant in a November 5, 2021 email.' Best Regards, Tricia Lowery (she/her) Environmental Specialist I, Division of Water Resources North Carolina Department of Environmental Quality Office: (336) 776-9691 1 Cell: (336) 354-2399 tricia.lowerykncdenngov Z:� E—Pd+£P'T %-AYvw *M}V rmm Iwi allrpii 1i Yirgiu i.}i'Ib From: Bennett, Bennett, Bradley <bradley. ben nett@ncdenr.gov> Sent: Tuesday, October 18, 2022 4:14 PM To: Graznak, Jenny <lenny.graznak@ncdenr.gov>; Lowery, Patricia <tricia.lowerv@ncdenr.gov> Subject: Draft Permit for ASU WTP - NCO044423 Hey Guy, I have gotten through this one (I think) and have a draft for your review. Hopefully this one can go to notice in our next batch the week of November 7th. Take a look and let me know if you have any comments. Draft Permit and Fact Sheet attached. Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality bradley.bennett(@ncdenr.gov DE :> . Q�^ ZN� Ems coffespxrdence fe and From lfus address rs sL,ih}aet fo flae Abrtr Cerv4aa FIrVk R�-. cards Law and moy be drsc used to Blvd p5rbgs Freshwater RPA - 95% Probability/95% Confidence Using Metal Translators MAXIMUM DATA POINTS = 58 REQUIRED DATA ENTRY Table 1. Project Information Facility Name WWTP/WTP Class NPDES Permit Outfall Flow, Qw (MGD) Receiving Stream HUC Number Stream Class 0 Apply WS Hardness WQC 7Q10s (cfs) 7Q10w (cfs) 301152 (cfs) QA (cfs) 1Q10s (cfs) Effluent Hardness _Upstream Hardness _Combined Hardness Chronic_ Combined Hardness Acute Data Source(s) 1 CHECK TO APPLY MODEL GG CHECK IF HQW OR ORW WQS WTP NCO044423 001 0.217 Norris Branch Reservoir 050500010202 WS-II; Tr; HOW CA 0.00 0.00 0.00 21.4 mg/L (Avg) 15.76 mg/L (Avg) -------- 25 mg/L--- ___ 25mg/L__- Par01 Par02 Par03 Par04 Par05 Par0M Par07 Par08 Par09 Par10 Par11 Par12 Par13 Par14 Par15 Par16 Par17 Par18 Par19 Par20 Par21 Par22 Par23 Par24 Table 2. Parameters of Concern Name WQs Type Chronic Modifier Acute PQL Units Arsenic Aquactic Life C 150 FW 340 ug/L Arsenic Human Health Water Supply C 10 HH/WS N/A ug/L Beryllium Aquatic Life NC 6.5 FW 65 ug/L Cadmium Aquatic Life INC 0.5899 FW 3.2396 ug/L Chlorides Aquatic Life NC 230 FW mg/L Chlorinated Phenolic Compounds Water Supply NC 1 A ug/L Total Phenolic Compounds Aquatic Life NC 300 A ug/L Chromium III Aquatic Life NC 117.7325 FW 905.0818 ug/L Chromium VI Aquatic Life NC 11 FW 16 pg/L Chromium, Total Aquatic Life NC N/A FW N/A pg/L Copper Aquatic Life INC 7.8806 FW 10.4720 ug/L Cyanide Aquatic Life NC 5 FW 22 10 ug/L Fluoride Aquatic Life NC 1,800 FW ug/L Lead Aquatic Life INC 2.9416 FW 75.4871 ug/L Mercury Aquatic Life NC 12 FW 0.5 ng/L Molybdenum Human Health NC 2000 HH ug/L Nickel Aquatic Life NC 37.2313 FW 335.2087 pg/L Nickel Water Supply NC 25.0000 WS N/A pg/L Selenium Aquatic Life NC 5 FW 56 ug/L Silver Aquatic Life NC 0.06 FW 0.2964 ug/L Zinc Aquatic Life NC 126.7335 FW 125.7052 ug/L NC0044423_Final FW RPA For Discharge to Lake_20221010, input 10/10/2022 Outfall 001 N C O044423 Freshwater RPA - 95% Probability/95% Confidence Using Metal Translators MAXIMUM DATA POINTS = 58 Qw (MGD) = 0.22 WWTP/WTP Class: WTP 1Q10S (cfs) = 0.00 1WC% @ 1Q10S = 100 7Q10S (cfs) = 0.00 rJVC% @ 7QIOS = 100 7Q10W (cfs) = 0.00 IWC% @ 7Q10W = 100 30Q2 (cfs) = 0.00 IWC% @ 30Q2 = 100 Avg. Stream Flow, QA (cfs) = NO QA DATA IW%C @ QA = N/A Receiving Stream: Norris Branch Reservoir HUC 050500010202 Stream Class: WS-II; Tr; HQW; CA Qw = 0.217 MGD YOU HAVE DESIGNATED THIS RECEIVING STREAM AS HQW OR ORW COMBINED HARDNESS (mg/L) Acute = 25 mg/L Chronic = 25 mg/L YOU HAVE DESIGNATED THIS RECEIVING STREAM AS WATER SUPPLY Effluent Hard: 0 value > 100 mg/L 21.4 mg/L (Avg) PARAMETER INC STANDARDS OR EPA CRITERIA U) REASONABLE POTENTIAL RESULTS RECOMMENDED ACTION TYPE J a Chronic Applied Acute n net. Max Pred Cw Allowable Cw Standard Acute (FW): 170.0 No RP, Predicted Max < 50% of Allowable Cw - No Arsenic C 75 FW 170 ug'L Monitoring required 24 1 18.3 Chronic (FW): 75.0 No RP, Predicted Max < 50% of Allowable Cw - No No value > Allowable Cw Monitoring required Acute: 5.24 RP shown - apply Monthly Monitoring with Limit Copper INC 3.9403 FW 5.2360 ug L 35 29 128.05 _ _ _ _ ----- _ _ ------------------------------ Chronic: 3.94 RP shown - apply Monthly Monitoring with Limit 27 values > Allowable Cw Acute: 62.9 RP shown - apply Monthly Monitoring with Limit Zinc INC 63.3667 FW 62.8526 ug/L 35 30 1,026.7 _ _ _ _ ----- _ _ ------------------------------ Chronic: 63.4 RP shown - apply Monthly Monitoring with Limit 12 values > Allowable Cw NC0044423_Final FW RPA For Discharge to Lake_20221010, rpa Page 1 of 1 10/10/2022 H1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 REASONABLE POTENTIAL ANALYSIS H2 Use "PASTE SPECIAL Effluent Hardness Values" then "COPY". Upstream Hardness Maximum data points = 58 Date Data BDL=1/2DL 8/14/2019 18.20 18.2 9/11/2019 20.80 20.8 10/8/2019 19.10 19.1 11/6/2019 30.10 30.1 12/10/2019 27.60 27.6 1/14/2020 21.20 21.2 2/12/2020 19.80 19.8 3/11 /2020 18.20 18.2 4/8/2020 19.50 19.5 4/21/2020 0.00 ERR 5/13/2020 20.20 20.2 6/10/2020 22.40 22.4 7/8/2020 17.40 17.4 8/12/2020 22.40 22.4 9/9/2020 21.50 21.5 10/14/2020 24.20 24.2 11/12/2020 25.80 25.8 12/9/2020 21.20 21.2 1 /13/2021 18.50 18.5 2/10/2021 17.70 17.7 3/10/2021 17.80 17.8 4/7/2021 17.90 17.9 5/5/2021 18.30 18.3 6/9/2021 19.70 19.7 7/14/2021 21.90 21.9 8/18/2021 21.10 21.1 9/15/2021 19.80 19.8 10/13/2021 22.00 22 11/12/2021 25.00 25 12/8/2021 2.00 2 2/9/2022 20.30 20.3 3/16/2022 21.30 21.3 4/13/2022 19.90 19.9 5/11/2022 56.90 56.9 6/8/2022 20.70 20.7 7/12/2022 18.70 18.7 Results Std Dev. 7.5089 Mean 21.4029 C.V. 0.3508 n 35 10th Per value 17.84 mg/L Average Value 21.40 mg/L Max. Value 56.90 mg/L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Date Data BDL=1/2DL 7/8/2020 8.98 8.98 8/12/2020 9.36 9.36 10/14/2020 10.80 10.8 11/12/2020 8.23 8.23 2/10/2021 17.70 17.7 5/5/2021 17.40 17.4 8/18/2021 18.10 18.1 10/27/2021 18.90 1 18.9 11 /12/2021 19.40 19.4 2/23/2022 18.70 18.7 3/16/2022 17.10 17.1 4/13/2022 19.50 19.5 5/25/2022 20.70 20.7 Use "PASTE SPECIAL Values" then "COPY". Maximum data points = 58 Results Std Dev. 4.5835 Mean 15.7592 C.V. 0.2908 n 13 10th Per value 9.06 mg/L Average Value 15.76 mg/L Max. Value 20.70 mg/L NC0044423_Final FW RPA For Discharge to Lake_20221010, data - 1 - 10/18/2022 REASONABLE POTENTIAL ANALYSIS Par01 & Par02 Arsenic Date Data BDL=1/2DL 1 6/5/2019 < 0.005 ERR 2 2/12/2020 < 0.5000 0.25 3 3/11/2020 < 0.500 0.25 4 4/8/2020 < 0.500 0.25 5 6 5/13/2020 < 0.500 0.25 7 6/10/2020 < 0.5000 0.25 8 9/9/2020 < 0.500 0.25 9 11/12/2020 < 5.000 2.5 10 12/9/2020 < 0.500 0.25 11 1/13/2021 < 0.5000 0.25 12 4/7/2021 < 0.5000 0.25 13 6/9/2021 < 0.500 0.25 14 7/14/2021 < 0.500 0.25 15 8/18/2021 < 0.5000 0.25 16 9/15/2021 < 0.500 0.25 17 10/13/2021 < 0.500 0.25 18 11/12/2021 < 5.0000 2.5 19 12/8/2021 < 5.000 2.5 20 1 /13/2022 10.000 10 21 2/9/2022 < 0.5000 0.25 22 3/16/2022 < 0.500 0.25 23 4/13/2022 < 0.500 0.25 24 5/11/2022 < 0.500 0.25 25 7/12/2022 < 0.5000 0.25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Use"PASTE SPECIAL Values" then "COPY" Maximum data points = 58 Results Std Dev. 2.1150 Mean 0.9674 C.V. 2.1863 n 23 Mult Factor = 1.83 Max. Value 10.0 ug/L Max. Pred Cw 18.3 ug/L NC0044423_Final FW RPA For Discharge to Lake_20221010, data - 2 - 10/18/2022 REASONABLE POTENTIAL ANALYSIS Pall Date Data 1 8/14/2019 < 0.50 2 9/11/2019 < 0.50 3 10/8/2019 10.00 4 11/6/2019 < 0.50 5 12/10/2019 < 0.50 6 1 /14/2020 15.00 7 2/12/2020 < 0.50 8 3/11/2020 0.50 9 4/8/2020 9.00 10 4/21 /2020 11 5/13/2020 4.00 12 6/10/2020 8.00 13 7/8/2020 4.00 14 8/12/2020 34.00 15 9/9/2020 14.00 16 10/14/2020 24.00 17 11/12/2020 27.00 18 12/9/2020 12.00 19 1 /13/2021 65.00 20 2/10/2021 26.00 21 3/10/2021 8.00 22 4/7/2021 6.00 23 5/5/2021 3.00 24 6/9/2021 9.30 25 7/14/2021 6.00 26 8/18/2021 10.00 27 9/15/2021 14.80 28 10/13/2021 4.30 29 11 /12/2021 28.00 30 12/8/2021 98.50 31 1/13/2022 5.70 32 2/9/2022 < 0.50 33 3/16/2022 9.90 34 4/13/2022 15.40 35 5/11/2022 4.20 36 7/12/2022 5.30 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Copper BDL=1/2DL Results 0.25 Std Dev. 0.25 Mean 10 C.V. 0.25 n 0.25 15 Mult Factor = 0.25 Max. Value 0.5 Max. Pred Cw 9 4 8 4 34 14 24 27 12 65 26 8 6 3 9.3 6 10 14.8 4.3 28 98.5 5.7 0.25 9.9 15.4 4.2 5.3 Use"PASTE SPECIAL Values" then "COPY" Maximum data points = 58 19.5722 13.7829 1.4200 35 1.30 98.50 ug/L 128.05 ug/L Par21 Zinc Date Data BDL=1/2DL Results 1 8/14/2019 < 0.50 0.25 Std Dev. 2 9/11/2019 < 0.50 0.25 Mean 3 10/8/2019 744.00 744 C.V. 4 11/6/2019 48.00 48 n 5 12/10/2019 < 0.50 0.25 6 1/14/2020 26.00 26 MultFactor= 7 2/12/2020 97.00 97 Max. Value 8 3/11/2020 36.00 36 Max. Pred Cw 9 4/8/2020 40.00 40 10 4/21 /2020 11 5/ 13/2020 102.00 102 12 6/10/2020 92.00 92 13 7/8/2020 73.00 73 14 8/12/2020 145.00 145 15 9/9/2020 48.00 48 16 10/14/2020 85.00 85 17 11/12/2020 68.00 68 18 12/9/2020 29.00 29 19 1/13/2021 30.00 30 20 2/10/2021 16.00 16 21 3/10/2021 2.50 2.5 22 4/7/2021 8.00 8 23 5/5/2021 2.50 2.5 24 6/9/2021 7.30 7.3 25 7/14/2021 7.00 7 26 8/18/2021 74.00 74 27 9/15/2021 48.50 48.5 28 10/13/2021 2.50 2.5 29 11/12/2021 245.00 245 30 12/8/2021 67.90 67.9 31 1 /13/2022 16.80 16.8 32 2/9/2022 < 0.50 0.25 33 3/16/2022 14.40 14.4 34 4/13/2022 20.80 20.8 35 5/11/2022 63.50 63.5 36 7/12/2022 < 0.50 0.25 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Use "PASTE SPECIAL Values" then "COPY". Maximum data points = 58 64.5986 1.9898 35 1.38 744.0 ug/L 1026.7 ug/L NC0044423_Final FW RPA For Discharge to Lake_20221010, data -3- 10/18/2022 Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Monday, October 3, 2022 3:11 PM To: Bennett, Bradley; Gryder, Daniel; Lowery, Patricia; Graznak, Jenny Subject: RE: [External] ASU WTP Revised WasteWater Discharge Outfall Relocation Memorandum CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, Let's see if this 7l OneDrive link works better. It's a big file! Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Monday, October 3, 2022 2:55 PM To: gryderde <gryderde@appstate.edu>; Lowery, Patricia <tricia.lowery@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov>; Dudley, Leigh -Ann <ldudley@Dewberry.com> Subject: RE: [External] ASU WTP Revised WasteWater Discharge Outfall Relocation Memorandum Mr. Gryder I wasn't able to open the file. It was sent as a link to the document and for some reason it would not open for me. Could you try sending it again? Thanks mm- Bradley Bennett Compliance and Expedited Permitting Division of Water Quality NC Department of Environmental Quality brad ley. ben nett()ncdenr.gov M � E wyrri�� Ema� ccnas once fe and from Ois address r.s sLtjed to the Nth CereYas FuNk cords Low and mpy be drs ad to ffiffd pprt es From: Daniel Gryder <gryderde@appstate.edu> Sent: Monday, October 3, 2022 2:45 PM To: Bennett, Bradley <bradley.ben nett@ncdenr.gov>; Lowery, Patricia <tricia.lowery@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.Rov>; Dudley, Leigh -Ann <Idudley@dewberry.com> Subject: [External] ASU WTP Revised WasteWater Discharge Outfall Relocation Memorandum CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ms. Lowery, Mr. Bennett, I hope you have been well. I am writing to follow up on our previous conversation about the wastewater discharge at the ASU Water Plant. When we last spoke I let you know that ASU was looking into the possibility of routing the plant's wastewater to the Town of Boone wastewater plant. ASU has had Dewberry evaluate the possibility of that option and they have created a revised outfall location memorandum. ASU is currently working to reach an agreement with the Town of Boone town council. If an agreement can be reached, this will likely be the most favorable alternative for ASU. Please see the memorandum attached and let me know if you have any questions or concerns. Thanks, Daniel Gryder 2022.09.28 ASU WTP Outfall Relocation.p CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. Bennett, Bradley From: Bennett, Bradley Sent: Monday, August 22, 2022 3:33 PM To: Frick, Jay Subject: RE: Update on ASU WTP Discharge Permit - NC0044423 Thanks Jay Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Email: bradlev.bennettC@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Frick, Jay <jay.frick@ncdenr.gov> Sent: Monday, August 22, 2022 1:05 PM To: Bennett, Bradley <bradley.bennett@ncdenr.gov>; Hudson, Eric <eric.hudson@ncdenr.gov>; Bass, Sarah <sarah.bass@ncdenr.gov> Subject: RE: Update on ASU WTP Discharge Permit - NC0044423 OK, Bradley. Thanks for the update. Just fyi: Sarah Bass left the agency a month or so ago. Jay Frick Technical Services Branch Head Public Water Supply Section Division of Water Resources Department of Environmental Quality 919 707 9102 office Jay.Frick@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bennett, Bradley <bradley. ben nett@ncdenr.eov> Sent: Monday, August 22, 2022 11:25 AM To: Frick, Jay <jay.frick@ncdenr.gov>; Hudson, Eric <eric.hudson@ncdenr.gov>; Bass, Sarah <sarah.bass@ncdenr.eov> Subject: Update on ASU WTP Discharge Permit - NC0044423 Hey Guys, Jut wanted to keep you updated on the process with the permit renewal for ASU WTP. We heard from their consultant last week that they are now working on the process to send their wastewater to the Town of Boone and remove this discharge. We still need verification from ASU on this and will keep you posted. Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Email: bradley.ben nett()ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Wednesday, August 17, 2022 1:52 PM To: Bennett, Bradley Subject: RE: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks Bradley. That makes sense. I've asked ASU to communicate their plans to you and the current status of discussions with Boone. Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Wednesday, August 17, 2022 1:06 PM To: Dudley, Leigh -Ann <ldudley@Dewberry.com> Subject: RE: [External] Appalachian State University WTP Question [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Leigh Ann, We would most likely reissue the permit including a time frame for the connection to be completed. Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Email: bradley.bennett(@ncdenr.gov Email correspondence to and from this address may be subject to public records laws From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Wednesday, August 17, 2022 1:04 PM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> Subject: RE: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, I'll ask ASU to provide documentation. We are currently in the initial evaluation phase (selecting a location to tie in, pipe route, etc.). I don't think they have verification yet from the Town that they can connect but I'll confirm. Would DEQ continue to administratively extend the permit while ASU pursues this option? Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley. ben nett@ncdenr.gov> Sent: Wednesday, August 17, 2022 12:45 PM To: Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: RE: [External] Appalachian State University WTP Question [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Thanks for the update Leigh -Ann. I guess information that would help us now in this process would be getting documentation from ASU that they are in fact pursuing this option. It would help if that included verification from the Town that they can connect. Thanks L3.3 Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Email: bradlev.bennettC@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Wednesday, August 17, 2022 8:52 AM To: Bennett, Bradley <bradley.ben nett@ncdenr.gov> Subject: RE: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bradley, Recently ASU has decided to pursue connection and discharge to the Town of Boone. Dewberry is currently designing the force main and pump station to connect to the town's sewer. We anticipate 12-15 months before design and construction are complete and the water plant can discharge to the Town instead of the current direct discharge. What is your recommendation for managing the NPDES permit in the interim before discharge is transferred to the Town? Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley. ben nett@ncdenr.eov> Sent: Monday, August 15, 2022 3:18 PM To: Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: RE: [External] Appalachian State University WTP Question [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hi Leigh -Ann, Just wanted to get back to you with a question. The proposed discharge to Howards Creek in Option 1 would be a pumped discharge it appears. Do you have information that would indicated the flow at the discharge point? This will be important given that Howards Creek at this location has some discharge flow limitations given it's HQW classification. Thanks mm- Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Email: bradlev. ben nettCo)ncden r.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Friday, July 8, 2022 8:42 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> Subject: FW: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, I wanted to follow up on the email below and see if you need any additional information from us at this time. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Dudley, Leigh -Ann Sent: Thursday, June 2, 2022 11:00 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> Cc: cartergal <cartergal@appstate.edu>; gryderde <gryderde@appstate.edu>; Miller, Anthony <admiller@Dewberry.com>; Frick, Jay <jay.frick@ncdenr.gov>; Hudson, Eric <eric.hudson@ncdenr.eov> Subject: FW: [External] Appalachian State University WTP Question Hey Bradley, Please see the email below from PWS regarding the proposal for dual use of the intake line from Howards Creek as an effluent discharge line as well. Please let me know if this provides the feedback you needed to continue with the review of the NPDES permit application. We will continue to work with PWS as this project progresses to make sure they have the information they need. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Frick, Jay <jay.frick@ncdenr.gov> Sent: Thursday, June 2, 2022 10:07 AM To: Dudley, Leigh -Ann <Idudley@Dewberry.com>; Hudson, Eric <eric.hudson@ncdenr.gov>; Bass, Sarah <sarah.bass@ncdenr.gov> Cc: gryderde <gryderde@appstate.edu>; Appelboom, Tim W <tim.appelboom@ncdenr.gov>; Notte, Skip <SNotte@Dewberry.com>; Sadosky, Rebecca <rebecca.sadosky@ncdenr.gov>; cartergal <cartergal@appstate.edu>; Miller, Anthony <admiller@Dewberry.com>; Sadosky, Rebecca <rebecca.sadosky@ncdenr.gov> Subject: RE: [External] Appalachian State University WTP Question [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hello Leigh -Ann, Thank you for your prompt response and the previous information you provided as we evaluated this concept. As you know, the request to designate the ASU raw water intake piping as dual purpose is unique, and we wanted to ensure that precedent and/or current engineering standards were not contrary to your proposed approach. Members of our engineering team reviewed language in 15A NCAC 18C, 10-State and AWWA Standards, and we could not find definitive language that prohibits the use of a raw water intake to serve a dual purpose. In addition, our understanding of your case -specific project includes the following: • The use of the intake line to transfer raw water from Howard's Creek to the ASU reservoir will not be hindered during the approximate "less than once every five years" frequency that the intake line is historically needed; • The water quality within the ASU reservoir may actually improve because the backwash currently being discharged directly into the reservoir will now be pumped out to Howard's Creek; • From an operational perspective, the procedures at the ASU facility and the SCADA/control system are adequate to ensure proper operation of the set up; and • The logistics and economic impact of alternative scenarios to transport the backwash discharge are complex and significantly more costly than the proposed solution. Therefore, given the arguments outlined above, we have no conceptual objection to the proposed dual use of the intake piping at the ASU facility. Because your proposed project is an anomaly, we are still discussing internally what an eventual project submittal to the PWS Section should include beyond our usual requirements (i.e., application, engineer's report, plans, and specifications). We will provide guidance to you once we have consensus on that. In the meantime, please contact me anytime if you have comments or wish to discuss further. Thank you. Jay Frick Technical Services Branch Head Public Water Supply Section Division of Water Resources Department of Environmental Quality 919 707 9102 office Jay.Frick@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dudley, Leigh -Ann [mailto:ldudley@Dewberry.com] Sent: Tuesday, May 31, 2022 8:50 AM To: Hudson, Eric <eric.hudson@ncdenr.gov> Cc: Gryder, Daniel <gryderde@appstate.edu>; Appelboom, Tim W <tim.appelboom@ncdenr.gov>; Notte, Skip <SNotte@Dewberry.com>; Sadosky, Rebecca <rebecca.sadosky@ncdenr.gov>; Frick, Jay <jay.frick@ncdenr.�ov>; cartergal <cartergal@appstate.edu>; Miller, Tony <admiller@Dewberry.com> Subject: RE: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Eric, Thank you for the questions. Below in blue are our responses. Please let me know if we can provide any additional information. How frequently and for what duration does ASU historically use its emergency intake? A related question is how frequently and for what duration will the pipe be needed to discharge the waste effluent? Obviously, only one train can be on the track at a given time. ASU historically uses the emergency intake less than once every five years. It is used very infrequently. When the emergency intake has been used, ASU indicates it has only been used for a couple days. The backwash discharge would occur daily. During the infrequent periods when the emergency intake is needed, the WTP has sufficient storage to hold the backwash for a period of several days so the pipe would only be used for a single purpose at a time. We envision possibly 2 valves at the T where the pipe splits to the intake in one direction and to the waste exhaust in the other direction. The open/close status would obviously need to be switched every time ASU changes the direction of flow in the pipe. Are there any operational concerns for this? Would it be automated? Correct, a minimum of two valves would be installed at this T intersection between the pump discharge and raw water line from Howard's Creek to the reservoir. The plant has a SCADA/control system that they use for all operations, and we would envision this system being used as a visual so it can clearly be seen which valves are open/closed. At this time, I would anticipate that the valves would be hand operated for opening and closing since the use of the raw water line is so infrequent. Is there residual waste effluent that will backflow into the reservoir as the pipe begins to carry raw water? It seems like any backflow of waste back into the reservoir would require a permit of some sort from the NPDES program. The system can include a connection to finished water or reservoir water to flush the line to Howards Creek before the intake from Howards Creek is initiated. This will ensure any effluent is discharged only to Howards Creek. The need to flush the line and reverse flow is expected to be less than once every five years based on historical use. What is the timetable/urgency for a response from the Public Water Suppl Section? Are they planning several years out? There is a sense of urgency for a response from PWS. The proposed changes impact the WTPs ability to comply with the existing NPDES permit which is currently being renewed. We would like to incorporate changes to the discharge outfall in this current permit renewal and, if approved, begin design and construction of the modifications soon. We are happy to provide information needed to address questions or concerns from PWS to facilitate your review. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Hudson, Eric <eric.hudson@ncdenr.gov> Sent: Tuesday, May 24, 2022 9:12 AM To: Dudley, Leigh -Ann <Idudley@Dewberry.com> Cc: gryderde <gryderde@appstate.edu>; Appelboom, Tim W <tim.appelboom@ncdenr.gov>; Notte, Skip <SNotte@Dewberry.com>; Sadosky, Rebecca <rebecca.sadoskv@ncdenr.gov>; Frick, Jay <jay.frick@ncdenr.gov> Subject: RE: [External] Appalachian State University WTP Question [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hello Leigh -Ann, Our central office staff have asked for additional information on this project. • How frequently and for what duration does ASU historically use its emergency intake? A related question is how frequently and for what duration will the pipe be needed to discharge the waste effluent? Obviously, only one train can be on the track at a given time. • We envision possibly 2 valves at the T where the pipe splits to the intake in one direction and to the waste exhaust in the other direction. The open/close status would obviously need to be switched every time ASU changes the direction of flow in the pipe. Are there any operational concerns for this? Would it be automated? • Is there residual waste effluent that will backflow into the reservoir as the pipe begins to carry raw water? It seems like any backflow of waste back into the reservoir would require a permit of some sort from the NPDES program. • What is the timetable/urgency for a response from the Public Water Suppl Section? Are they planning several years out? Respectfully, Eric Eric Hudson, P.E. Regional Engineering Supervisor Public Water Supply Section Department of Environmental Quality 336-776-9665 office 336-776-9797 fax Eric. HudsonCcDncdenr.gov Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Wednesday, June 1, 2022 2:02 PM To: Bennett, Bradley; Gryder, Daniel Cc: Lowery, Patricia; Graznak, Jenny Subject: RE: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report Attachments: RE: [External] Appalachian State University WTP Question CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, We received some questions from PWS last week that we responded to yesterday. Attached is that email exchange. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Wednesday, June 1, 2022 1:28 PM To: Dudley, Leigh -Ann <ldudley@Dewberry.com>; gryderde <gryderde@appstate.edu> Cc: Lowery, Patricia <tricia.lowery@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: RE: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hi Leigh -Ann, Just wanted to check in again and see if you had received response yet from the Public Water Supply staff? Thanks Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Phone: (919) 707-3629 Email: bradlev.bennett(@ncdenr.gov Email correspondence to and from this address may be subject to public records laws From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Tuesday, May 3, 2022 8:23 AM To: Bennett, Bradley <bradley.ben nett@ncdenr.gov>; Gryder, Daniel <gryderde@appstate.edu> Cc: Lowery, Patricia <tricia.lowery@ncdenr.gov>; Graznak, Jenny <ienny.graznak@ncdenr.gov> Subject: RE: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bradley, Thank you for the questions. The site changed the sampling procedure in November and have not seen a notable difference in copper or zinc concentrations in the effluent. We had a call with Public Water Supply yesterday. During the call they didn't have immediate concerns, but are going to review the information in more detail and will aim to provide a response by the end of this week. The call was with Eric Hudson, Tim Appelboom, Sarah Bass, and Jay Frick. We will share any feedback that we receive from them. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley. ben nett@ncdenr.gov> Sent: Wednesday, April 27, 2022 3:42 PM To: gryderde <gryderde@appstate.edu> Cc: Lowery, Patricia <tricia.lowery@ncdenr.gov>; Graznak, Jenny <ienny.graznak@ncdenr.gov>; Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: RE: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Mr. Gryder, Sorry I am just getting back to your February submittal. I starting to get back into the review of the material for the ASU permit renewal. As I have started review of the most recent information I have come across a few issues that I wanted to touch base on and ask for additional information. In October our Winston-Salem Regional Office staff had a site visit at your facility. One of the issues they raised at the time was proper location and procedures for sampling your effluent. I was wondering if you have implemented any sampling changes as a result of those discussions. Our regional staff noted that you indicated you had and SOP in development. Has that been completed and implemented? It is possible that addressing these issues could impact the results of monitoring for some of your pollutants of concern. It seems reasonable to address this and see what impacts changes could have. Your documents related to moving your outfall do not address and issue that we had earlier. In an email to Leigh -Ann Dudley on 11/15/2021 we mentioned that you were proposing using some of the same infrastructure that is currently in place for your secondary water supply. As such, we requested that you contact staff in the Division's Public Water Supply Section to address any potential concerns they may have with the dual use of your infrastructure. We did not see any information that addresses this issue. As we continue our review, we may have additional questions. Thank you for your attending to these issues Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradley.ben nett()ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Daniel Gryder <gryderde@appstate.edu> Sent: Wednesday, February 16, 2022 8:44 AM To: Lowery, Patricia <tricia.lowerv@ncdenr.gov>; Bennett, Bradley <bradley. bennett@ncdenr.gov> Subject: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ms. Lowery, It was good to speak with you yesterday. I hope your trip to Boone today was enjoyable. As we discussed, I have attached the wastewater discharge metals remediation evaluation report from Dewberry engineers. I have gone ahead and printed the report and will be sending it to the Raleigh office shortly to make your life easier. Thank you for all of your assistance on this project this far. Please don't hesitate to reach out to me if you require any additional information from ASU. Thanks, Daniel Gryder CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is intended only for the use of the person(s) to whom it is addressed and may contain confidential and privileged information. Any unauthorized review, use, disclosure, copying, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. Bennett, Bradley From: Daniel Gryder <gryderde@appstate.edu> Sent: Wednesday, February 16, 2022 8:44 AM To: Lowery, Patricia; Bennett, Bradley Subject: [External] ASU WTP WasteWater Discharge Metals Remediation Evaluation Report Attachments: 2022.01.26 Bench Test Results Memo.pdf; ASU Permit Modification Request Letter Signed.pdf, 2022.01.25 Discharge Outfall Alternatives Memo (1).pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ms. Lowery, It was good to speak with you yesterday. I hope your trip to Boone today was enjoyable. As we discussed, I have attached the wastewater discharge metals remediation evaluation report from Dewberry engineers. I have gone ahead and printed the report and will be sending it to the Raleigh office shortly to make your life easier. Thank you for all of your assistance on this project this far. Please don't hesitate to reach out to me if you require any additional information from ASU. Thanks, Daniel Gryder Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Thursday, January 27, 2022 8:54 AM To: Bennett, Bradley; Wall, L. Alex Cc: Graznak, Jenny Subject: RE: [External] Water Transfer CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thank you for the feedback. Additional information to support the permit renewal and modification from ASU should be submitted any day now. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Senior Project Manager D 919.424.3764 C 919.418.1727 www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Wednesday, January 26, 2022 3:25 PM To: Wall, L. Alex <Iwall@Dewberry.com> Cc: Dudley, Leigh -Ann <Idudley@Dewberry.com>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: RE: [External] Water Transfer [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all ails. Hi Alex, Sorry for the time it has taken for me to get back to you on this. We have discussed your request with regard to transferring water from Howards Creek to Norris Branch. This would not be an option that would provide any benefits in the development of the permit limits. Our rules require the development of permit limits based on the 7Q10 flow of the receiving stream. This flow is calculated based on the natural flow conditions of the surface waters of a period of time. This flow would not be impacted by any transfer of flow artificially from another water body. Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Phone: (919) 707-3629 Email: bradley.bennettC@ncdenr.gov Email correspondence to and from this address may be subject to public records laws From: Bennett, Bradley Sent: Tuesday, January 11, 2022 3:33 PM To: Wall, L. Alex <Iwall@Dewberry.com> Cc: Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: RE: [External] Water Transfer Alex, Sorry, I was out for a couple of weeks. I haven't heard back from my supervisor on this question yet, but I hope to be able to discuss it with him this week. mm- Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradlev.bennettC@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Wall, L. Alex <Iwall@Dewberry.com> Sent: Tuesday, January 11, 2022 2:16 PM To: Bennett, Bradley <bradley. ben nett@ncdenr.gov> Cc: Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: RE: [External] Water Transfer CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon Bradley, I hope you are doing well and that you have had a great New Year thus far. I wanted to follow up on the email chain below. Have you heard back about the transferring of flow from Howards Creek to Norris Branch? Warm Regards, L. Alex Wall, El Staff Engineer 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 D 919.424.3718 10 Dewberry. in V O a www.dewberry.com From: Bennett, Bradley <bradley. ben nett@ncdenr.gov> Sent: Friday, December 17, 2021 10:48 AM To: Wall, L. Alex <Iwall@Dewberry.com> Cc: Dudley, Leigh -Ann <Idudlev@Dewberry.com> Subject: Re: [External] Water Transfer Alex, I just wanted to let you know that I got your message. I will have to check with my supervisor on the question you have raised since I'm not familiar with any situation similar to this. My first impression is that this would not be an option we would allow. I will get back to you after getting more information within our group. Just so you know, my supervisor is out for the rest of the year so it will likely be the first of the year before I can respond. Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradlev.ben nettCaMcdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws From: Wall, L. Alex <Iwall@Dewberry.com> Sent: Thursday, December 16, 2021 9:14 AM To: Bennett, Bradley <bradley. ben nett@ncdenr.gov> Cc: Dudley, Leigh -Ann <Idudlev@Dewberry.com> Subject: [External] Water Transfer CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning Mr. Bennet, I work with Leigh -Ann at Dewberry. We are working through the alternatives to stay compliant with permit, in order for the client to receive internal funding for any further project we have to exhaust all potentially lower cost alternatives. An idea has been brought up by ASU that they would like us to consult with you about. Would DEQ consider letting ASU transfer water from Howards Creek to Norris Branch on a continuous basis to provide a baseline flow Norris Branch? Is there any information you would need to assess the feasibility? If it is not feasible, can you explain why? Thanks, L. Alex Wall, El Staff Engineer 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 D 919.424.3718 Dewberry - in W Q a www.dewberry.com Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Monday, November 8, 2021 11:39 AM To: Bennett, Bradley Cc: Graznak, Jenny; Lowery, Patricia; gryderde Subject: [External] RE: ASU WTP Renewal - NCO044423 Attachments: USGS response to DWR USGS Low Flows request # 2022-152 (dated 2021110101) for Norris Branch Watauga County ... RE: [EXTERNAL] Low -flow request approval CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, Thanks for checking in. Your summary is correct. We are evaluating multiple treatment options to confirm they could achieve the current low limits of copper if the discharge remains at the same location and also evaluating the new discharge location on Howards Creek. We anticipate the evaluation would be ready to submit to you in mid -December. We have requested the stream flow information for a potential point on Howards Creek and the attached is the email response from USGS. Thank you for the tip on checking with PWS on the potential dual use of infrastructure. Leigh -Ann Leigh -Ann Dudley, PE Associate, Project Manager D 919.424.3764 Dewberry. in V Q www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Friday, November 5, 2021 2:27 PM To: Dudley, Leigh -Ann <ldudley@Dewberry.com> Cc: Graznak, Jenny <jenny.graznak@ncdenr.gov>; Lowery, Patricia <tricia.lowery@ncdenr.gov> Subject: ASU WTP Renewal - NCO044423 Hi Leigh -Ann, Hope you are doing okay. I just wanted to touch base on the status of this permit renewal. At this point we understand that you are looking at alternatives, including possible discharge to another water body. Our Winston-Salem office meet onsite with ASU staff recently and it sounds as if a request has been made for flow information from the USGS for this location on Howards Creek. This is also apparently ASU's backup water supply. Once we receive the stream flow information at this location we can evaluate the potential impacts for the permit to relocate to this discharge point. We also understand that ASU is evaluating various treatment options as well to assure that permit conditions can be met on an ongoing basis. It is our understanding that if ASU moves toward the alternative to discharge to Howards Creek, they plan to use existing infrastructure for their emergency intake as a conduit for the wastewater discharge. We would recommend that you also check with Division staff in the Public Water Supply Program to address any issues that they might have with the dual use of the infrastructure. We look forward to seeing the additional information that is being prepared at this point. Please keep us informed on the status. Thanks Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradley.bennett@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. 11 /9/21, 11:02 AM Mail - Bennett, Bradley - Outlook [External] RE: ASU WTP Renewal - NCO044423 Dudley, Leigh -Ann <ldudley@Dewberry.com> Mon 11/8/2021 11:38 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> Cc: Graznak, Jenny <jenny.graznak@ncdenr.gov>; Lowery, Patricia <tricia.lowery@ncdenr.gov>; gryderde <gryderde@appstate.edu> 1 1 attachments (99 KB) USGS response to DWR USGS Low Flows request # 2022-152 (dated 2021/10/01) for Norris Branch Watauga County RE: [EXTERNAL] Low -flow request approval; CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, Thanks for checking in. Your summary is correct. We are evaluating multiple treatment options to confirm they could achieve the current low limits of copper if the discharge remains at the same location and also evaluating the new discharge location on Howards Creek. We anticipate the evaluation would be ready to submit to you in mid -December. We have requested the stream flow information for a potential point on Howards Creek and the attached is the email response from USGS. Thank you for the tip on checking with PWS on the potential dual use of infrastructure. Leigh -Ann Leigh -Ann Dudley, PE Associate, Project Manager D 919.424.3764 IP Eks'w rry- ................................................................... in V Q a www.dewberry.com From: Bennett, Bradley <brad ley. bennett@ ncden r.gov> Sent: Friday, November 5, 2021 2:27 PM To: Dudley, Leigh -Ann <Idudley@Dewberry.com> Cc: Graznak, Jenny <jenny.graznak@ncdenr.gov>; Lowery, Patricia <tricia.lowery@ncdenr.gov> Subject: ASU WTP Renewal - NCO044423 [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hi Leigh -Ann, Hope you are doing okay. I just wanted to touch base on the status of this permit renewal. At this point we understand that you are looking at alternatives, including possible discharge to another water body. Our Winston-Salem office meet onsite with ASU staff recently and it sounds as if a request has been made for flow information from the USGS for this location on Howards Creek. This is also apparently ASU's backup water supply. Once we receive the stream flow information at this location we can evaluate the potential impacts for the permit to relocate to this discharge point. We also understand that ASU is evaluating various treatment options as well to assure that permit conditions can be met on an ongoing basis. https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2El ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 1/2 11 /9/21, 11:02 AM Mail - Bennett, Bradley - Outlook It is our understanding that if ASU moves toward the alternative to discharge to Howards Creek, they plan to use existing infrastructure for their emergency intake as a conduit for the wastewater discharge. We would recommend that you also check with Division staff in the Public Water Supply Program to address any issues that they might have with the dual use of the infrastructure. We look forward to seeing the additional information that is being prepared at this point. Please keep us informed on the status. Thanks :: Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradley.bennett@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2E1 ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 2/2 11/1121, 9:55 AM Mail - Bennett, Bradley - Outlook FW: App State visit 10/12/2021 Graznak, Jenny <jenny.graznak@ncdenr.gov> Thu 10/21/2021 11:01 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> 0 6 attachments (17 MB) ASU Dam 1 jpeg; ASU Dam 2.jpeg; ASU Dam 3.jpeg; ASU Lake Outfall.jpeg; ASU Lakejpeg; Dam Equipment.jpeg; Jenny Graznak Assistant Regional Supervisor Winston Salem Regional Office Division of Water Resources Department of Environmental Quality 450 West Hanes Mill Road, Suite 300 Winston Salem NC 27105 336-776-9695 office 336-403-7388 mobile jenny.graznak@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lowery, Patricia <tricia.lowery@ncdenr.gov> Sent: Thursday, October 14, 2021 1:01 PM To: Snider, Lon <lon.snider@ncdenr.gov>; Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: App State visit 10/12/2021 Good afternoon, Here are my notes from the visit: • Considering 5 options to correct Cu/Turbidity issues. 3 are 'treatment' based and 2 are'non-treatment' based. Treatment- 1. Sulfide precipitation 2. Ion exchange ** (Daniel emphasized this is primary option right now) 3. Activated charcoal Non-Treatment- 1. Outfall relocation (away from lake) 2. Route discharge over to Howard's Creek (aka: Rich Mtn watershed - which is secondary in times of dry weather when water table is low). Primary watershed is Howard's Knob watershed which feeds Norris Branch. • Turbidity meter recently installed in reservoir. It is places midway down/midway in diameter in basin. https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2E1 ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 1/2 11/1121, 9:55 AM Mail - Bennett, Bradley - Outlook Sludge removal (from settling basin is conducted by STAT out of Lenoir. *Recently done as it has not been done is quite some time and now is scheduled to be done regularly. Discussed where and how samples are being taking. Mr. Gryder did state there was no consistent SOP (one was being constructed) in sampling techniques and sampling points. Jenny and I discussed the true effluent point is located directly at lake and that taking samples from the basin is more a 'process control' sample. Combine that with how inconsistent the operators take samples from the basin (ie: may take sample mid -level, decant from top, or at bottom of basin, etc). Mr. Gryder did state many samples were taken from bottom of basin (where things settle). • Went to dam location (Pictures are attached in email and labeled). Note: equipment (ie: pumps) is very aged and in need of repair. One pump is currently being repaired. Heavy rust was observed at location. Upgrade to dam outfall is highly recommended. Hope this helps Q Thanks, Tricia Lowery Environmental Specialist I N.C. Department of Environmental Quality Division of Water Resources Winston-Salem Regional Office 450 Hanes Mill Rd., Suite 300 Winston-Salem, NC 27105 Office: 336.776.9691 Cell: 336.354.2399 tricia.lowery@ncdenr.gov https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2E1 ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 2/2 Bennett, Bradley From: Dudley, Leigh -Ann <Idudley@Dewberry.com> Sent: Tuesday, September 28, 2021 4:08 PM To: Bennett, Bradley Cc: Graznak, Jenny; Miller, Tony; Lowery, Patricia; gryderde Subject: [External] RE: ASU Reservoir WTP Meeting Last Week CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Bradley, Thank you for following up. We are currently working on evaluating additional options including alternative discharge locations and a deeper evaluation into treatment options for copper and zinc removal. We request DEQ continue to hold on the full processing of the permit renewal application so that the results of this evaluation can be incorporated into future requested modifications. Please let us know if you have any questions, concerns, or if you need additional information. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Project Manager Water Market Segment 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 D 919.424.3764 C 919.418.1727 LICENSED PE: NC, AL in V Q o www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Tuesday, September 28, 2021 1:03 PM To: Dudley, Leigh -Ann <ldudley@Dewberry.com> Cc: Graznak, Jenny <jenny.graznak@ncdenr.gov>; Lowery, Patricia <tricia.lowery@ncdenr.gov> Subject: ASU Reservoir WTP Meeting Last Week [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Leigh -Ann, Sorry I'm just getting to this, but I wanted to follow up after our call last week with a brief summary. As we discussed, it appears that the location you are proposing to move the discharge point to would be in a location that will receive no flow since there is no minimum release from the Lake. You can still relocate the discharge to this point however, the discharge limits will be based on a zero -flow stream situation just as we are looking at in the Lake. So, the limits will be the same as at the current discharge location in the lake. As we discussed it does look like the RPA analysis using the permit DMR data from the last cycle will result in some changes to the limits for Copper that will give you a higher limit. It does appear that you will still have concerns for meeting this limit at your discharge location (either in the lake or at the new location below the dam). We would encourage you to work on evaluating potential approaches to address your compliance issues. Our regional office is available to talk with you about this and potentially meet you onsite to discuss and look at your situation. It did seem that ASU was interested in moving the outfall location in order to remove the discharge point from its current location near their inlet structure. Our understanding is that ASU wanted to go back and discuss some things a little more about the outfall location and would then get back in touch with us about your decisions. Please keep us updated on your review process and what you would like to do. ::3 Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradley.ben nett&ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Bennett, Bradley From: Graznak, Jenny Sent: Tuesday, September 28, 2021 12:50 PM To: Bennett, Bradley Subject: RE: Draft Email on ASU Reservoir WTP - Please review and comment. Attachments: ASU wastewater copper and zinc study.xlsx I think this email looks good. We just asked the ORC for the copper data they have from the reservoir. I've attached it so you can see. I am hoping that they will start looking at other options to reduce copper. I am not completely sure where it is coming from, and I'm not sure they do either. It may be in the reservoir and simply be recirculating. They need to start looking outside the box. Jenny Graznak Assistant Regional Supervisor Winston Salem Regional Office Division of Water Resources Department of Environmental Quality 450 West Hanes Mill Road, Suite 300 Winston Salem NC 27105 336-776-9695 office 336-403-7388 mobile 6enny.graznak@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Tuesday, September 28, 2021 11:26 AM To: Graznak, Jenny <jenny.graznak@ncdenr.gov> Subject: Draft Email on ASU Reservoir WTP - Please review and comment. Jenny, As we discussed last week, I have drafted a response to Legh-Ann about the call last week. Take a look at the language below and let me know if you have comments to make some of this clearer, especially as it relates to pointing out compliance concerns. Leigh -Ann, Sorry I'm just getting to this, but I wanted to follow up after our call last week with a brief summary. As we discussed, it appears that the location you are proposing to move the discharge point to would be in a location that will receive no flow since there is no minimum release from the Lake. You can still relocate the discharge to this point however the discharge limits will be based on a zero flow stream situation just as we are looking at in the Lake. So, the limits will be the same as at the current discharge location in the lake. As we discussed it does look like the RPA analysis using the permit DMR data from the last cycle will result in some changes to the limits for Copper that will give you a higher limit. It does appear that you will still have concerns for meeting this limit at your discharge location (either in the lake or at the new location below the dam). We would encourage you to work on evaluating potential approaches to address your compliance issues. Our regional office is available to talk with you about this and potentially meet you onsite to discuss and look at your situaton. It did seem that ASU was interested in moving the outfall location in order to remove the discharge point from its current location near their inlet structure. Our understanding is that ASU wanted to go back and discuss some things a little more about the outfall location and would then get back in touch with us about your decisions. Please keep us updated on your review process and what you would like to do. Bradley Bennett Compliance and Expedited Permitting Phone: (919) 707-3629 NC Division of Water Resources 1617 Mail Service Center Email: bradlev.bennettC@ncdenr.gov Raleigh, NC 27699-1617 Email correspondence to and from this address may be subject to public records laws 9/13/21, 4:57 PM Mail - Bennett, Bradley - Outlook [External] RE: ASU Flow Information Dudley, Leigh -Ann <ldudley@Dewberry.com> Mon 8/9/2021 9:13 AM To: Bennett, Bradley <bradley.bennett@ncdenr.gov> CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Bradley, Sorry for the delay in returning your call. Last week got away from me. There is no data over the dam. It isn't monitoring or controlled and water flows over the spillway based on level in the reservoir. The proposed discharge location is upstream of where the dam overflow ties into Norris Creek. Also, when considering the critical low flow 7Q10 period for limit development, the expectation is no water would be flowing over the dam. Please let me know if the absence of this data poses a concern for evaluating the discharge location downstream of the dam. Best Leigh -Ann Leigh -Ann Dudley, PE Associate, Project Manager Water Market Segment 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 D 919.424.3764 C 919.418.1727 LICENSED PE: NC, AL be, in V Q Q www.dewberry.com From: Bennett, Bradley <bradley.bennett@ncdenr.gov> Sent: Monday, August 9, 2021 8:22 AM To: Dudley, Leigh -Ann <IdAley@Dewberry.com> Subject: ASU Flow Information [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Hi Leigh -Ann, Just wanted to touch base. I returned your call and left a voicemail message about any potential data that might be available for continuous monitoring from release from the ASU dam. Let me know if you do have any data that you could provide. We can set up a meeting to discuss if we need to. https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2El ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 1/2 9/13/21, 4:57 PM Thanks Mail - Bennett, Bradley - Outlook Bradley Bennett Compliance and Expedited Permitting NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Phone: (919) 707-3629 Email: brad ley.bennett@ncdenr.gov Email correspondence to and from this address may be subject to public records laws Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. https://outlook.office365.com/mail/id/AAMkADgl YjdhZmlxLTMzMGYtNGU3Nil hNGU4LTY3M2El ODhmOGQxYgBGAAAAAACylgPJgHeWQptjfgCAO... 2/2 Appendix - Permit Application Modification Requests I. Final Modification - Received October 3, 2022 This modification was used along with the original application request in the review and drafting of the permit renewal. II. Modification Received February 16, 2022 III. Modification Received July 7, 2021 Final Modification - Received October 3, 2022 19 Dewberry DATE: January 25, 2022 Revised: September 28, 2022 TO: Mr. Daniel Gryder (Appalachian State University) FROM: Robert S. Notte, PE, LEED AP Anthony D. Miller, PE SUBJECT: Appalachian State University Water Treatment Plant — Sludge Basin Outfall Relocation Message 1.0 Introduction Appalachian State University (ASU) is submitting a major permit modification request and supporting information to move the current sludge thickener discharge outfall location. The ASU Water Treatment Plant (WTP) currently discharges backwash and CIP waste to Norris Branch Reservoir under the auspices of NPDES Permit NC0044423. The existing permit expired March 31, 2021 and ASU has applied for but has not yet received a renewed permit. The current permit has been administratively extended, and as such, ASU is submitting a permit application addendum to request a change in the discharge outfall location. The current NPDES discharge outfall is located near the WTP's intake structure in Norris Branch Reservoir. ASU desires to move the discharge outfall location. The purpose of this memorandum is to evaluate the infrastructure requirements and water quality considerations, and to provide opinion of probable costs for each alternative discharge considered. 2.0 Existing Conditions Figure 1 attached shows the WTP and the existing sludge thickener basin. The existing sludge thickener located at the WTP currently sends its discharge to the north of the site to Norris Branch Reservoir. The existing reservoir is currently used as a monitoring station and holding area. The location of the sludge thickener discharge raises concerns due to impact from the discharge on the water intake. 3.0 Proposed Improvements Proposed improvements for this project include three options to address the relocation of the existing sludge thickener basin discharge. See attached Figure 1, Figure 2, and Figure 3 for diagrams of the proposed options. The proposed options include: • Option 1: Relocate the outfall to Howards Creek in the vicinity of the ASU Howards Creek influent pump station • Option 2: Relocate the outfall to Norris Branch downstream of the reservoir and in the vicinity of Highway 194 N • Option 3: Discharge to the Town of Boone Option 1: Proposed improvements associated with this option include utilizing the existing 12" Ductile Iron Pipe (DIP) bypass and the existing 16" raw water main from Howards Creek pump station. This option would tie the existing sludge thickener outfall pipe to the existing 12" DIP bypass. Based on conversations with ASU, the condition of this existing 12" DIP bypass is unknown as it has not been used since raw water has been pulled from the reservoir. As such, it is anticipated that approximately 2,000-1-F of this existing 12" DIP will need to be investigated and potentially rehabilitated to allow it to be used for this option. ASU WTP SLUDGE BASIN OUTFALL RELOCATION 1 OF 4 The existing 12" DIP will gravity flow downstream to a proposed duplex pump station near the discharge of the 16" DIP raw water main into the Norris Branch reservoir. From the new pump station, the existing 12" DIP will transition to a force main until it tees into the 16" raw water main from Howards Creek pump station. The wet well within the proposed pump station is anticipated to be approximately 15-FT deep. Using an assumed flow rate of 1,300 GPM in the 16" DIP raw water main (approximately 2 FPS) and utilizing existing as -built drawings and information provided by ASU, a pump would need be selected to handle approximately 1,300 GPM of flow at 36.70-FT of total dynamic head. Cut sheets of the proposed pump can be found in the attachments. Preliminary pump calculations can be found on Figure 1. Additional valves will be added on the existing lines to allow for ASU to conduct routine maintenance and isolate the existing holding reservoir when the sludge thickener basin is drained. Based on the outlined approach above, the existing 16" DIP raw water main will serve two purposes; to convey flow from the sludge thickener basin to Howards Creek, and convey raw water from Howards Creek to the reservoir during drought years when the reservoir cannot fill itself. Conveyance of raw water from Howards Creek to the reservoir occurs infrequently. When it is necessary to convey raw water, the 16" DIP line will need to be fully flushed prior to conveyance of raw water from Howards Creek to the reservoir to prevent the sludge decant from entering the reservoir. To allow for the full flush of this line, a proposed finished water connection from the ASU Water Treatment Plant will need to be connected to the existing 12" DIP bypass which flows to the proposed pump station. ASU will need to discharge approximately 28,200 gallons of finished water to the pump station to complete a full flush of the 16" line to Howard Creek. Preliminary probable construction cost for Option 1 is $1,172,000. Option 2: Proposed improvements associated with this option include the installation of approximately 3,440 LF of 24" RCP to convey the discharge from the existing sludge thickener basin downstream to NC Highway 194 N. Improvements associated with this option will include limited clearing for the pipe trench, new 24" RCP, and associated manholes. The proposed 24" RCP segments will require routing through privately owned properties. It is assumed that there will be a 30-LF wide permanent easement along the routing of the new 24" RCP segments. Utilizing Watagua County GIS, a cost for easements was determined by comparing surrounding property values and property sizes. Note, this cost for easement acquisition is based on publicly available information. Easement acquisition costs may change once negotiations with property owners takes place. Preliminary probable construction cost for Option 2 is $1,661,000. Option 3: Proposed improvements associated with this option include the installation of a new suction lift pump station adjacent to the existing sludge thickening basin and discharging the backwash to an existing Town of Boone manhole located on Market Hills Road. This option would change the use of the existing sludge thickening tank to a holding tank, and utilize the proposed suction lift pump station to convey the filter backwash water to the discharge manhole with a rate that minimizes the storage of the backwash at the water treatment plant. The new suction lift pump station would be located adjacent to the current sludge thickening tank, with the discharge forcemain extending along Rainbow Trail, Wake Robin Lane, and an existing Appalachian State University utility easement, before discharging to the existing Town of Boone manhole located on Market Hills Road. The forcemain will be sized based on the allowable discharge rate of the backwash water, but for the purposes of this analysis it is assumed that this option will utilize a 6" ductile iron forcemain with a minimum flow rate of 180 gallons per minute (2 feet per second). The proposed improvements assume that the Town of Boone will require a new manhole immediately upstream of their receiving manhole for actual discharge of the forcemain, and then a small section of 8" gravity sewer. The forcemain routing will include approximately 4,400-LF of 6" pipe. At this time, it is believed that the new forcemain and gravity sewer will be routed in existing right -of way or Appalachian Utility easements, therefore, easement acquisition is not anticipated to be required for this option. itDewberry. ASU WTP SLUDGE BASIN OUTFALL RELOCATION 2 OF 4 Appalachian State University has held a preliminary discussion with the Town of Boone regarding this option and has received positive feedback regarding this new sewer connection to the Town's system. Preliminary probably construction cost for this option is $1,527,000. 4.0 Water Quality Considerations In addition to the infrastructure and project costs, Dewberry also considered the characteristics of the two receiving waters to accept the discharge for Options 1 and 2. The current discharge to Norris Branch Reservoir is to a zero -flow receiving water with a classification of WS-II, Tr, HQQ, CA. Howards Creek, discharge Option 1, is classified as Class C, Tr, HOW (Stream Index 10-1-9-(6)). The low flow statistics provided by USGS for Howards Creek indicate a drainage area of 8.26 square miles and an annual 7Q10 low flow average discharge of 2.6 cubic feet per second (cfs). The low flow statistics evaluation from USGS is provided as an attachment. Howards Creek is a much larger receiving stream than the current discharge and will have a larger assimilative capacity to receive a discharge and result in improved compliance. Norris Branch at the Option 2 discharge location is classified as Class C, Tr (Stream Index 10-1-9-7-(2)). The drainage area to the Option 2 outfall location is 0.94 square miles, significantly smaller than the drainage area to Howards Creek. The Stream Stats report for the Norris Branch discharge location is provided as an attachment. As the drainage area for the Norris Branch outfall location is only 11 % of the drainage area to Howards Creek, the 7Q10 flows are anticipated to also be significantly reduced and Dewberry did not make a request of USGS to provide flows. For Option 3, the discharge would not go directly to a surface water but would be discharged to the Town of Boone's wastewater treatment plant (WWTP) for treatment and discharge by the Town. The Town's WWTP has a permitted and constructed capacity of 4.82 million gallons per day (mgd). The maximum allowable industrial load (MAIL) remaining is 2.33 mgd, according to the allocation table included with the Town's 2021 Pretreatment Annual Report. The allocation table in the 2021 Pretreatment Annual Report also indicates significant headworks capacity remaining for copper and zinc, 4.04 Ibs/day and 8.34 Ibs/day, respectively. The Town of Boone has more than sufficient capacity available to accept the discharge from the ASU WTP and manage it effectively within their treatment system. 5.0 Conclusion Advantages of Option 1 include the reuse of existing infrastructure, a lower capital cost, and is the larger receiving water with more assimilative capacity. Option 2 would require significantly greater new infrastructure and land disturbance, would be disruptive to the neighboring community for easement acquisition and construction, has a higher capital cost, and would result in the discharge still being within a smaller receiving water. Option 3 has the advantage of eliminating direct discharge and redirecting the discharge to the Town of Boone where it will undergo additional treatment at the Town's WWTP prior to discharge. While Option 3 is not the lowest capital cost option, the alternative has other benefits to consider such as permitting with the Town instead of maintaining an NPDES permit and the available treatment capacity of the Town to accept the discharge without requiring additional pretreatment. As such, it is recommended that ASU pursue discharge to the Town of Boone (Option 3). ItDewberry, ASU WTP SLUDGE BASIN OUTFALL RELOCATION 3 OF 4 Attachments 1. Figure 1: Outfall Option 1 2. Figure 2: Outfall Option 2 3. Figure 3: Sewer Tie -In Option 3 4. Option 1 Preliminary Opinion of Probable Construction Cost 5.Option 2 Preliminary Opinion of Probable Construction Cost 6.Option 3 Preliminary Opinion of Probable Construction Cost 7. Pump Selection Cut Sheets 8. USGS Low Flow Statistics for Howards Creek 9. StreamStats Report for Norris Branch itDewberry, ASU WTP SLUDGE BASIN OUTFALL RELOCATION 4 OF 4 E A C 0 1 2 3 4 5 -- �% _ _ __� /' ` \ \\ \ \ \ \ / � / / \ \\ -_ \\\ IIII \\\ \-- \ h\ \ , / / J / i \ \ / - --- � - \ \- / /__ / / I /- \ \ 1 1 / / \ / I I \ I I / / I / \\\ \\ -_ \\ \ -/1) I / \ _I== - - / ;// / / / I / \ \\1\ I I / 1 / \ /l- r, \ // \ \ I ( I .�/ ,\\ \ \` �\\-_\ \\\\\\ \\\\� � -- / /--- - 1 PRELIMINARY PUMP STATION _\ - //, /__ s _L / �/ /I , /// / - I I \ \1 I I / \ ► \ ( l \ ` ` ' 11 \\ �\ _ -_-// '/ ==_= \�/////�' ==J - /� f //I'/ l / \ 11 I I 111\I \ \\ l 1\� / \ 1 / I \ - 1 \\/ \\\ \\ \\_ 11 \\ \ - `�\ , \\ ` -/ / '- /'� — ___-_// CALCULATIONS _ - ► i `\1\ ` \ \ ) \\� \ `' \\ 1\ - I 1 \ \`_ ;' / ; ; i -_____ � / / // ." \\ \\ \ \ / / / 1 \\ \ \\ / \. -' \ \ I \ I / -/'/�/ / I \I l\\\ \ \ / 1 / 1 \ / I - \ \\ /' \ 1 //, /i \\ \` \\\�� - \\ \ \\\\ \ \ , ///_S -_ _ _ --� FLOW CALCULATIONS o � �\\-N. - �J ) \ \ / - I \\ \\\\ \ \ \ , r l / I l \ \ , I I - \ 1 \ \\ / 1 ( I l \ \ � \ \\ \ \ \ \ / /� / / ii %' �_ _ _ � -� _ ' 1 I // \ \ - \ \ / I I 1 \ / 1 \ \ / \ \ \ \ \ \ \ \ \ \ //� \ / / // i __ _ - SLUDGE THICKENER BASIN w \ _- -\ \\ \ - / I I\ I \ \\IIII \ \ \ \ i \ \ \ - / l/ _ \ i \ / / \ \ _ - \ \ \ \ \\ \\ \ - \ I i I ' / - - _ _ _— - oN = \\ 1 \ \ ,� \ EXISTING _ I / \\ \ \ \ \ \ \ `l \ \ +�; I 1 \ l I / \ \ \ \\ \ _ - I / Z 00 \ \ \ \ I HOWARDS CREEK \ �,� \ \ \ \ \ \ \ \\ , I I � � ` ` �. 1 \\ ` / / \� \ ` '- - \ \ \\ \ \\ \ \ \ \ \ \ 11 - _ / ) I I I � //�/ _ - � � -- EXISTING CONDITIONS = 400 GPM (INFORMATION PROVIDED BY ASU) o �\ \ \ - - / / / \ \ \ \ \ I ( \ \ \\\ \ \ \ / I \ \ 1 \ \ \ / \ \ \ '� \ \ \ \ / �` - - 1 I 1 / / / � /.1 wQ .\ \\-\\\ __� \ \ \ IIII \ 1 \\ \ \- / \ \_ \\ \\ \\ / / \ \\ \ \ \ \\\ \\ - / �� / - a! `\� \� ��\�I-- / \PUMP STATION < / /� \ \ \ \ \ \ \ \ \ \ \ , \ \\ \`\ \ \ r� �///)/ / /// // "" _- \ I- - / I / \ \ \ \\ \ \ \ \ \ �I. \ / / \, - \ \\ - \ \ \__- IIII\ \ \\ \ \ \\ \ / ///// /// / --_- SCOUR FLOW = 1,300 GPM (FLOW TO ACHIEVE 2 FPS IN 16" FORCE MAIN) � \ --- - - _ \ \ _ I_ _ - - I I ) ( \\ \\\\ \ _ \ \ / / / \ \ / I _ _ - \ \ \ \ \ \ \ \ \ / / - _ //, /�,/ �/ l / �- - _ - _; Xc� ��\--= _= �� --- I---- --) \ l � / r / / / \ \ \ \ ` _ \ \� \ / \ \ ` \\_,/ \ \ 1 \ -\ \ \\ \ \ \ \\ \ \\\ \ \ / / ice/ //, / / / -_ -- - DESIGNPUMPRATE=1,3000PM 0U \\� - - --- _ \\ / 11 1 / �, / \\ \\ \ \ I\\\ / 1 \\ I , 1 / / \ \ / \ i\_� \ \ \ I /// // zz \\ - \ \\ \ / // / \ \IIII \\\ \ _ \\\ ) / / \ \\\ \ /� \ �`\--. \ \ \ IIII \\ �\ I I\ \I l / ///,/ /�/ - - /1 1// -- \ \\ \ \ \ \ �/ / / _ \ \_/ \ I I // / /// / \�_: POTENTIAL VALVE ______ -_-_ \ , I I �, / / /,/_� I \ \ \- -_--/ \ \\ I - \ \ \ \ \ \\ t \ ( 1 / / // TOTAL DYNAMIC HEAD CALCULATIONS = ASSEMBLIES AT - - / \ - _ _ \ ' \ - _ _ \ \ `- - \ \ \ '\ \\ \ \ \ \ \�' l I I // / //i / / / - _ / LL \ \ - \ \ \ \ \ \\ \\ / I 111 /// ' / / / // / / \ \ I \ / \ \ - - - ` \ \ \ ` \\IIII \ ` \ /I /) / '/ i , / / "/ �-_ - POTENTIAL NEW \\\ \ \ \�\ \ �\ / `\ \ \ \ \ \ \ \ \\ \ \ " \ / // ► /�;// / /, / / STATIC HEAD = 35.50 FT k` HOWARDS CREEK = = / _ \ \ \ � \\\ - \ \ ` \ ` --- \ \\ \\ �\ IIII\ \ \� \` l / � j// /// / / i / / // /�/// l/l l / x=-= \ DISCHARGE TO I(/ IIII\\ \ \\�_ —_-IIII \ \ \ \ \ --/ `\ \ x _ ` IIII \ \\ \\\ \\\ -�� \ Ir //'//�I1 /� / ,/ J / /// /// / /// r (� FRICTION HEAD LOSS AT DESIGN PUMP RATE = 1.19 FT (C FACTOR = 100) \ - - 33G I \ ' III \ \ \ - - \\ ,, \ \ - \ ` \ 1 \ \ `\ , \ \ _ \ \ \ \ \ \ \-'c \ \ \ \ / I I 111' l / / 1 // / / /// / / // I 1 l PUMP STATION = __ , HOWARDS CREEK 1,\ \1 \ 11I I \\\\\ _ _; \\ \`\ y_ \ ` `\ `>� \ \ \ -' \ \ \\ \ \�\ \ 1\�\\\\ 1\I ► \� 1 II(I //// ) (/ / / /// //,// ) +\ TOTAL DYNAMIC HEAD=36.70FT -\ _\ - `---. I \,,, / w \ _ ;_ \ \�` \\ ---\ \ \\ \\ \ \ `� I 1 I I I IIJ LI `\� I 0//// //// // /l /l///�// // I I :."I ` `-------- -3\� \\---------/ I o \�,\I \ \\ _ \\\ IIII`_ - \\ \� J \ 1 �___/ \`_ \� r 1 11 III 11 i/ �f I \`�/ /j/lj////// ////�� //1 //1/ // / / / / I \\ J___-- _- - — _--------/ \\�\\ ` \ // \_`- \ - \ Z -, \ I / \ \ \ \_ I 1 1 I `'/ / r \_��, �/ /(((/ / / / // I I i PUMP STATION DESIGN POINT I \ _� _ _ _ _ \� \ \ \ / � - \ - _ - \\ \\ \ \ \ I / \ \ ) / 1 / / / l l / \ \ i� //// 111 // /' , / I ( \ \ \ l / / / / \ \ \( - \ , // / /, / I - //./ / 1 111 / / // I )) I// / \ / _ \ =; -_ =----_ =3 50_ _ \ ` \ \ \-/ \ \ . � - \ , \ \ \ \ \ / //- �� / 1 /l I \ - /l /� 1 1 I / / / l ) I / / OPERATING POINT1:1,300GPM 36.70 TDH - __-_____—_ _-,� \\ / / \ \-- -__-\ \\ \ \ \. 1 ( \-'" - \ \ ,//' �/ /// r I I I \ _ -'/ / 1)///// / /////////� /// @ I\ �\ \l_ /- 3200,— IIII\\ \`-/ ' _ \\ \� \\\ \ \\ \ \ \\ \ II �j / �- // I I ( 1 - / /�- ll1 //// / / II /// //I/ 0 .\ \\ �� \ \ / /- / I \ \ / / / / /// / // / \ I - \` \ EXISTING HOWARDS \. -,, , N, 1 \\ \ \ /-'\ \\ \\ \ l r_/ l \ \ \ / I I I / / PUMP SELECTION \ / \ \\ \ \ -' \ I � \ - /i \ \\ - / \ \ / \ I I I / / I I T - , - L r / / 1 / / _r S2 \\ �� / 30\\ \ - \ \ I 1 \\ \ 1 I ( / I I IIII \ -_-- ' / i /' I \ / - \ / \ o / \ \o\ \\ \\ \ \\ / 1�1 II 11 / /-� I \ \ IIII\ / I I \1,11 III' I \ \ I ////�." / PUMP: NP 3153 MT 3- 434 \ / - \ \ \ - \ \ \\� \\ \\ \ \ I / \ _ / \ \` _ _ \ \ / \ \ \ I I \ \ CREEK \\\\\ \ S� \ /' / / I T \ \ \ I /)/'l) II I'I / /) l / / // /l1I / �/ / MOTOR: 20HP / l I \ \ I / �\ - \ _ \ %__ \ \\� \\\ \\ \ IIII \ _\ \/ , -_, \ 1 , I I I �/ I �/ ,, ) 111 I / / /�/ // // / //// // // // / I I - - - /// // I I / / / ///_ / / \ \ �/ , I \ \ \_/ \ __ --- \ \ \\\ \\ `�\ \\ ` \ \_ `L I ' //I I I 1 I / / /,_'� 1 /�,i�I/ jll �i /' / \ \ \\ \ \ //// (( I I \ /- / // /_ \_/ / \ \ `\ \\\�\ \ \\ / 1 / I / IMPELLER: 327 mm DIA. \ U \ \ / - _ \ \\ \ \�\ \ \ \ \\ I I ` \ I I \ \ \ \ T / // / / /' 1 //// / �// ' SUCTION: 6 DIA. \ — / \ ' \ ` ` / \\ \ \� \ - \ I I / 1 1 I ( ( // , / / // / / / / / / / /,/ / / / / - _ I \ \ \ \ 1 \\ \ \ \ \\ ///ii / // / / I / I // // / \ \\ / 1 I / / \ I \ \ / -\. IIII\\ `IIII \\`� \ \ \ / / / / / / / / // / / I \\ \ \ I \ \ l \ \ \ �,/ , DISCHARGE: 6" DIA. \ \ \ \ �\ \ \ \ \ I \\ \ \ ` \ _ I /' / / // / / / I l/ / // \ / \ \ \\\ \\ \ \ \\ I \ I / I \ \\ \�\ \ \ \ I _ _ / /�/ I / / // / / ` ( rl - 2� \ \ \ `\ `\\ `\ \\\ \ . 1 I I I \ \ \ \`\ \ \\` \ v\ _-T / I / _ --/,, / /// / //// //'I DUTY POINT: 1,378 GPM @ 36.8 @ 60 Hz \ ` l \ 3 \ `/ \ ` \ \ ` ` \ \ 1 \ \ \ \ \ _►- / / / "' ' / // \ \ I \ I \ \ \ \\ \ \\ . I I 1 \ \ \ \\ \ - �/ I 1` / POWER REQUIREMENT: 60 Hz - 3 PHASE 460 V \ - - \ \ /- \ \ - \�\ \ \ \ \` / / \ \ \\ \ \ I \ \ (/' / //��/ i/ )// � / / PUMP STATION LEVEL CONTROL ELEVATIONS I I 1 /► I / i % / ► - - - \ \ \ \ _ _ - - _ _ / I \ \ ` \ `\ -, �/ / / / \ \ \\ _ _ _ -' / -' \ \ \\ \1 / '' / I \ - I \ \ IIII \\\\ \ / / I / / \ \ \\\ - � -//- r7T�� 1 /44 // I TOP OF SLAB = 3450.00 (PER GIS TOPO) ' // /'/ // / / � _ - - - - `\ - - - \ \ N, _.- -/ �_ - - - _ -' \ \ \\\\ \\\ \ /\ / / / I / / \ \ ` \\ \ - _ � ///�- _ ��/ / I / / / / / \ �r\- ,- -- /_--- _ ` ` \�\\\\\ \\" \ / // I III / \ ` \ \\\ __-F__-=_r___ '�'' �'���� /1/) I/ j i- I / INLET=3444.50 1 �(,�( \ _► �/ � \ \ - _ -- - _ _-\ _ - _ \ \ \\ \ `\\\\\`\\\ \ l /l/ I I I `\ \ `\ \ __,11� _.I•-�!�'�� _=�_ /�/�j/�" j I I) I \ 1 1/ ' //' -- _ 2S\----7 T / - ---- -- \ \ \\3\S \\ J/ l// Il I 1 \ 1 -\\ - _---- _ '/�/ `'//'/' /� - / HIGH WATER ALARM = 3443.50 I I \ / / \ 3 \` / - - _ // - / / ( / / / / - \ 0 _--- \ \ \ I . \ \ / / 1\ 1 33 --- - '/ __�,-,/, // / LAG PUMP ON=3442.50 ////// \ / I / / / - \\ 325 - _ /- \ \ \ \ \\\\�/ I II 1 / \ I = � �- ----- ---- ��/i�� ____- /_ /// \ / / %' J I / / -- \ - '_ -- _ - \ '\\\ , \ IIII ` " / II ,11 ,/ --- ///�/-r=_---"// /// _ / / J \� \/ / \-/ - \ \ \ I I \\ \ \\\\� //// \ I 1 \ - __ // / / --,/ // / / LEAD PUMP ON = 3441.50 _ / / // I / \ \ \ \ -I \ / - - _ \ �' - \ \\\ \\ \ I I \ IIII " , I I I I ) I � / / - - /�/ / / ��-� //// I I I/1 ALL PUMPS OFF=3436.50 /.. _ _L - / i �\33pp\\_\ - ����_�-f-�`,. /---�� \\� \ \\ \> ��\\\//i II 11 I \J / / /' __�----- / / / // % /' F + 1 / / //, APPROXIMATE LOCATION I -\ \ -_� /' - _-\ / =- \\ \\\ \ \�'/ 1/ / / / / /\ /- _ / — ;///'; /`_-_ /✓ \ �// PUMP BENCH = 3435.50 • - I 1 - _ /' /' - \ - / _ - ' - - 1 \ \ \\Z` _ , / / OF EXISTING 2,400-LF 16 JI I /--\�►`/ ,/ / /, /-__-- - , (� I \ ,_ \`\ I \\ I Il,ll�\ \ I I I I r -- // \-\ _- ;��;%;�*;__•_-- \ \ PROPOSED WET WELL SIZE: 96 (8) DIA. RAW WATER MAIN FROM - _ - / / / 3/ / - \\ _ 1 \ \ \ \ I \ I / \ / I \ \ \ \ \\ , / / // //; r — \rt \ _ / l / ///, �� _� \ 1 1 1 / y, ,- -,\ ` // ��-- -� \\ I I � \ -- \\\ \ \` \\\ / IV ` \\`\ \� \\\_ ) \ \ \\ \ /` \- // �/ii' ! Ill///// l �` HOWARDS CREEK PUMP _ / ''-TI - / .I, \�\� ,, \\\I �� ,�_ 11\ \` \ ` I , / \\\ ,S\ \ _J \ \ \ \ ` / Div/ / �_J , 11( Ilrr , FORCE MAIN DATA .>, - �__�/ / /31k0 \ \- / / \\II\k\\ _ 1 I \ \\�\ \i \ \\ \\ \\\� - ---I \ 2 \ _ / /,/ ( 1 III \, / \ \/ / / ,/ , / \� �/ / �_ \ \ \\\__\- \ 11 \ \/ \ /\1' �\\ \ ---- ! \\_ �// - I' I IIII DIAMETER: 16 INCHES \, STATION ,- - _ �' \\ \ / // " -I " / / /,I- , \� -� / / \\\ \\ \ \\ - _ \\ \\ \ I l\Ik\ \ \ \ \ \ _ _ _ _ \ \\ IIII I \ �/ / � �� I IIII I ` _ -- �3 \ f / / �JI/// -\\\ / \\\\ \ \ \ I I \ IIII \ _ __ \ I / `'' I I I I TOTAL LENGTH-2,700LF I'^��--_ '� ----_- 3Sp�\\ l /,/i'--�\\\-_�// "I/-- \IIII \ \\ \I I\\\\\ \ - / _ \� =__ - / IIII --- ///' r .: IIII III' / _ -\-- \ \ \ \ \ \ \ i I I11 HIGH POINT ELEVATION = 3472.00' PER AS -BUILT DRAWINGS / - - - - - - = _ -� -' ' \ - \ / / / / -- --, —_ \ \`� \ \ \ - \\ \` \ \` I \ ` \ 32pb, - - - _ _ _ - - \ / \ \ _ _ /' ': ' ff , F I i I I I I I ( I / / /--�--� \\\_— 0 \ \/ _� // / I —` \ --_ _— \ \�\ \\ —\ `\ \\ \ \ \ \ \ I \ \ / 1 \ / I / \ 1 I11 VELOCITY AT PUMP RATE = 2.0 FEET/SECOND C FACTOR = 100 / - - - - _ _ \ \\ - -\�Op \ - / - \ ( // / �/ / / \` _ _ _ - _\ \ \ \` \ \ \ \\ \\ \\\ \`\ ` \ \ I \ \ \ \\\ _I/ \ \` / \ / `\ \ I III I ( ) - -- \ - J / / / / \------ \ \ - \ \ \ \ \ \ l \ \ / I I III // / / - - �-\ - - -\\ �` / -f- / / / 3500 \ \ \ \ \ I I \ \ \ \ _ — \ � I \ I I\ I I I _ / - \- \ \ \ -�- // // _\ -- - \\ - \ \ \ \ \ \ \ /� _ __ / II I II \ \ \ \\�_ .\\\�\\ � I i/ �I'I�l/ /-// i// / -\\\ \� -\ �/ _\ I / -- - , `- \\\ \ \ \\ I 1 \ \ \ \ \ _/_/ \11 / / /_ - \\ 1 \ - _-_ _ / �� \ 1 II ` -� \\ \\`- -_ 1 \ \\ I III I I 1 / / , / / �/- -IIII\\ \�'s, - - ``- \ l 1 (1 /I -\\\\\� IIII\\\ \ \ \\�1\\\\\\ \`\\ o \ \\ \ \\� / `/ _ / � / `\ -/ I 11111111\\I \\ I I I / / / I / / / �/ / _ �3 \\` EXISTING 16 LINE / I I I \ POTENTIAL VALVE \ \ \\ \ \,\ \ \\\ / I - \ - // /'% III / / _ \ \0\ - \ \� \ \\\ \\ \ \ \ \ \ \ / 1 \ \ \ \-\_�i / // / /// I r / / /� \ So I I IIII\ \\\ \\`�\\ \, \ \ \\ \ \\ \ \__ \ - %// ��� I / /'� HIGH POINT ---/ I ► ASSEMBLIES AT ���\IIII \1\ \ \ \\�' � \\� \ \� /\ , ,. \ / II I \ \ \ \ \ \ \ \ /-- \\ \ /�///I III // \ - _ 1 1 \ \ ` \ \moo\� \ � \ I I / / -IIII \\ //// /-�/ I I II�/ / / \ ` \- - - - -/ I \\\- \- \11 1\ �\ \ \\\\\ -\ \ \ \ I \ \ _ \ \ \ _ / ////-- / 1 / / 3ss _ CONNECTION POINT \ \ \ �\ \ \ I ► � I \ \` \\ , \ \\ \ - \\ \ _ 1\ \ �� \\ //i /��_--1 I I 1 / - \- / I \ \ \ 1 \1 \ \\3 \\ \ \ \ - - \ \ --__ \\\ IIII\\\\_-_=� /, _ / / _/-_\\ \ \ \ \ / _ �\ \ \ `\\ \ \ \ \ \ \ \\ \ \3S \\ \ \ \ \ \\ \ \_ - \_ / \ _ \I /'//ice=���� \� -\ -- ' // l I r1 f / l \ \\ \\ ► _�\ 1 \\�\ \____-`-1) \ \'\\ \ \\\`\ \; \\\\\\\\\ \\ \ \\\ \\\� - --\ / / // _\ \\ \ — / - J I _ - POTENTIAL NEW - - _ \ _ - _ _ _ _ �I\� \ \\� \\�3 p _ - \\\ �_ \ -\ \ �> \ /ter - \ \ \ ll I \ \\ \ \ - - - \\ \ \ \ \ \� / / 1 I \ - - \ \ \ \ �-- \ _ / - - \ \ / \ 1 / / \ - \ \ - \ \ - \ \\ \ - \ c _ �- _ ///�/ �\\\>< ��� �` _ (\\\ _// -J I ( \` ) 1 -''/ - - �- \\\ -, \ 4 - IIII \\\ - \ \ \ _ \ - _ _ // _-__- - \ \ / \\ \ —�—/ / 1 1 / — \\ \ 0_ �\\ /_— \ _� -- \ \ _ \ \ \ \�- -\ / // ` 1 A I \\ --__ �__ I \ I ,-7 - PUMP STATION - -' - ----- --��1 \\ \ , \\\\`.\\\_4_ \\ - _ -- '// /// / \ \\ \- --- r _ I ' / / ) \ / / -' .14- -:i = ilk _ �� __ ___l\\ \\ \ \I '\ 7•--- \ _--\ \ - -- _' = i_-� �- _ \ / \\ \ \ `/� / \\ \\\ \ - __ /--_� l / , �/ I —35 / / _ �� \ SS \ \ I \ __N _ \11 \ - _ \ // / \ \ \\__ ) / \ 50 / / / \`\ \ EXISTING RAW \/-- -\/ - - ?op \ /i// / / \\ \ \ -- - /'-\-/ // / �/� //r_ �- EXISTING SLUDGE BASIN ' \ \ \o \ \ - � IIII _ - \\\ / \\ \ \ �� _ / / '\ \\ ��— = \-- --- ' /// ( --' ' %/ ' �' _ _ - \\ _ _ \—J \` \\ \ `. WATER INTAKE —\"` \ -- _ �\ \\ _ _ - \ \ \ \ / /�/ --/ 1 \ IIII \ __'\ \ / \ I `\\ I �— / / / - i// I -� \ _- — \\\ \ — \ \ \ \\ \ \\\ \ \ \_— — \ \ \ \ $ \ \ \ — I 1 _ II I r /-- - \ _ - \ \ _ --- / \ - \ I ( \ \ - _ \ °o _ I / \ \ ` \ EXISTING SLUDGE _ \ \ / / / ---- - \ \ I I / I 1J \ \ _ / / / // / r \ \ _ \ --- \ \\ \ice/, Y \ 11 IIII --- \\\` < -' \- \ \ / / i ' ' /�/' � -I- ' BASIN OUTFALL \ \\ --- \ \��/i ; \_ \ \ T1 I - 1 I 11 / \\ _ _\ / \\ \ \ \- \ \ 33 \ 1 1 1 1 I I// / \� L- \ \ / / � \ \ - - \ // \ \ I 1 1.1 I //I - - \\ ` _ _-_-_-_- - _ _ \ / POTENTIAL VALVE - - �\ - \ \ �\ \\\ - \\ / // - - \\ �\ \ / I III // /i - IIII _-_ - \- -- - ___ I \ \' I \- \\ �\ \ ` \---- "� �� \ \ \ _/' -N,I 50\\\\\� �\ \ \\1 �. / \ \ I I \ \ \ — \ \ \ \ \ — \� — /\\ \ \ / �\-1 IIII / % �/ \`IIII _ --- \ \�------_ \ \\ \ \-t\�- -- -- \\ ` ` ---_ \� -- /- \ \ - \ '� - \ \ \ 1 Jam' :/- \\ \ \ 1 I I _ \ / \ / \ \ \_— \ \\ ASSEMBLIES - - \ \ \\ \ \\ ` \ // \ \ \ \ \ ------__ _\_ — -\ \ \ UPSTREAM OF \\���=�\� \\ - / 40 _ �\\ \ \` / , \ \\J / / \ \ \ \ _ \ \\- \ \ \ \ /-/"/ _\`\_,\ --_----_ -- - ---__ \\ \ \ PUMP STATION �- // \ \ ` \\� \\- `\ \\ \ \ \ \ \ \\ / \ \-_-- _ - \ _ \ \ \ \ /r \ \ \ \ \ \ \ \ I /�/ \, �-;�_�___- ---_-- \ ` \\ ` \\`IIII \ \ / / / \\ ,_\ / 11(� �_ - ___ �� \\_a / \ \� \ \\\ \\ \\ _--\ \ \ \ \ _ _ _ _ _ _ \ \ \/ / p / \ \\\ _ _ rt- \ \ \ \\ _\ \�, /, /' , I / \\` ---; \` \�\ \ APPROXIMATE LOCATION OF ` \ \ \�-f _----� `\--'' / �\ \\ ,' \ / I \I� _ _--_--__--' \ \ \ \ \ IIII I // 1 \ \ \ \ \ \\ \ \ \ I\ \� - /� \\ -\ �. \ \ \ - -� \ — \ _\ — — \ \ i /� \ \ \ IIII IIII \ \ \ \ \ / / / lI �,%/� ` J/ 1 / / / =L \ \� 1 1 \\ EXISTING 2 000-LF 12" DIP - -----_ �� _ - \ \.N \ \\ \ - \- \___ - 1 \ \ / / / /// �_\� / //-- \_� _ — \ // I/ \— \ �o\ /\ \ \_ / \ _\ �\ \ \ ----_— \ \ \ / / / -\ --___ - -� \ \ / / / \ \\- , /) � , - \ \ \ \ \ \ \\ \ _ \ / ��\ \ \ / - ///��// / --- __ IIII I I /// / 1 Il�-�\_= \ BYPASS FROM HOWARDS - _� • . , \ \\\_i�/'(-—_��-` \\\`\�/ \ \\`� \; - ��\ \I \ '/'/'/' /� ' l / , �-\ / // / / -- _ \ - �\ IIII \ \ 1 \ _- \ �3 \ _ \ \\ \ - \ -\ \ \\\ /j/ \ _ -- \ \ 1 % / / / l / / ` \ 10_< CREEK PUMP STATION _ / I� ' IIII /-_ _ - \ \` / _ \`\ _ \\ \ \ \) / /�-_ /�/ / //i // l I I I / II/I / / / I/f(// / I III I/ I / // / II\ III / // / / / / / \ \`1 / /I// / / / I 1 - / // _ -:\ \ \\ \1 \ -,� _ \ \ / _ \ \\ \ \\\ \ / / \ \ \ - / / / / / / 1 1 _� I II / \J/// // / /-�/ -\� \ �\ \\ \IIII ���--�\\\\ \\\\�__ \`�- -\___- \ \`/ c ' \ l I 1 1 \/ \ 1 r---� IIII\ \\\ �// \__-- \\ \\` `- - / '/ _ /// '/;,/ / / \ \ \ '\ / / / \ \ \ \\ /-- \ -/ \ i J ► \ 1 \ \ \ // / // / \ \ \ I / �\ 1 \ _/ /-- \ _ \ - - 1 I \ \ \\ 3\-/�� �� \\ \ --- - / / / I II / �_ J \ I► I f /�, , / __\�\ �` \\ \11 1\ \ __ _30 `� \ � _ -_ \ - / , , I I ` -\ \: gip=-/ '\ 1 \ \ — /-/ /// -\ I // / / \ �\ / \ \ I) \ �o EXISTING RAW WATER - -_\ \ _ - /'//' /_ . /__ `\\ IIII = \\_--_�_=�� \) r� - /-•\\ I l l \ / /---___ \ _ --- \ \ - 1 I / - -\ \ \ \\ 3 \ I ----- / // �-\, / I Ill/ 1 / \ / \ I / \/ / // \ \ \ / - ' _- \ -\ \ / / / \ _ // / /1 // / /- \ \\ \ III - \\x\ \ / ( - \ - IIII _/,_\ I I \ - / 1 \/ I \I I I \-/ / /' / \ \ I I / \\\ \ -a-- \ \\\ \ 1 , - \ \ \3 \ ` \ _ // I(I / �--___/ / / // / \ \ \ \ \ // l \ I/� - _ RESERVOIR - '\ \ \ \ \ \ \ \ \\ \\ \ \` .00 \ 11 \___ _ _ __-'// /i,//_ \`/ I / / / \ __/ —\� //I 1 Ij / / / / \\\ I III \ ',N �// /1—___ \\—/�\�� ---\ - \ — — `'- --_' \ ��' = \/\\\ _ \ \ 1 \— f- �` \ \ \ \ \ r IIII \\ \ \ /� /� /=ii'�// \ `, / / 1 / / / \\ / I I / / 0 \ / \ \ \ \\ \ \\ 1 \ /, \ \ / I / I \ III I - \ \\ /// \ ;��\;_ POTENTIAL FINISHED WATER ' \ - \ \ \\ , \\� \I I ( ` ` I ` "\ \\ \ �_ = _/// '\_;/ / / // / / / \\ \\\' I I / IIII 11 \ -__-� \ I'//'/i ---- - _ �_ IIII -� //-\\ \ \ \ \ i. I I \ \ _\ \\ \ I \ 1 / 1 1 I / / '\`___ /' - /- / / I // / / ( / \ \ \�� \/ I) // / /, �� \ 1 I I \ _ ` \ /,/// 3g - CONNECTION AT WATER \ \\ \ \ \ \ \\ \ \ / / / \\ - �- / . \ \\ / / / \ / L - \ \ \ \ / 1 / \ - / I 1 1 IIII\\ / / / / / // I/ -- /-_�\\ \ \\ / \ — / \_/ — — — / / / // / / - \\11 \ \ \--\\\`\_-_ ;,/ _ _ TREATMENT PLANT WITH (1)•\\ \\ `\ \\\ 1 I ,�, _ /1/ / '// / /�' <1 - �__= _ I IIII \ \ \ \ % -� \\\ \\\\�I/ / / / , \\ \ ----- \ \ , ' _-- \\ \\ \ \ I ( EXISTING NORRIS ' 1 \ 1 %1 / V / - - I I / \ \ \\ \ - \ \\ \ \� \ \ \ \ 1 I I J \ (/ / \ \\ \\\\\" //�/// / / / / \ IIII\_ _ \\ \ 1 --// ,/ ,�, / 3g00��\_ 1, �\\ \\ \__ \ \ \ \\ f /�� __/ 0 1 1 I I l ' - ___ / Y \ \ \ % \ \ / \ \ _ \ _ % / , _ _ BACKFLOW PREVENTION \\ \� \ \ \ \\ / BRANCH f/ � - \ \ � i � r , _ _ / I (\\ \ IIII\ /\ \\\ \ I/ l/I/ I I ( \`\ \ \�- \\ ' _ _ \\ \ \ _- \ I / / 1 1/ ` I / \\ \\ �\� \ IIII �\\ / r 1 I \ \ \ \ �\ �� \ / // / _- �\ ASSEMBLY AND VALVE \� \\ - \ \\ \ \ �11 \ \ ( _ \ \ \ I / / / //� _ //' / / 11/ \ I I \ \ \ \ \ \\ \I\ \I \ \\)/ I'1I\\(\ \ \ / \ �� T\�� __ '' _ - - \ \ �' \ --_�'\\ \ \ \ \ II \ 1\ \ 11 I /_/ ,\ I \ \ \, \ \ \ \\ \ \\ _ -� / /// / _-_ \\--\- \\ \\ \ IIII\\_ �\ \\\ \ \ \ ! \ \ 1 / /i / l \ li i \ \ 1 111 1 \ I \ / �- \\\ \ �\ \' \ �\ / 3950� -\\ IIII \\� -\\\ `\\`IIII\ \ \\ \ I �\ \ IIII \\�. I \ I I l I I l l/-/'/'%//l --�\ \�\1 / \ \ \ \ _ \`\ \I \\\ \ \..`.. \ \ \\\ �%/ / / // / \_ / / _ '/ \ `\ IIII \ \ I \ / \ \ / / _ \ \ \ \ \ \ / \ _ � / `l \� \ IIII \ III I III I 1 \ \\ I I 1 I \ IIII-- `\ '%/ �/ - \`� IIII \ \ IIII \ \ \ \ \ \ \\ �� / //, / // I f _ \__- _ ` \ / — I _ I \ \\ \\ \ \� IIII I I I \ / / \ ` \\ — `\` - /'/%-- --_-\ \\ \\ \ EXISTING WATER \ \ \� 1 , _ / // \ \ \\ \ \ ' 1 I \ IIII I I / \ \- \ \-- \ \� / / //- - - \ \ \\ \ \ \ IIII\ \\ \ >\ \ \\\ \ \\`''\ \ `l ( (/ I 1 l �Q \ �- \ � \\ ��� \ 1 I _ \ 1 \ 1 \ \ \ III IIIII\,(/ \ I I / / / `\ \� \�\_ /I// __ -_ _ \ -_IIII \\ \ k \` \ \\ 1 \ l \ \ \ - \ = - \ \\ /J \ \ \• 1 \ \ \ ` I I I \ \ _ _ - \ \ \ \\ \ \ \ • TREATMENT PLANT \ \ \ \ \ \ \ \ \ \ \ - _ \ \ \ — I ( / / / —4000 \ \ \ I \ � \ I \ \ I \ \ / III I 1 / --\ -\ \ \ \� /- _ - \\\\ \\l \ \� ' \ \ \ \ 1 �\ \ \ I _ - - \1- \ I►\II I/ 1 I I I�/ / / / \ \ \\ \ \ \- \ \ \\ \ \ \� / \ I / I \'\ _ _ \ . \\ \ \\ % \\ \ \ \ \ \ / - \ / \ / �--\ _ \ I I I I / , / \ \ \ \ \ / -----_ -_ \ \\ \ \ \ \ \ \ \ - \ \ s \ - \ \ / // \\`/ / \ \ - / -- I/ IIIII( ( \ 1 / \ _ - /' /' � � �\ \ \ \\ -\ \ \ \ / \\ \\ \< \ \\ S \ \\ '., \ \ \� - \ \ 1 / / \ \ \/� _ _-_ \ \ _ J \\ \\\ `- ,// // 1I I I I I , \\\`\�\ 1 r I / \ � - % /,, i --- _ \ \-\�\\\\�\\ \\ \\ \ ���� \ \ \ - \\ IIII \ \ X \ 1 I \ \ \-\\\ , _ \ _� I\ \ /- �— __� - \ •r-- \ \ \ 1 1\ ( /-\ \ \ \ // —4050 _ \ \ \� \ \ 1\ \ \ \\ , \ \\\ \\ \ \ �\ \\ \ \ o \ \ \ \\-'` / ) \ / // \ / / \ / / - \` - \ \ \ / // I I I r / 1 \ \\ \\ \ \ \ / ,--- \ \ �, ,, ��_- _-- =�_ � \� \ \\ \ \\\\,\ \\ \-_\ `��\\ \\ \\ \\ \\\ \� \ 3 \\ \ / ( IIII \ / / 1 __ I I I / 1 1 \ \ \\ \ / / / \\ \ \ \ \ \ \ \ \\ \\ \ \ \ GO l \ \ \ \ \\\ / // �/ /, \ - // , \ J \ \ � / -- \ \ I 1 / l I I \ \ l �_' \ \1 1 _ - -' \ \ \ \ \ \ \\\ \ \ _\ \ \ \ \ \\ \ \ \ \ ,,(� \ \ \ \\ \ - \ \� / - r� 1 \ i / - - \ \ \\ \ / / _ \ \ \ \ \\ _ \\ IIII\ \ \ \\� \ \ \ \\ \ \ 1 I I / \ / \ \ IIII / \ I I /// / / \ I1 / / ,�__ \ \ \\ \\ \ \_-�_- - \ \\\ \ \` \\ \\ - \ \\ \ \\ \ \ l \_ \ � \\- I \ \\ 11/ / �-� \-_ \\ \ \ \� / \\\ \\ 1 I I I / ll / / /- 1 l 1 /�/ _ _ \\ \ \ \ \ - \ \ \ \\, \ o \ .\\ \ \ 0 \ \ I �\ .l / \ \ / / / _ \ \ I \\ IIII / / ) I I // / // '/ \ \--' , / / \ \ \ \ \\\ \ \____ - \ \IIII \ \` \` \\ \\` \ \ \ \\ \ \ \ \ \ \ \ \� / / \�/ \ \\ \- III / -- \, - `,\\\\\\\` / /,. - \ \ \ \\ \ \ \ \ \ \\ \ \ \\\ `\ \\\// I I I)) I I // // / \\ _/ / / //_ - \ \ \ \ \ \\` \\ IIII\ \ \ \` ` \ ` \\. \\ \\ \ \\ \\\ \\ \ \ \\ \ \ \\\ \�\ \' \\ �\ \ \ \ I /' / I //- \�/ ////I � �\ \ III ' /' /'/'�//' / ` \ -- \ \`IIII /I I I I I ' \ \ /I/\ \\��/ /I/ \\ \ / / - \� \ \\ \\ \ I I IIII\\\\\\ `\\ II l l / / y/� \ \ , /, // ,_.---� \ \\ \, IIII\ `\\ \� \\ \�\\� \\\\\��\`\\\\\\ \\ \\\ \\ \\\\ \\\\\� \ \\\ \ \_ \�\\ - )/ \ �\ 1 // II /'/'I/ -^ IIII \\�\\11 I I \ \ / / // /'// / ' / / \ \ \ \- ' /' / /' \ ` \ \ \\ �� IIII\\ \\`\\\ ` \ \ \�� \ \ \ \�\ \`\\` \\ \\ IIII \ \ \ \ \ \\ \\ \ \� \ 1\ / _ L -/ // \\\� I I \ / / I I I Y\ \ \ / \ -� / \ \ I► II\/ / _ / / \ \ \ \ \ \ \\ \ \ \ \ \ 1 I /-- \_ - \ \ I I I \ \\ \\ \\ \\ \ \ \\ \\ \ 1 \ \ \ \ \ / I I r� I I \ / / / \ \ 1 \ \ \\ 1\ /1 / I / / / _ _ \ \ \ / / \ \ \ \ \ \ \ -\ r I I 1 / / / / \ \ I \ \ \ \ \ - / / / I ' \ \ / / / - \ � - \` \ \ \ \ \ � \ \ \ \\ \\ \ \ \ \\ IIII \ 1 1 / / \ \ \ / \\ , / / -- - \ \\_ \ IIII \ \\� \ \ \ \ \ \ \ I \ / I ► 1 // ( L �/- \\\\\ \11 \ \ I/ / ///ll � ll/ /// l l // / / -\ \ \ \ \ \/\\ \\\ \ \ \\ \ \ / , / / \ \ 11 \ \ \\ \\� \\ \\ \\ \ \ \\ \ / _-\ \I I l \ \ / y/ / % // \ \I lull I \ \ / // / / // // /'/' / -\\ \\, \ \ -\\IIII\\\ IIII\\ \ \ \\\ \ \\ \\ \ \` \\ \\\ \'k \ \ \ 1 \ - ,-- \_/ I /\\ \ /\ / / / / �- \ \ \\\ \ \\ -/ I \\\ \ \11 \ \ . - / //// /'// / / / / / , , / / / / / /--- `\ \ \ -� \� \\\ \\ \ \ \ \ \\\ \ \\\ \ \\ \\ \\\ \ \ IIII �`\\ \ \ -\ �`� /I//--��/ / \-\ _- I I 1 1 / / /_ / \ 1 ► 1 /l \ / / / - - \ \ \ \ \ \ \ \ \ \\ \ \\ \ \ / I I I l 11 \11 \ \ / /// // l//I // / / / / \\ - / �, / /// /� / �` \\ \ \\\ \ \ \ \ \\ \ \\ \\ \ \ y/ \\ \ \ \ \\ I1 I 1 1 I / /i-/ . _ / / I / 1 I I / I \ / / / / \\\ \\ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ IIII \ \\\ �� \\ �// - / 1 / / l \ \ \ / l l I l l l 1 / , / / / // /--= \ \ \ \\ \\ \ \\ \ \ \ \\ \ \\ \ \\ \\ \\\ \ \\ \,`C \� k\� /- / /-_-- \ / / I / ( \ / / // \ _ // / / l/ I 1 \ , / / / „/// _ \ \\\ \\ \\ \ �` \ \` \\ \�\\ \\ \\` \ \\\ IIII \\\� \\ \\,\\-_/ I ----/' ll // I I - \ 1 (( _ ( / / / / / / / ,/ IIII\ - - _ \ \\ II II \ \ 1 \ \ / I \\\ ' / \\\ 11 / C \ \ \ \ �/ /I/I /l / I / 1 / I l \ /, / / / ///�-_IIII \-\_ _ \ \ \`\\ \\\\ �\\\\\ \\� \� \\ \� \\ \�\\\ �I IIII \\ / I \\-�/ / --� / I/ / // // / _<-�\ \ \ \ \ \\ \ // / / I / / / / // / /-,/ /,/ IIII— -- _ \ \ \ \ \\ \ \\ \\ `\ I I \ \ —� ./ ( // \ / // ///` _ \ \\ \ \\\\ /—_ -__ \ III I\\\ ` \ \ \ \ II III I \ 1 //I \ /-- // I / //( /// _ - \\ \\ \\ / / / / / / / I \ �/ / / / ///// - _ -� \\ \ \\\ - - \ \ \\ \\\ \ \ I \\\ \ I 1 I 1 11 \-- ' //�i /�/ - �\- \ \1 \ / \ \ \ \\ \\\ / / // / / / /// / \ 11 \1 \\I I 1 -� /// ��— \�\\\�\�\ / \ —\ \ \ \ \ \� \ \ \ \ \ \ 1 / / /—__ — .\ \\\ \ \ \ / / / / / ` / / / \ -_ ,/ / / ///// // ,/'--_ �_;\����\\� \\ \\\\\\\ \\`IIII \\\ \ \ \\\ \ ` C \\ I\ 1 \�/ /// /�� \ \ \ \\\ \ \ \I \ , -�- / \ \\ \ \\ \ \\ / / / / / / / I / ( \ / / -----\`\\\ IIII \ \ \ \ \ IIII\ \\ \ \`\ \ \ \ \\ \\\ \ \ \ \ IIII\\ \ 1 / // \ - 1 / / / ---- \ \ / / / / / , / / / /i / , , _ \ -IIII\\ \\ \\ \ \ �` \� IIII`\ \` \\\`\\ \ \ \\`\ \\k \\\\\\\ \\\ \ \\\\\�` ,/// //-\� -- , -� \ \ \ \ I / ((( / /// /\ -\\ \\ \ \ \ / \ \ \. \\ \ \ // // /// / / / / 1 / / // / ///// / - IIII \ \\ \ \\ \ �\ \ \ \ \�\\ , - \ \ \ \ \ \ \ \\ \\\ \\ I // \\\ \ <—_ -/\\ \\\\\ \ l/ T // ---- \ .\ \ I I \ \\ \\--'/ / / / / / / / / / // / \\\\\\\\\ \ \ \ \\ \ \ \\ \\ IIII \ \ �\\\\ I //� // \ l \ 11 I \ \ / I / / , / /' --- \ l \ -- ///'/ / / / I / / / l / T // ��__ \�\`�� \ IIII\ \1\ \ \\ \� \ \ \ \ \ \ \\ \\�y\ \\ \\\\`\\\ \\ 111 -/ / \\\ \\ / \ \ I \ I / I / -- \ \ \III\ ` / f / I \ I \\ / / // / I / / y /I / ' / / /�/ / / �\ \ \ \\\ \ \ \\ \ \ \ \ \ / \ / \ / / I J \ \ \ \ 1 1 ) ►,IIII\ \\ \ 1 \II1 rr / /, \ \\ . \ \ \ 1 I► T I , / / _ \ \ I 1 \ \ \\--/ // / / / / / / / / �---". \\ \\ IIII \ \ \\) 1 1 1 )/\ \� / // / 1 / / /��//i 11 \\\ \ III \\ ( \ \ \\ - 1 1 I l / / / I / \ \ I 1 -III I / 1 _ / , / / // // 1 //\ / I / ' 1 ) / 1 \\ III I I 1 \\ \\ \ 11 \ \ , / / I'i/ , / , / / /,// 1 \ \ \ \ \ \ \ \\ 1 I l / I / l / _ 1 1 I I I - \\ l/ I./, \\\ ) // , , / /// / , / ///// 1 \ \ I III \ !\ \ \ / / / / / / / /% / I / / i' / ' \ 1 1 T \\ \ i1 / /, / / / / / / \ //ice/ // /ice///�i- , , '' ////�_/lI \\ I111111 \\ \ \ / �\\ / I l l /, / / /' /' / _-- I f / �// \\ I / l / ll I /I l / / / / / -�` \ \\\\ I///,// / / �/i //i/ /i/ %// ,- ,- - /i'�iii'ii===/ //1�//// // I 1 \\ \ (-_//=� _\ \ \ \ \\\\�_ /'/ / 1/ / // -- / / / / _ \ 1 Il l �--� \ \\\ I / 1 \ \ \\ \ / ///�i i/, //// // // - - // / / /�'/ �/ / //J/ I \ 1 \ \\\� /-, / 1'1 1 I I I I f / / / - \ 1 1 I 1 I \ \ / / / / /�- `� / / \ \\ \ \ \ I / ( l I I' I l / 1 1 / / //� \ \ )/I/ //i�//��/ //ii/ // // /iii %� // ////// ��ii'/i//%�'////�,�//ice / //1 \ II i�-z--\ \ \\ \ / / 1' I \ (/ _/ I I _ \ \\\ \` \ / - - / - \ \ \l / / \ \1// /// �/� / / _ _ / / / III // \ " I \ \ '", / , // ��/ //� /_-- -//// / I I I III �- \ \ --- / \ \ / I I / IIII\ \/ - / - \ \ \\ \ \ -\\ ` ,\ �\ \ 1 \ \ I \ \ \ I 1 I r I \) I //�/�/ //////'/� / /// //�///�////// / // ��/i/��i'//// //' ///� '/// ////�/i//�/ ( \\\ \\\ \ , T// , // / / /� \ \ ( / l l l / \ \\_, _ / /. �/ \ \\ \ /-_ a \ \ - \ I _ / / // // /// /// //// // // // //- / _-__/ /i/ I I IIII / / \ \ \ \ \ - _ / / / - ) \ \ I / \ 1 / -\\ \ \ \ I / // / / // / // / /// / / / / / _i I) \ \ -'/ _ /—_\ _ \� \ \ \ \\ \� /_ �_ \\\_� \\\ \ l— / / // / / / /// / �/ / i_ \ / \ \ 1 \ \ 1/.�.���/�/. /_/„ /��/�_, , _ _%�/ /� �� IL/��,=�i�.���//�/_ /��II�IIII I1 \ \ 1 I \ \ \ '/I- �� //� �\ _I I I I I / I I //III I / \ \ ��� _. rgiHoi ��•_•�� Dewberr Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z O Q �ZU - O ct -W, 0- w � 0 Q z J 0 z z W J (j 2 LL >. U ct W ~ cr r�� � Q D - z �' LLJ O 00 z o Z Q O LL ] m L.L W M W Q W 5 0 D ��_j U) SEAL KEY PLAN SCALE: 0' 300' 600' SCALE: 1" = 300' REVISIONS No. I DATE I BY I Description DRAWN BY JGL APPROVED BY RSN CHECKED BY RSN DATE JANUARY 25, 2022 TITLE OUTFALL OPTION 1 DEI PROJECT NO: 50140792 SHEET NO. FIGURE 1 E C 0 W 1 2 3 4 5 `__/ / /- \ / I I I / / / / / I I \ \ \ / — — --- / J i / \\ \ \ \ I / \ / / / \ \- \\\ \\\\ \ \ / \ II / / III \\\ \___/ / �- =1-- _ / // // / I /� \\\1 \ \ 1 \ / / I I \\ / I1 / l I /� \\\ \\ �_� \\ \\\\ \\\\ _--�11 II _--- - 1 \ - // \ \- / / / \ \\ _ _-ii -// / / / I / \ \ 1 I I 1 / I \ / \\ 'c \\ / / - -_--- / /_- I I II II / / I 1 - �� / 1 \ 1 I I �.� y / I \ _ � �'I \ ( ( I .�-/ /\\ \ \\ �\\-- \ \ � /' �_ —_� / \ J III ( I Ill \\\ \\ // �'��'_ =//-i- // / �/ /� \ I I I I \ ( ' '1/ 1 �- �/1 \ �// \\\\ \ C ( \ \ /,- 11\ \ \\ �\\ \\ \\\\ \\ �-1 / � � // --- _ \ / ,mil / //-\� __/ \( ll 1111 1I I 1 \ \\\ \ //// --_J __- / / / l I �/ \\\ \\ \ \ \ \ \\ \\ - --- -/// // // 1/ / // III`I\I \ - l \ \ / \ 1 / \ �1 / \ \ \ / / _ _ / \ \\ \\\\\\l 1 1 �-// // _ _ --_% --� / I I\\ I \ \ \\\ \ I \ I / / / \ \ /� \ \ \ \ \- / I \ --_ \\ \\ \\ \ //// ///-_______ '�;_ _-/ �- / \ \\\\\\\\��"I \`\\\�- \\_/-/ / / / I \ \\ \\\\ 1 \ I r\ I 1 / 1 \ 1 \\\ \\ \\ \ / - _- / ^. /� \\\\ \ \\\ �\ ` \ i__l I / l ' - / _ \ \\\ \ \ / I I I II J/ 1 �_ \\ \/ I / I I \\/ \\ \I\ \ \- -, \ \�\ \ \ \--' \\\ '/ %/%�/'��5� -ice -�/ � \ '�\ \\\\ \ \ \ \ \`- \\� 1 \ I \ ( / /� / / I \ I l \ \ / 1 ) 1 \ / I \ , / // \\ \ \ \ .� - \\ \ \ \\\ \ ./ /i /�S -- _ _-/- o-- \\�\ \ \ � ���� \ -/1 I I I \ \\ \ \ I / / 1 I / 1 \ / 1 \ \ / \ \ \ \ /-- �\\'- \ \ i / ' / \\ \ \ ) \ EXISTING _ - / \ \ ( ►� \'� - I I I \ 1 II \ ,' \ \ �\ \ �- \ \ \ \ \ \ \ - I I wN \ \ �\\\\ \\\\\\\_ __ \" \ I \ \ / \ \ \\ \ \\ \ \ I \ \ \ \ \ �_� I - I \ \/ \\ \ -� \ \\\ \\\\ \ / - �/ I I f / / _ / \ _ \\ \ - -\ \ \ 1 \ \ \ \ \ I Za I 1 / I / / \\\ \ \\ \\\ \\ \\ _-\ _ _ -/ - I HOWARDS CREEK \ \'`� \\ I \ \\ --� _ (/ / - _= /, / \ w r -� \ \\ \ _ \\ \ / // \ \ \ \ \ / I \ \ \ \ \ \ \ - II _ 1 I \\\ \ \\ \\ \\- \ 0` 'i ' 4' \\`��\�\ \\\\__�`�-; ��1-- \ PUMP STATION 1 /� / h \\\\ \\\ �\ \ \ \ \\ \ ' ` / / \ 1 \\ \` �� I \ \ \ \\ \ \\\ \\ \\ ! __ /J/ ) / - - _ \ \ \ \ \ \ \\ / / /i — �� \> ---- ' l \\ \�\ \\\\ ��� \\� — I_-__ , , , / /' \\ \\ \ \\ \ \ I\\\ \ mil.\ / / \ \ \� \ \ \ \ \\ \ \\`\\\ \ \ \ , / / / % /,//, '/ — \ / \ \\ \ I \ \ I 1 / \ \ / \ % \ I / // / - \\ \� - _ \ \\\ / / / \ 1\ 111\ \ \ \ \\ / / \ \� \\_//�\ -�_ \ \\ \\ \ \} \ I 111 I / //%///i�%/%i// 1 // �\ \ / / \\\\\\\��� — l / I1 / // _/ \\ (I\l \\\ \�-----/ \\\\ 1 /- - I \\ \\\ \\ \ \\ \\`�-_e;: \\ \\\�\ �\ \,,1 1 II if/, /�i�///�/�/��l ///�__= _\_- - \ / / / N, " \/_ -- \, -- _ // / / \\\,\,\�\\\ \� \ \ \ - _--\ _ \ \ � \ \ \ \\ \ / III 1 ///// /��/ �/ /Z/ __ \ \ \\ \ / I %/ /// / / // /- _ \\ \ \ _ _ / 1 \ \ - \ \ \ \ \ \ \\ / I _ _ _ __ _ _ __ __ ____ \ 1 \ \-- _ \ \ \ _ --_ \ \ \ \ \, \ / / / \ \ _ _ \ — \ \ ----- _ / f \\ \� \ \ \ \ —\ \ \\\\ \ \ \ / /) / / // / I _ \ \ \\ \ \ / / -I ` \�\ \-` _ �-__ - -�330\ -____ --� 11 \I \ ' IIII \ \ \�-----\ \\ \\ �� \ \ \\ /� 1 \\ `\\/ \ \ \ \\ \\\-�c\�\'�� \ \ III ///// /l / / /// /i//// / I 1 \ \ 1 \\ i , ^\ - \\\\\ ��— \\ _ J \ \ 1 ( \ 11 \\ \ \ _ \ \ \ \ \ \\ �-- \ �c __ \ \� \ \ \ \ \ III / / / / / /- ( --_ _ _ 1 / \ \ � \ \ \ \ \ _ - '\ \ \ \ \ \ / ( / 111 / / / / / // ////l \ 1I I \ �r ` / \ - _ /--_ \p --� } 1\ \ I I - \ \\\ \ > \ \ \ T-� \ \ 1 I 1\ 1 �� \I \ I 11/l//// I/ / /l /l/,i/ /i'/ I \ \ _ ( \ \ �_-- \ \ \ \ I / / // / \ \ 1 \ _ \ \ y \ \ \ \ 1 \ \ \ 1 1 I L� I II 1 / / / / 1 _ - //� I `\ _ \ \ \ -___ - - _ 3 ------ I o \�,\I\ \\ \\ \\\�__ - \� \� -J 1 ` / \`_ \. 1 I \ I I II �/ \� /,/ , ////// - //1 //1/ /( , / / / / //-\ \\___ \ 1 _ I f I / r //� /// /�/' \ \� \ �i �/ \ \\ `\`�\ - _ ___==�=3 50. \ \ - \\ \ \ \ \ I ___ / \� \ )� /' I! I \ - ' /l / 1 I I / /' /// l \ 111 / / \ / _ / I I `� \ ���_ \ \ \ \ //-` \ _ \\\ \ \\--- �\ / / I l // /�l \ \ _ /.+/ �'/ 111 1 1 / / / / II \ \ / / / // / // 1 / 1 / / I / \\ \ _ _ / / \ /_ \ // / ! I _ / � I� /// / / // // \ \\ //ter \ \ \ \_ �( \ - _-______ \ \ //-- \\ _ - \\\ \\ \ \\ \ / //-�/ / I / // / // /// '/ / \ / \ \__ \ \ _ 3200 \\\\ \ \ \ \ _� il( // / / \ \ / // I I / / // / // / / / \ �\�\\\ \ \ \ / /^\ _ S \\\ \�_' �3\ \\ \ -_/ \\\ \ /�\ _ \\\ \ I / l \ \ \ �� I 1 7/ I I 1 // l 1 / - \ \ \ -- \\\ \ _ \ \ EXISTING HOWARDS 3 \ \ i _ - \ / / ! f t ( l 1 I \ _� _ �\\ \ / �- \ \ \-- \ \ \ \ \ / \ ^\ �- �2 / \\\\/i \ \o \\ \\ \\ \ / \ I /( /- / \ \\\ -- / ( 4 III I\ I / / o \ \ \ \\ 1 \ \ i /� \ 11 \ 1 ) I I / / // / \\ \ 1 0 \\ \\ \\ / I \ \ _ I \ 1 I / \ \ \ \ \ \\ -\ . - \ - \ \ \ ,/ I /. I/ / I /- / 1 1 \ \\ -// /�1/ II I / / / / / / /- \\� \ \\ \ \ CREEK \ _ \ -' / - / \ \ 1 _� \ \ \ 1 / ( \ \\ \ \ \ S \ \ / / / / I I I 1 / I - /// 1 I / / /� 1 I //'/i / / / /// \ - _ \ . 1 1 // / /I ( / , I --- /// //i,) I / / / ///_ . / - _-\ -- III I \ / \\ \ \ 1 \ \ \ / /-\ _ \\ \\ \\ \ / -� / / /// I ;/ = \\ \\I 111 l \ ' ' \ \I I\/��\ \ \ \ \\\`_/_ /// I\ \\\ 1 �\ / \� �\ `` - \ \�\\ \\ , %, \ `- \ \\ \ L / / / I I / �r I / /// / /ll �/' i' / - \ III \\I 1 1 I \ \ I \ \ \ / \ — \ \ \\\ \\ \ \ `\ I I / 1 I ( // / / / // /� // �i/ - \ \ \\\\ \\ \ \ // / ( ( I I I 1 � \ J -// �/i/ / ( I / // // /- _ - _ _ // // / / / / / / - _ �` \ \ \ \ I \.-'\ \ \\ \\ \—�/ / /- \ \ \ \ I \ \\\ \\\ \ \ \ 1 I ( \\ \ \\ -- / � / / / // l 1 1 / /// I // / \ \ -/ \ / \ \ \ —\I _ _ \ \ \\\ / ____\ '\\\\�\\\`\\ \ \/ -\�\1 (/ \ \ \\\ \ \ / I / I \ / \\ \ \�N \ \\\`, \ \\ \\ \ / / I I \\ \ ( \ \\ \ \ - / / /,j// / / I If /ll//"///%�//i" /' ( —\ \\ \ \ 1 \ \ -. \ \ \ \ t / / / / / / / / / / --_--\\ \ \\ \\\\ \\ \\ / — \ \I 11 ` — -� \\` \ \ \ \ \\ ( \ 3 I \ \ \ \ I \ I \ \ \\\ \ \ \ I — // 'r — i / \\ \ \ \ \ \\ \ \ \ rl 2cv \// \\\\ \ \ \\\\\\�\ \1 \\ 1 \ I \\ \\ \ \ —1_ / — — /�j/ ///// / // \ \ \ \ v I / /� / // / \ \ I I I \ \ \ \ \ \ \ --� / l 11 i �\ - \ \ \\ \\ ` \ \ \ \ - - , - - / / / // / / / _ _ - - \< \ \ \ \ \ \ \ \ _ i / \\ \ \\ ` \ �\ \\\ \ \ 1 - I I \ \ \ \ \ \ \ l I / \ � � ' / i' \ \\ \ \,\(( ,� / //, " , // //// - - \\\\\ \ `\ ` \ / \ \ \\ - / \ \ \ \\\\ \ / - \ y \\ / \\ \\\ \\\ 11 \ \ \ _ _ -- _ ' _ \ l/ ii%/// // \ ' \\�\ \ \ \ '�\ \ \ \ \ I ) 1 11 I / / _ \yam - - / I \ \ \\\ I / / / / / 1 \ \ \ \- \ - _ - <;_ -� 1 9 \\' \1 \If / --�\\\ \ \ \� \\ \\ \\`I- \ \\ _ / / / l / / / / �/' _-- \ _ \\, _ -----/ \ \\\ \\\ \ __/\ l/ / I 1 / / % \ \ \ \ \ _ -_�— _-///� _�� _ 7 )� ./ l \\ /\ \ \ \ \\ \ \\ _ \ \ \ \ —\ / / / l / / / I -- \ —�� —_l —�� \ _ \ � \ \ \ / � \ �— — _—_ /—/ /_ ----/ / I _ ( l \\\\\\ \\\_�\. \ \ \�-, NN,\ \\`_ / / / / // / \ ► /'� \\ \ter___-_ - \_ - N, \ \\\,NN, \ / // 1 I I / \ \\ ,_-__-F_---=t==- - __ ���!ii /)/1 % / / / l / / \_ _/ -�-- \\ \ \\ \ \ J/ I \\ \\ \ _ ��/- _� / JI// 1) l \ \ \ \ \ \ \ \ \\ \\\ \ \ _ \\ 1 I l !� _ \ \ - � _ \ __ - _-_ \ _ \ \ \\ \\ \ l /I I I � \ \ \ � �� ram- -�_// / -_i/// // /// �/ ' I) I / 1 \\\\\ \\ \ \�\\� \\\�\ �\ \ \ l I/ 1 /l/l / // / /) l j l / // I ' �/ /' --- \\ - 321J I _ ----_ \ \ \\ \\ I \ \\\ \\\ J// // I 1\ \/ \ I _ 33 -_ __-__ ---- /ii� ��i%/'//'/ / \ \ \ // / 5 \ I 1 \ -- _---� \\\\�\\\\\ \\ \ \ \\ \ l/Ij/ //// //// , /// f\ �/ / /'_ \ / _ _ - - \ /\\\ `:� \\\\\ `�// / II /I1 ,/ _ --- ///�/-r_ //////// / / / \ \ \ \ \ \ \ \ \ \ ) // /j /; ,,`0 — /�i�� �/ // / I / ) I / / � \ � I� \ / / / _ - - - \ \ \ \ \ I I \ \\\\\ \� / // 1 1 I 1 1 - - - s - - / / / / � ��_� ' / 1 / / 1 --I _ \ \ \ \ I / / /i I - / / �/ _ \ -- �_- \ -_-_- \ \\/ // I I I / - _ - / \_/ -_ 1 \ \\\ I I \ \\ I / - - / / / / �/ / _ f I -r- 1 1/l /j / � / / '- K_ / - 33 \_ / /_ - � - -- /__� \ \ \ \\ \ \"', / II l J / / / \ --- --_ _,� / / / / / - / ` i 1 1 // \ \ / / I l / / / / - l �/ \ _ /- \\ \ \ \ \�_ / 1/ / / / / / i / /// / / \\ ,/ /� /�//i/��jl'I I II I (_ _ _ -� -/ I \ I \\ \\ \ \\\ II / (I 1 ( /I/ / / - / i_ - 1' / /. err / // `- � - / /'�/ / /�/-// / / I — — --- - 1 \ 0�- \ Ill \ �\ \\\\ I \\ A � 1 \ \ _\\ _ '� =- 1 _ _ _ - / _ \ \ \ \\\ \ 1 I I \ I I I �- // / — \ \ / \J `�` = / ////� -/ / / /�/%/, I _ --- ��-1 \ I /---\+. yg35-\\�—��_ ____ �\ I l \� �\ \ \\ I /\ / \\ l\ \ \\ \ \ I 1 1/i'� %ter j rt / \ / l///�// -__ \ -'//l / i IJl (I / //// / / //___ —� _ _ \ \ I / /yi ice--\\I./'/� _---- \ \\ I I \\ � - \\ \ - I - \ / 1 \\ \\\\\\\ \ \� 1 \ \ \\ \ �/` \`- /� (ii''- \-/ l llll/'l'l - _ \ \ \ \ - - / / // r _ / \ \ / - _ - _ _ - _ _ / _ _ - _ / ram_ .-. - / / l \ \ / / / \ \ \ \ ` \ \ \ \ \ \ \ \ \ _ -c Il / - �i / rr 1 l ---�\ - `_y - __/ \ T I -\ / / /I-\\ / / � \ II/� \ 1 \ \ / \ \\ _ \ \ / /✓/ 11 I i \\ - / / / I l I I \\�/-�� - -/----- /- ///�00 \ \- / - \ I _\\\ \\ 1 \ \ l I \� �\\� _ J I \ 2 \\ // / II I III \\ ��- / / ) I \\\\\ \ \\/ __� - __/ \ \/ / /—I - / //I-\\� �/ / // \ \ 11 I I \ \ %,, \ \i \ �\\`\\�� \ \ \ / I I IIII I I _ 1 i / / / i -' \\ \ \ \ � \ \ \/ \ \ I \�\\ - /'//�/ ,.— / / 1/ I )11 I I\ \ I /,_� ���_____� -- - - \\ / - /J /// \\ / \ \ \ \ \\\ II \ \ \ \ \ \ \\ \ _ - / ! \ 1__I—\ /i/ �� r II l - \ I \ \ \ \ 1 \ \ \ // r *'- I III I \ - _ / // ��/// / / )� I / SQ �\ /////= \\\�/ /-\ \\\ \ \ \ _ \ \\ ( _ - '/// I IIII II \ \ \_- ;-_ _ - _ \�\ I / /' /// --� \\_,/ / \ \\ \ \ \\\I I \\ \I \ / -- _ / \ , I IIIIII —�\ \ \ / / / I // / / / / /------_/-__ \ \\\\\\ 1\ \ OjT = \ -// I Y. r IIII \ / 1 /� /� / / \\ \ I / / / \ _— \\\ \ _ I _ \ \\--__-\\ \ ( / / / I / / / / / / -,_ \\ \ \ / i \ \ \�\ \ _ \ \ \ -\ \ 1 I \ \ / / \ I 111 _---\\\ \ \\ \ I ( I \ II / / / ----__ \ \ -\\ OO _ / / // / \ ---- _ \ \\ \ - \ \\\ \\\ \ \ \ I \ \ \ \\ _�/ \ / \ / \ \ I II III I _\ \\\\—J \ \1 I III /�/ / / / -\ \ \ \/-�\ _I / / / / /'\ ----\\ \\`� \ \ \ \ \ \ --- \ \ / I III 1 / \ \\\ I \ \ \ \ \\ / I1 I II / / / // / / — _ —\ _ -\\ ^`� / �'-\ I / //// / 3500 \ \ \ \\ I I \ \ \ \ \\ \ \ \ ,- `\ — �� j 1\1\ \ \ / \ ° I �\ III I \ \\ \\ \ I / %/III 1/ / /� / / / \ \o _\ �/ / / / - ---_ �\\ \\ \\\ \ \ \ \ \ \ \ \ _// / �-T \ 1 III 11 I \---� \\ \\`-__ __�I \\ \\\ I � //'/IIIIII I 1 / / �� �/ ��- _ �\�\\\\�so� \ , -- _/' l I I I I /i' \` /- ---- \�\���\\\\\\\\\\ \\V,\\\\\\ \\\\ o \ \\ \ \\\ / �-/ ----_-- - / � I �\ -/ I III11 I\\\� // / I III / / \ \ 3 \\ / I \ 1 / , \\ \ \\ \ \ \ \ �1 \ \ \ I 1 I — , \ \ �\ \ Zvi /- // / /// II( / / / � /� _ \ \ NZ-VN,� — \\\\\\—/ � I I l • /�-__ \ ,\\ \ .\ N\\ \\\\\\\ \I\\ \ \ \\ \ \\ \ \ _ / • \ _ - > _ III I / / /� I/ \ \ \\\\\�'\ \\\\�/ /�-- __1 \ \ ( \ I \\ \ \ \ \\ \o�,\ \ \ \ \ \ \\ \ -\\ \-- _ \ \ - -// � I I I / / \ \ \ \ \ \ - . I 1 \ \ ( EXISTING RAW \ 1\ 1 1 \ \ \\ \ o \ \ \ \\\ \ \ \`\ \ /\ �I 1 / \ \ \ �� //I I 1 I' 1 \ \ \o \ \ \ \ \ I /•_/ �� \\\� \\ ---////-- /I II ( / / _ -85 \ \ 1 \ \ \ / -__/ I \--�� 11I 1 1 I \ \ \ \ -- / _ _ \ / -//i /_--/ III / � \ \ \ \ / \ I I \ � \ \ \ �- \\ \ l� \ \ - / / / / - _ _ / _ WATER INTAKE 1 \ \ \ \ \ \ \ - - \ / -- _ \\\ \ \\\\\\�— _� // / / —/—_\\ \ \ \ \ / \\ \ \ \ \ \ \\ \\\\ \ \35� \ \ \ \_ / \ \ 3 . \ \ \ — \_ \ \ / //�=� \ \\ \ __ / / - / I ) f / ( 1 - _ \ \ ) \ �\ \ \`\ EXISTING SLUDGE - / / \\ \ ---- _/ \ - J/ -- 1 \_-- / --_ _ \ ---_ \ \ _ 0 - - _ /_-- - / - \ //i�IF ��\\,� �\� \�______ _ �_ / I \) \\1 �// _j I I -) 1 j 1 / l - 6 _ - - __�_-_____ ��\ \�\ \340_ , BASIN OUTFALL _ _\ \� _ - _--- \`_ `\ // / \ \ it l \ `_ -- - J�( / I -� -- / / / ' -' - _--- \ -_ \ \\ \ `\\ I \ \�. �� .\\\"�/� - \ \ _ �\ _ �- �� \ �� __` _ --.�- �_ , \ '/--/� // / \ \\\\ 1� \ \ `�__- -- 'iT �-'�,C /l I / //- // /1 \ _ 355 '/, /i/ / 1 i- �'--.-./�-r`T.- - = ilk-� -_ _�__� \\\ \� \ \\ \ - - \\_--�i---'� ' i-� �Q \ / - \\ \� !/// /� / \\ \ \�\\ _ / - ;_/ / �-- ° -/ / / /� I- ' �J EXISTING SLUDGE BASIN \� \ �s0 \\ ` CONNECT EXISTING DISCHARGE TO \� --- - \ o \\ / _ _\ \ \ ��-�' / / �\ \\,\ \\\�� � ��\ (' /(/ r -/ W /' /%'� /�' o! -- ;`\ _ � �_� \\ \� \ EXISTING STORM DRAIN SYSTEM WITHIN \-� - �,\\ `�\ / � \ r= / ice_// ( \ \ \ \\\_� -_\\_ \_-_ ( i__ r// // / / / / I J3A5/ - \ \'. - __ \__ \ \ \ - \\-/ / �_ \\\ / \ / - \ - - _ \ - \ \ " _ - / - \ - \ \ \ J \ \ / - \\ \ \ _ \ \ \ ll�/ - -- I/ -\\� \�\\�, --� - \�1\ \\ ��, -- ;, ,/__ / I - \\ \ \ \ THE WATER TREATMENT PLANT _ \\- jam ; 32Sp\ \/` \ \\ /� \__ ,� \\\III / \ \ \ �c � \ � \\ - - \ 1 I \\\ _\\\_J_/ \ � _ \ \ / / 35-- / / \�; �,, ` \ \ `\� CONNECTION TO EXISTING \\\ \ \\\ - — --- \� \ / \\ 1 I / - \ I 1 / / / i// f, I \ \\ \\ \ T I I / -- - \ \\L_�^ -.---\ I / / � \\ \ ,% \ \ \ \ _\ \\/-i%� _\ _33 \\ \ /I1 I I1 1, II/// / --_ \\ �� L-,-_\ \ ----- - I \ 'I / / I I _ -'\\ \ \ �'/ / --\ - _ \ _ - 1 I / -T\ I 1 \ I _ \ _ --- - _ III _ `` - ---- _-' / 1 \ / ( C3 I \ \ \\ . OU ALL PI E , \\ \\ \ � % \ I /-- I � I . / — _ \\\\ _ --- \ \ — \ __ 1 ) -- r— \ \\ L\ �\ \ \� -\� _ \ \\� \\ 'i // -_ — \\ \\ i\ \ `. / / \ \ I I \ \ III I (//� \\ \\ �� --- \ -, \ \ \ r- �N ---_-- \ �� -� \ - _\\ � L--_\\\`�_ \\\ / \ �--\ \ \ \ \I — Jam. _ \ \ I, 1 \\_ // / / /' _�\\\ \--------_-- \ \ \ \ \ \ \\ _ __ _ \\ \\� \ - _ \ \ \1 \ 1 J / / \��-_----_ _ _ _____-_-_- \ \ S \ I -�\ \ \ \ \ �/ /-� _\ y \\ \ \ \ / \ \ \� / // /// \ \-_\- - _--_ -�__-- - �\ \ \ 34 - -�\\ �_`/� \�\� \ \ \ \\ \ \_/ - \\\4�� \\ \ \ \ `\ \\ / 1 �-_ � -� ---- _\\�\\\\\\\ \\ \ \3SS \ \ ---1- \ \ \ \ ( / \\ \ �(( f /� \\ J/I /// t``_ - _ \ S \ \\ \\ \ \\ \ \\ \ ` \ \ \ \\ \ \�////J 1III 1 / •-\\�� - - \-_-�� -__ \ \\\ \ \7� \� \ \ \ `-_ `\ \ \-_- - \ \ \ \ \\ i- \\\\ \ \ \ \_ 1 /�1`-\\ _--_-___-__ __-'-'- \ \ \ \ \�C \\ \\ \\= �\\ -_ \ \ \\\ \ \\\ 1 /// / \ —\\ _ \ \ 1l \\ _ \ \_ _ \ \ _---- \ _-- \\ \ \ _ \ —� \\ _ —_—__ — / \ \ \ — _ \ // _ _ \ _ \ \ ' —\_ \ \\ �_ I ( \\ -- — / \ \\I\\\\ \ _\ \ \ \ \ III �/ / / / _ \ // I/ o\ \ \ / \ \ _ - - _ \\ \ / \ \ _ \\ - \ / / / / // / /,/ / / _ -�� \\\ \ 1 I / \\\ -\ �\ g \ \ �\ ��-y1 // PROPOSED 24 RCP \ \ \ 1) / / l / / \ / — \ _ \ \\ \ \ N \6S\ \\ ��\ \ \ — — �_/\ \' �, J I '_ �\II, /—_ — - \ \ ` 1 )/ //— // / / /// // l I I I I /I/1 / / / / /// l l 111(// / IIII II I / // / III II- / // / / / / / \ \`I / / /�-�/ / // �\ \ \� \ \- \ \ I \ \ \STORM DRAIN \ \ \ _ I / / / / / / \ 1 I ' I 1 �/ ' - , �\ \ \\\ \ \III _-i \�_ \ \\ _ \ / _ \ \Y��_ ` _ I 1 \ \ \\ \ :/__ �- �/ // -- I / �\ // / //'� - \ \ -_ _\� \\\ _ - \`�---- �\__ \ o / �� \ \ I I \ - \ \\ l \ \ /___ - // ////_ /// //�///, // \ \ \ __)III I / _/ / / \ \\ \ \\ , \\ \; __\_\\ -__ .\ - _ / 1 _� 11 I I _ \ \' EXTENSION W/ 30 WIDE `-______ -'- // _ i ( / \ 1 / \ 1 \ \ \ \ 1 1 I ( / / r_ / / / / \ \ \ 1 \\ _/ \� \ \ \ _ \ I _ \ \\ ///// / / 1 / //// _ \ 1 / / \ \ 3� \\ \ \\ -\ / / / _ I _ \ \ \ \ _ -� II , (/ �/ // / - \r\ \ \\ 1 \11 1 \\\ / -- _Op \ - _ / 1 I \ / I \\ / / \ \ \ \\ 111 _ \ \� \ _EXISTING RAW WATER _-- _ _ _ / //� _ / '( -__ \\ _ \PERMANENT EASEMENT . `-_ ___=_- '' /' J/ J/ 1/1////' ' _ \\ II \ III / \ / / /, /' -\\ \ I 1// / \\\ \_�_ \\\\,_ _ �' \ \ -/ - 1 I / / _ _ ` \ \ I \- ' �-/ 1 I Ill/ l ) // - _ I / / \ \ _ \ \ / /� / I / , \ \ \ /I ( / — RESERVOIR \ \ — \ \ \ \ \ \ \o \ \ \ — — --- / /, //— \`/ I / --/ -\_ / / I I / --/ / / /\ \\\ 11 III \\\\\\ �// /1---_� \\ �` ___ \ - __.::- /__� \�\\\ / \ \ 1 \ \ \ -f--� \ \ \ \ r \ \ _ \\ \\ \_ /� i =i��// ` / / / / \ _�\/ III l (/ ----// ///' _ I I \\ \\ \ ' /----_ _ - \ \ \ \ \ \ \ _ - \ \ \ -__-�\ _ / / '/ \/// / / / // / / \ . / __ _ \ ___ \, \ _ _ \ \/ — \ \ \ __ _ \ � i _\ / / / / — \ _ / \ \ \ / \ \ _-- _ \ _/\_\\ \ �_ -�/ \ \ \ \ - / . _ / \� / / \_ 1 I l / --/ \ \ \ \\\ /// — \\\\�_ \ \\\\ -yam _ \ \ \ \ \ \ \ \ \ _ __ / - / / / \ -= \\- I I /- / / _ / / / \\\`_ / I III / / 1 \ 11/l lI \ _ , \ // -- \ _ \ \ \ \ \ \ _ / I-\_- / / / \ \\\� I I )/ / / /- _ -� III I --__ \ / / __-- _ \� \ - \ \\\ \ \ \ \ - I \ _ \ r \ 1 . / - / / / I / / / \ \ \ \\ \ \ / I _ / - \ \ \ \ \\\ I I _ 1 \ \\ —/ / _ __ \ _ \\\\\ \\_ — \ �\ — \ \ I \ \ \ I / 1 I / / \� _ \ _ \ \\ \� I / / / i _ \ IIII II \ \\\ ///�—_ 3g0� __\ \\\-_ �Nk \\ \\ J/ \ \\ \ \ \ \\ \ \__�- \ I // 1 I l / l l --\\ �\---- / — . --/ // _/ / II (l 1 1 I -, \ _ \ _ _ \ \ _ \ \ -� \1 \ / _ \ / \ \ // / \ \ _ -, - \\ \ \ I I EXISTING NORRIS ' I (\ ! ( / Q / / \ \\ \ / / _-- - _ \ \\ ,_ \ , _ /-\ \\\\ � _ \ I \ (o _- \ \\ \\ I / I l l l / \ \\\\\___ \ \\\_�// , j/ /_ /3 -_ - '\\ \ \\ \ \\\ \ \\ \\ \-- \ \ \ \ BRANCH / � \ 1 \�+, ( - -- / ' / I I 1\\\\\ \\\\\ \ - \ \ \ / / I I 1 _—_ / Y \ \ \ \ \ \ / / / / I ! \ \ \ \\ \\ \ \ \ \ ( f / 'A / I I - 1 \ \ \ \\\ \-' / ! I I ( I \ ( \\� \\ ��- \ \ _ �� - _ \\\\ \L\ \�_- \\� �� \ \ \1 �11 \ l \ _ - I \ I I / _ / l 1� / \\ I - \ )p l \ \\ �\ \ \\\ 1 \ \ \\ \ .Y / - __� \ \ \\ \ \\\ ___ \ \\\ \ \ % \ 11 \ \ l\\ \\ \ 1 1 I I / / // / / li' i I / I `�\ \ \ \\\\\\\ \\\ I l 1 ( \ <� T�}� i/ ///'- ____ \ _\ \\ \\ \ \\ / / / \ �\'\\\\\\\ \ \ I 1 \ \ \ / \ \ \ \ \ \ / \ -_ \ \ \\ \ \ \ \\ \ \ \ I \ \ ) 1 I 1 1 - J - �// /Il _ \\ lI 1Il I 1 \\I I \\ \ I / ) / �-\ \ \\ \\ \ \\\ — - / / \ \ \\ \ \\\ \\\-� \\ \\ \` V) / // \ \ ( / - \ \ \ / / / 3950� \ \ \ \ \ -\\\ \ \\ 1 \ \ \ 1 I l --r / /�— __„c II I I III I 1 \ \ \ 1 I 1 / � \ _ \\\ -- -- / - \ \ \\ \ \ \ \ \ \ \ \\ \o �i / / / l I I \__- - \ \ / — I _ . I \ \\ \ \ \ \\ IIII I I l \ / / ,'_�\ ` \\ — `\\ ;/ /'/ %-- -- \\\ \ \\ \ \\ \\ \ EXISTING WATER \ \ \� \ _ / // \ \ \\ \ \ ' 1 I I IIII I I / \ \ \-_ \ \� / - //- - 1 \ \ \\ \ \ \ \ \\\\ \\ \ �` \ \\\ \ \\`''\ \ `/1 (/ I I l oQ \ �- \ \\ ��� \ 1 1 \ 1 \ \ \ \ \ IIIIII\1\I(/ \ I ( / / / /\ \\ \�� \�\-- //I// __-_ _ \-_�\\\\\ \ k \\ \ \\ ( \ l \\\ = _ \ �\ \1 _ - \ _ \ \ /- \� \ \` \ \ ,I \ \ \ I I 1 I 1 ( / \ \ - -4000 - - \ \ \ \\ \ \ \ ' TREATM ENT PLANT \ \ \ \ \ \ \ \ \ \ \ \ \ \ - / - - 1 \\III \\ / I I // \ \- \ \ \\ - /I' /�+ /' J \= \ \\ \ \ \\ \ \ \\ \\ \ �., \ �o \ '\ I \ _-- - \ \-_-_---- --- _ \ \ \ �y \ \ . \ \ -\ l _ \ \ �� � \ I \ \ \\ I 1111 `, / I / / / - -_ \ \ \\\\-/ / / _--- \ \ \ \ \ � \ \\\ \, \ �. \\\\ \\ / \ \ \ \ \ \ \ _ \\ \ _ _ 1 / - - - _ \ \ _ \ \ \ \ I I I 1 / J I I I I I 1 , / / \\ \ ' ' - _ -- -- \ \ \\\�\ \ � \\� \\ \ IN. , \\�- 'N \\\\\ \\\ \\\ \0 1\ \\ \.\ \\\ \\\ \ ► \ \- \'\ \� ; , Jl( /. -�\ \ \ \\ _ _ �\ \\ \ \ \ 1 I III / ( I I IIII �/ / / / �'\ �\ \` \ \ \ / / / /- _-____ \ \� \ \ \\\ \\\ \ -\\\ \ \\ \\ \\\ \\\\\\ \ \\\ \ \ \ �5 \ \\\ \\- �\ \ \-'_� \ \ \ / / / / / \ \\ / ---\ \ \ �\I_�I _�-- /- - _ �\ \ \ \\ \ \ / I1 / ,—� 1 \ \ _ \\ \\ \ \ \ - \ - _ _ \ \ \\ /—_\ \ \ \ \ \ \ \ \\ O \� ) /// \ / —�� � / \ —_ \ —�— \ _ / // IIII / I 1 \\ \ I / _ \ \\ ,� / i �_ 4050 _ � \\\�-��\\\\"\\ \\ \\ \ \�« \ \ \`\\\\\ �\ \\\` \ \ \X \ \\ 1 1 `\ \\ \ �\\ / / \ I\ \ /- _� ( / \\ \ \ \ / / / -- \ \ \ O \\\ \ / / 1 / I I I I / / 1 I \ \ / \ / / /// \ \ \ \ \ \\\ \ \\\ \\\\ \ \ - G /�— \ \ \\ \ \ \ \ \ \ \ / / \ \ I l� / —\\ _ \ 11 / I \ / . \ \ 1 1 / / \ \ \ \ \\ \ \\\ \ \ \ � \\\\ \ \\�\ \ \ \ \\ \\ \ � 1 \ \\ \J 1 l 1 I 1 I / 1 I \ / / / 4 _ \ \ \\ \\ \ \\ _ \ \ \-\ \\ \ \ \\ \ \ 11 ( \� \ /-_ \\\ _ _-/ / /'- / \ \ / / / / / / / 00 \ \ \ \\ \\ \ \\\\ \ ,c\ \ o \ \ \\ \ \ \ / \ / \\\ _ 11/ / �� / / "I \\ \ 1 I I I I l l / / - 1 (� /// _ _ \ \ \ \ \ _ _ - \ \ \ \v \ o \ \\ \ \ \ >< \ \ I \\ .l / \ \ \ / / 24 RCP STORM DRAIN /� \\\\ \\\\ I / I I I // / // �/ \ \--' / / / \ \ \ \ \\\ \ _-___ ` \ \ \\\\ \ \\ \\ \\ \\` , \ \ \\ \ \ \ \ \ \ \ \ \� / / \-/ \ \\ III / I / / \ \ \\ \ l I I I l / /j / \\ // / / ---_ \ \ \ \ \ \\� -- - \ \ \ \� \` \\\ \\\\\ \\\ \ \ \ /\\ \ \ - /�' \\ // / I -- / , .� I \ \ \ \ I �� \ \ / _ \ \ \ \ \ / a DISCHARGE TO NORRIS / -\ \ \ \ \ / I I / / / / \ / / / //' —4150— _ \ \ \ \ \ \_ __ \ \ \ \\ \ \ \ \ \ \ \\\ \ \\\ \ \ \ \ \ \ / / \ // / _ \ \ \ \ III / / I I I ` \ \\\ \\\ \ \ I IIII / / y-� \ _-- / / / _ \ \ \ _-_ \\ \ \\ \ \ \ \ \\ \\ \ \ \ \\ \ \ \ \\ \ _ - / \ / I / / / / / BRANCH I I _ \ \ / / \\\�/ I \\ \ / I / \ \ _ \, \ \\\ \\\ \ \ \ \ \\\ � \ \\ \\ \ \\ \ \\ \ \ \ \\\ \ \ \ \ \ \ \ \\ 1 \ \ \ \\ / / / ///I/ ll/ l /�i \ - \ \\ \- ' // '/ '�- - , \ \ \\ —_ \\\\\\ \\\\� \ \ \`� \ N� \ \�� \\\\\ \\ \\ \\\\ \ \ \ \ \ \\ \ \\- \ �\ / _ L \� \\\ �\ 1 I I / / / / I / / \ \ \ \ \ \ \ \ \\ / �� / \ \ I► II\/ / \ \\ \\\ \\\- l I 11 / / I / \\\ - / / - \ ---\ \\ \ \\ \\ \ \ \\ \ \\ \\ \\ \\ \ \\\ \\ \\ \\\\\\ \\ \ \ \ \\ 1) /-_- (/\ -/ // -\ \\\1 II \ 1\ / - // /// / I �IF� ��`\\ II I �I �i\ \ \ �\ \ \\ / / l 111 l l / 1 / \\ - �/ / / ' , /' _\\ - \\\\ \ \\\ \ \ \ \ \ \ - I \ / I ► \ \/ / / / / _ \ \ L --- 1 \ \ \ \ \ \ \ \ I /_ _\_ _ \ I \\ \\ \\ \\ \ \ \\ \\ \ 1 \ \ \ \\\\11 I11 I\ \ / / ////// /// / / Il/ // // / / / ___ _\ \\\ _,_ � \\\\\ \� \` \ \�\\ \�\ �\ \\\ \\� \\ \ \\ \ \ � \\ \/\ \ II �i/ _ �\ � l Ill\ \ / / / / / / \\ \ \ III I / / / / - \\ \ \\\\ \\ \ \ \ \\\ \ \ \ \\-\\\ \ \\\ \/x /_'\ 1 \L/,// \\-/ 1 / I I \- / / I \ \ 1I � ) \\ \ \III \ 1\ // //////l// / / / / l / \ �/, / /j/�/ �\ \ \ \N \\\\\\ , \ \ \ �\\ \ \\ \ \ \ \ \ \ � �\ \ /�__��/ / -- I I 1 1 / / /- / \ 1 ► 1/l \ _ \\\\ \ \ \\ \ \ \\\ `�\ _/ / 111 I11 \ \ / / / // III I l( / / / / \\ - �'/ / // /� _ _-\ \ \ \ \ \\\ \ \ \ \ \\ \ \\ \\ \ \-- \ -_ \ I I / / _/ - / // I 1 / // l / I l / / / // / �,\ \\\ \ \ _ \\ \ \ \ \ \ \ \ Z \\ \\\ \\ \\ \\\\kl \ \ \1 \,\\\_III -'( /i l // ` / /I , \ I ( \ (� // / // ---\ \ \_,_ _ \ \ \ \ \ \ \ \ \ 1 \ \ / 1 \\\_� / I / / / //_ < _\\\1 \IIII\1\ 1\` \ ,- _ \ \ / // I / I / \ / / - . // \\\ _ \\ \\\ \\ \\ \ \ \ \\ III / \\ / / —� / I / // // / \\ \ / / // I l / I b \ /-/ / ///\\\_�_ \ \\\\\\\ \"`\\\\\ \ \ \\\ \ \` \\ \ 1 IIII III 1 \ I //I \ ��-- ll ( I lI/I /// _ -- �\ - / // /// l _ \ \ \\\ \ \ \ \ \ / /// \ I \ / \ \ \\ \ \\ / . // l l l I I I \-- / / \\\\\\ \\\\ \ \ \ \ \ \\\\\ \\ \ \�\ \ \ \ \\ \\\ \ \ \\ \�\ \\\\\\ 1 l� / l/ \ /- \ 1 \ -� // / //- _--_ \\ , \ - // // /// / / ) / 1 / � // / //�// ' - \\\\ \ \\ \ \\ \ �\ \ \ \ \�\\ \\\ \ \ \ \ \ \ \ \\ \\\ \\` I //' Ill / \�\ \ -- �__ �/\\ \\\\\ \ /( T // ---- \ .\\\\\\ \ / �\ I \ \\ \\�-'/ / / / / / / / / / // / / \\\\\\\\\ \ \ \ \\ \ \ \\ \\ \\\\ \ \ �\\\\ I - - // \ l - \ 11 I \ \ / I / / ' / // /--- \\ \ l \ -- -//// / / / I / / / l / T // ��__ \N\\,, \ \\\\\ \I\ \ �\ \� \ \ \ \ \ \ \ \\ \\�y\ \\ \\\\\\\\ \\ III /, / \\\ \\ / � \ \ I \ I / I // -- \ \ \III\ \ � / I / I \ - I \\ -- - / // / 1 / / y /I / � / / //// / / �\ \ \ \\\ \ , \\ \ \ \ \ \ / \ / \ , 1 1 J \ \ \ \ 1 ) ) \ ►1\\1\\ \\ \ 1 11�1 (( / // \ \\ . \ \ \ 1 i t T 1 , / / _ \ 1 I 1 \ \ \�- / // / / / / / / - / /----\% \\ \\ \\\\ \ \ 1\)1 ) 1 I/\ \� I // / 1 / / /,�//I 11 \\\ \ II I \\ ( \ \ \\ — 1 1 / I / / / I / \ \ I ( -\\\\ / 1 \ - I / / / / I / / _y \ \\ \ / // / // // // / / / / _ \ \ \ _/ / / _ _ / / / / // // ) -/1 , 1 I / ) ) 1 1 \\ III I I l \\ \\ \ 11 \ \ _ / - / / I'i/ / / / / / //// 1 \ \ 1 \ \ \ \ \\ 1 I l / I / l / _ 1 1 III _ - - l/ l-/, \\ // / / / /// / / / ///// � 1 \ \ I III \ 1\ \ \ / / / / / / / /% / I / / - i' / ' \ 1 1 �` \\ \ /1 / /, / / / / / / / \ /i/S' '- /' /i�1///�i//'/// '/ "//�_/11 \\ Illllll \\ \ \ / �\\ / I l l // / ' /' /' / --- I 1 / / \ 1 1 / / / / / / / / - - \ \ \ \\ \ \ 1 1 / /i/ / // /� /// / i / %/ / / 1 I I I \ \ \\\ \\ \ - - / / / / / / / I I \ \ �// \\ I / l / ll I // l / / / / / -�� - \\\\ �)////// / / �I- '/i/ /i/ —/ ///— — /i/�iii'ii===/ //I�//// // I 1 \\ \ (\—//=� _\ \ \ \ \\\\�_ /// / 1/ I // —/ / / / / _ \ 1 II (�--� \ \\\ l / 1 \ \ \\ 1 / ///�i i// //i/ /- /// // / - /�/ �/ //J/ I \ 1 \ 1\\� -/ / 1'1 I I I ( / f / / / - \ 1 I I I I \ \ - / / / / \� / / \ \\ \ \ \ 1 / ( l I I' I I / I ( / / //� \ \ //I/ //i�//��/ //ii/ /- // //ii j� // /-//-/ ��ii'/i//% ////�/�//ice / //1 \ II i�-�-_� \ \\ \ / / 1' I ((/ _/ I I _ \ \\\ \` \ / - / \ \ \l / / \ 1 I // / // / _ _ / / / I II / / \ - 1 1 \ // / / \ \\ \ I l / / \ /�/i/ /i / /ii/ //i / / / / / / 1 I(- \\ / \J / /�/ / / // /// /-- / z/ 1 // _ \ \ / / \ \ l I / / \ \ \\ \ \ \ — \ \ 1 \ I 1 (I / / ///// /�// jj //// ///�//-- ///// /--/'T�i//// S // % �/ /i/ /i— / I — `- — J / 1 I / // /� \\\ /i /— / \ \ \\ \ \ ��\ \_ \� �� /1� \ 1 \ \ I \ \ \ 1 1 I I / 1 ) ///�/�/ //////'/� �/ /// //�//— —/---/ �/ /- ��/i/��i'—/// //' ///� '/// ////�/i//�/ I \\ \\\ \\\ T-- / // / / —� \ \ ( / l l I / \ \\—� _ / /. �/ \ \\ \ /-- — \ \ — \ I _ / / // // /// /// ///— -- —/ // --- — / —__— -i/ -- I I IIII / / \ \ \ \ \ — — / / - I \ \ I / \ \ \ \ \ \\ \/ -_ �\ \\\_\ \\\ \ l- / / // / / / /// / �/ / i_ \ / \ \ .\ 1 � \ \ 1 � .� � �/.�.���/�/. /_/„ ��, /��/�- �, , _ _—,�/ /� �� , I�/,�-=�i�.���//�/- //,IIIIII I1 ,'- \ \ 1 I \ \ \ '/I— �� //� �1 _ _I � \ I I I / I I //III I / \ \ \�\ �. r6i610i �'110f Dewberr Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 Z O Q �ZU - O -, w 0 Q t z J 0 z � W J �j ct- 2 L.L >. W+ -D cr �� � Q D - O w O 00 z O Z Q O LL ] m _ / LL LU Q W Q L LJ 5 0 D U) SEAL KEY PLAN SCALE: 0' 300' 600' SCALE: 1" = 300' REVISIONS No. I DATE I BY I Description DRAWN BY JGL APPROVED BY RSN CHECKED BY RSN DATE JANUARY 25, 2022 TITLE OUTFALL OPTION 2 DEI PROJECT NO: 50140792 SHEET NO. FIGURE 2 1 PRELIMINARY PUMP STATION CALCULATIONS FLOW CALCULATIONS SCOUR FLOW = 180 GPM (FLOW TO ACHIEVE 2 FPS IN 6" FORCE MAIN) DESIGN PUMP RATE = 180 GPM E TOTAL DYNAMIC HEAD CALCULATIONS STATIC HEAD = 65 FT (FROM GIS TOPO) FRICTION HEAD LOSS AT DESIGN PUMP RATE = 0.283 FT/100 LF OF FORCE MAIN TOTAL DYNAMIC HEAD NEEDED AT HIGH POINT --70' TOTAL DYNAMIC HEAD FOR ENTIRE FORCE MAIN -80' PUMP STATION DESIGN POINTS OPERATING POINT 180 GPM @ 70' TDH - OPERATING POINT 180 GPM @ 80' TDH — PUMP SELECTION PUMP: GORMAN RUPP T6 DUPLEX STATION POWER REQUIREMENT: 60 Hz - 3 PHASE 460 V PUMP STATION LEVEL CONTROL ELEVATIONS SUCTION LIFT PUMP STATION = 3460.00 (PER GIS TOPO) INLET = 3475.00 LAG PUMP ON = 3447 00 LEAD PUMP ON = 3450.00 \ \ ALL PUMPS OFF = 3446.00 \ 2 3 As /A 4hT I _ 00 wQ 0 _ o co fl I I o0 0 — I / i \ EXISTING RAW — — — EXISTING SLUDGE BASIN \ WATER INTAKE EXISTING SLUDGE BASIN OUTFACE I tD A / EXISTING WATER TREATMENT PLANT FORCE MAIN DATA \ \ �L \ / _ - ► ` i — — \ \ ! / DIAMETER: 6" TOTAL LENGTH: 4400 LF \ \ \ i � ❑ �\ \ / / / / .. , \_ ( ' \ � \ \ / D HIGH POINT ELEVATION = 3525.00'(PER GIS TOPO) LENGTH TO HIGH POINT = 1300 LF APPROXIMATE LOCATION OF VELOCITY AT PUMP RATE = 2.0 FEET/SECOND SUCTION LIFT PUMP STATION ;.t \ --- 3550, ' — —3soo, 4 EXISTING NORRIS \ \ \ BRANCH PROPOSED 4,400 LF OF 6" FORCE MAINZ IX I I \ \ , p\-- \ 4 'SOS pp\ \ —\ \\\ \\ \\ \\ \\\ \\ \\3, E\ \\ \ /� / \\ sk \` \\ "3900 \ 1-1i \ \ \ &0' / i \ 11 ' \ ,33y— PROPOSED CONNECTION OF 8 GRAVITY SEWER TO EXISTING TOWN OF BOONE MANHOLECn PROPOSED APPALACHIAN \� \ \_ \ \ Imo\ // / // / I / T _ / / /-3500 \STATE UNIVERSITY ` —,\ \\ \\ \\ / / / / J SANITARY MANHOLE PROPOSED 8" // I \\ \ APPROXIMATE LOCATION �Qsp /��-- — GRAVITY SEWER A _ \ \ \ \\ / /� / OF TOWN OF BOONE SANITARY MANHOLE Dewberry �. •� .• •.so, Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z O :- Z 0 J J Lu �__ 1= p z J "ZJ o W tr �L o w Z Q O W 0° ILL W Q W J SEAL KEY PLAN SCALE: 0' 300' 600' SCALE: 1" = 300' REVISIONS No. DATE BY Description DRAWN BY JGL APPROVED BY RSN CHECKED BY RSN DATE SEPTEMBER 22, 2022 TITLE OUTFALL OPTION 3 DEI PROJECT NO: 50140792 SHEET NO. FIGURE 3 Preliminary Opinion of Probable Construction Cost 30lelberry ASU Sludge Basin Outfall Feasibility - Option 1 Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 01/25/21 Charlotte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. NIT $/UNIT COST Misc. Items 1 Mobilization LS $10,000.00 $10,000.00 Demolition/ESC Temporary Silt Fence 2,100 LF $4.15 $8,715.00 Stone Outlets 1 EA $250.00 $250.00 Temporary Seeding and Mulching 0.01 AC $4,000.00 $40.00 Inlet Protection 1 EA $500.00 $500.00 Erosion and Sediment Control Maintenance 1 MO $1,500.001 $1,500.00 Site Work Permanent Seeding 0.01 AC $4,500.00 $45.00 Utilities Connect to Existing 12" DIP 1 LS $50,000.00 $50,000.00 12" Pipe Rehabilitation or Replacement 2,000 LF $200.00 $400,000.00 New Pump Station 1 LS $250,000.00 $250,000.00 12" Gate Valve 2 EA $2,500.00 $5,000.00 16" Gate Valve 4 EA $3,500.00 $14,000.00 Pipe Excavation 85 LF $25.00 $2,125.00 16" Headwall 1 EA $10,000.00 $10,000.00 16" DIP 85 LF $220.00 $18,700.00 Electrical Work 1 LS $130,000.00 $130,000.00 SUB -TOTAL $900,875.00 Construction Contingency 30.0% $270,262.50 SUB -TOTAL $270,262.50 TOTAL 1 171 137.50 1 172 000.00 NOTES: Preliminary Opinion of Probable Construction Cost ]Dever ly ASU Sludge Basin Outfall Feasibility - Option 2 Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 01/25/21 Charlotte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. UNITO $/UNIT COST Misc. Items LS $30,000.00 Mobilization 1 $30,000.00 Demolition/ESC Site Clearing & Grubbing 0.25 AC $6,000.00 $1,500.00 Tree Removal 1 LS $20,000.00 $20,000.00 Flagging of Clearing Limits 2,164 LF $1.25 $2,705.00 Temporary Silt Fence 3,440 LF $4.15 $14,276.00 Stone Outlets 15 EA $250.00 $3,750.00 Temporary Seeding and Mulching 0.25 AC $4,000.00 $1,000.00 Inlet Protection 5 EA $500.00 $2,500.00 Erosion and Sediment Control Maintenance 3 MO $1,500.00 $4,500.00 Site Work Permanent Seeding 0.25 AC $4,500.00 $1,125.00 Utilities Connect to Proposed Manhole 1 EA $1,000.00 $1,000.00 Pipe Excavation 3,440 LF $25.00 $86,000.00 24" RCP 3,440 LF $200.00 $688,000.00 Precast Storm Manhole 10 EA $7,500.00 $75,000.00 30' Wide Easement 86,550 SF $4.00 $346,200.00 SUB -TOTAL $1,277,556.00 30.0% Construction Contingency $383,266.80 SUB -TOTAL $383,266.80 TOTAL 1 660 822.80 1 661 000.00 Preliminary Opinion of Probable Construction Costcmbrr ASU Sludge Basin Outfall Feasibility - Option 3 PROJECT NO.: 50140792 Dewberry Engineers Inc. TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 09/22/22 Charlotte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. UNITS $/UNIT COST Misc. Items 1 $10,000.00 $10,000.00 Mobilization LS Demolition/ESC Temporary Silt Fence 4,400 LF $4.15 $18,260.00 Stone Outlets 1 EA $250.00 $250.00 Temporary Seeding and Mulching Inlet Protection Erosion and Sediment Control Maintenance 0.25 AC $4,000.00 $1,000.00 3 EA $500.00 $1,500.00 3 MO $1,500.00 $4,500.00 Site Work Permanent Seeding $4,500.00 $1,125.00 0.25 AC Utilities New Pump Station 6" Gate Valve 1 LS $200,000.00 $200,000.00 2 EA $2,500.00 $5,000.00 Manhole 1 EA $7,500.00 $7,500.00 8" Gravity Sewer 6" DIP 10 LF $300.00 $3,000.00 4,400 LF $180.001 $792,000.00 Electrical Work 1 LS $130,000.001 $130,000.00 30.0% SUB -TOTAL $1,174,135.00 Construction Contingency $352,240.50 SUB -TOTAL $352,240.50 TOTAL 1 526 375.50 1 527 000.00 NOTES: N P 3153 MT 3— 434 Patented self cleaning semi -open channel impeller, ideal for pumping in wastewater applications. Mod ularbased design with high adaptation grade. Technical specification Configuration WL u rylerK krdiL- Curves according to: Water, pure ,39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/s IN 88 84 ea 80 76 72 68 64 60 56 52 48 77.4 40 36 32 28 24 20 16 12 8 4 227m 4 0 0 400 800 1200 1600 2000 [US g.p.rn] Curve: I50 9906 Motor number Installation type N3153.18521-18-4AA-W P- Semipermanent, Wet 20hp Impeller diameter Discharge diameter 227 mm 6 inch Pump information Materials Impeller diameter Impeller 227 mm Hard -Iron' Discharge diameter 6 inch Inlet diameter 150 mm Maximum operating speed 1755 rpm Number of blades 2 Max. fluid temperature 40 °C Project Block Rogramversion Dab version 60.0 - 10aQ021 (WW 220) Usergroup(s) Xylem: U3 -INT Created by PETERCARLSON Created on 12/1/2021 Last update 12/1/2021 NP 3153 MT 3— 434 Technical specification Motor - General L .1 YylarnkrrpL Motor number Phases Rated speed Rated power N3153.185 21-18-4AA-W 3— 1755 rpm 20 hp 20hp ATEX approved Number of poles Rated current Stator variant No 4 26 A 5 Frequency Rated voltage Insulation class Type of Duty 60 Hz 460 V H S1 Version code 185 Motor - Technical Power factor- 1/1 Load Motor efficiency- 1/1 Load Total moment of inertia Starts per hour max. 0.83 87.5 % 2.07 lb ft2 30 Power factor -3/4Load Motor efficiency -3/4Load Starting current, direct starting 0.77 89.0 % 148 A Power factor -1/2Load Motor efficiency -1/2Load Starting current, star -delta 0.66 89.0 % 49.3 A Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Rogr version Data vers— Us er g ro up(s) 60.0- 10M2021(&,Id 220) 112202116.17A11P11 Xylem'. USA-INT NP 3153 MT 3- 434 Performance curve L Duty point r1 YylemkrrpL Flow Head 1380 US g. p.m. 36.8 ft Curves according to: Water, pure39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/5 [ft 92- 84- 80- 76- 72- 68- 64- 60-7 56 52 48 44 40 36 .8 ft 32 28- 24- 20- 167 12 8 4 0 I%j 6 % 7 2 % 60 5 40 mm 3 20 1 0 [hp: h 20 1 h 12 8 4 0 [ft 4 3 32 28 24 20 .8 ft 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.1 Curve: I50 9906 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Head Eft: .1 0 34`227ri�ii' 437 194mm Pump Efficiency 73. Overall Efficiency 65. Power input Pl Shaft power P2 19.7 34227mm P 17.5 NPSHR-values 433 234mm P�HR=�2.809ft -- - 1378 US ..m. 22 R'ogramversion Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17A11 P11 Xylem:U54-INT N P 3153 MT 3- 434 Duty Analysis L u Yy mrrm tCd1. Curves according to: Water, pure [100%] ; 39.2°F; 62.42lb/ft6; 1.6891E-5ft2/s [ft] Head 88 84 80 76 72 68 64 60 56 52 48 44 40 ° 36.8 ft 36 ° 32 28 77.4 ° 24 20 ° 16 12 43 227mm 8 55 Hz 40 Hz 45 Hz 50 Hz 4 1378 US g.p.m. 0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] / Operating characteristics Pumps / Flow Head Shaft power Flow Head Shaft power Hydr.eff. Spec. Energy NPSHre Systems US g.p.m. ft hp US g.p.m. ft hp kWh/US MG ft 1 1380 36.8 17.5 1380 36.8 17.5 73.6 % 178 22.8 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Programver.ion oar ,r,ioo User group(.) 60.0- 10a2021(euild220) 115202116:17 Al P11 Xyl— US -INT N P 3153 MT 3- 434 VFD Curve rL J +ywlR trRrL Curves according to: Water, pure,39.2 °F,62.42 Ib/ft;,1.6891E-5 ft2/s [ftl a 88 84 80 76 72 68 — 64 60 56 52 48 44 40 0 36 32 0 28 77.4 0 24 20 0 16 12 8 45 Hz 55 Hz 3 227rrm 4 [°/.9 mp tffTiciency 70 Overall Efficiency 60 50 40 30 20 10 0 p]- Power On put P1 16 Shaft power P2 227mm (P2) 5b1� ( ) 55 Hz 12 8 8 $� f4 [f� NPSHR alues 434 227mm 40 35 30 NPSH -32.809 25 20 15 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.1 Curve: ISO 9906 Project Created by PETER CARLSON Block Created on 12/1/2021 Lastupdate 12/1/2021 Progrzmve,.bn Dab version User group(.) 60.0- 10R2021(Wid220) 115202116:17 Al P11 Xylem:U3-INT NP 3153 MT 3- 434 VFD Analysis rL Li +y�a 1R tad 1 Curves according to: Water, pure [100%] ; 39.2°F; 62.42lb/ft3; 1.6891E-5ft2/s [ft] 88 84 80 76 72 68 64 60 56 52 48 44 40 36 ft 3277 28 24 20 16 12 9 8 - 4 -- 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] Operating Characteristics Pumps / Frequency Flow Head Shaft power Flow Head Shaft power Hydr.eff. Specific energy NPSHre Systems USa.o.m ft hp USg.p.m. ft hp WVIVUSMG ft 1 60 Hz 1380 36.8 17.5 1380 36.8 17.5 73.6 % 178 22.8 1 55 Hz 1100 36.4 13.2 1100 36.4 13.2 76.9 % 167 19.2 1 50 Hz 784 35.9 9.39 784 35.9 9.39 75.9 % 167 16.7 1 45 Hz 398 35.6 6.16 398 35.6 6.16 58.2 % 220 15.4 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Head I 77.4°° 0 36.8 i 77.4 0 0 227mm 3 55 Hz 40 Hz 45 Hz 1378 US g.p.m. R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT NP 3153 MT 3- 434 VFD Analysis rf�L rl •ywlR tad 1 Curves according to: Water, pure [100%) ; 39.2°F; 62.42lb/ft3; 1.6891E-5ft2/s [ft] Head 88 84 80 76 72 68 64 60 56 52 48 44 40 36 ft 32 28 24 20 16 227mm 12 8 4 - - 9 -- 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] Operating Characteristics Pumps/ Frequency Flow Head Shaft power Flow Head Shaft power Hydr.eff. Specific energy NPSHre Systems US a.o.m It hp US g.p.m. ft hp kWh/US MG it 1 40 Hz 71.7 35.S 3.96 71.7 35.5 3.96 16.3 % 827 14.6 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 I 77.4°° 36.8 i 0 77.4 0 0 3 55 Hz 40 Hz 45 Hz 1378 US g.p.m. R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT NP 3153 MT 3- 434 Dimensional drawing '01 (TO R)RTFESTPONT) REF.LINt VIEW — ❑Z If O 0 11" BaT (Abo LL O J U " DIKENSICKI TO ENDS CF WIDE BARS Project Block Created by PETER CARLSON Created on 12/1/2021 Last update 12/1/2021 IF "+ywlR tr�RR RNrzmversbn Da. version User group(.) 60.0- 10R2021(Build220) 115202116:17 Al P11 Xylem: USA- INT From: Weaver, John C To: Dudley, Leiah-Ann Cc: Hill, David A; adugna.kebede(alncdeor.gov; Montebello, Michael J; Dowden, Doug; Albertin, Klaus P; Weaver, John C Subject: USGS response to DWR USGS Low Flows request # 2022-152 (dated 2021/10/01) for Norris Branch Watauga County... RE: [EXTERNAL] Low -flow request approval Date: Friday, October 8, 2021 9:26:22 AM [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Ms. Dudley, In response to your inquiry about the low -flow characteristics for a location on Howard Creek adjacent Howards Creek Road near Boone in central Watauga County, the following information is provided: A check of the low -flow files here at the USGS South Atlantic Water Science Center (SAWSC, Raleigh office) does not indicate a previous low -flow determination for the point of interest, identified by the lat/long coordinates (36.246227,-81.675717) associated with the email dated 10/01/2021 from the DWR USGS Low Flow portal following your request submission. No USGS discharge records are known to exist for the point of interest. However, per USGS Water - Supply Paper 2403 (Giese and Mason, 1993), there is a USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. The USGS discharge records for this site indicate 13 miscellaneous measurements obtained during the 1954, 1956-60, and 1962 water years. In the absence of site -specific discharge records sufficient for a low -flow analysis, estimates of low - flow characteristics at ungaged locations are determined by assessing a range in the low -flow yields (expressed as flow per square mile drainage area, or cfsm) at nearby index sites where estimates have previously been determined. A basin delineation completed using the online USGS StreamStats application for North Carolina (https://streamstats.usgs.gov/ss/) indicates the drainage area for the point of interest (StreamStats adjusted coordinates 36.24615,-81.67572 NAD83) is 8.26 sgmi. For streams in Watauga County, low -flow characteristics published by the USGS are provided in two reports: (1) The first is a statewide report completed in the early 1990's. It is USGS Water -Supply Paper 2403, "Low -flow characteristics of streams in North Carolina" (Giese and Mason, 1993). An online version of the report is available at http://pubs.usgs.gov/wsp/2403/report.pdf. The report provides the low - flow characteristics (based on data through 1988) via regional relations and at -site values for sites with drainage basins between 1 and 400 sgmi and not considered or known to be affected by regulation and/or diversions. (2) The second is a statewide report published in March 2015. It is USGS Scientific Investigations Report 2015-5001, "Low -flow characteristics and flow -duration statistics for selected USGS continuous -record streamgaging stations in North Carolina through 2012" (Weaver, 2015). The report is available online at http://pubs.usgs.gov/sir/2015/5001/. The report provides updated low - flow characteristics and flow -duration statistics for 266 active (as of 2012 water year) and discontinued streamgages across the state where a minimum of 10 climatic years discharge records were available for flow analyses. Low -flow characteristics estimated for point of interest: Inspection of the two reports indicates the presence of four (4) nearby selected USGS partial -record site (4) and continuous -record streamgages (0) in the general vicinity of the point of interest where low -flow characteristics were published. This group of index sites includes the USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. Among these 4 sites, the low -flow discharge yields for the indicated flow statistics are as follows: Annual 7Q10 low -flow yields =_> from 0.23 to 0.42 cfsm (average about 0.32 cfsm, median about 0.33 cfsm) Annual 30Q2 low -flow yields =_> from 0.49 to 0.91 cfsm (average about 0.72 cfsm, median about 0.74 cfsm) Winter 7Q10 low -flow yields =_> from 0.31 to 0.57 cfsm (average about 0.46 cfsm, median about 0.48 cfsm) Annual 7Q2 low -flow yields ==> from 0.39 to 0.7 cfsm (average about 0.57 cfsm, median about 0.61 cfsm) Average annual discharge yields ==> from 1.9 to 3.2 cfsm (average about 2.3 cfsm, median about 2 cfsm) Application of the above range in yields to the drainage area (8.26 sgmi) for the point of interest results in the following estimated low -flow discharges: Annual 7Q10 low -flow discharges =_> from 1.9 to 3.5 cfs (average about 2.6 cfs, median about 2.7 cfs) Annual 30Q2 low -flow discharges =_> from 4 to 7.5 cfs (average about 5.9 cfs, median about 6.1 cfs) Winter 7Q10 low -flow discharges =_> from 2.6 to 4.7 cfs (average about 3.8 cfs, median about 4 cfs) Annual 7Q2 low -flow discharges ==> from 3.2 to 5.8 cfs (average about 4.7 cfs, median about 5 cfs) Average annual discharge discharges ==> from 15.7 to 26.4 cfs (average about 19 cfs, median about 16.5 cfs) Please note: (1) The estimated flows are provided in units of cubic feet per second (cfs). (2) The low -flow yields provided above are rounded to 2 significant figures. Estimated low -flow discharges less than 1 cfs are rounded to 2 significant figures. If between 1 and 100 cfs, then rounded to 1 decimal place; if greater than 100, then rounded to the nearest whole number (zero decimal places). (3) The information provided in this message is based on a preliminary assessment and considered provisional, subject to revision pending collection of future data and further analyses. These provisional streamflow statistics are provided via the DWR USGS Low Flows cooperative agreement between the USGS and the N.C. Department of Environmental Quality, Division of Water Resources. Hope this information is helpful. Thank you. Curtis Weaver J. Curtis Weaver, Hydrologist, PE Email: icweaver@usgs.aov USGS South Atlantic Water Science Center Online: https://www.usgs.gov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Albertin, Klaus P <klaus.albertin@ncdenr.gov> Sent: Friday, October 1, 2021 11:13 AM To: Idudley@dewberry.com Cc: Albertin, Klaus P <klaus.albertin@ncdenr.gov>; Hill, David A <david.hill@ncdenr.gov>; adugna.kebede@ncdenr.gov; Weaver, John C <jcweaver@usgs.gov>; Montebello, Michael J <Michael.Montebello@ncdenr.gov>; Dowden, Doug <doug.dowden@ncdenr.gov> Subject: [EXTERNAL] Low -flow request approval This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Your request has been approved and will be forwarded to USGS. A response from USGS usually takes 7 - 10 business days. Request Flow Statistic Approval Request ID: 152 Requestor: Leigh -Ann Dudley Requestor e-mail: ldudleyAdewberry.com Requestor Phone: 9194243764 Local Government: Public Water Supply: Consultant: Dewberry Contact: Leigh -Ann Dudley Reason: Permit River/Stream: Howards Creek Drainage Area (sq. mi.): 8.27 Latitude: 36.246227 Longitude:-81.675717 Other Information: Statististics: [7Q10","7Q10 - Winter","30Q2","Average Annual"] Approved by: Albertin, Klaus P 9/27/21, 2:39 PM StreamStats StreamStats Report Region ID: NC Workspace ID: NC20210927183610129000 Clicked Point (Latitude, Longitude): 36.23809,-81.65618 Time: 2021-09-27 14:36:31 -0400 r 7 L J Basin Characteristics Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 0.94 square miles PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / 0 percent Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge 100 percent PCTREG3 Percentage of drainage area located in Region 3 - Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4 - Coastal 0 percent Plains https://streamstats.usgs.gov/ss/ 1 /3 9/27/21, 2:39 PM Parameter Code PCTREG5 StreamStats Parameter Description Percentage of drainage area located in Region 5 - Lower Tifton Uplands Peak -Flow Statistics Parameters [Peak Southeast US over 1 sgmi 2009 51581 Value Unit 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.94 square miles 1 9000 PCTREG1 Percent Area in Region 1 0 percent 0 100 PCTREG2 Percent Area in Region 2 100 percent 0 100 PCTREG3 Percent Area in Region 3 0 percent 0 100 PCTREG4 Percent Area in Region 4 0 percent 0 100 PCTREG5 Percent Area in Region 5 0 percent 0 100 Peak -Flow Statistics Disclaimers [Peak Southeast US over 1 sgmi 2009 51581 One or more of the parameters is outside the suggested range. Estimates were extrapolated with unknown errors Peak -Flow Statistics Flow Report [Peak Southeast US over 1 sgmi 2009 5158] Statistic Value Unit 50-percent AEP flood 104 ft"3/s 20-percent AEP flood 199 ft^3/s 10-percent AEP flood 276 ft^3/s 4-percent AEP flood 381 ft^3/s 2-percent AEP flood 458 ft^3/s 1-percent AEP flood 551 ft^3/s 0.5-percent AEP flood 632 ft"3/s 0.2-percent AEP flood 760 ft"3/s Peak -Flow Statistics Citations Weaver, J.C., Feaster, T.D., and Gotvald, A.J.,2009, Magnitude and frequency of rural floods in the Southeastern United States, through 2006—Volume 2, North Carolina: U.S. Geological https://streamstats.usgs.gov/ss/ 2/3 9/27/21, 2:39 PM StreamStats Survey Scientific Investigations Report 2009-5158, 111 p. (http://pubs.usgs.gov/sir/2009/5158/) USGS Data Disclaimer: Unless otherwise stated, all data, metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected. Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S. Geological Survey (USGS), no warranty expressed or implied is made regarding the display or utility of the data for other purposes, nor on all computer systems, nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer: This software has been approved for release by the U.S. Geological Survey (USGS). Although the software has been subjected to rigorous review, the USGS reserves the right to update the software as needed pursuant to further analysis and review. No warranty, expressed or implied, is made by the USGS or the U.S. Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty. Furthermore, the software is released on condition that neither the USGS nor the U.S. Government shall be held liable for any damages resulting from its authorized or unauthorized use. USGS Product Names Disclaimer: Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Application Version: 4.6.2 StreamStats Services Version: 1.2.22 NSS Services Version: 2.1.2 https://streamstats.usgs.gov/ss/ 3/3 II. Modification Received February 16, 2022 Ji1111Y:1Tk' 25, :2()2'Z NPUFS %-V@SteYMtMT Nag -rain Dcpsrtmc is of Rnvirrr15mental Quality 1 fi 117 l� MI &--Mir-P Center Raleigh, NC ' -^r qL) Appalachian 4'rA71•. UKI3I'K�,1T5' F.n i lil ikr'a1:111 I. C'71cm Ai i I Ili.v i21f - o-sjq.--lry v L-,n 1:ha11rdaC' A-MhrMri d "I71 mini• . i li I R L•, AjIp l ieh 0I1 �I.Lde U ELLV :}LL}' JN PLIES F UMI.it N C00-I+p 3 klodi['itatit}n bequest TO Whom Ik May Content Appalachian 5tltr Univertiity (ASIJ) i-s siiihmitting this m kjnr peri7lit m(Aifi0ad,w rvg1I-tsL aINd 6k1Vpurting inec-rnl:itit�n t�s 11]{}FS'. thr riLqrlsarr r aLltf 11 ]r�r yiinn. '17�k, r 5>; ,Lk 1 Tl'k's ik[IC11t 1'lauL �'1r-IT1 dLsc'ba cs hH I"LWaslL Li IYCL CI P W&%J . 141 \ fr7'1•i%,� BAI11-:LL k, Ild er 010 ki L1JAVX!� !r UUO-1441z;l . The ekis#inP, [wrl1]it f?xpimrl. M,11xdh 31: 202L :ln:l Ag1~1 h:l.a gppliod fir but lmti ne)k �tl reue31 ml P. rCnc'u'ed ]}ri-mit.'Thr. rllrfe'nk p0rihik 110� ty[' 15 t'r( mitligtvltivv-lw l'metldell..I1(l tU SkIQIL ASU is �kdJlniLllrLg fl pernlit k1111}l ic;kriw1,1 joentl kun to ;1 k'bi hkt e jil CI1-v (li!s:lkargu witfall IuL aUIJ13. T17if? r.L1rne nt NIT fZ i1 e}}-C, 0101I1 is ]1� *' J Cloy e ko [ILe W11"$ I I I Lak-' sLJ'ur.LUrr it l Norris I5ra1Lr1J Rr_gnrvfJr. AFA - degiroq kr� L51-we khe rjkc lm vg-:� oll kf,1111-nfi�1til JtL to t EicJwi)A. 6vi.Lk a1clhLt a ul LIP 113C. CI(isting H01V,1rd-3 C'IT.-A ilL111.1-ehl PUMP M1.61:1). The p11.111 TY dTj'vur lu mi-we LiLe kknttall is to mducc impart frcfln thr. disrha i7o {1L7. I1w water i make, A L;r LIOILk:Gk 10 uLUVIEL.t, 1110 otLLfdII Will be 113uve Lht t] i FvIxaT ;c: frainl 4 wter 51hppli, mrv6i v t{ I a la r.1+,v r r o-viwil'Qr, wate1' v, ith hi-O v 1f,sirl l lli:ltiv-;co u it}'. AW buS tk'tllkkakvd 11ijvt c)pLiuJks Lu rimi gt! OR: rfl]uCLLI. EIRLIUILk Lruat.IHVILk WLL]L ik1J1 MILaul;e i.tiukl CiJILLiD lt`d diSVILarKe i3ktO N,)rris RCSC3T0ir ke-1,watilly�, kl:c- d41;1. 1101,-0 CJkLlf�lll W 19+J1ti'alLx1x L'1xTk in llu' virinity of rhr c!X3stin; HnwiMv L L'Terk iIIOLIC'uk PumPSLUIUB kt]rxi:lti ng dLk? disclJal-g-2 OLLL L11 dcAvi: stLx!SJ15 Of tit NOrFiS C'.rrek Rmcrwi r i11 t]Le. VifL.i llity Of I'J.Lgh1ti'I y 194 V .AEU. with thi! :L441 tFinre -m DuwFx! ny, had prP.Animly PmAhm ref thu. M.V fur i 11if,1-F1n e.11 king irMl i'x-�Il $r1g'i.` and rm:Ezv ayincmi5 to remove meals fvorn the effluent. Tn fkLrtEIC.V 11]I}rPrr khF irfiItLYl-'151 M-j)I.k1{jiL4JILj Dcwberr}' p1,rfnnnfirl L,enrh marabilir}'t-p-3ts in vekifvthfL. k1o;)tm1 Tit n]yiiotl.� CjLrI LIGhle-eE tmkLvlIL mnrentmti-nns sib 1mv ;I s rhfs r-%:►ari nF 11 m ip.rim I I imii` . 'M e. resi I k.,, nf• the }jktitii- L Se -Me- tl eatabillikV ti.7HU. Finis smut .3T!zvd M AttiC11ment A.'ne. treaty 'ilit'y teF;r.q cok,arn1 tiiat im, �LKc'ILxuge can meet LILT• Uk131CDt nk1 movirkil {tl1.11Mi 1i t111t•I. 'flLa I)I1jtLinn of pi i�babl-e k'-05ks fC-r tLL%? iOrL MARI IIVC L,3-skcw pun-i'm6ly [l[`vc 11 IpH. I anal v DFQ in a .w hkuilull flAtNl 07;'07,202 1 1',. A Llll APIJI'MI le, WILlk 21 LFIYiiMled mpital m.c:l nt �iILCri k' [I•}[k1 1.1.118 Llm ruutirl'JJYg - u` L£ u[ Ck s ICL 11—UPI&ML:NIt, U13Cm 1i21 CUstS. Ond im'dil Lkmim icc, LELL 20-}'1far life i'ti'k:1C C UTA Of iOLL bxk-11,J 11gC Arm. inLffllgill1C itt Llix a�rclk`I �t��i WAl1 i011 k•ikk'11i1Ikg ]lkrl ]ILUIIJ I.t`i] Ill LILL7 lark'sk'nLUd CTVA C% iMati`ki HTC: tlhi w1clitinn kl 1-flior regLlilk?d fQr -Jpu4LI:3UD and tht unvLTonmcnul] impact frf fR:g1LcnL gcneradcm of gpent rr i11 trrr r1hpeFal. S 1:1 L: 1. 1'l I 511': 01.:v 01' :I•I L'III ti.11til lS i,r Hfik I ti-mui.1:.. .,v 1•4 ti•:.I 1-r•I•1, 11 v1 % ry 1.11;6 Rear 1 I)f ", NPDE:E hru.b p 25. 2C22 AS also con:eulcrcd twu options tar 3Lternadwo digi•harge Icw.aions. Optirm 1 i� to w..Lnc:,ttu 111e uuLlall to Howarils CTc k in tlLc vicinity of tllc ASU IlMV211' L, Cr"k intltlant P133nj75tLltinn. Option p �j to rtrlclrtlit L1kG uutf.Lll Lo NorrLq llruatlk du nstrmun of the rf-.qi rmi r and in tho. %�ci nity of Highway 194 N. [lie ��L�js c Liti c of t1ke aft) r.ativ(: dischuge LocatiGna U trr PM-Oi?Llt the eithlf.15t €l-0111 hCdtlg cLl$C174i k CIjJL t'•t1y IIYLQ the rtSC•rV{}lr and tD iduntifi- a HICCMLIA'rMtrr 1}itll 9LLrYiriena ;wLilTOAtivf' i AApk •iCv t1iiit Allover efJltltMt tU rc)mgLv with goplical)LD rc:�LL Mir n% �-;1thgllt rNgliriI1g IrLrlitirin;h1 prPtrP..gwent. Tho 1k1e111.)r.i11{1aIlk pruyIdtd in Attachment Ja from Dc:wbeiFy l}rrlk idrq'a ALI III 15 uw -A ThQ 41I1t`•umatiue Ji-} .lmTge ltxki Liuns, infrastructure requirenl.-cus. wimr gmility resll MoratiQtl,.111d L11 jrt trrcl U111i1A CO-SIS (Or 030 IWO 31tr.M:LtiVL'24. W-h(:l_ r:rmsiaL'M.rl maintr•nanr:r~ fx,ngh f-sr egfillth,� life c ycle et?;t Etlr Ol dGl) i i- S 1,764MMO and thO '—" E-yeav lit rkr:le tr]Sk fcir ()pticisl 2 is A.qU rrrinF-StF,IJ3e e41113ent Ontfnll be. mriuort to Howark ('I lk Ln 11v vicknily rPf 11w AV ffuwares Crc:eL- iliflr-r•nt 11LL1111MIflticrll. Tbis alterng iue -�)ffuN 111a11y .j-JWLL1L[,1�OS i11-210{li lLg LtL-t� 14j resl lift--v�cic m9t. r[!I1S.�44iJNih1WKinfIA-21F41.tltl1�,-. YYlillim:1I1 1i!suu ltV11 to thuJjuig1LbL?t•LnV U1,11l113u[LLLy fur CUMLrurtiim. 1-n"?r npfratifin and n5minteman-re. emits rrintive I in15 k' t`Iltl�f�'r'} aiul iICLLxIlwt`� {'ompli,"Iwu with tli: tuharp tG a 19rgor recolving wit,:- with morr ,hsMmilgivQ Qapacil}- $iltt•�ruL�, 11;4n iel {Tr}�I�r f-r! An th-n-n y Millp.r. 11h LU' 11-fULn L1udl-ev. PE Rolm�rt-Ski 11" Mme. FF Appenili-A- Bench Test Reaults Mam* Appf)nd N B- ,�l tl 1p l mb) OtltNI Relocakiuji H- lku ['dry} a �1 2 Dewberry DATE: January 25, 2022 TO: Mr. Daniel Gryder (Appalachian State University) FROM: Robert S. Notte, PE, LEED AP Anthony D. Miller, PE SUBJECT: Appalachian State University Water Treatment Plant — Sludge Basin Outfall Relocation Message 1.0 Introduction Appalachian State University (ASU) is submitting a major permit modification request and supporting information to move the current sludge thickener discharge outfall location. The ASU Water Treatment Plant (WTP) currently discharges backwash and CIP waste to Norris Branch Reservoir under the auspices of NPDES Permit NC0044423. The existing permit expired March 31, 2021 and ASU has applied for but has not yet received a renewed permit. The current permit has been administratively extended, and as such, ASU is submitting a permit application addendum to request a change in the discharge outfall location. The current NPDES discharge outfall is located near the WTP's intake structure in Norris Branch Reservoir. ASU desires to move the discharge outfall location. The purpose of this memorandum is to evaluate the infrastructure requirements and water quality considerations, and to provide opinion of probable costs for each alternative. 2.0 Existing Conditions Figure 1 attached shows the WTP and the existing sludge thickener basin. The existing sludge thickener located at the WTP currently sends its discharge to the north of the site to Norris Branch Reservoir. The existing reservoir is currently used as a monitoring station and holding area. The location of the sludge thickener discharge raises concerns due to impact from the discharge on the water intake. 3.0 Proposed Improvements Proposed improvements for this project include two options to address the relocation of the existing sludge thickener basin outfall. See attached Figure 1 and Figure 2 for a diagram of the proposed options. The proposed options include: • Option 1: Relocate the outfall to Howards Creek in the vicinity of the ASU Howards Creek influent pump station • Option 2: Relocate the outfall to Norris Branch downstream of the reservoir and in the vicinity of Highway 194 N Option 1: Proposed improvements associated with this option include utilizing the existing 12" Ductile Iron Pipe (DIP) bypass and the existing 16" raw water main from Howards Creek pump station. This option would tie the existing sludge thickener outfall pipe to the existing 12" DIP bypass. Based on conversations with ASU, the condition of this existing 12" DIP bypass is unknown as it has not been used since raw water has been pulled from the reservoir. As such, it is anticipated that approximately 2,000-1-F of this existing 12" DIP will need to be investigated and potentially rehabilitated to allow it to be used for this option. The existing 12" DIP will gravity flow downstream to a proposed duplex pump station near the discharge of the 16" DIP raw water main into the Norris Branch reservoir. From the new pump station, the existing ASU WTP SLUDGE BASIN OUTFALL RELOCATION 1 OF 3 12" DIP will transition to a force main until it tees into the 16" raw water main from Howards Creek pump station. The wet well within the proposed pump station is anticipated to be approximately 15-FT deep. Using an assumed flow rate of 1,300 GPM in the 16" DIP raw water main (approximately 2 FPS) and utilizing existing as -built drawings and information provided by ASU, a pump would need be selected to handle approximately 1,300 GPM of flow at 36.70-FT of total dynamic head. Cut sheets of the proposed pump can be found in the attachments. Preliminary pump calculations can be found on Figure 1. Additional valves will be added on the existing lines to allow for ASU to conduct routine maintenance and isolate the existing holding reservoir when the sludge thickener basin is drained. Based on the outlined approach above, the existing 16" DIP raw water main will serve two purposes; to convey flow from the sludge thickener basin to Howards Creek, and convey raw water from Howards Creek to the reservoir during drought years when the reservoir cannot fill itself. Conveyance of raw water from Howards Creek to the reservoir occurs infrequently. When it is necessary to convey raw water, the 16" DIP line will need to be fully flushed prior to conveyance of raw water from Howards Creek to the reservoir to prevent the sludge decant from entering the reservoir. To allow for the full flush of this line, a proposed finished water connection from the ASU Water Treatment Plant will need to be connected to the existing 12" DIP bypass which flows to the proposed pump station. ASU will need to discharge approximately 28,200 gallons of finished water to the pump station to complete a full flush of the 16" line to Howard Creek. Preliminary probable construction cost for Option 1 is $1,172,000. Option 2: Proposed improvements associated with this option include the installation of approximately 3,440 LF of 24" RCP to convey the discharge from the existing sludge thickener basin downstream to NC Highway 194 N. Improvements associated with this option will include limited clearing for the pipe trench, new 24" RCP, and associated manholes. The proposed 24" RCP segments will require routing through privately owned properties. It is assumed that there will be a 30-LF wide permanent easement along the routing of the new 24" RCP segments. Utilizing Watagua County GIS, a cost for easements was determined by comparing surrounding property values and property sizes. Note, this cost for easement acquisition is based on publicly available information. Easement acquisition costs may change once negotiations with property owners takes place. Preliminary probable construction cost for Option 2 is $1,661,000. 4.0 Water Quality Considerations In addition to the infrastructure and project costs, Dewberry also considered the characteristics of the two receiving waters to accept the discharge. The current discharge to Norris Branch Reservoir is to a zero - flow receiving water with a classification of WS-II, Tr, HQQ, CA. Howards Creek, discharge Option 1, is classified as Class C, Tr, HQW (Stream Index 10-1-9-(6)). The low flow statistics provided by USGS for Howards Creek indicate a drainage area of 8.26 square miles and an annual 7Q10 low flow average discharge of 2.6 cubic feet per second (cfs). The low flow statistics evaluation from USGS is provided as an attachment. Howards Creek is a much larger receiving stream than the current discharge and will have a larger assimilative capacity to receive a discharge and result in improved compliance. Norris Branch at the Option 2 discharge location is classified as Class C, Tr (Stream Index 10-1-9-7-(2)). The drainage area to the Option 2 outfall location is 0.94 square miles, significantly smaller than the drainage area to Howards Creek. The Stream Stats report for the Norris Branch discharge location is provided as an attachment. As the drainage area for the Norris Branch outfall location is only 11 % of the drainage area to Howards Creek, the 7Q10 flows are anticipated to also be significantly reduced and Dewberry did not make a request of USGS to provide flows. Dewberry' ASU WTP SLUDGE BASIN OUTFALL RELOCATION 2 OF 3 5.0 Conclusion Advantages of Option 1 include the reuse of existing infrastructure, a lower capital cost, and is the larger receiving water with more assimilative capacity. Option 2 would require significantly greater new infrastructure and land disturbance, would be disruptive to the neighboring community for easement acquisition and construction, has a higher capital cost, and would result in the discharge still being within a smaller receiving water. As such, it is recommended that between the two alternative discharge locations ASU pursue a discharge to Howards Creeks (Option 1). Attachments 1. Figure 1: Outfall Option 1 2. Figure 2: Outfall Option 2 3. Option 1 Preliminary Opinion of Probable Construction Cost 4.Option 2 Preliminary Opinion of Probable Construction Cost 5. Pump Selection Cut Sheets 6. USGS Low Flow Statistics for Howards Creek 7. StreamStats Report for Norris Branch FSDewberry ASU WTP SLUDGE BASIN OUTFALL RELOCATION 3 OF 3 1 2 3 4 5 PRELIMINARY PUMP STATION _ __-_ _ ' ' ' \\\1 ' ' \-,' ,,' _,/ ` _ \\ `\ _ _____ -__ \ _ I— _ - / / \ 1 i - -�- / / //�/ —�J __ �, / �/ ,/ /�\\II III \ \\ l \ ( / \ 1 /'I, J \ \ \ \ \\\ \\ \ '- \1 \ \\ \ �_�\�\ \ \ \\__ / /� —_ / / / ` \ I / /\\ \ / \ \ \ \\\ \ / �_ // :t \_////// , / _ _ --_% _f/ //// /�1 I I /� \111 `I l \ \ \\\ \\ \ I \ I / 1 1 \ �/ / 1 \\\\\ \ \\\_// \II \\\ \_ ��\� ��\\\ \�_ ---�/j /� // ______='�% CALCULATIONS - - ' /-- 1 \ ) .., .$I 1 \ \ 1 , \\\\ ��___� '/;; - -_-- �_-;_-- �-��"� // '// / 1 \\\I\\ \\ \ \ I \ \ \ ) I I \ / \ ( \ \ \ / 1 \� 1 \ \ � \ / / / �__\ \`� __/ (/ / --- _ \ \ \\ 1 I �\ + I 1 1 \ \ \/ / 1 / I \ �/ \1 1 \ \ \ \ \ \ ..\ \ \_- / �/ //// _ - — �!_; ��`�` 1 \ I \ \ I / / ���// �- / I/I\I I,\\\ \\\\ / 1 / // I \ \ ,, I / I 1 i- \ \ / 1 /// // \\\\\\ \\ - \\ \ \\\\ \ ` /�_S/-_%__ FLOW CALCULATIONS o�--�\\\\ /- `J J \ /- \ \\ \ \ I ( / \ , I I __/ . \ \\ / I I II, -' \ \\\ \ ----- ////// /__- �� \ I \ \ \\ \ / \ \ \ \ \ / /, /" -__ 1 I \ // \ \ \ \ / // �� --_ \\��- , 11 I � I \ ,, \\\\ \\ \ \ I I \ \ / \ III \\ \ / / \ \ \ \ \ \ \\ Y \\ - I - // / / _--_ / ' oN __ �\\_ 1 \ \ , I \ EXISTING i / \\\ \ \ \ \ \ `( \ \ �; I \ l / \\\\ \ _ \ \ \ \\\�\_ - 1 / SLUDGE THICKENER BASIN � M - - - `\\ \\ \- - 1 \ \ - -- \\ \\ \\ I \ \ 1 ,� \ - I I - I I 1 \ \ / \ \ \ � - \ \ \ \ % - \ \ \\ '/ '/ i I I I I / / i / -L — _ _- / Z00 \\ \ \ -- ) I HOWARDS CREEK / - \��-\ \ \ 1 \ \ \ \\1 , I I �� \ ` I \\\ / / \� \` '--�\ \\\\\ \\\ \\� /u / �-/ JI( I( //�/ _ - �� -- EXISTING CONDITIONS = 400 GPM (INFORMATION PROVIDED BY ASU) o Z\ \ \ - - - / / / \ \ \ \ \ I I \ \ \\\ \ \ \ / I \ \ I \ \ \ / \ \ \ // \ \ \ \ / �` '- - - I I I / / / �� o? `\� \� - _� \�I-- / \ PUMP STATION < / /' \ \ \ \ \ \ \ \ \ \ , \ \\ \` \ \ � \ r/ �J/r�r l , // ///�/ \ \ \\ \ \ �` / - /i / /// / /�/ - SCOUR FLOW = 1,300 GPM (FLOW TO ACHIEVE 2 FPS IN 16" FORCE MAIN) \ - - - _ - _ I_ _ - - 1 I 1 / \\ \\\\ \ _ \ \ / / - / \ \ / / _ _ - \ \ \ \ \ \ \ \ \ / / - - - � / /�// // l / - - - - _ = �c� ��\- _= z�� - �---- __1 \ 1 / ( / / / \ \ \ \ �` \ - \ \� \ / \ \ \ `\_/ \ \ I -\ \ \\ \ \ \ \\ \ \\\ \ 1 / / j// / /// / l I j / --,z - ; E DESIGN PUMP RATE = 1,300 GPM - - - - - - _ _ \ \ / I 1 \ \\ \ \ I \ \ \ 1 \ \ ► 1 / / _ - \ _ — \ \ \ I /// / / POTENTIAL VALVE \ \ \ \ I / -� I I / ll.// \ 1 \\ \` \ I �� \ \\ \ \\\ t t \ I 1 / / // / TOTAL DYNAMIC HEAD CALCULATIONS `_ _ - _ / / / Z\� \ \ \\ \,_ - _ \\ , - _ - - \ '- - - \ -\ \\ \ \ \ `� / / I I J I I I/// /// % �%'i /' �,/ /, _ ASSEMBLIES AT _ POTENTIAL NEW \\ __ \ �\ \ ,� / \\ \ \\ _/ \\` - \ \ _ \� \ \\ � \��\�\`\\\\\ \ \\, /,/ 1)//////'/ / / / // // / /�-_- STATIC HEAD = 35.50 FT - — - l _ \ \ \ \\ � \ I \ / \ \ \ _ - \ \ \\ \ \\ \\ \ \ \ \ . /// , / /// l I l / x � _ ` HOWARDS CREEK - _ _ \DISCHARGE TO / \ \11\\\ ` \ \ ` \` - / \ \ \ \ \\ \ \\ \ / / //r /// / / / /'/' / _ 1 / \ \ \ x_ \ \\ \ \ \ �- r- \ \ '� - \\\ \ \\ \\\\\\ -:� \ Ir //'// /// / //)//// ///////I(�/� FRICTION HEAD LOSS AT DESIGN PUMP RATE = 1.19 FT (C FACTOR = 100) — _ - 33G I \ ' I I I \ \ \ - \\ \ \ � \ \ \ - \ \ \ \ / \ \ _ \ - \ \ \ \ \ \-,� k \ \ - J I 1 (I /' / / / / // / / �//i / / // J 1 1 TOTAL DYNAMIC HEAD = 36.70 FT - PUMP STATION _ HOWARDS CREEK 11\ \ 1� 1 I I \\ \ \ -- _ - \ \` y \ \ \ \ \ \ \ -- \ \ \ 1 / / / / / '' / / 1 - 1 \N / w \ - \ \\ \ \\_- \ \ \1 \\ \ 1 I\ \ ,\ I J1 l�l I "I I)'IJ//// /i l //i' ' / I I \ \------'- _3, \\ ---- . / 1 \``r\I\ \\ - \\\ \\\\__ _ \\ \' J \ I \___/ \`_ \\ I I I1 I I I II 1/ �l I .\�/'�/"j, //// //// - - //1 /,1/ /(/ / / / I \\/____- _- �� _--------/ \\�\\ \ \ // \\� - �\\\ \ Z \\ \ �--' 1 / \ \ \ \ I 1 1 I �/ / ( \_��/ �/ / ((r (r / / / /, ( I i PUMP STATION DESIGN POINT I - _� _ _ - \� \ \ \ / / \ � - _ - \\ \\ \ \ \ I / \ \ J / J 1 / / l 1 r \ \ /� //// lI 1 // , / / / � I ( \ \ \ l , / / / - _ // \ / \ _ \ \ Il - \ / // / // / 1 __-/i.l l/ ( Ill r / // I J) //, / OPERATING POINT 1: 1,300GPM 36.70 TDH - = = = _ _ / \ / / _ \ \ - - \ \ \\ \ \ \\ \ I ( \ - - - - \ \ ,// �/ /r / 1 I I 1 \ _ _ __ i , 1 0 / / / // / // / / /// //� / / / / I\ \l_ / 0 '- r-3200�— \\\\\ \ `� / '_.` \ \\\�\ `\\--1 \\\\ \ \ \ \ \ \ I( / �_i // / II \ 1 _ /� / // / / / l / / /j / / / / \ I `` EXISTING HOWARDS \ ,-N- - \\ \ \\ \ \ /-'\ \\ \- \\ \ ( r_� l \ \ \ / / I I / / PUMP SELECTION I \ / \ - \ -' \ / � - - �/ \ \\ _ / \ / \ \� I I I I l I 1 T - 7 - L 1 / / 1 / \ / \ \ / \ o / \ \o\\\ \\ \\\ / 1�, II 1((/-� 1\ \ \\\\- / I I \1,11 IIII I \ \ 1 ////�i// l PUMP: NP 3153 MT 3- 434 \ / \ \ \ \ �\ \ \ , \\ \\ \ \ I / \ - / \ \\ - - / 1 \ \ / \ \ \ I\ , \ \ CREEK \\\\\ \ S� \ /' / ' I T 1 \ \ / / //�1 (I III / / l l / / /, /llr / �� MOTOR: 20HP \ \-/ / 1 \ I (^\-\ - - \ �_- \\ Via\ \\\\\ o� \\\\\\ _ .- \ ( / Il// II I I (/ / /' I 1 \ �-- /' " �111 I I / / //rllJ/ // / //// // /// \ 1 / / \ \ \ /-\ \ \ \ \\ \\ `rb\\ \\ \\ \`_ J/ -, , / / / I I / /� / / , / /// I / \_ / I \\` _ - __ \\\ \ \\ \ \\ - , I / // / III I I / I � " //1 I I ////// / /ll /�'///� ////, \ \ \ \ \ \ // / / ( I I \ // / / / / _ IMPELLER: 327 mm DIA. \ U \ ` / - - _ ` \\ \ \\\ \ \ \ \\ 1 I ` \ 1 1 \ \ \ \ T , // / / /I 1 //// ,/ �// ' SUCTION: 6 DIA. \ _ - \\ \ 1 \ ( / / / \ \\ / 1 / / / \ I \ \ / -\\ \\\\-\ `\\\\ \\�. \ \ \ / / / / / / / / / // / / DISCHARGE: 6" DIA. \ \ I r \ \ �\ \ \ \\ \ ` \ \ \ / 1 1\ \ \ ( \ \ ` \ \ \ '/_ _ / / / /r / /' \ \ \\ \ \'' I /'///// �%// /1 1 //�/ // I - 2 / \ \ \ \ \ I \ I \ \ \�; \ \ \ \ v ' I / / / / \ \\ r I 3 I \ \, \ \ \\ \ \\\\\` \ \ \ I \ �\ \\ \ _I- / / //// / ///I / // DUTY POINT: 1,378 GPM @ 36.8 @ 60 Hz l \ \ \ \ 1 \ I _ � / / / / / \ \ 1 1 I I \ \ \ \ \ \ \ /-\ / /// I 11 i \ \ I \ \ - \ \ \\ \ \\ . \ \ \ - _ POWER REQUIREMENT: 60 Hz - 3 PHASE 460 V \ \ \ I I \ \ \ \ �' I 1 \ \ - \\\ \ \ 1 I Jl 1 / I \ \ \ \ --- /J \ / //// / \ \ /� ` ` \ \ / \� \ \ \\�\ I //// / / / / / I 1 \ \ \ \� \ - --- �.�_ �� J 1 `\\l 1//(� /// // \ y \ \� \ \ \\\ \ \ \ \ \ — — _ / '- / / / / / / PUMP STATION LEVEL CONTROL ELEVATIONS , 1 1 /I I / i , / 1 - - - - - - - _ _ - - � - - / ' ` \ \ \ \ _ / \/ / / / \ \ -\ _ _ _ _ _ / - 1 \ \\ \\ / // / _ _ \ / / --- -- _ // /- - / / / I/III ( / TOP OF SLAB = 3450.00 (PER GIS TOPO) / '/ /'r /� / _ - - `\ - - -_ \� _ - -/ - - - -' ` \ \\\\ \\\ /\ / / / I / / \ \ \ \\ \ - _ — _ ///�- _ ��.. / I / / / / \ �r \- _- --- /_ - �_-_ - \ \ \\\N\\ `NNE / // 1 III / \ \ \ \\\ :-__-r•__--_r___ '�/_ ������ /1/J I/ / c I / / INLET=3444.50 I I r�� ( \ _► // \ I— -- _ _-\ _ _-- _ \ \ - `� \ \\\\N\'?, \ \ ll/l/ I (I \- \ \\ _ ��� --�-�� �'i-�'�//��/�// %� ') l / HIGH WATER ALARM=3443.50 I 1 I / 11 , \ // /// - \ \\325 O—I�-i \\ - _ -� N \ I • \\\\\ \\��/ // 1 1 \ I - \ 33 \\-- _--__ ___ - ��/% � 1 1 _ 11 j'�'� A l/ LAG PUMP ON=3442.50 // / I / / I / / / /- - \ - -,325 - - /--- \ \ \ \ `\\\� / r I I 1 / \ I \ �- -- ---- //i - �/ // // / - - / D / / / f / / _ \ - / _ _--_ --- - \ ^\\ .\ \ \\\\ `�/ / \III r1 1 -- --- ////,-_r_ ____-// / / // ( / / LEAD PUMP ON=3441.50 _/ // / /, I / - / --_ \ � - _ \ \ \ \ , \ \� \\�// II I I / / -_ --- �/ / / /�'�-��J// // I 11 ALL PUMPS OFF=3436.50 33p \_'� / ' `- /-_� \ \ \ \� / l / / --- --_ - ---- - / / // �'` APPROXIMATE LOCATION ► I ' - °� �' - �� �' \ _ - \ ` \ / / (/ / / ,\ / - - — / / /�/ / PUMP BENCH = 3435.50 - • I 1 �- - 3 / \ / - _ - 1 \ \ \\Z` \ I l I / ( / \/ 50 _ _ - - _ _ %/ // ' / I / \ / / _ / / I / OF EXISTING 2,400-LF 16 JI I /--\`►`, _/ / _ \ 1 I \ \�\\ \\\ I \\ I ll/11\ \ \ I I III-- // - - /'%�/' \ \ //// /- - - \\ I l �\ \ \ \ \\ \ \ I 1 \ / / _ . \J \ /// PROPOSED WET WELL SIZE: 96 (8) DIA. RAW WATER MAIN FROM _ 3/ / - \\ - 1 \ \ \ \ I \ / \ / 1 \ \ \ \\ , %-/; r \ _ / l / r/J, �` HOWARDS CREEK PUMP _ / �-T1 /, /"/- \�:'/'/'%_ \`II/� \�\\, �_- 1'\\ \\�\ \ ` I / \\�`\\\ - _/ \ \ \ \ \ / /v/ —J 'l 111 �Irr , FORCE MAIN DATA .\ , _ / //p00�1-\\ _ / _ _ \ 1 - - \ 1 \ 1 \ \ \\ \ - I \ 2 \ / / r 1 I I I I \, / \ \/ I / //- �'/ 3 / \ , 1 \k\ - - \ 111 �\\\ /\1/ \/ \ \ \ \� --- \ \ \ \ - /� � �� _. I IIII DIAMETER:16INCHES \' STATION _- /\\ I / I _-/ /'// jI—l_,\\� // / --\\\ \ \ \\- --- I I �\ \ \/ \\ \� \` \�1 _� -----/ ! \ \I \ ,'/i/ I I (IIIIII \. _ \r / /-1 _/J / \\ -� / / / \ \\\ - \ I \\ \ \ - \\ - __�__ 1 \ \ ____ /// ; f"'-l. I III \_ _ - 33S \ l f / / - / ✓//// \���-� / / /-\ \\\ \ \ \\ -\\\ 1 \ \` `�\ / \\� / \ \ 1 ' ' �•191F I 1 1/1 TOTAL LENGTH: 2,700 LF _-, / _ _� _ _ _ - - - 0 \ , / / i --� / \ \I I \ \ \ - - _ _ \ ( // / I I I - f_ \ \ \ - �\ \ \ \ I _ \ / - - - _ / - I III/I I - / --- - \\� \ I I / / / ,// gR / \ \ \ \ \ --- I 1 HIGH POINT ELEVATION = 3472.00' PER AS -BUILT DRAWINGS _ _ - _ \ \ \ 32 _ _ -- - '/ { ( ) --- / ) \ \ _ -� \�\ \ \ \ \ \ \ \ -\ \ 1 I \ 1\\ - , , \ .� ( III VELOCITY AT PUMP RATE = 2.0 FEET/SECOND (C FACTOR = 100) / / / - - - _ - _\\ \ - oo \ - � _ JI / / / /// / _ \ \ _ _ _ _ - _ _\ \ \ \\ \ \ \ \ \ \ \\\\ \\\ \ \ \ I \ \ \ \\ -I/ \ \ \ / \ / , \ \ 1 I 1 I III 111 \ / \� ,\ \ / I �/ /'/ j' _�-\`'�-��^��-%�'`� - l / I/� / , �3 0\�--�\r. \�\\\\ �\ \\� \\111 \�\\\\ \ \ \\\ \\ _—�J�r \I I / \ I I I 1 \I\\ 1 \ 1 \ \ \\ / II If// / / / \\ \o_ / _ I / /- \ \\ \\ \ \ \ \ \ \ \ i / �-T \ \ II I /l 1 / -- \ \ \\ \ \ \ \\ \ \ o \ \ \ / ---_-- - / / \ -/ 1 IIII \\\\� \ \ \\ --- 1 \\ I I / , / / �/- --\ \ \. _ \ - _ _ I I I \ - --�\\\ \ \ \ 1 \ - I I - - \\ - J \ 11 1) I / / I I� I 111 �''/%'' /'// - \3 ^EXISTING 16 LINE _ I \ POTENTIAL VALVE \ \\ \\\\\\\ \ \\ \ \ _ I11 \ \ \ \ - f / / '/% jl I III I (// / / \ \ \oo \ - I \ �\ \ \\ \ \ \ \\ \ \\ I \ \ \\ \ \ / / _ I �I \\\ \ \\\\ II _/ , III I `_\\ \ \\\ \ , \\ \ \\ \\ \ p / \ - \ \\\ / '\ \ \ 1 \ \ 11 \ \ \ \\ \-\ I - \ \ /// / III I \ \ \\ \ \ o\ \ \ II \ \ ' ;�.i l 11 III / /// / HIGH POINT - _ I I ASSEMBLIES AT \� \ \I \ I 1 1 1 \ \ \ \ \-o `- \ \ I I \ I I I i \11 / --\\ \\ \ \ /////--/ I I I I �/ / / \ \ \ - - \ - .c __/ I \ \ \ \ 111 1 1 \ \ \ \\ \ \` \ ` \ ` -- \ - - \ \ _ ///,-- l I / I 35S`� \ \\` CONNECTION POINT \ \ �\ \ \ I 1 \ \ \ \ \\ \ � - \� \ - \ \ \ 1 I I ( � / \\\ - /i /��--- / I I 1 / 0 \ _ / 1 \ \ \ 11 1 \ \ \\ \-\ \ \ \ \ _ \ \ - / �- \\ \\\\\ __- _�- //�� I / _/--\\ \ \ \ \ , - �\ \ \ \ �\ _\ \ \ \ \ \ \\ \ \'- \335 \\\\ \ \ \ \ \\ _ \ - \_ - \_ - / \ _ _\ I I / /� \\� ---- // // - I f / l \ - - -- \\ \ \\ \\\\ - \ \ \ \ _ , I r \ \ \ ( 1 I \ - - \ \ \ \ \ � \ /-- / I ///X// =-\\` \\\ \_ _ / -/ /% I I --\ ) > POTENTIAL NEW / --- \� - -___ \ \ \�` - 30 \\\ \ '_\\ > _ _ / \ - %/ / /� ` \1 ► \`_ ____ `�--L\► \ I /-' J --- � , PUMP STATION - ----- - - _� \` \ -,I � .\\ \\\\`..\�_�_ 7 --___- _ _ / \ r / / / / /�/// \ \ /1 \ �_ , --_ / —' / \ ter, s- -- __ -----_i\\\ \ \ -- \?— _ \ _ —\ --_ __ /-- _ \ / \ \ / // �/ - \\\ \ __ --1 l J / 50- ' / / '-� - \,\\ \�Q\ I\ EXISTING RAW • \/__ __ - -\\ - _ - zoo - _ l �/ l // / \ \\ \ \ - \ \ ! / / / / ---35 / / / / /'I. I _ / / — ,, \ \ \ \ \ — \ \ \ \ _ \ / \ — \ / r/ -" -- \ - - - - \ \ I \ '/r / \ ` \ _ - -/ /� , / / , �' EXISTING SLUDGE BASIN ' - - \ ` \ \ \\ - ` I I C// / / \ \`\ - _ / / /' / // � - -�~\ \ .WATER INTAKE —�"� \ - r- I_ \ // / / Ii \ \ \ \\\__-'\\-� "I _ (! l l \ • /' / ii'/ / I �35/ -- ,T --- — — \ \ \ \` \ \ — \\\ 1—� \\ \\\_/ _ �32 i \ \ \\\ / _\ \ \ \ 1 \ / / --/ I \ \ \ ` -- \ I l I �—' / / / // I I \ \ \ — \ \ \ \ - \\ \\— \\\ - \ \\ — / S \ I I / I J 1 — ,_ _ \ / / / / \ \ \ — _ _ \ \\ / � \ _ _ _ I — _ 50 _ \ EXISTING SLUDGE _ \ /, \ 1 11 / �_-_ �` \\\�--_-, 1_. --_ /. I r - / _ � � \` -I\ ' BASIN OUTFALL -- � �� - `; \\` \�//� \-_ _33 \ `\ 11 1 /1� / r \ \ \ - / / \ \ I — -ram \\ \ / - \ / \ \ \ \ \ ( / , I / / \ - - - \ \ \ - _ \ - -- \ \ \\ \ / // �\ \ \ i III I III _ \\ \ - --- - / \ 1 I 1 _ \ \\ \ \ < - r\\\ \ \ \ / \_- \ \ I 1 I II f '/' _ \\\ ` _- __ _----_-___\ \_ - �_/ POTENTIAL VALVE - - \ \ \ -T- _ __ \ // // \� �\ \ \ , \ 1 \ I I I I r _J III I // /� _ \\`\ ___--- - ` = _--\\ \ I \\- I _ _ \ \\\\\�� `\ \ \ \-_ \ -L- ^\ \\\ �-�\� \��i50\ \\ \ \ \ \ 1 -� _ \ 1 I \.. I I I 1� I�� \ \ \ - \\ %\ \\ \ \ // \ �\ \ \ \ \ I 1 �1 III\\-- _ -- \ - __-__ \\ ASSEMBLIES •\ - --- \\ _ - _ �\\ _ \\ 1 \ \ \ \ - \ - / �-\\ \_ I \ \ \ \ \ \\ \J �i / /-\-----_____---\_ _-_-_- \\\ UPSTREAM OF /^\. _ /_- _ y \\ \ \ - I 1 \ �� \ —\ — — `/ / \ \ \ \ \ 1 / / / / / — -\\ — —tom— ` \ � \ / ` — _//,/� F— \ \ \\ / / \ \ / \ \\ ) J \ \ \ -� \ \ v \ — \ \ \ \\ \�i//�/// — \�_ —__,-------_-- \ \\\\ \� PUMP STATION �— \\ \\ / \\ \\ — —/��\ — \\�/ r �___ \\\\\\� \\\\ \ \', J 1/ \ \\I / / \ — — —___—_ �� _— _ -- \ \\ \ \ \ L \ / / \\ — \ — -- \ \ / \ \ \ \ \_/ \ \ \ \ // )\1 II�T - ---- \ \\ \\ \ \ \3 \ \ - - Q\ _ \\\ \ / r / / \ - - \ j /I I`` \\_ 7------____ \�' ' \ \\ \ \ `� \ \ \ \ \ \\ l l ii(�// 1 ( \ I 11 ` \--/_ —� SQ . \, \ \ \� \ \ \\ \ \ \ \Ac \\ . / I I IrI /�'Jl 11�f - \� - _ ___\` \ \\'1 \ \ - - \\ \\ _ �, \\\` c \\ // - —� / -\\ \ \k \ \\ _ \ \ \\ �\ 1 1IIII /�/'� -1 1 -�\ � ---; - \ \` \\ \\ APPROXIMATE LOCATION OF \ \ \\�� _----�\ `---'' - (�\ \�\ \\ -- 1 I \�'� -�� ---__ _ -- -' ` `\ - - \ \\\, / i' //i / 1 / /-\ _ -� - = \ \ \ I \\\\ \ \ _ - /�- _� \ \"I \\ \ \\\ - _ _-_ — -\\ // 3�001\ \ \ \\ \\ \ \\ - \ \ /, // /J11 / \ \`1 ,�/ ,�1/ / `- -=L-\ \ \ > J I I f \ \--3�\\� EXISTING 2,000-LF 12 DIP �\ ;/ _ \\ \ �'\ \ --- - -s_ \-- _ _ \ \�\�\\- - \\ \ / / / // �� _ _ - - - / / r >` \ BYPASS FROM HOWARDS _ _� \ -� _ \ \ / \\ ` _ - \ // /// / /—\ / / _---- / I f / --- \\\ _ —/-- \ - \ \ \�\ �/ --� --- _\ \ \\\\ \ - \ \ \\ \ \ l I / �// // // // / I / / / —/ / / \ \\ / ( �� _ �— \ \ > \ \ \ // =-- \ J/ \ \ l ' // // / / /// / -/ / _ CREEK PUMP STATION -_ _\ I _ \ /� \�__- \ \ / / / / / //, // r / 1 I I I / , /�;-/r / //10,, — \N%\ , \ \ \\ \ _ \\ \\\ \� --\ \\ --___ .\ ----- \ \ _ \ 1� 1 I 1 I I \ \\ \3 �- \ --- /// '/-- / \ / \ \ —/ \ % 1 \ \ \ \ /_ _ / / // / \ \ \ —� / / / \ \ \ _/ - -- \ 3 \ \ \ \ / I \ e- \ \\ \ \35 _� /� / / /�\ _ EXISTING RAW WATER - - _ _ - / /� \ \ � I \ \\ / -/ / , / � \ \ \ � III - / - - \\ \x \ - \ - / / / f \\\ / I I I \ _ - _�-- ;- / -� - 1 / -- \ I / / \\ \ --__ _ - \ - - ` - - / - - \ \ \ \ - \\ \oo --\\ \ 1 ` \ - / / ///�/- \ // l/ 11/ / l / / / ji -� -_/ / I \ II I / \� / / // // � \ \ I / \ `a-_/ / = \ \\\ ---_ \ \ \ - _ 1 l / - \ \ \\ \33\ I \ - / // -\, 11 I Ill/ 1 / - \ -\/ r I IIII / �--__ // / / // / \ \ \ 1 Ill (1 \ \ /,�_ --3\`� _ RESERVOIR _-- - \ \—_ \ \ / \ \ \ - - \ \\ \ \ ��__ _ _ _�i/ / I / / / �- \ \ 1 I \\ / --50�\ \ - \ \ \ \ \ i \ \ \ \\ \ \ - \ \ \ / \ / // , '- �\ I r �---� / / — I \ \ /-- -\� —__ \ — — — _ -- \ _ _ \ — \ \ \ _ \ \ \ —__� \ \ —___/r\ L _/ // \ /// 1 / l _\\ / /I 1 I \ I / \ \\\ ' //'1 —___ - \\ \ \ / \ \ \ \ _-_-_ \ \ \ \ - \ \ ` � / _ / / , / r/ / / I \r __ / -� _ \\ \ \ - _ - /- -ice // �/ / / / \\\ / I III / /' / I \ 11 / /l \\ \_ - \ \- - /// _--_ - \� POTENTIAL FINISHED WATER \ \`-.,- \ \ - \\ \\ \11 II 1 \` \\ -\\\ \�\\\\\\ 1 - \ . - _ �' / / // // / \ \ ��� I I I I I / / /- III/ lI \ _ \ � I-',- ." _- \ \\ - \\ \ -� /-\ \ \ \ i I \ \ _ \ �\ 1 \ 1 1 . ��i�- ' '\`� /' - ��' //--' /- l 1 1 / / // ( / -11 � \ \ / / _ l/ / \\\ \ / I / I I �- / \ \ \ _ __ / / I I // / / , / / \ I I (\ - CONNECTION AT WATER \\ \ \ \ \ \\ \ \ 0 / I / \\ - �_ .� . I - \\ \ \ I \ - - / // I / I \- -- - / I I 1 \` \\ / �/ \ 1\ \ -- \` /,�- --�- - TREATMENT PLANT WITH (1) •\\ \\ / / U - - J / I I \ \ \ \ `` \// /, / / / / \ \ \ \ \\ �/ ;� \ \ \ \ \ 1 I EXISTING NORRIS ' \ 1 11 ( i1 / / _ _ / J I \ I \ \ \ \ r' - � \\\\ \ I / l� l / l l / / ^ \\\ \\ _ _ _ \ \\\ �-/ / ��' / 3900 - - - - BACKFLOW PREVENTION .\\ \� \\ _ / \ \ / - / , 1 ( > _ \\\ \\ / l l / I I / \` \\\\ - \ \`- / i / //- i - - \ \\ \ _- \ \ \\ \\ BRANCH I 1 / / �� __/ \ �I 1 1 I I I l '_--' _.d.a / / \ I 1 \ \ \ \ \ \ \\ \\ \ \ - , , \ \\ ASSEMBLY AND VALVE \ \ \ �II \. �\ (\ \ 1 I i/ / i 1 - \ l/ \\ ` \ \ \ / 1� / r \\\ \ �\ -- / , �----- - . - -- - \ \ I / / / / \ \ \ �\ \ (I ( I \ / \ \ \ \\\ \ \ \\ \\ \\ I \ \ \\ // - - \ 1 \ \ I / m / /- I \ \\ \ \\\\ \\ / I ( \ <� \ T\ / / / / - ---- \\---\\\\\\\ \ � \`� `1, \\ \ \ \ / 1 1 / / / / / % / - / \ \ �\'- \ \ \\ \ i 1 \ \ / \ \ \ \ \ / / /-\\ \ \ \ I 1 \ \ 1 I I I) / \ \ \\ \ \ \ \ \ I \ \ I / / / \ \ \ 1 \\1 \\ \ \ \ \\-- \\\ \\\\ \ -'\\\ \ \ \ \ �\ \ \\\ \\ I I I I I - r / /l \1 1 I I j \ I \ \ I I / / - \ \ \ - ` \ \ \ \ � i '/ / -� 3950 - \ \ \ \ \ / _ - - -- _ ,c \ \ �\ I I'I I 1 1 \ \\ I I 1 / / � \ \\\`-- \�\ ��/ /� __ \\� \\\\\\ \\ \\\\ \ \ \ \ \ \ \\ \�� 1 //-i// / / // 1 f _ \-__ _ \ \ / _ I _ I \ \ \\ \ \ II 1 I 1 1 / \ \\ — ` ,--- _-\ \ \\ \ \\ \\ \ EXISTING WATER \ \ \ \\ • , _ / \ --_ \_ \ \\ \ \ 1 I / \ 1 I I I I I / \ \ \ / - \ \\ \ \ \ \ \ \\ \ \\ \ \ ` 1 �/ I \� -- \ \ 1 \ \ III\ \1\I( \\1 1 �/ /\\ \�� -�\- -\\ \ \ \ \ " \ \ l \\ - 1 _ \ /J \ \ \\ \ \ I / \ \ ._ � � Imo/ _ \ - \ \\ k \\ \ ( \ - - \ ,- — \\ 1 \ I 1 \ \ \\ - � / /' \ - \ \\ \ \ \ • TREATMENT PLANT '\ \�' \ \ \ . \ \ \ \ \ 1 _ _ \ \ I 1 \ `. I \ \ / % I I I I I 1 �/ / /'-\ \ -\ \ \ ��/ / � �� \ \\\\\ \\l \\ \ \\\ \ \ \ \\,1 `\\ \ \)< \ \ \ \ \ \, \ I. 11 '\-- \\\ \ 1 I \ - - - - \\ -\ _ .\____ \ \ 1 I I II / ( I I I (/ / / - ---` ` ' - _---_ \` \\\\ \ \\ \\ \\ \ \ \ \\\`\ \ �� \ \\\ \\\ \ \ , \ \ � \ I< \ �\ // /'�- \ \ \\ _ _ \ \ \� \ \ 1 I I / I I / I - - \\ / - ` \ \ \ \ \\ \\ -\\\\ \\ \ \ \\\ \ \ \ \\ \ \ \ / - \ / // \\ / �- \ \ / 11 I I I / \ 1\ \\\ \ \\ \ \ ( _\ \\ / / --- - \� - - \ \\\� \ �-�< \ \ \ \ \\ \ of \ / - 1 / \ _ \ - - - - - - \ _/ \ // / � \ \\ 1 1 / / / / \ _ 1 I /// / / \ - \ \ \ \ \ \�\ \ \'�\ \\\ 3 \ l \ `/ / / /'- \ / - \ ( // I I III / / 1 I \ \ \ \ ( / � - \ \\\\ /'i ,,// _ _ \\\\\� \ \\ --\ \ \\ - \ \ \ \oo \\\\ \ \ \ / / / \\ / r.\ \ / -- - \\ 1 / / 1 \ \ / /-- \ \ \ \ \ \\\ \ \ - \\\ \ \ \\ \ \\\ \ \ \ 6 \ \ \ �/ \ - \ I / \\ - \ , \ ( l I 1 1 1 \ / _ 1 \ / / / / __- \\\ \ -\\\\ \\ \ \ \\ \\ \ �((�\ \ \ \ \ \\ \ \ \ \ / < / / -- \\\� / -� \\ 1 `� /-- - �_ \\ \ 1 / / \ \ L - \�. \� / / \\\ \ \ \\1 V / 1 I ( I l I I 1 1 1 / / / // \ , I I \_ //// / 4 _ - \ \ \ \\ \\\\ \ \�\ - _ \ \ \ \� \\ \\ \ \ \\ \ \ 1 I ( \ \ \ \ - _-/ ---\ \ \ / / / OQ \\ \ \ \\,,\ \ �c \ , \ \ \ / \ / \\\ \ \ \ I I // �_ \ 1 - / /�__ \ \\ \ \�---�- \\ \\\\ \\\\\ \\\6�5`\ \ \ \\`\\\ \ \ \ \ \ - \ l \_ \ /�/-\\\\/ // \ \\ 11/ \� / // �� �- \\ -� / / \\ \ \\ 1 I I I I l l / / 1 l I I _ _ \ \ \ \ \ \ - `_ �\\ \ \ \ \ \ \ \. \ \o \ . \ \\ \ k C \ \ 1 \\ .l / / \ \ , / / - ,\ \ \ I \\ \\\\ l / J I I // / r/ // \ `- / / / \ \ \ \\\ \ \ \ \\\\ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \/ / / ,% \ \\ III / -- \` `\`\\\\\ I / /. \ I / . \\ // / / / ---_ \ \ \ \ \ \ \\� -- - \ \ \ \\ \\ \\` \`\\\ \\\ \ \ \ /\\ \ \ /�' \\ //// \\ 1 -- /// '/ \\ r \ \\ \\ I I ( / \ \ \ \\ \ \ \ \ \ \\ \ \ \\\\\\\ \ / / I I /// / / / \ �� ' ---- _ - \ \ \\ \ ` \ � \\ \ - \\ \\ \ \ 1 \\" \\ \` \`\\\\ \ \\ \ `\ ` \ I r / \ - \ \`\\ \ III / / / / �/ \ \ \ \\\ \ \ J I I I \\ \\ \ / I // / / \ / / / //'� \ \ \\ \ \ \\ \ \ \ \ \. '� \ \ / I \\ \\ / / \\\\\ \ / \\\ \ \ \ \/ 1 I I I I I / // / \\ \\ �/ / / ' _ 4150 ` \ \ \ \ \\\\---_ \ \ \ \ \ \ \ \ \\ \ \\ \ \\ \ \ \\ \ \ \ \ \ \\ \ - / I I /^ / //I/- \ / / /- \ \ \ \ \ \ \\ \ \ \ \\\ \ \ \\ / 1 \ I I \\\" / / I1111l l / /\ / - \\ \ �\ \\ \\ \ \\ \ \\ \\ \\ \ \\ \ \\ \ \ \ \ \ \- - / / / / / \ \ \ I �- / / / \ ,- \ \ \ \ \ \\ \ \ / \ / I / \ - \ \ I 1 \\ \ \ \ \ \ \ / / / \\\ / / /-\\\ \ / - \ \ \ \ \\ \\ / I l I l � \ \\ / / / // \ \ \ \ \ \ \ \ \ \ \ \v \ \`\ \ \\ \ \ \ \\ \\ �- / \\\_i / \\\\\ \11► II\/ / �i / \ \ I \ \ \ \\ I // / / / \\_ / / / / - '\ \ \ \\\ \ \\\ \ \ \\ \ t\\ \ \\ \\ \\ \ \ \\ \ \\ \ \ \ \ / �/ \_/ / \ \ I\ I / / / / / I \ \\\1 I I V\I \ \\ \ \ / / / / I _ / /// -\\\ \ \\\ \ \\ \\\ / \ \ \\ \\\ \\\ \ \ \ \\\\ \ \ \ \ \ - I I / \`/ \ - 1 I I \1\ / /// / / ( \\\\` \ �1,1(I �/- I \ \ \\ 11 \ ' / // // /,/ / // / / / \\ - / / // / ///� /---= -_\\ \ -- �\ \\ \ \ \ \-,\` \\\ \\\ \� \\ ` \\\\\\ \\\\\\\ , 1 \ \ \ \/\ \ II r�i I , \ / 1 I►I IIII\ \\/ / / / / / / -\\ \ \ \l I 1 \\ \ \\ 11 I \\ \ / //// /// / / , / \ \\\ \ -\\ \ \\\\\\ \\\\\ \ \ \\\ \ \ \\\\\\ \\\\ \ \ \ \ \ \ \ \ 1 \ //'/- \/ I /--\- I / / / \ II \ 11 \ . - / /// // / / / / \ / / / /// ��\\ `\ \ _ \ \\ �\ \ \ \ \�\ \ \\\ \\ \\ \\\\\ \\ r \ \ \\ \ -\\ \\\ /// \/ // I \ \\\ \ y- / / \ 1 IIII \ \ 1 \ // / / / / / / / / / / / /--- \ \ \ \ \ \\ \\\ \\ \ \ \ \ \\\ \ , \ \\ \\ \ \ \\\\ `�\ \ -\ / -- \/ / - I I 1 1 / / /I / \ 1 I J ll \ II \ / / / // / / / \ \ / / _ \ \ y' I 1 1 I // _ � / / I - \ \ \ \ \ \\ \ \\ \ \ \ \ \ \\\ \ \ \\ \ \ \ \ \ � \ \ / /� - \ / / - _ _- \ \ / l l I I l l 1 / / / / / / / _--\ \ \ \ \\ \\ \ \ \ \ \ \\ \ \\ \\ \\\ \ \\ \ ,`C \- k\\ /----/---- \ / / 1 J 1 / // _ // / / // 1 / / / / / - \ \\\ \ - \\ \ \\ \ \` \\ \�\\ \\ \�` \ \\\ \ \\ \\\\ \\,\\\-/ _/� // ` / _ �\ \ I ( / I 1 / I I I- \ / / / / // / /�//'---\\ \\\\\ - \\ \\ \ \\ \ \ \\ \ kl \ I, 1 I _ '1( "- l �i 1 / 11 \ , ( ( (l \ // / //11/lI l I l \ / // ./ _ \\\"-- _ - \\ \ \ \ \\\\ \� \\`` �\\ \\ \\\� �1 III 1 \ \ //I \\\-� /`--- / I/ // // // __;<- \\\\ _ / / / / / / // \\\ — _ — — \ \� / I / \ \\ �_ \\ \\\\ \ \__// // / / I I b I - / / / / ,/ // // _ � --_� _ - \\\ \ \\�\\\�\ \\\ \\ `\ \\ \\ \ II III \ \\ \ 1 1 //1 \\_/ ��-- II (I( l 111I `� / ii%/ // /- -- �\- \ \\\ / \ \ / /-___ - I \-- / / / _ �\ \\ \ \ \ \ / / / / / I \ -- / �/ / / -_ �_;�� \\� \-\\ .\\�\ \\\�\ \ \ \ \ \ \ \\\ \ \ \ \\ 111 1 \ \ \ / //\ I \ ( I I _ \ \ / / / / // / // \\ \ \ \� \ \ \\ �\ \ 1 11 \ \11�//lI l/�- \ \ / /// / /'�— \ -, /-- \ \ / / / / / \— \ \ \ \ \\ \` \\\\ \ \ \\ \ \\ \ \ \ \\ \ k \ \ \ \\\\ \� \\ —� \ \ \ / / / \ \ //// // . - \ i // / / - \ / \\ 1 \\\ \/// // / / / / / 1 / - / / / / /// /� \ \\\\ \ \ \ \ \ \ \ \ \\ I / \ -/ \\ 1 I / / -- \ \ 1 \ \ ` 1 I \ - \\ \\\\ \ \ \ \ \ \ \\ \ \ \\\ \\ `1 \ \ `\ `\ 11\\\\ \\ \ \\ \\\III (/// ,/ \ \ \ /' - \ \ ` \ / 1 / / / \ ��\\\ \ \ , l \ \\\\\ \ \ \\ II / // �` \ \ ( IIII► \ \ I / I / /'/ ' --\ \ 1 I \ \ \/ \ I \\ \\ // / // I I / l % /// — \ \\ \ \ \ \ \ \ \ \ I / / \ \ \ \ \ 1 / I / / /--- \ \ / / / / / / / / /- / / / / // /---\ \\ \\\\ \\ I \ \ \ ( / \\ \� \ \ \ 1 I II / 1 / / / / - \ \ \ I (\ \\ f I \ \ .l / \\ \ \ \ \ \ \\ \ \ \ \ I , \ \ \-- // / / / / / / / / , / / /---\\ " \ \ 1\� 1 1 /\ \� / / / �/ /I 1 \ \ III \\ ( \ / I / I / -\\\ \ / / \ \ I \ // \ I I / J 1 J / \ / / / / / / _� - \\ \\\\ /// /J /l �l/%1 J/�l/r ,1 J / �/ / 1 \ \\ \ \\ II \1 \ \ \-\\ \ - \ //�'. `\ 1 - / / / / / / / / I / \ \\ �\ \\ \\\\ \ / / // / / \. ) / / / \ �i/ // /I'i/ / / / / / //// J 11 \\\ \ III II 1\\ \\ \ 11 \\ \\ 1 I l / I / l / \ 1 I I I \ l/ 1_// / l 1 / / /'\�\\ \�\\\\ \ )J/// / // / _. / //// , � / //i/r//� J I\ \ IIII \ �\\ _ ` C / / / l /Il r%/ 1 // i� � / ' \ 1\1 r \\\ /1 / // / / / 1 / / / / / / // // / / \\ / / / / / 1 / / // / / / - \ \\ \11 // / / %/ // /i/I//,,�/, //�/ / //i/_�/JI \\ 1 /ll 11 1\\ \ \\\ / \\\ /i / II l/ l / / /// //..e I II \ \ f / / \ — 1 / / / l / I I / / / /' \\ \ \\\\1 //// //// / / ,�� /////// //%/ / // /i ////i/ // 1 II I \ \ \ \� \ �� / /r / / / / \ 1 I �--� \ \\ I / / \\ 1 \ \ 1 ' / l l -� \�\ \ //� //�//i // //�� ///���/ /// �����/ ////�==/�j//1 ///�////J/III\\\ \\1\\�r\_//_ _\\ \ \\ \`\\\�_ ��/ / II I / ,/ / / _ Il _ \ \\ \\ / r l I 1 I / / / I/ //i�/�� / / --/ / // // //// ///i / // / 1 I I( I r/ / \ 11 II -\ \ \ -/ I I ( \ ,\ // / ///A //// /// / //�/ ///// // / // / 11 //-z-_ / 1 J I (f / I 1 \ \\\ \ \ \ \ / I I /� �'�//// ///� //ii' ��� / i%' / / / /�/ J///i/i/� //)II I Ire/-��--\� \ /� ' 1\ /-� \\ \ / / / / l / J lI lI \\ \\ �j / / \\ � \\ \ \ - \ \\1 1 \ I 1 I / / / \ 1 1 // / /�////� /i/� j� /�� / // /// r�/i'%%� /i%�ijv/ii===//i!/�ii /i/ /I IIIIIIIIII/� \ - - / `- \ \ / / \� \\ / / / / \\ \ = \ \ \ — I / 1 // /// //i / / / / /i / / / / / / /i / l / / / — \ \ \ / / / / /- — \ / 1 I l \ \ \ , \ \\ \ \ -�\ -;� - \ 1 \ \ I \\ ( I / \ )//i�/rr /�///�''% /' ////�� //�// /�' /�- '// -/�// ////_ _;/�r�i//�� ;i/� l \\ \\ \\ r/ / \ \ r / / / 1 / , \\\_- / / _ \ \ z \ 1 1 /i //i /�i // // // - / - IIII IIII // \\\ \\_/ / / %_�\ ) \ \ 1 I / / \ \ / / // / �/ // / / \ \ r I / // I \ \ \ - \/ \ \\ \\ _ / / // / / / / / / / / / / ////// /_ \ \ / \ \ \ = \ \ l - / / // / / / /ii / /_- // // �/ /// �/ / / // / / / / /� / / _ I 1 \-- �1— �// / // \— 1 \ 1 1 I \ — /_i -/ _ _ _ �\ / _ _ _ _ _ �_� _\I \ . ♦\\..\\1� 1 1 �i./�//../i�//�/i /�i../�/. i. �ii/�/. /_/i�� ii�/i�/i_��_ �� �� /i �i iI//ii� ��ii.,�,//i/_ ��i JlIIIII II i�� \ \ I \ \ \ ` '� / //i/�1- / I I /// I� I / \ \\�\�� -- /. rgiHoi ��•_•�� Dewberr Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z O Q �ZU O a- w P_- � � Ir p Q z J -) z 4 W J (j 2 � >. U M � ~ � � I-QD �' LLJ O 00 z � � o Z Q O �^ LU m W � W W Q W V 0 D U) SEAL KEY PLAN SCALE: 0' 300' 600' SCALE: 1" = 300' REVISIONS No. DATE BY Description DRAWN BY JGL APPROVED BY RSN CHECKED BY RSN DATE JANUARY 25, 2022 TITLE OUTFALL OPTION 1 DEI PROJECT NO: 50140792 SHEET NO. FIGURE 1 1 __ 2 __ _ _ 3 4 5 / / /-\ \ / I IIII //// //I1 (III \\\\ \\ / / /_---- /,/' // 1 / i , /-\ \ \ \ 1 \ 1 / \ / 1 1 \ I\ �I /// / I /^ \\\ \ \\ \ \_ \\ \\\\\\\\ __=/IJ Il --__ \ \ \ I I II (,// /, / I 1 \ - _ s-- /� - // , \ 1 I \ 1 ( I l \-� y / 1 \ __/ I / \ \ \ //\ \\ \,��\\-- \ � \\ - / Il - ------ -/ / /_- ' \ III ( I (II\\\ \ /// /,_-- ----/ - / ,/ / // \ I \ / - / \ \ C 1 \ \ / _ _ \ _ I / /-\ \ _/, 1 ll 1111 IIII \ \\� \\\-' / //// , —__J __-/�� / / \ I I ( t a. I/ 1 \ /\\ \ \ /,- \ \\ \ \\ \\ \-/ ,� \`-/\\\\\ \ \� \ 1 \,fir\'\\�\ \ i / - / /' /- / I \1 \ \ ) \ \ \ 1 :., �,� / r\ / 1 1 \ � \\ /- \\ \\ \\ / //�/ ---� ,- / \ \ \\\\ \\\\\ \ \\\ \\ /'/ / / - /-- / \ \ 1 I / \ 1 �` \\ \ \ / / \\ I / \ \ \ \ \ \ \ \ ) \ \ \ \ \ \ .- / / __ _ . \ \ \\ \ I I \ I ,-_ \ \ / \ 1 // \ \ \ \ \ \ - _ -/ / / \ I \ \ \\ \ / \ \ - \ \ - / / // � _ 1 / (I I // \ \ \ � // _ \\ \ \-- \ I 1 I \\ I I \\ \ \�- \ \_ __ _ \\ \\ \ \ -� \ J \ \ \ I I I I I \ \\ \ \ \ I I \ \ / \ \ \ \ \ \ \ \ \ \ - - /�� \ / / // i __ _ - �� r \ \ \\ \\ \\ \ \ _- \\- �_> I I \ \ \ \\ \ \ I 1 ! \ \ I / \ \ / I \ \ / / \ _ \ \ \ \ \_� I I I / '/ %��_,_ ° \\ \ \ \ _ _ ) \ EXISTING _ _ / \ \ `I I 1 I \ 1 \ // \ \ �\ \ - \ \ \ \ \ \ \ - I I /-\ \ \ \ \\ \ u / / / / /� -_ i M / _ - \\\ \ \\\ \\\ \ \� \ _ 1 \ \ \ 1 i \ \ \ \ / \ \ I I / - - i WQ I 1 rl l \ /` \\ \\ \\ \\\ \ \_ \\\\ \` \ \ l \ \ \\ \ \ / / / l 1 I / /// _ \_/ i \ \ _ - / 1 HOWARDS CREEK / / \ �'� \ \ I \ \ \ I I / / ° \ \\ \ \ \ \\ I I \ \ \ \ \ / I \ \ I \\ \/ / \ \ \ \ \\ o- // 4 / ,\_ \\ �\ \\ \ ;�`�-\�\�I-- _ / \PUMP STATION < / \ \ \ \ \ \ \ \ \ \ , \ \\ \ \\\ \�\\ �` ! / // /l l / l// i /\_' _❑ \ `r \\�\ �\\�\\\ \ \ - \ \---_ / i 1 / \ \\ \ \\ \\\\ \ � \\ / / \ / 1 \\ \`\ / \ I \ \\_- \ \ \ \ \\ \\\ \\\\ \ / / /// / J l 1 I ( / \ �, \ \ \ \ \ \ 1 _ /// /// / / \\\ \ I__ \ / / \ // \ \ \ \ \ \ \\\\ \ \\ \ \ / j,, / � / z� / / \\\ \ \\`�\\ \\�_ \ 1 1 / / \ 1 \ _ / \ / _\ \ \__ \ \\ \\ \ \ // /� /// / l _ \ - ` \ _ \ \ 1 / � 1 \`�\�� \�7- _\ \-��- - l ) I / -/ \\ II\1\\\\\ \�_ \ I / �_ I \ \ \\ _ _ \ \ \ \ \ \ I \ ( ///�/ i // ///j/j/ / _ —` \� \ \\\ — _ \\ \ —\ \ \\___--_ —\\�-- \ \\ \ \ \ \\ \\ \\ \\ \ \\\\ \ \ / III I///// / // , // / /// ____— \ - \ - l / \ \ \ \ \ \ / / / / // / _ _\ \\ 1 \\ \ \ / / _� \ \ \\ \\\`__-� _ -�33 �� - ---� 11 , - (II \\ \\�-__-_ \\ ` �� \ \ \\ \ \ \ ' \ \ --'1\\ \ \\\ \ \\� \ \ \ \/ ( (( //// / // / /�''// / �I\ ° _ \ \ \ \ \ 11 11 /// / /� / _ \ \ \ \ \ y __\ \ \ \ 1 \\ \ \ 1 I L� I I J /• \ l Imo- �� \ \ / \ �- �`---_-- __) 1 \ I \ //-\\\\__-' //� \ \ - \ I \ _ _ _\3\_ _�-- I 1 j�o,/ o\ \\\ -\\\ -\- \� \\� \\ - \\\ \ I 111 I I I I�I I II �/ /,///I//// /%/ �l//(//�/ /� \ \ \ _\__-_ \ i � \a\\ __ \ \ \ - \-\ -J 1 \ / \ \\ I I 1 I I 4 \ /,/JI // ///, / / l / // ,' \ `---- \ \\\\ \� \� %\\ // \ ---- _ >\\_--______--/ \ \\ \ \ //��� \ \ _ \`� \ \ \\ \ /--- I / \ \ / J l / / l l! \ \ '/%/�///�ll f // - / / ///I I \ \ \ I / /, / \ ��— \ / �/ \ \\ _ ---- - / , / / / 1 _ - / 1 / // I / / _ I 1 1 I / / / / ( ` l / -� \ --- �\ \\\\\-, \\ \ \\`\! \ / \/ - _ =-=350.�/ \\\�\\�\\`- \ \\� = ��`\` \� \ \ \ I �l - // \\ \ \ J�/i/- �,v / �lI( \ - _- i.+//l//1I1 11 / // / , /// 1 JIJ /,l/ / \ -____ _-- _ / \\� \-- �__��\ \ \ \ \ I _ �/ //� III ( - - /' // I11 / l l ///// /' / / //, // \ \ \\� \ I \ -- \ \ \ \ 1;\ \\ \ \ \ \ \ / / / II \ 1 / / / / /// /// , / \\ \/ /� \ \ \\\ \-- \ \ \ �\ 0 3200 \ �./ \ \\ \\ \ -/ \\\\ \ _ il( / / / / // / / // / / \�/-- \��\\\\ \ -- __ ,(\ \\\ \ \ \\ \ \ \--/ / \\\\ \ -' EXISTING HOWARDS 3\\ \ \ \ \\ (i r_/ 1 \\ \ \ / / f t ( l / JI �I 1 / '-�\_� /---\\\ \ \/� �\ \ \ --\ \ \ / \ // o , \ - \ \ / -\ I \ \\ \ 1 I (/ / I \\ \ \\ \ �' -- I i I T- / -t-II� \\ \� \3\ \\ _/ \ ( 1 7' / / 1 I I I / - \ \\ / I \ 1 \ III I \ / 11 \ 1 _ I _ I I / / � // / -�\_/ \\ \ �- \ \ \-- \ \ / \ \ \\ \ _\ \/ -- 11 / I _ / / III ► I / // / / / - \ \ \ \ \ \ r- \ -0 \ \o \\ \\ \ \1\ \ \\ \ \ ' \\ CREEK \ \\ \\ - \\ \ ` \ 1 I I / \ \\ \ \ \ \ / 4 I \ \ / / , \ \ \ 0 \\ / I / / 1 \ / \_�/- / \ \ 1 \ -_- \ \ \\ \ \ \ \ \ \\--1/ \ \ I / -\ \ _ \ - \ , \\ , \ S \ / / T _ / / // / / /-\\ � , \ I1 / \ \\\ \ \ \1 /\\ \ , 1 / �\ \ _ \ i__ \ \\� \\\ \\ \ \\\\ \ \ // -� I \ \ / / / / I III �' ( \ \ \ _ / �'/�I /lII I /l / �i/ I /I (/ //�/// /// --\�� III \ / \\ \ \ \ \ \ / - \ ► / ( / ---/i/ I I / / /_ / / --\ - \ I ( \ - -\ \ // , I \ \ \ _ _--\ \\ \\\ \\ `b\ \\ \ \ \� / // / / I I I I / 1 � "/ 1 I // //,I/ /// �'i / / /' --\ =-� \ 1 Ill \ \ / - 1 I I \-\\\ \ \ \ \ \\ \ / \ \ / � \\ - \\\ \\ \\ \\ \ \\ \\ \ / / / I / / -�\\ \ Ill \1 /'\\ 1 I \ ` / / I \ \ \ / _ � � \ \ \ \ \\ \ I I / \1 I I 1 l \ \ T / /// / I /// / / ,I / // /, ` I \\ \ \ I \ \ 1 \ \ \ /,/ / \ \\ \ '` 1 I \-' \\\,, \ r r 3 I / \ \ \ \\\\\\ \\\ \\ \ \1\ I \ I I I \ \\ \�\ \ \\ \ I t /// ///� �/ / J / & - \ - \ \ \ \ \ III _ 2 \ \ \ \ \ 1 IIII \ \ \ \\\ \\ - 1I /II\\\'t /'�/// �///�//I /// �/ - `�\ \ `\ `\ \ I \ \ \/ \\\\ ` \\ \\ \ \ I I I \ \ \ \ \ \ \ \ -� / / // i \\\ \ \ \ \ \ \ / / \ \ \ / \ \ l \ \ \ \ \ 1 \ I // �/ / _ \ \ \\ \\\ \\\\\\ \- - \ \ \\ I \ \ \ \ \ \ \ I \\ ' \\<\\\\\\\ \\\ \/ /\\\\\ \\\\ \ \ I I \ I \ \ \\\\ \ ) I fl I / I \ \\\ ///�\\ �1f///,///////�J/ / _ \ \ \ \ \ \ \ \ /// / / / // / / \�\�� \ \� \ ' \ \ \\ �- / \ \ 1 \\\\ \ / - \__ y \\ / \\ \\\ \\\ 11 \ \ \ _ -- _ _ \ l/ ii%'// // \ \ \\�\\ _ \\ \ \ \ \\ . _/\% // / / / / // 1 \ \\ \ \ _-/ �___/ / 1 1� \ ( Ili // \ \\\ \ \\ \\__ / J I ► 1 /1 //// ► \ I _ _ - _ \ \\\\ \\ / J \ \ - \ ---- - ///_ \ 1 / / / \`� i� \\�\\`�\ \\ \ \ \\ - / / / / / / / , / ----_ \ _ \ i _ _ ____-/ I \ \\ \\\ \\ \� -/\/// / II (I ' / / \ \ \'\\ \\ - _ // , _ �'`/7'I�7) / / / / I \\�(\\ \\ \\\\\ \ \\\\\\\\\\`� \ / / / / // / \ 1 /'i \ \i\_— ��_ --- \\-- — ��\\\\\ \\ \ / // 1 I // ` \\ F-_--=tom= '' ' __ /'�iii /)/J i / \ \ \ _ - _ - / / / // I _ / 1 \ \ \\ \ \ \\ / / 1 I 1 / \ 325 —I __i 1 / _ — \ \\\ \�/ / \ 1 3 _ --_ -- --- - -�i //,� I . ---/ \\ \ \\, \\\`\ \ \\\�\\ \ \ l/ ///// / / //I/ //I/ l /' I /' //' ---_ \\\\ 350 - _ \ \ \ I \\ \ / / \\\ 3 __ ---- /.%/- __��i / / \ l \ / / / 2 _ \ \ \\ \ \ \\// / I1 / \ I - � �_ __- __- �//i __ /////, / I / \\ \ \ \ \ \ \ / / / / / \/'/ �'- - I \\ \ �/ \ I I r ' / // / / \ \ \ \ \ \ \ / //i / / - / / \I \_/ \ \ \\\ \ 1 I \ \\ I / - - -- /�/ / / _ �� / I \\\ \ )� 1 1 \ 1 ► J 1 1/I// /,�„/// / / _-- / J ► pp \ -r-�I y \ l I/ / / J // / / I \\ -, ) 1 / / 1 / / //' / I11 / // / _ - /___ _ -% I I \ _ \ _ --- \ \\\ \\ \� / I ( / / /\ / / l/ l / / / \ - / - - - \ - \ \ \ \ \ / / _ - - _ - \\\\\\\ _/' / / �� / / / i /I I'll/(// /j/'/ �_-----� - --- -/ I I I \__ -�� �' \_/ _ _ 1 I \ \�\ \\��\ \\ ) 111 (� / ( / �' / / ,\'� 50� �_��—� 1�_ //'' _'/ (' / / \ I / /// _ / / / / I IIII /,(� -\ _-r / \ \\ \ I I .: / - _-` / // /� / // //� I I -i - - _ _ - - /�_ _ 11 —\I\ /- �' // //// I(.- ___�— - _1-\-I l I / \�� - i'- 1 ( \ \\ \ \\ 11 i1 \ I I 1 / / \ / /// / - -_ \\ \ / - _ _ \J _ \____=_�� / ////� -' / / 'I 1/0 '-____ — \ I /---\+. J'33i / _\\�-��___--\ \\ I 1 I \� \ \\�\ \\\\I \ I /\ / \ \\\l\\\ \\ _ \ I \ I \\ //// -r / \ //////�// - \ \ \- - / / J // / d _ - - _ 1 1 I / ice/ //_- \\\/ / ---_ \\ 1 \ \ ---\ \\ \ / \ \\ \ \ I \ \ \ \_ / - // _ -- \ / \ I I \ \ \ \\ \\ \ II /l \\ \\ \ _ '/ l - /i / I / ' 1 l // -�\\ _ \- _ -� \ I // 0 \ /' - /�\ \ 1 \\ \\ \\\ I / \ \\\ \\\ - \ \ \ /` // Yi// / l / I l \ \ / /III it 1/ / /.--\ _ / \\ // I � --\ \ \ \ / \ \ _ _ \ \ / r- 11 \� _ /�/ / �11 / \� _ = - \j -� / rk \ \- / / \ = \ ^\ \ \\ / I \\ / ( _ r III/Illi \\� \\ - // ////// \\ \ \ I I \ 1 /-\ _ - \\ _ J / 3 - \ 1 I 1 \ \ / \\ _ -/ ! 1 - \ /// ` I'I ( III / \ 1 \ \ \ , / / I II 1� \\ // / / /J 1 I I 1 \ - /f \ I \ \ ' \ - / / l l l - 3 l J \ \ \ / /' \ \ \ \ \ \ / _ \ i i \ \ _ _ _ /// ; f"'�`} 4 I I I I \ \ \ -// _ ( I // //� / 1 \ \ --` - \3Sp -\ / �/ 1�//// _/ /--, \ \\\\ \\ \ I I \ \ \ \ 1 '/// "'* III111 ►III \ --_ \ I '// , , , l �/ l/ / / l -- -----_ \-- \\\� / . / ( I / / / / 3� - \\\_/ / \\\\ \ \\ \\\\ \\\ \ \ \1 \ _ \ / _ _ - / I II IIII \\ \_� _ ---- _ \\- // f / I / / / / s\ \\ \ / / , \ / \\\ \ \ \ I \ ?T \ - I r Q \ \ / \ _ - \ - \ \\ \ \ \ \ \ \ \ I \ ( / / / / / I / / / -t- \\ \ \ � I // , -\` \ \�\ \\ \ \ -\ \ 1 I \ 1 / / \ I 111 \ / / I / �- — — --_ 3 \ - \\\_----\\\ \\ \ I I ( \ 11 / / / ----__ \ -\\Op - / / �/ / \ _-_ \ \% \ \ , \\\ \\\ \ \ \ I \ \ \ \\ _�/ \ / \ / \ \ I II II1 I - ---\ \_� I I II /�/ / / / --_ -_� \ \ \/-�\ _J / / ' / /-'\ \-------\\ \\\� \ \ \ \ \ \ --- \ \ / I III \ \ _ \ I // J \ ► \ 1\\ / � , \ / \ 1 I\ I I I 1 \ / `\\�_ I \\\\ \\ �I /1 IIII // - / _ _ \^ /-�-\ / I // / 3500 _� __ \\ \ 111\ \ \ \ \\\ \\ -// I I 11 1 \ _\ \ \\ -_\-J \ \\ /III I�l// � / / / \\\\\\o�\_ \\_ _ l / /, /--- \ \\ \\ \\\ \ 1\ \ \ \ \ \ \ `/ ----�/ / ��\ \` - j IIIIII \\\\� I \ \ / / IIII / _ \ \o \ / 1 / `./ - _ \\\\ \\ \\ \ \\ \o \ \ \ I I \ \ \\ -) 1 1 I / l / /� / ' // / _ /_��/ I 1 _ \\\\ \\\� \\\\ \ \ \ \`\\\ \\ \\ \\, \ / �' / / \ II 1 \ \_ ) \\ \ \ / \ r\ \\--- ,/ �// I III / /�/ \ \3S\\ \ // I \ \ \ / / \\ \\\ \\ \\\\ \ \ \�\ \ \ \ \ / 1 _ III \ I I \ \ // 1 I / / _ \ \\ 0 \ �' / III l \ \ \\ \\\ \ , \ \\ \\ \\ \ \ 0 I / / III 11 \\\ _, ; "/ / III I r \ ( EXISTING RAW \I \ \ \ \\\ \ \ /� , / i I I ► ( \ \ o \ \ \ I / 1 �// / \ \\ \ \ \ \ \ \ \ --_ \\ \ -� //I I / / - I 1 \\ \ \o \ \ \ _ __ / 11 / \\\\\ \ \ ( /_:: / ---/ III 111 ( / / \ \ \ \ \ // � _-/ I �-��� . 11\ \1I \ \ \ \ \\\ \\ \ \ \ 1 / , -1 J I I I / /— 3 0 \ _ I \ WATER INTAKE I \\ \ \ \ \ \ - \ - \ I I ► I \ \ \ \ / I'll - - I / S \ \ \ I I \ \ \ \ \ \ \ l� \ \ I 1 I I _ \\\ \ /_/ - �_ / _ \ \ \\ \ _ �\\\ \ \\\ \\\S�\ -\_ 1I II I //,4"=� \ \\ _ _ / / / 1 1 I / t 1 \ � __ \ \ \ _) \ �\ � \ \ \ EXISTING SLUDGE _ _ - , ► I 1 I T- \ \ \ 1 I \ 1 1 _ \ /-- \ \—_ / / / / \ 1 _ _ / \ \ ---- \ — -- \_—� / �— _--_ \ 0 — _ _ /_-- — / //%X% ��\ ��\ \\�`--_;_-�_/_/ I \I 1\\1 �_ I I I \ \\ -) > 1 / / lag `6 / - \\�� - ��� \�\`�34p= , BASIN OUTFALL ` \\ _\ \� ` _ - _--- \`- \\\ \\ // / / / / - %i�//// \ \ \ \\ \/1 I� \ ` r J I ' / / I \ // / ' / / J - - ter. s-�►� -� - _ __� \\� �\ \ \\ \ \�� . \ \ - - \ \ _ - _ =' �_ \ \ \ \ I / / / / // // - \ \ '—r - \- �,l / l / //' / \ —3550� / / / - \ \\\ '\ \ I \ - � - _ / - \ //, / / \ \ \ -_ _ -\;_, / / / / / /' � ,5 \ \ CONNECT EXISTING DISCHARGE TO \\ _-- _ °° / - \ _ I // I /�/ i / � � \\ \ \\\� __, ,� / /' / / / / / , EXISTING SLUDGE BASIN ' - ` \� °\ `\ ;, _ '__ _ - \ \� `\ \ - III \ \ \ / �i / I ( / / , , / / 1 —gg50/ �__\_-_ ,� \ \EXISTING STORM DRAIN SYSTEM WITHIN _ \\_/ - \\\ , \ I \ /�/_ _ (1 \ \ \ \ -_ \� f \ I \l l \ _—/// / / / �/ �- I \ \ \ \. �\ \ 32S%\\ \\ , - \ 11 I I 1 / / \ _� 1 �/ / ` \ ` \ THE WATER TREATMENT PLANT \\ - \ \ ' �i Q , �� _ _ \ \ l, l / I / / � - - / I \ \ \ \ _ _ \ \ \ \ \ P \ 1 - / �' - - / / / - \ \ \ \ \ , � - ` \ \ \ / / % - - - - _ \ \/ _ _ \ \ \ \ 1 \ , , / / , IIII ► J , -\\ \\\� \\\ _ ° � CONNECTION TO EXISTING 33 \ \ I I I I I I 1 I I I / / // i JI(Il/ /-�_` \\�\�� I----\\ \___ __ _ /' I % \ (/i' I 1 _ `--I \\ \ �-�/ ;—\ _ _ --\ \_ \ I , _ I I \ \ I /1// / / I \\ \ \ \ . OUTFALL PIPE \ \ //� - \ \ \ \ \ \� ( , I {I 1( / /, IIII( �\\ \ -� \_---- \_/ // 1 1 / ( , \ \ \) \-_ \\ `\\I \ - \ \� - - - \ \ \\ // / - \_/ _ \ \ \ ' I I II ! f / \\\ \ _-_ -- \ \ - — \ --_ - \ \ \ _ \ / _ \ \ I I I IIII // /i \ - __ --- \ \-- - _ I \ \' \\ 1 � / -_ \\\ �\ \ \ 7-- / `\ \ �// \ \\\\i \ / \\ II II I II I \\\ -\\ \ _- - \ 35 \ �\ \ \ 1 \- J �-1 I 1 \J/ // / / / _ \\\ \\\__ ____--_ _—_--�\tom \ \ \\\\ \ ' \ \ 4-` ® \\ //ate \ — \ — — \ \\— \\\`'/ / \ \ ` `/ — \ \\ 1 J \ J// /./ - �\ -_-__ __\\ ---__ \ \ \ \ // _ \ _ \\\ \ \ / //- �\ \ \ \ , \ \ \\ / I I / _ \ ____ \ \\ \ \ \ I 1 / \\ -L�\ / // \ )� r�// \ ��\\ ------ - --- \\ \ \\ \ `\ \�� \ _ / I / /�'\ �\ \\\ I -- -,:\- / ° `may \ \\\ \ '-\ \ \\ \\\ / / �// \I }�/ \ _ \ _ - _ \ \\\ \ \ \ \ -�/ V - _ / / \\ \\ _ -\ \\ II - _ _ _ _ a / \ \i \ \ \ \ l \ / /- '�� _ _ \ \\ \\\ \ ` \SSO\ \_ 1` \\\ _/ __ \ \ \\ ` \ �/ _ \\ \\__ /(((( \ \ \ JlI / \�- �-- �p \ \\\ \ \ \ \ \\ \� - \ \ \ \ \�t\ 1 \ I I I ��/,// Jj \ \ /-- \\__- � - `\\\ \\��\ \\ \ \ \-- \- /' / \\ \ \\_� __ __ \\ - \�\ \\ \\ I ((Illy'\\ _ - i - \ \\ \\�Ik\ \�\ , � -- \\`\ \ \\' I I 1 / / / , I jll \I / / I f \ _ \ \ \ \ \ \ _ _ \ - I \ \ \ \ \ \ _ \ _ - / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \3 \ \- _ _ \ R \ \ \\ - _ \ / _ \ y- \ \ \ \ \ \ \\ \ 1� \ / // / / // / / / / / // /��// /// //- _----_ ` �_ --_ \` i \ I I// // 1 i\- \ - \\\\\ \- ``� `ice \\_- - - -\ \\� _ ./ 1 \ `\\\\\ \\\ \ \\\\\=�, I( - -` \-=-\\ . � i// -\ \ \ \-\\\\\ \ \\\ \ \\ \ \ \ ,/� %/,//�///// ( / , I / / �'' = ////�' --- \ \� 1 ( --�\-_1\\\\\ \��_--_ ---_�_/- `I \\ \ \_ ;,� -'I'// _:_ ____ - PROPOSED 24" RCP \\ \` \� / //�i/ //� / // / (/ , / // \ 1 \ \\ _ \) / \ ,// , -\\-� / / / _-- \ \_ '\ \\\ \ II \ _\ 3�,\ \ �l \ \ - -\_- 0\ �� \ _ J \, \ I\ 111 / \ \\ \ \ \ /// // / / / / 1 l / \ /'// ,_�� -_\\ \ \� \ \ so \\ \-- — \ \ \ - �\ \STORM DRAIN / I / /ii%=-/i/ / / /i;, ' \ 1 I !, / / / / \ --_\ ---- - / 1 I 11 \ EXTENSION W/ 30 WIDE \ ----'/ / /// ,/ \ II II I \I / // '/ / _-\\�\ \ \\ 1 \II 1\ \\\ / \0 \ \� - / /, 1 I \ \ ___s / / / I 1 // / / / __ \ \ _ _ ° _ _ EXISTING RAW WATER _ _ / / ' - ` _ \ \�� / / / \ \ \ III - \\ \x \ _ ---_ \ - / �/ - I ! _-= \ \\ \ PERMANENT EASEMENT --_--__- // //-� `/ /III/ // I // _ \\ / IIII / �\--_'_/ / /"/'/ \� \ \\\ III 1 \\ -_ //- ---3-- \\\�_ RESERVOIR \\ \ \\ ��'��\ \ \ \ \ \ --\ \ \\ \ \ \\0���� \ \ ` \___ - _-_i� // //- \`// I II/ / / / , \ __/ -�\/ I I I --- // / / II I \ \ --_ \\ \ -_ \ \-_ \ \- _- �\� �--_ \ \,/ \ \ \\ \ \ \ \__I-- \ \ \ \ \-_ \ \ \ \ -� \-� /- _i_i/\ // / _ -/ / / / // / '-\� \ I / I I / /- /, / / '� \\\ 1 I II (\ \\�\\\ // \S��\ � r� A \ �\\ \ / � \ l \ \ -- � \ \`\ \ \\ \\,_� � �/ / -N `/ I 1 / j � \ �\ / I , - ,\ \ -- \\�z ---_ \ \ \\ \ ---__ \\ \ \ \ \ \ \ \ - _ _ / / //III ( III / / \ \ I / (\ �\\ /%/ \\\\ \ \� \\� -,� \ \-_ _ \\ -\\\ \\ \ \ \ _ -ter; ' _//-/ / // \ / �// 1 / �jlll// -�\ / 6 -- \\- I I / / // / / \ \ 1 I / I \\ \\-'-// __-_3g0\,` \\ \ -� \ \\ \\ \ \ \ \ \1 \ \\ \\ _ - _ / /i/ l / / / / / \\� _\�\\� / I I 1 I / -// �/ I \ \ II / lI \ \ _ \\\- ' /// __-_ �\ - \ \\ \ \\ \ \ �� / \\\ \ \ \ 111 ! ( \ \ \ \ \\ \ \, \ 1 \ \ \ �i �_ \� /�/ 1 / / ///I/ \ `\ \ L—/� \ \ \ \� \ \ / \ \ \ \ \\ / / / / \\\ / \ \ _I— / \ _—\ \ \ \\ \ \ \-- /— \ _ / —\ \ \_— / /__-- / \ \ \ \\\� I I / / ,�- III I \ / / \ \� \ \\ \\\ --\ \ \ \ \. I \ \ \ 1 \ _ \ - - I / \\/ III I///// /, // \ 1 ( f 1 \\ l- \\\ \ /.1", 3g \\; __ \\_\ \\/�\�� - \\\>�\\\ \ \ \ \ \ \\ \ \ I \ _ \ \ J// I / // / / --\\\ \_ - ��_ , // / l/ / /f / I \ f \ \\ / II / , \ / �\ _ `^�- �/ \\ \, _ \ \ \ I - / / I - ---- 1. I I I I ( \ \ \ \\\ \\�J l i / / / \ \ \ -\\ \_ / \� \ \\ \\ \ \ \ 1 ( EXISTING NORRIS ' I 1 t (f �I / Q / _ _ / l I 1 1 \ \ \ \ r� \ / / \\ \\\ \ \ \ / : \\\\ \\ \\ \ / / \ - \ \ \ \ BRANCH / �/ / I I 1 f I ( 1 -.�aa - / / �\ I \ \ \\\ \� \\� \'�\ \\ \ \ \\ / / / 1 \ \ _\\ \\ \ - \ \ \ \\ \\ \ \ \ \ \\\ r f I �� / 1 11 \ --- \ \ \ I \� / / - \ \ \ \ \ \ \ / \\\ \\\\ \\ I I ( \ \ <, \ T� \-, /// - ---- \\-_\\--,,,' \ \`�\� \ \\ \ \ \ ) 1 / / / - /% / / \ \ '\'\`\\\\\ \ \ \ \ II \ ! \ \ \ / // / / /� / \ i 1 \ \ / \ \ \ \ \ / / '�\\ \ \ 1 I 1 I \ 1) I) I \ \\\J \ \ / \\\ \\\ \\\ � // /-�3950 ` \ ` \` ` \\-' \\ \ / \_„c /\ 1 > / \�\ \ \ \\, I \ \ \ / \\ \ -\\\ /, / - --_ \ \ \\ " \ \ \ -_ \ \ \ \ \\ \ \ \\ \ , / / / / �, \/ \-_ / - - \-/ \ \ \\ \ \ Ill) T I I I I \ \ \ \ I I I / / / \ \ \,\ _ \\\-- /, __ \ \ \\ \\\ \ \\\\ \ \ \ \ \ \\ \�� 1 /(�i// / , / / I f _ \-__ _ \ \ / _ I _ I \ \ , \ \ \ I 1j ( I ( \ / \ \ \\ — ` ;/ /// ,--- _\\\\ \ \\ \ \\ \\ \ EXISTING WATER \ \ \ \\ , _ / \ \ \\ \ \ \ \- / \ \\ \\ / I l o \ �- \ �-� \ ( \ 1 \ \ \ \ 1 I / \ IIII I I / \_ \ \-\ \ r _ \ \\ \ \ \ \ \ \\ \ \\ \ \ ` l �/ I \- -- \ \ 1 -, _ \ . (I I \ \\\, \� I I � / -__ \ ,— \�\ - -\ \ \ \ \ \ \ \ \ l \ \ \ 1 \ �- \ \\ \ \ \ -, I / \ \ I/ - _ \ - \ \\ k \\ \ l \ \ \ 1 \ 1 ) \ \ \\ _ / I-_ \ --\ \\ \ \\ \\ \' TREATMENT PLANT '\ \ \ \ . \ \ \ \ \ I _ _ f \ ` I 1 \ \ I \ \ / % I I III 1 �/ / /'-\ \ -\ \ \ ��I / __ �� \ \\\\\ \\l \\ \ \\\ \ \ \ \`,1 \\\ \ \)< \ \ \ \\\ \ \�S\ \ I. •I \ '\_- \\\ \ 1 I \ _ - \\ \ _ \\-,- \\ \ \1 I 1 ., /) IIII / _ \ - / ____-_ \ \ \\\\ \\\\ \\\\\\ \\ \ \ \\ 0\1 \ \\ \ \\ \/ ` // - - - - \ \ \ I \ \ \ �, \ \ \ \ \ \ \ I \ IIII I/ , I1 / / , / \� \ \ \ \ \ \ \ \ \\\ \ \\ \ \ \\ \ \ \ / / \ �- \ I / I \ \\ \ \ / \ \ ,\ \ J IIII I 1 \\ \ I //-\ \ \ / //--4050_ \\\�- ` \\\\ \ `-�� \ \\ \\ \\ \ \\ \\ 0) \ �\ \\\ / / _ \ \\\ \ —� \ `\ _/ \ \ / I I I I / / / / / 1 I \ \ \\ / ` \\\\��///'/' / - =-- \ \ \ \ \\\\\\ \\ \\ \ \ \\ 1\ I \ \\\ 0 \ \ \ \` \ \ \ \ / < / / / ,// �\ / /// \\ \ \ \\ 1 \ �\//---\\\�\\\� \ / \ / \ \ \ \ \ \\\ \ \\\ \\ \\ \ \\ \\ \ 60 \\\ \ \ / // -- / \ /- \ \ I / \\ \ \ \\\ \ \ \ \ \ \ \ \ \ \1 1 1\ \ / \ \\ 1\ - / / / /- \ \ \ \ \ \ \ \ \\ \ \ _ - \\ /- \ \ - - - \ l \ 11/ - / �r / \ I I I / 1 I \ / , /, / 4 p0 \ \ \ \\ \ \\�\ \ \ X':6 \\ \ \ \ \ \ \ \ \ 1 // /-\� / / \\\ _/ / \ \ \\ \� / I ( / (/ / /�_ l ___ , / _ \ \ \ \ \ \\ \\ \ \_ - \\ \\�\ �'\ \ \\\ \ \\ I \ \ _ �/ , '- \_ / / 24 RCP STORM DRAIN / \\ \\ \ 1 \ I I I / / / \ 1 , / / � - \ \ \ \\ \ \ \\; \\ \\\ \ \ \\ \y`C \\ \so \ \\ \\\ \ \ \ k C \ \ 1 \ / �.l / \ \ / / 1 \ \ \\\ l I I I l / / /, - 1 l \_--// / �- _ - \ \\ \ \ _ \\ \ \ \\ \\ \\ \ \ \ \\ \ \ \ \ \- / / \ \\ \ III /� I �/ /' \\\ \ / / I I // / / \ / - \ \ \ \ \\\ \ \\ \\\\ \ \ \ \ \ \\ \\ \\ \ \ \ \ \ \ \ - \ /\ \ - \ / / \� // 1 / / 1 \ \ \\ \ I I I I / / /I /' \ \\ // ' ' -----_ \ \ \ \\`\\\\� - \�\\ \ , \ \\ -, \ \\ \ \�\\ \\\ \ \\ \\ \ \ \ \ \ \\ \\\ \ // //� /-'\ \\\/ // \\\\`\ \ -- - / /. I ( / \ \ \ \ I / / / / \ \ - _ _ - - \ \ \ \ \1 \\ \ \ \ \ \ \, \ / ( \ \ \ \ / a DISCHARGE TO NORRIS / \ \\ \ \ \ / I IIII // / / \ \ - / / / - \ \ \ \ \\ - \\ \\\ \\ \ \ \ \/ \\ \ \ \ \ \ \ \\ \ \ \ \ I _ / / `\ �/ / \ \\ / / �/ / /' / \ \\\\\\ \\ / / I I l I l l l /�/ �'� \ \ / /, // \ \\ \\\ \ — \\\\ \\\ ` \\ \� \\ \\ ��,, �'\`\ \ \ \ \\\ \ \\ \ \ \ \ \\ \ \ \ / / \ / \ \ III / / / \ / // / / / - \\_ / / // /� \ \\ \ \\\ \ \ \\\ �\ \�\ \\ \\\\\ \\ \ \\ \ \ \\\ \\ \ \ \� \ 1\ ' -%�/ I I,/ \\\�\IIIIII`\' / 1BRANH \` \ it \ \ \ \ / / / / I \ _ / //// - -\\\ -_\\ \\ - \\\ \ \\ \\\ / \ \ \\ \\\ \\\ \ \ \ \ \\\ \ \ I \ \ \ I I I /i ^_-/ \ \\ \_- \ �/ \ \ \ �( -- 1' \\ \\ \\ \\ \ \ \\\\ \ 1 \ \ I \_ i i \ / / i /I/ \ \ \1\I J \\ \� 11 \ \\ \\� \\ \\ \\ \ \ \ \ \ / 1 \ \ ` • y- / / � 1 l I I I I \ \ / / l /\ / /i' / ' /'� _`� - \\ \�� \\\\\\\\\\\\\ \� \\\\ \ ,, \\ \`\ \ \\ \\ \\ \r/k\ \ \ \ \\\11\\\ ''-�`�/1 /\ \\ I I \I\1\\ \ / / / / / / \\ \ \ III I \11\1 \ \ / // / / // / / / \ \ / / / / // //�/ _ \\ \ \ \ \\ \\\\ \\ \ \ \ \\\\ \ \\ \\ \ \\ \\ \ \\\ `A\\ \ \\ \\\ ��� / /� ��, / \\- I I 1 1 I� / / ' / // \ 1 ( // � \ I 11 / / i \ / / // / \ \ \ / J 1 / // -__ \ \ \ \ \\ \\\\ \ \ \ \\ \\\ \ \\ \\ \\ \\\ \ / \ \ \ �/ - I 1 / / /I I 1 \ / / / \ \ \ \ \\ \\ \\ \ \ \ � \ \ \\ \\ \\\ y _ \ / \ I I / / _ / - / 1 / l l I l l l \ //// / / / , // �\\� \ _ \ \\\ \ \\ \ \\ \ \\ \\ \ \� \\\ \ \\\ \\ \� \\\\\ \\\\ I\ \ ,`C \� ' \�k\�J////-`\---/ ----- \ / / I/ / I I //� l \ \ / I \ / / / // -_-\ \ \ \\ \\ \ \ \\ _- / // // // / / / // / \ \\\ \ - \ \ �\ \ \ \ Z \\ \ \ \\ \\\ ,\\\_ // ` / - �\ \ I 1 --- / I 1 / / I \ / / / , /i / /�/---\\\\ \\\\\ \\ \\ \ \\ \ \ \ \\ \ kl \ \ 1 I _ '"\ /i l / 1// J / 1 1 \ \/ ( l (l \ // / I,/I/I/ l / l \ / // /// _ \\\\\� _ \\ \ \ \ \\\\\� \\ \\\ �\\ \\ \\\� �l III 1 \ \ //I \\\`/ /`--- / II 11 /I // __;<--\ \\\\ 11 , \ \\ \` \\ \ \ //, //// / / I/ l I 1 i \ ' /' ' �/, /j/'/ \\\ \\\\_ _ \ \ �\��\\\\�\ \\\\ \ \ \\\ \\\\ \\\\\ II I \\ \ \ I \\ / —� //- / /// // _ \\ \I \\ \ / / / / / / // \\\ _ \ \ \ �� / I / \ \\ \\ \\\\ \ \__/, // / / I I b /� / / / / . / /� // � _ � \\_� _ - \\\ \ \\�\-,—Z \\\ `\ `\ \\ \\ \ II III \ \\ \ 1 / //I \\_/ ��-- II (II ( (III `� / ii%/ // /' -- �\_ \ I \\ / --- \ / /-___ _ I \-- / / / _ �\ \\ \ \ \ / / / / \_ _ \ \ \ \\ \\ \\\\ \ \ \\ \ \\ \ \ \ \\ \ k \ \ \ \\\\ �\ \\ —� \ \ \ \ - \\ \\\\ \ \ \ \ \ \ \\ \ \ \\\ \\ \) \ \\\ `\ 11\\\\ \\ \ \\ \\\III (/// // \ \ \ /' \ \ \ \ / 1 / / ,- � ` ��\\\ \ \ \l l \ \\\\\ \ \ \\ II // \ \ l 1111► \ \ ' / I / / /" / -\\ \ 1 I \ \ \/ \ I \\ \\ // / / // / I / / % /// - \ \\ \ \ \ \ \ \ \ \ I / / \ \ \ \ \ 1I / / / / ----\ \ \ / / / / I I / / /- / / / / // /-- \\ \\\\ \\ ) \ \ \ ( / \\ \� \ \ \ 1 1 II / 1 / / / / - \ \ \ I 1\ \\ I / I \ \ .l / \\ \ \ \ \ \ \ \ \ \ \ \ I _ \ \ \\_-' // / / / / / / / / , / / / /--\\\ " \ \ 1\� 1 1 /\ �, / / / X /I 1 \ \ III \\ ( \ / I / I / -\\\ \ , \\\\ / y // // \ > > 1 1 / \ _ /� __ / \ \ I \ // \ I I J I J \ / / / / , _7, _ \\ \\\\ /�/ 1 J �l - - I /,/ // ,) J J/ / 1 \ \\ \ \\ II \1 \ \ \\\\ _ \ /,/ \\ I / / / / / / / / I / \ \\ \\ \\ \\\\ \ / / // / / \. I / / / \ /i/ // // /I'i/ / / / / / ///, J 11 \\\ \ ) II II \\\ \\ \ 11 \\ \\ 1 I l / I / l / \ 1 I I I \ l/ 1_// / l 1 ( / /__ ,-, �\\\\ \ �J//, / /, /// / //- / �/ ////r//�1\\ \ I IIII \!\\ � - ` C / / /l/II/%/ 1 // // / / \11l r \\\ / / // / - / / 1 / / / / / / / // // / / \\ / / / / / 1 / / // / / / - \ \\ \)I // / / //- // __ /ice//,,//, //,, / //i/-_/ \. 1 Jll 11 1\\ \ \ - / \ \\\ // / Il l/ l / / /// /�/ _-- I II \ \ f / / \ — 1 / / / l / 11 I / / / /' \\\ \ \\\\� )/// ////, , ,�� ,�/i/// --//// / // /i ///i/ /- 1 II I \ \ \ \� \ �� / /r / / / / \ 1 I �--� \ \\ I / / \\ 1 \ \ I ' / l l -� \�\ 1 //� //� .- - - /, //-/ /�%�// /// /�//�/ //// �=_'�///J ///�////JJII1\\\ \\1\\\I\_//_ -\\ \ \\ \\\\\�_ �// / I1 I / -/ / / _ II - \ \\ \\ / ( l I1 I / / / / I///i�/��/ / /i//, // -- ///-/ - /,-// ///i/ / // / 1 I I( ( r/ / \ 11 II -\ \ \ �/ \ \ \ \ / I I /�/�//// ///� //ii' /// / ii' / / / / /�/ J///i/i,� //)II ( Ire/-��\\\� \ /� ' 1\ /-� \\ \ I / , / l / J lI lI \\ \\ /j / / \\ \\ \ \ - \ \\( I \ I 1 I / / / \ 1 1 // /�////� /i/� j� / /�/ / // /// r�/i''/%� /i%�ijv�ii===//i!/�ii /i/ /I IIIIIIIIII/� \ \�i / `' \ \ / / \\ \\ / , / _ \ \ - z \ 1 1 /i //i /�i // // // - / - III( IIII // \\\ \ __- / / ) \ \ 1 I / / \ \ `-_ / / // / �/ - // / / / \ \ r I / // I / \ \ \ _ \- \ \\ \\ - / / // / / / / / / / / / / ////// /_ \ \ / \ \ \ \� \ \\\ \\ I I / // /i / / / / \ \ \ = \ \ l - / / // / / / /ii / /_\ // // �/ /// �/ / / // / / / / /� / / — I 1 \\— /1_ �// / // \— I \ 1 1 I � \ _ --/ - -- � _ _ _�\ / - _ _ _ � _ �_� � _\I \�.♦\\..\11\ 1 1 �i,/�//../i�//�/i /�i../�/.i.�ii/�/. /_/i��ii�/i�/i_ ���_ �� ��/i �i iI//ii��ii.i�i//i/_ ��illlllll 11 i�� \ \ I\\ \ ` '� / //i/�1\ / I I /// I� I / \\\\\\� __ /. rgiHoi �N•_•f Dewberr Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 Z O Q �ZU - O 0_ W >_ P_- � � LL p Q z J -) z W J �j ° 2 LL >. U M � ~ cr � 1-QD � W 00 z � � o Z Q O W m � LL W Q In Q W 0 0 D J Cn SEAL KEY PLAN SCALE: 0' 300' 600' SCALE: 1" = 300' REVISIONS No. I DATE I BY I Description DRAWN BY JGL APPROVED BY RSN CHECKED BY RSN DATE JANUARY 25, 2022 TITLE OUTFALL OPTION 2 DEI PROJECT NO: 50140792 SHEET NO. FIGURE 2 Preliminary Opinion of Probable Construction Cost D4aberry ASU Sludge Basin Outfall Feasibility - Option 1 Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 01/25/21 Charlotte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. ONITO $/UNIT COST Misc. Items 1 Mobilization LS $10,000.00 $10,000.00 Demolition/ESC Temporary Silt Fence 2,100 LF $4.15 $8,715.00 Stone Outlets 1 EA $250.00 $250.00 Temporary Seeding and Mulching 0.01 AC $4,000.00 $40.00 Inlet Protection 1 EA $500.00 $500.00 Erosion and Sediment Control Maintenance 1 MO $1,500.001 $1,500.00 Site Work Permanent Seeding 0.01 AC $4,500.00 $45.00 Utilities Connect to Existing 12" DIP 1 LS $50,000.00 $50,000.00 12" Pipe Rehabilitation or Replacement 2,000 LF $200.00 $400,000.00 New Pump Station 1 LS $250,000.00 $250,000.00 12" Gate Valve 2 EA $2,500.00 $5,000.00 16" Gate Valve 4 EA $3,500.00 $14,000.00 Pipe Excavation 85 LF $25.00 $2,125.00 16" Headwall 1 EA $10,000.00 $10,000.00 16" DIP 85 LF $220.00 $18,700.00 Electrical Work 1 LS $130,000.00 $130,000.00 SUB -TOTAL $900,875.00 Construction Contingency 30.0% $270,262.50 SUB -TOTAL $270,262.50 TOTAL 1 171 137.50 1 172 000.00 NOTES: Preliminary Opinion of Probable Construction Cost #V Dewhowiry ASU Sludge Basin Outfall Feasibility - Option 2 Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 01/25/21 Charlotte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. UNITO $/UNIT COST Misc. Items LS $30,000.00 Mobilization 1 $30,000.00 Demolition/ESC Site Clearing & Grubbing 0.25 AC $6,000.00 $1,500.00 Tree Removal 1 LS $20,000.00 $20,000.00 Flagging of Clearing Limits 2,164 LF $1.25 $2,705.00 Temporary Silt Fence 3,440 LF $4.15 $14,276.00 Stone Outlets 15 EA $250.00 $3,750.00 Temporary Seeding and Mulching 0.25 AC $4,000.00 $1,000.00 Inlet Protection 5 EA $500.00 $2,500.00 Erosion and Sediment Control Maintenance 3 MO $1,500.00 $4,500.00 Site Work Permanent Seeding 0.25 AC $4,500.00 $1,125.00 Utilities Connect to Proposed Manhole 1 EA $1,000.00 $1,000.00 Pipe Excavation 3,440 LF $25.00 $86,000.00 24" RCP 3,440 LF $200.00 $688,000.00 Precast Storm Manhole 10 EA $7,500.00 $75,000.00 30' Wide Easement 86,550 SF $4.00 $346,200.00 SUB -TOTAL $1,277,556.00 30.0% Construction Contingency $383,266.80 SUB -TOTAL $383,266.80 TOTAL 1 660 822.80 1,661,000.00 N P 3153 MT 3- 434 Patented self cleaning semi -open channel impeller, ideal for pumping in wastewater applications. Mod ularbased design with high adaptation grade. r) �yriem!f�K Technical specification Curves according to: Water, pure ,39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/s IN 88 84 ea 80 76 72 68 64 60 56 52 48 77.4 40 36 32 28 24 20 16 12 8 4 227m 4 0 0 400 800 1200 1600 2000 [US g.p.rn] Curve: I50 9906 Configuration Motor number Installation type N3153.18521-18-4AA-W P- Semipermanent, Wet 20hp Impeller diameter Discharge diameter 227 mm 6 inch Pump information Materials Impeller diameter Impeller 227 mm Hard -Iron' Discharge diameter 6 inch Inlet diameter 150 mm Maximum operating speed 1755 rpm Number of blades 2 Max. fluid temperature 40 °C Project Block Rogramversion Dab version 60.0 - 10aQ021 (WW 220) Usergroup(s) Xylem: U3 -INT Created by PETERCARLSON Created on 12/1/2021 Last update 12/1/2021 NP 3153 MT 3— 434 Technical specification Motor - General D-L z .1 Oern�vep% Motor number Phases Rated speed Rated power N3153.185 21-18-4AA-W 3— 1755 rpm 20 hp 20hp ATEX approved Number of poles Rated current Stator variant No 4 26 A 5 Frequency Rated voltage Insulation class Type of Duty 60 Hz 460 V H S1 Version code 185 Motor - Technical Power factor- 1/1 Load Motor efficiency- 1/1 Load Total moment of inertia Starts per hour max. 0.83 87.5 % 2.07 lb ft2 30 Power factor -3/4Load Motor efficiency -3/4Load Starting current, direct starting 0.77 89.0 % 148 A Power factor -1/2Load Motor efficiency -1/2Load Starting current, star -delta 0.66 89.0 % 49.3 A Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Rogr version Data vers— Us er g ro up(s) 60.0- 10M2021(&,Id 220) 112202116.17A11P11 Xylem'. USA-INT NP 3153 MT 3- 434 Performance curve WM z Duty point i1 +hem �vep% Flow Head 1380 US g. p.m. 36.8 ft Curves according to: Water, pure39.2 °F,62.42 Ib/ft3,1.6891E-5 ft2/5 [ft Head 92 88 84 80 76 72 68 64 60-7 56 52 Eft: 48 44 40 36 .8 ft 32 28 24 20 167 12 8 4 0 I%j Pump Efficiency 736 % 7 Overall Efficiency 60 2 % 5 40 3 mm 20 1 0 [hp: 20 h 1 h 12 8 4 0 [ft 4 3 32 28 24 20 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.1 Curve: I50 9906 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 .1 0 34`227ri�ii' 437 194mm . 65. Power input Pl Shaft power P2 19.7 34227mm P 17.5 NPSHR-values 433 234mm P�HR=�2.809ft -- - 1378 US ..m. 22 R'ogramversion Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17A11 P11 Xylem:U54-INT R'ogramversion Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17A11 P11 Xylem:U54-INT N P 3153 MT 3- 434 Duty Analysis Curves according to: Water, pure [100%] ; 39.2°F; 62.42lb/ft6; 1.6891E-5ft2/s [ft] Head 88 84 80 76 72 68 64 60 56 52 48 7 44 40 . ° 36.8 ft 36 7710 32 28 77.4 ° 24 NI- 20- 16- 12- 43 227mm 8 55 Hz 40 Hz 45 Hz 4 1378 US g.p.m. 0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] / Operating characteristics Pumps / Flow Head Shaft power Flow Head Shaft power Hydr.eff. Spec. Energy NPSHre Systems US g.p.m. ft hp US g.p.m. ft hp kWh/US MG ft 1 1380 36.8 17.5 1380 36.8 17.5 73.6 % 178 22.8 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Programver.ion oar ,r,ioo User group(.) 60.0- 10a2021(euild220) 115202116:17 Al P11 Xyl— US -INT N P 3153 MT 3- 434 VFD Curve W-L ► z u v)Amrt; Lrdr�C' Curves according to: Water, pure,39.2 °F,62.42 Ib/ft;,1.6891E-5 ft2/s [ftl a 88 84 80 76 72 68 — 64 60 56 52 48 44 40 0 36 32 0 28 77.4 0 24 20 0 16 12 8 45 Hz 55 Hz 3 227rrm 4 [°/.9 mp tffTiciency 70 Overall Efficiency 60 50 40 30 20 10 0 [hp] 16 Shaft po er P2 2m ( P2 27m( 5b 55 H)) 12 8 8 $� f4 [f� NPSHR alues 434 227mm 40 35 30 NPSH -32.809 25 20 15 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.1 Curve: ISO 9906 Project Created by PETER CARLSON Block Created on 12/1/2021 Lastupdate 12/1/2021 Progrzmve,.bn Dab version User group(.) 60.0- 10R2021(Wid220) 115202116:17 Al P11 Xylem:U3-INT NP 3153 MT 3- 434 VFD Analysis •� �RRS •F d'� Curves according to: Water, pure [100%] ; 39.2°F; 62.42lb/ft3; 1.6891E-5ft2/s [ft] 88 84 80 76 72 68 64 60 56 52 48 44 40 36 ft 3277 28 24 20 16 12 9 8 - 4 -- 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] Operating Characteristics Pumps / Frequency Flow Head Shaft power Flow Head Shaft power Hydr.eff. Specific energy NPSHre Systems USa.o.m ft hp USg.p.m. ft hp WVIVUSMG ft 1 60 Hz 1380 36.8 17.5 1380 36.8 17.5 73.6 % 178 22.8 1 55 Hz 1100 36.4 13.2 1100 36.4 13.2 76.9 % 167 19.2 1 50 Hz 784 35.9 9.39 784 35.9 9.39 75.9 % 167 16.7 1 45 Hz 398 35.6 6.16 398 35.6 6.16 58.2 % 220 15.4 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 Head I 77.4°° 0 36.8 i 77.4 0 0 227mm 3 55 Hz 40 Hz 45 Hz 1378 US g.p.m. R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT NP 3153 MT 3- 434 VFD Analysis •�RRS •F d' Curves according to: Water, pure [100%) ; 39.2°F; 62.42lb/ft3; 1.6891E-5ft2/s [ft] Head 88 84 80 76 72 68 64 60 56 52 48 44 40 36 ft 32 28 24 20 16 227mm 12 8 4 - - 9 -- 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 [US g.p.m.] Operating Characteristics Pumps/ Frequency Flow Head Shaft power Flow Head Shaft power Hydr.eff. Specific energy NPSHre Systems US a.o.m It hp US g.p.m. ft hp kWh/US MG it 1 40 Hz 71.7 35.S 3.96 71.7 35.5 3.96 16.3 % 827 14.6 Project Created by PETER CARLSON Block Created on 12/1/2021 Last update 12/1/2021 I 77.4°° 36.8 i 0 77.4 0 0 3 55 Hz 40 Hz 45 Hz 1378 US g.p.m. R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT R'ogram version Dab version User groups) 60.0-1082021 (euiIE 220) 115202116:17 A11P11 Xylem:U54-INT NP 3153 MT 3- 434 Dimensional drawing '01 (TO R)RTFESTPONT) REF.LINt VIEW z] — ❑Z If O 0 11" LO BaT (Abo LL O J U " DIKENSICKI TO ENDS CF WIDE BARS Project Block Created by PETER CARLSON Created on 12/1/2021 Last update 12/1/2021 Fes'! T u 40trn �vKrw. RNrzmversbn Da. version User group(.) 60.0- 10R2021(Build220) 115202116:17 Al P11 Xylem: USA- INT From: Weaver, John C To: Dudley, Leiah-Ann Cc: Hill, David A; adugna.kebede(alncdeor.gov; Montebello, Michael J; Dowden, Doug; Albertin, Klaus P; Weaver, John C Subject: USGS response to DWR USGS Low Flows request # 2022-152 (dated 2021/10/01) for Norris Branch Watauga County... RE: [EXTERNAL] Low -flow request approval Date: Friday, October 8, 2021 9:26:22 AM [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Ms. Dudley, In response to your inquiry about the low -flow characteristics for a location on Howard Creek adjacent Howards Creek Road near Boone in central Watauga County, the following information is provided: A check of the low -flow files here at the USGS South Atlantic Water Science Center (SAWSC, Raleigh office) does not indicate a previous low -flow determination for the point of interest, identified by the lat/long coordinates (36.246227,-81.675717) associated with the email dated 10/01/2021 from the DWR USGS Low Flow portal following your request submission. No USGS discharge records are known to exist for the point of interest. However, per USGS Water - Supply Paper 2403 (Giese and Mason, 1993), there is a USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. The USGS discharge records for this site indicate 13 miscellaneous measurements obtained during the 1954, 1956-60, and 1962 water years. In the absence of site -specific discharge records sufficient for a low -flow analysis, estimates of low - flow characteristics at ungaged locations are determined by assessing a range in the low -flow yields (expressed as flow per square mile drainage area, or cfsm) at nearby index sites where estimates have previously been determined. A basin delineation completed using the online USGS StreamStats application for North Carolina (https://streamstats.usgs.gov/ss/) indicates the drainage area for the point of interest (StreamStats adjusted coordinates 36.24615,-81.67572 NAD83) is 8.26 sgmi. For streams in Watauga County, low -flow characteristics published by the USGS are provided in two reports: (1) The first is a statewide report completed in the early 1990's. It is USGS Water -Supply Paper 2403, "Low -flow characteristics of streams in North Carolina" (Giese and Mason, 1993). An online version of the report is available at http://pubs.usgs.gov/wsp/2403/report.pdf. The report provides the low - flow characteristics (based on data through 1988) via regional relations and at -site values for sites with drainage basins between 1 and 400 sgmi and not considered or known to be affected by regulation and/or diversions. (2) The second is a statewide report published in March 2015. It is USGS Scientific Investigations Report 2015-5001, "Low -flow characteristics and flow -duration statistics for selected USGS continuous -record streamgaging stations in North Carolina through 2012" (Weaver, 2015). The report is available online at http://pubs.usgs.gov/sir/2015/5001/. The report provides updated low - flow characteristics and flow -duration statistics for 266 active (as of 2012 water year) and discontinued streamgages across the state where a minimum of 10 climatic years discharge records were available for flow analyses. Low -flow characteristics estimated for point of interest: Inspection of the two reports indicates the presence of four (4) nearby selected USGS partial -record site (4) and continuous -record streamgages (0) in the general vicinity of the point of interest where low -flow characteristics were published. This group of index sites includes the USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. Among these 4 sites, the low -flow discharge yields for the indicated flow statistics are as follows: Annual 7Q10 low -flow yields =_> from 0.23 to 0.42 cfsm (average about 0.32 cfsm, median about 0.33 cfsm) Annual 30Q2 low -flow yields =_> from 0.49 to 0.91 cfsm (average about 0.72 cfsm, median about 0.74 cfsm) Winter 7Q10 low -flow yields =_> from 0.31 to 0.57 cfsm (average about 0.46 cfsm, median about 0.48 cfsm) Annual 7Q2 low -flow yields ==> from 0.39 to 0.7 cfsm (average about 0.57 cfsm, median about 0.61 cfsm) Average annual discharge yields ==> from 1.9 to 3.2 cfsm (average about 2.3 cfsm, median about 2 cfsm) Application of the above range in yields to the drainage area (8.26 sgmi) for the point of interest results in the following estimated low -flow discharges: Annual 7Q10 low -flow discharges =_> from 1.9 to 3.5 cfs (average about 2.6 cfs, median about 2.7 cfs) Annual 30Q2 low -flow discharges =_> from 4 to 7.5 cfs (average about 5.9 cfs, median about 6.1 cfs) Winter 7Q10 low -flow discharges =_> from 2.6 to 4.7 cfs (average about 3.8 cfs, median about 4 cfs) Annual 7Q2 low -flow discharges ==> from 3.2 to 5.8 cfs (average about 4.7 cfs, median about 5 cfs) Average annual discharge discharges ==> from 15.7 to 26.4 cfs (average about 19 cfs, median about 16.5 cfs) Please note: (1) The estimated flows are provided in units of cubic feet per second (cfs). (2) The low -flow yields provided above are rounded to 2 significant figures. Estimated low -flow discharges less than 1 cfs are rounded to 2 significant figures. If between 1 and 100 cfs, then rounded to 1 decimal place; if greater than 100, then rounded to the nearest whole number (zero decimal places). (3) The information provided in this message is based on a preliminary assessment and considered provisional, subject to revision pending collection of future data and further analyses. These provisional streamflow statistics are provided via the DWR USGS Low Flows cooperative agreement between the USGS and the N.C. Department of Environmental Quality, Division of Water Resources. Hope this information is helpful. Thank you. Curtis Weaver J. Curtis Weaver, Hydrologist, PE Email: icweaver@usgs.aov USGS South Atlantic Water Science Center Online: https://www.usgs.gov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Albertin, Klaus P <klaus.albertin@ncdenr.gov> Sent: Friday, October 1, 2021 11:13 AM To: Idudley@dewberry.com Cc: Albertin, Klaus P <klaus.albertin@ncdenr.gov>; Hill, David A <david.hill@ncdenr.gov>; adugna.kebede@ncdenr.gov; Weaver, John C <jcweaver@usgs.gov>; Montebello, Michael J <Michael.Montebello@ncdenr.gov>; Dowden, Doug <doug.dowden@ncdenr.gov> Subject: [EXTERNAL] Low -flow request approval This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Your request has been approved and will be forwarded to USGS. A response from USGS usually takes 7 - 10 business days. Request Flow Statistic Approval Request ID: 152 Requestor: Leigh -Ann Dudley Requestor e-mail: ldudleyAdewberry.com Requestor Phone: 9194243764 Local Government: Public Water Supply: Consultant: Dewberry Contact: Leigh -Ann Dudley Reason: Permit River/Stream: Howards Creek Drainage Area (sq. mi.): 8.27 Latitude: 36.246227 Longitude:-81.675717 Other Information: Statististics: [7Q10","7Q10 - Winter","30Q2","Average Annual"] Approved by: Albertin, Klaus P 9/27/21, 2:39 PM StreamStats StreamStats Report Region ID: NC Workspace ID: NC20210927183610129000 Clicked Point (Latitude, Longitude): 36.23809,-81.65618 Time: 2021-09-27 14:36:31 -0400 v i3 i Basin Characteristics Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 0.94 square miles PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / 0 percent Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge 100 percent PCTREG3 Percentage of drainage area located in Region 3 - Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4 - Coastal 0 percent Plains https://streamstats.usgs.gov/ss/ 1 /3 9/27/21, 2:39 PM Parameter Code PCTREG5 StreamStats Parameter Description Percentage of drainage area located in Region 5 - Lower Tifton Uplands Peak -Flow Statistics Parameters [Peak Southeast US over 1 sgmi 2009 51581 Value Unit 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.94 square miles 1 9000 PCTREG1 Percent Area in Region 1 0 percent 0 100 PCTREG2 Percent Area in Region 2 100 percent 0 100 PCTREG3 Percent Area in Region 3 0 percent 0 100 PCTREG4 Percent Area in Region 4 0 percent 0 100 PCTREG5 Percent Area in Region 5 0 percent 0 100 Peak -Flow Statistics Disclaimers [Peak Southeast US over 1 sgmi 2009 51581 One or more of the parameters is outside the suggested range. Estimates were extrapolated with unknown errors Peak -Flow Statistics Flow Report [Peak Southeast US over 1 sgmi 2009 5158] Statistic Value Unit 50-percent AEP flood 104 ft"3/s 20-percent AEP flood 199 ft^3/s 10-percent AEP flood 276 ft^3/s 4-percent AEP flood 381 ft^3/s 2-percent AEP flood 458 ft^3/s 1-percent AEP flood 551 ft^3/s 0.5-percent AEP flood 632 ft"3/s 0.2-percent AEP flood 760 ft"3/s Peak -Flow Statistics Citations Weaver, J.C., Feaster, T.D., and Gotvald, A.J.,2009, Magnitude and frequency of rural floods in the Southeastern United States, through 2006—Volume 2, North Carolina: U.S. Geological https://streamstats.usgs.gov/ss/ 2/3 9/27/21, 2:39 PM StreamStats Survey Scientific Investigations Report 2009-5158, 111 p. (http://pubs.usgs.gov/sir/2009/5158/) USGS Data Disclaimer: Unless otherwise stated, all data, metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected. Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S. Geological Survey (USGS), no warranty expressed or implied is made regarding the display or utility of the data for other purposes, nor on all computer systems, nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer: This software has been approved for release by the U.S. Geological Survey (USGS). Although the software has been subjected to rigorous review, the USGS reserves the right to update the software as needed pursuant to further analysis and review. No warranty, expressed or implied, is made by the USGS or the U.S. Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty. Furthermore, the software is released on condition that neither the USGS nor the U.S. Government shall be held liable for any damages resulting from its authorized or unauthorized use. USGS Product Names Disclaimer: Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Application Version: 4.6.2 StreamStats Services Version: 1.2.22 NSS Services Version: 2.1.2 https://streamstats.usgs.gov/ss/ 3/3 From: Weaver, John C To: Dudley, Leiah-Ann Cc: Hill, David A; adugna.kebede(alncdeor.gov; Montebello, Michael J; Dowden, Doug; Albertin, Klaus P; Weaver, John C Subject: USGS response to DWR USGS Low Flows request # 2022-152 (dated 2021/10/01) for Norris Branch Watauga County... RE: [EXTERNAL] Low -flow request approval Date: Friday, October 8, 2021 9:26:22 AM [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Ms. Dudley, In response to your inquiry about the low -flow characteristics for a location on Howard Creek adjacent Howards Creek Road near Boone in central Watauga County, the following information is provided: A check of the low -flow files here at the USGS South Atlantic Water Science Center (SAWSC, Raleigh office) does not indicate a previous low -flow determination for the point of interest, identified by the lat/long coordinates (36.246227,-81.675717) associated with the email dated 10/01/2021 from the DWR USGS Low Flow portal following your request submission. No USGS discharge records are known to exist for the point of interest. However, per USGS Water - Supply Paper 2403 (Giese and Mason, 1993), there is a USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. The USGS discharge records for this site indicate 13 miscellaneous measurements obtained during the 1954, 1956-60, and 1962 water years. In the absence of site -specific discharge records sufficient for a low -flow analysis, estimates of low - flow characteristics at ungaged locations are determined by assessing a range in the low -flow yields (expressed as flow per square mile drainage area, or cfsm) at nearby index sites where estimates have previously been determined. A basin delineation completed using the online USGS StreamStats application for North Carolina (https://streamstats.usgs.gov/ss/) indicates the drainage area for the point of interest (StreamStats adjusted coordinates 36.24615,-81.67572 NAD83) is 8.26 sgmi. For streams in Watauga County, low -flow characteristics published by the USGS are provided in two reports: (1) The first is a statewide report completed in the early 1990's. It is USGS Water -Supply Paper 2403, "Low -flow characteristics of streams in North Carolina" (Giese and Mason, 1993). An online version of the report is available at http://pubs.usgs.gov/wsp/2403/report.pdf. The report provides the low - flow characteristics (based on data through 1988) via regional relations and at -site values for sites with drainage basins between 1 and 400 sgmi and not considered or known to be affected by regulation and/or diversions. (2) The second is a statewide report published in March 2015. It is USGS Scientific Investigations Report 2015-5001, "Low -flow characteristics and flow -duration statistics for selected USGS continuous -record streamgaging stations in North Carolina through 2012" (Weaver, 2015). The report is available online at http://pubs.usgs.gov/sir/2015/5001/. The report provides updated low - flow characteristics and flow -duration statistics for 266 active (as of 2012 water year) and discontinued streamgages across the state where a minimum of 10 climatic years discharge records were available for flow analyses. Low -flow characteristics estimated for point of interest: Inspection of the two reports indicates the presence of four (4) nearby selected USGS partial -record site (4) and continuous -record streamgages (0) in the general vicinity of the point of interest where low -flow characteristics were published. This group of index sites includes the USGS partial -record site on Howard Creek at Sands (station id 03160310, NWIS drainage area = 10.3 sqmi) located downstream from the point of interest. Among these 4 sites, the low -flow discharge yields for the indicated flow statistics are as follows: Annual 7Q10 low -flow yields =_> from 0.23 to 0.42 cfsm (average about 0.32 cfsm, median about 0.33 cfsm) Annual 30Q2 low -flow yields =_> from 0.49 to 0.91 cfsm (average about 0.72 cfsm, median about 0.74 cfsm) Winter 7Q10 low -flow yields =_> from 0.31 to 0.57 cfsm (average about 0.46 cfsm, median about 0.48 cfsm) Annual 7Q2 low -flow yields ==> from 0.39 to 0.7 cfsm (average about 0.57 cfsm, median about 0.61 cfsm) Average annual discharge yields ==> from 1.9 to 3.2 cfsm (average about 2.3 cfsm, median about 2 cfsm) Application of the above range in yields to the drainage area (8.26 sgmi) for the point of interest results in the following estimated low -flow discharges: Annual 7Q10 low -flow discharges =_> from 1.9 to 3.5 cfs (average about 2.6 cfs, median about 2.7 cfs) Annual 30Q2 low -flow discharges =_> from 4 to 7.5 cfs (average about 5.9 cfs, median about 6.1 cfs) Winter 7Q10 low -flow discharges =_> from 2.6 to 4.7 cfs (average about 3.8 cfs, median about 4 cfs) Annual 7Q2 low -flow discharges ==> from 3.2 to 5.8 cfs (average about 4.7 cfs, median about 5 cfs) Average annual discharge discharges ==> from 15.7 to 26.4 cfs (average about 19 cfs, median about 16.5 cfs) Please note: (1) The estimated flows are provided in units of cubic feet per second (cfs). (2) The low -flow yields provided above are rounded to 2 significant figures. Estimated low -flow discharges less than 1 cfs are rounded to 2 significant figures. If between 1 and 100 cfs, then rounded to 1 decimal place; if greater than 100, then rounded to the nearest whole number (zero decimal places). (3) The information provided in this message is based on a preliminary assessment and considered provisional, subject to revision pending collection of future data and further analyses. These provisional streamflow statistics are provided via the DWR USGS Low Flows cooperative agreement between the USGS and the N.C. Department of Environmental Quality, Division of Water Resources. Hope this information is helpful. Thank you. Curtis Weaver J. Curtis Weaver, Hydrologist, PE Email: icweaver@usgs.aov USGS South Atlantic Water Science Center Online: https://www.usgs.gov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Albertin, Klaus P <klaus.albertin@ncdenr.gov> Sent: Friday, October 1, 2021 11:13 AM To: Idudley@dewberry.com Cc: Albertin, Klaus P <klaus.albertin@ncdenr.gov>; Hill, David A <david.hill@ncdenr.gov>; adugna.kebede@ncdenr.gov; Weaver, John C <jcweaver@usgs.gov>; Montebello, Michael J <Michael.Montebello@ncdenr.gov>; Dowden, Doug <doug.dowden@ncdenr.gov> Subject: [EXTERNAL] Low -flow request approval This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Your request has been approved and will be forwarded to USGS. A response from USGS usually takes 7 - 10 business days. Request Flow Statistic Approval Request ID: 152 Requestor: Leigh -Ann Dudley Requestor e-mail: ldudleyAdewberry.com Requestor Phone: 9194243764 Local Government: Public Water Supply: Consultant: Dewberry Contact: Leigh -Ann Dudley Reason: Permit River/Stream: Howards Creek Drainage Area (sq. mi.): 8.27 Latitude: 36.246227 Longitude:-81.675717 Other Information: Statististics: [7Q10","7Q10 - Winter","30Q2","Average Annual"] Approved by: Albertin, Klaus P 9/27/21, 2:39 PM StreamStats StreamStats Report Region ID: NC Workspace ID: NC20210927183610129000 Clicked Point (Latitude, Longitude): 36.23809,-81.65618 Time: 2021-09-27 14:36:31 -0400 v i3 i Basin Characteristics Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 0.94 square miles PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / 0 percent Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge 100 percent PCTREG3 Percentage of drainage area located in Region 3 - Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4 - Coastal 0 percent Plains https://streamstats.usgs.gov/ss/ 1 /3 9/27/21, 2:39 PM Parameter Code PCTREG5 StreamStats Parameter Description Percentage of drainage area located in Region 5 - Lower Tifton Uplands Peak -Flow Statistics Parameters [Peak Southeast US over 1 sgmi 2009 51581 Value Unit 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.94 square miles 1 9000 PCTREG1 Percent Area in Region 1 0 percent 0 100 PCTREG2 Percent Area in Region 2 100 percent 0 100 PCTREG3 Percent Area in Region 3 0 percent 0 100 PCTREG4 Percent Area in Region 4 0 percent 0 100 PCTREG5 Percent Area in Region 5 0 percent 0 100 Peak -Flow Statistics Disclaimers [Peak Southeast US over 1 sgmi 2009 51581 One or more of the parameters is outside the suggested range. Estimates were extrapolated with unknown errors Peak -Flow Statistics Flow Report [Peak Southeast US over 1 sgmi 2009 5158] Statistic Value Unit 50-percent AEP flood 104 ft"3/s 20-percent AEP flood 199 ft^3/s 10-percent AEP flood 276 ft^3/s 4-percent AEP flood 381 ft^3/s 2-percent AEP flood 458 ft^3/s 1-percent AEP flood 551 ft^3/s 0.5-percent AEP flood 632 ft"3/s 0.2-percent AEP flood 760 ft"3/s Peak -Flow Statistics Citations Weaver, J.C., Feaster, T.D., and Gotvald, A.J.,2009, Magnitude and frequency of rural floods in the Southeastern United States, through 2006—Volume 2, North Carolina: U.S. Geological https://streamstats.usgs.gov/ss/ 2/3 9/27/21, 2:39 PM StreamStats Survey Scientific Investigations Report 2009-5158, 111 p. (http://pubs.usgs.gov/sir/2009/5158/) USGS Data Disclaimer: Unless otherwise stated, all data, metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected. Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S. Geological Survey (USGS), no warranty expressed or implied is made regarding the display or utility of the data for other purposes, nor on all computer systems, nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer: This software has been approved for release by the U.S. Geological Survey (USGS). Although the software has been subjected to rigorous review, the USGS reserves the right to update the software as needed pursuant to further analysis and review. No warranty, expressed or implied, is made by the USGS or the U.S. Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty. Furthermore, the software is released on condition that neither the USGS nor the U.S. Government shall be held liable for any damages resulting from its authorized or unauthorized use. USGS Product Names Disclaimer: Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Application Version: 4.6.2 StreamStats Services Version: 1.2.22 NSS Services Version: 2.1.2 https://streamstats.usgs.gov/ss/ 3/3 Dewberry DATE: January 26, 2022 TO: Mr. Daniel Gryder (Appalachian State University) FROM: Leigh -Ann Dudley, PE Anthony D. Miller, PE SUBJECT: Effluent Treatability Bench Testing Results Message 1.0 Background Appalachian State University (ASU) water treatment plant (WTP) currently discharges membrane system backwash for the ASU WTP to Norris Branch Reservoir (Appalachian State Reservoir) under the auspices of NPDES Permit NC0044423. ASU is subject to numerical effluent discharge limits for copper and zinc and at times the effluent exceeds the numerical limits. The monthly average permitted effluent zinc and copper limits are 63 ug/I and 4 ug/I, respectively. ASU is evaluating multiple options to manage the wastewater discharge, including alternative discharge locations or treatment. The evaluation of alternative discharge locations is provided in a separate submittal Sludge Basin Outfall Relocation dated January 26, 2022. Dewberry initially performed a desktop evaluation of ion exchange and reverse osmosis (RO) for metals removal from the ASU WTP effluent. The results of the desktop evaluation were provided to ASU and subsequently to NCDEQ in the Metals Treatment Alternatives Analysis dated July 7, 2021 prepared by Dewberry. The projected capital costs for the ion exchange and RO treatment system were significant, ranging from $2,100,000-$4,200,000. Ion exchange and RO were selected for the desktop evaluation because they are proven technologies expected to be capable of achieving the low concentrations necessary to meet the current effluent discharge limits. To further evaluate potential treatment options, to specifically identify more cost-effective options, Dewberry performed treatability testing to evaluate the efficacy of other treatment methods. The results presented in subsequent sections do not indicate the more cost-effective treatment options will be as effective at reducing copper and zinc in the effluent. The ion exchange system and opinion of probable costs presented in the July 7, 2021 Metals Treatment Alternatives Analysis are still applicable. 2.0 Protocol Bench testing was performed on WTP effluent discharged from the sludge thickener basin. Dewberry performed bench scale testing of five (5) treatment alternatives: • Ion Exchange (with and without prefiltration) • Clay Blend Media Adsorption • Activated Carbon Adsorption • Sodium Hydroxide Precipitation Bench scale tests were planned for sulfide precipitation, however due to supply chain issues Dewberry was unable to obtain the sulfide chemical necessary to perform the testing. Thus, the test was not performed. Test protocols were developed as proof -of -concept testing, which is intended to determine if a particular treatment method is effective, and not to obtain sizing criteria or optimize treatment options. Ion exchange tests were performed on the Lewatit MonoPlus TP207 ion exchange resin provided by EFFLUENT TREATABILITY BENCH TEST RESULTS 1 OF 3 Lanxess. Ion exchange resin was dosed at concentrations of 2.5 g/L (grams per liter) and 20 g/L resin into a 2-liter volume of WTP effluent. Ion exchange tests were performed at each dose on filtered effluent and unfiltered effluent. Samples were filtered with a 0.45 micrometer glass fiber lab filter. For each test, the reactors were mixed on a stir plate, and samples were collected from the ion exchange reactors at 30 minutes and 2 hours. Clay beads and rice hull activated carbon were the two adsorption medias tested. The clay blend media tested was AquaPure Quick Drop supplied by Hubbard Hall. The clay beads were dosed at concentrations of 3.75 g/L and 30 g/L into a 2-liter volume of WTP effluent. The rice hull activated carbon was a powdered activated carbon also supplied by Hubbard Hall. The activated carbon was dosed at concentrations of 7.5 g/L and 12 g/L into a 2-liter volume of WTP effluent. For each test, the reactors were mixed on a stir plant, and samples from the adsorption reactors were collected at reaction times of 30 minutes and 2 hours. Sodium hydroxide precipitation was performed at pH targets 8.5 and 9.5 based on the minimum solubility pH of copper and zinc hydroxides. Sodium hydroxide was used to adjust the pH of a 2-liter reactor of WTP effluent to achieve the target pH. For each test, the reactor mixed for 30 minutes at the target pH, then aluminum chlorohydrate settling aid was added to promote solids settling, and a sample was collected from the supernatant on in the top of the rector. Treated effluent samples from each bench test were submitted to Enthalpy Analytical, a certified commercial laboratory, for low level total and soluble copper and zinc analysis. 3.0 Results Dewberry performed the testing in the Raleigh laboratory on November 8, 2021. The zinc and copper concentrations in the initial effluent sample were below the current effluent discharge permit limits for zinc. The total copper concentration was above the current permit limit for copper. Table 1. Initial Effluent Sample M Daily Maximum Permit Limit, ug/L M 4 0 63 Monthly Average Permit Limit, ug/L 5.2 63 Sample Dissolved Metal, ug/L 1.77 < 10 Sample Total Metal, ug/L 6.56 19.2 At such low initial concentrations, treatment efficiencies are significantly reduced. Table 2 provides the treated water total copper and total zinc concentrations for each treatment method for the 2-hour contact period. t.'�1 Dewberry- EFFLUENT TREATABILITY BENCH TEST RESULTS 2 OF 3 Table 2. Treated Effluent Total Copper and Zinc Data TECHNIQUETREATMENT Ion Exchange with 2.5 g/L COPPER• • •N, 4.05 PERCENT CONCENTRAI ION, REMOVAL 38 % < 10 48 % Prefiltration 20 g/L 3.37 49 % < 10 48 % Ion Exchange 2.5 g/L 3.28 50 % 21.7 -13 % without Prefiltration 20 g/L 2.45 63 % 33.0 -72 % 3.75 g/L < 1 85 % 10.8 44 % Clay Media 30 g/L 4.29 35 % 50.1 -161% Rice Hull Activated 7.5 g/L 7.11 -8 % 38.2 -99 % Carbon 12 g/L 14.4 -120 % 30.4 -58 % Hydroxide pH 9.5 7.25 -11 % 20.0 -4 % Precipitation pH 8.5 6.75 -3 % 19.7 -3 % The results of bench testing indicated the following: • The concentration of copper and zinc increased in the hydroxide precipitation and rice hull activated carbon reactors. It is anticipated that this is due to normal variability in the analytical method at such low concentrations and represents zero removal from these treatment options. • Ion exchange and clay media adsorption removed copper from the effluent, achieving concentrations below the 5.2 ug/I monthly average permit limit for all samples and below the 4 ug/I daily maximum limit for several conditions tested. • Ion exchange with a prefiltration step resulted in zinc being reduced to non -detect while zinc concentrations increased in the reactors without prefiltration. The lower doses of the clay media reduced the zinc concentration by 44 % but at the higher doses the zinc concentration in the reactor nearly doubled. At such low initial concentrations, treatment efficiencies are significantly reduced; however, for the purpose of demonstrating proof -of -concept, the results indicate ion exchange, an originally evaluated treatment technique and well -established treatment technique for metals removal, is effective for reducing concentrations of copper and zinc. For copper, the testing demonstrated ion exchange is effective for meeting current permit limits. If ASU implements a full-scale ion exchange system, resin bed sizing would be further evaluated based on desired resin life and projected breakthrough. Additional testing on effluent with higher copper and zinc concentrations is recommended to properly size a system. The ion exchange system and opinion of probable costs presented in the July 7, 2021 Metals Treatment Alternatives Analysis are still applicable. t.'�1 Dewberry- EFFLUENT TREATABILITY BENCH TEST RESULTS 3 OF 3 III. Modification Received July 7, 2021 ,Iula' .20'_13 NP13E 8 WaLsLL'watiLT Program Dr-paFrtmc31t-Jf D1Vif(:3l33YCnti1 QLAity i61-7 M231 SL rvic't• C_cnt1!T IRdlcigh. NC AppAachian I E.71 II d iry i.i01' - �t•uu •d /y :L�t� 141k j'21 r1'I LY.II. IIL•, Nk::.9I:W-t 110 .{2H.2Q11F'1 :;R L.Il uldl7�7 jrh IN ILA 1:11LIdIr 1+ II 1 RF: App llanhi111 gtake IFILiyt-l-Aik+' NPDEh PIJrmit NCFJO�.1423 MudifLiMti01k RegILU6L To W-h- ni Tk NIO' C'Otl,-ellW APpa61713ian Sutt Uni%-Mitt' 1;ASU) L4 sl3bEllitting thin nL;ijni permit 1nQL itio;Lril?n I%akjI3e$L;,illd t;klppurtin-� informati;Dn to mare the dL�ehflr;-,e Mt(all INItioll. Th-F AF�U Faker Tl%e11rru'lll Plan 1v+y1TP) I.ILIAIldrggE backwLqh nFul C 1P wmsta V) Tunis hInnch Rt}1:pw�knir 11nrLer the zIwpi(\m{ of \'P15T,;S' pert111t Nf'�r The existin;; permit expired Ma Leh 31: air}i ind Al 13 I1a7.3 applierl. 6- r bt1L his IwL yet WuLw-J a ix:nowcd permit. 'llic ciirrent I7crrnit Ilk18 tin kidnlitji :tnitivelk' exit!n(1ett. A,{ su41111SU IS ELMbU31'ILLL1Lg a perJI]]t ippliriitiiin midandum to iw[iiagt a Change in the <li56taege r�i1Lf.iII 14)t.pLin11. The 013FL'Clkt NPI) I i (iisr:h:1 rK+� I ffiti'm I I i9 ilk (:I I1:v,- I111 FXI 11) i1~w t.�) Tht! V4 IFS iuktl kt s[.rrtWl ee Ln'Nikrris 13 ranch Re-servnir. AqU &-Nires trr mm-f the ctigr llprh OLItf�11114ct1Lk711 ,1gWti,-�k1+!�tlln-ulflIle r-�rv1xu' into Nurris Branch. Tho pl'i I-02T ' rlri%TF to MOW kh r: rrnl [aI L I�: to L`'dutx 1 rnpilt' L (3-0111. LhO & t11arge on the t; atcr hite lie. 'I11Ltofi iwntiiLSl'.h4irg1J rnrlll tL7+�1-TITIVjlft-NelltRulil117-e L1eid.13Mtlk 1)Ltix't+m - backwmlland -'IP wgtf�r. Diwchnryingthe -.►dare .;m r.Inse tr: tha illkwlr r"kiLLs LII the. je�yQJLlL�, uIuridt-6ir klc' c�unStikuent.5 txnj ini.n the in[91-e rnr rr.111cirvatl iXitl. 1ti additiorl1 the UfflUeat clisr'IMUg-! 1.1LIAtirbs the bottom of the Lak-p, ytirrilIg till sa,llil IS CHILL ill, Ve-nsi11.l; Ow tt1vhj(UL� gild WELur L-iASLI.Ritilts in LILU WTP LLLL1uer1it 11I11(-WLng, n ri iaCll.jrgn FNAIlt. I1r1Inr',a kill g JIIL {liF:ch a rp,(- dwItiAwain u [ die Nftt:3VQi r ILL N ui ris Brark� h wiLL reni-we the. tj-C&1 jNr. i nlll; r.k{ un tiLfi IVIT i0o kt, f k;IJ, DEQ, ati(I Parkitiip014si III iX WIL(I-TerIM call un May .11 am to d:i c'us�i thi patcntinI tr; 1:1l(JVe klYt LOU I[all. DEQ IJ3d1CaltN1 it was Itasible w MUM the dischaTpe lrxatiim U) NorrL4 Enh3Lr.II. 111 .L IdllIon. DEQ aL.reml M t'Inlsitlrr aLL11%virig r 1J to UNP cxrsti no stx)rm�3'atJr infraStnIi"tI t1 i r . jr klle �1ISCILurge to Nurris Branch. T hi: REQ rrqutsted that the application aMenrlulll inr 113dr tlsr! fc111uWi118; • An:LL1r1w Of effluent tl-Uw tktB W recnrr-nt-End a neW tlMV 3Utr for MnsirLertitiQLl rLurillS IM�rtlliLking ah the effluent flf)w rate has cl-Mcatitid witb npp.ritinll of tIL� In.x-prag�NLre I tembCaae EVt.LduL; r Qw flmv rite fi+om USCaS for thy: pi%, Ppw !d Lim- rjitftill Mc.;lkion ALCIT. kllfi MOil3g skonatiwLrkcr scMIF 41iR!1L;Lrl;eti tiI Nryris LiraILrls; • A iP.-;�ihiIit}' iinlyi� a11d [ul LLLe IC-KAILC kind tM']IL 01J arw k'raviL+' bdi:i -WRS13 ih7 Vhargp. Lily Irvintlrr.IND-Atti'taAl wetw�111141 Lbt,x'VI13%s[Ourrl sewer-t1r141 + Ail alternatiry w5alwis-zuIJJjJa7i11e N0llatlilk Lrtatnit'at tU-VhrlulC&E [1Fr ri!M-Winp. metals fLnvn Olt W i P ' EM klerlt La lieu of Lriuv'Lug d3C disc'hiJ rg-e. r'l scuondar v benetit to mgving the outi1311 Will. ha pOkc'akitiil to i113PFUVC CUMpliancr 1+Zth c+ulkper and zing c ffLucnt LLmits-As AS W01 Stl-UgglP. to Illr;ek turrtAaL 11u31kL?Uknll Limits (M Cv)pperand zinc, DEQ rn(LuastN] thei1)p1ir-.atirin idd-P17rlirrn i3l(`111(I� d •1 "R-ii Ivt 1" rpr 1•ry • . IIIF iivivi KL1 •y .ir he, Ir'I �'.511�•I IWJL ­ 1'nrl'•yo' rVIrS 1 "1•I.LIV.t aR CvLk1kHLtFJ1L OfMet ily, ti-catmcnt oFrtinns rG lltic-.aDSidQTO{I RS,1114 1.0 311:0Ving the diSC132FPc. WnterTreiaLmcnt Plant Effluent Flow •11Yc 41 rEP -i�flltlCnt f[O% " IMSCd OR (Wa collcctM ,TkLIV 2014) - .1111Y 2030 1.� prCtMACd in '1 Bbh 1. W-c rcglJCSt ulydattxd flOW i3stu ia'1'abli! 1 he i1K'd ft�r &'Veli 111i] 19 �fflu�tlL 1ijlliils. AW LyFiU ll� dory J30L diKhar6L,. dLdly. Disvllmrgt's typiCiLlIV :)VCILrcn'ar a !�-IMUT L1eTinei. ` hi$ MgUIB IIl all LIlWALI.Mk uI i dllwhiugL of 1,}t) gillcmn per JninutC (gp3n) at wr.rg-c alW aRrl 41F:F gpil] aI I))--IXi3lkULL1 LIUW. Table 1, Eff'lUFMI F ICkW i 0.5ed iF111 Ally 20ig - July UCONP Data WTP F.fflikent Di. lkar-ge Maximum Flow Qpol 48,000 Noio rLg 1 "" Clx 7Q 10 FlO w DP.'Wtk°T3T,-nc?iX1iIlakfll Wl.k Y US to &velop a' io tlu-Lv rate fm the proposed -niiit pII Lnc.1lirrn.TIie prrrpn-,ed ouLfull 1� whL-�rc llltr owtiLLg �w mwmkrscrrcr discharg-Ps to NnTll1 BTA]If:Il. Tile e, tb Liltcl J1LIJILL%-e area fur tllr 111L}pchsnl disulkirgU liwiLtion (.36.2�.¢iiJ695: 4111169:3l21}) iR �1,;,1? 5(ih1;LrO ITILIe,,;. T75ere ale ikL) U` Ci$ CGL•ords or 11L4JDitQriLl,Rslrlt111]]5 111Y Ni(wris Kram-IY. A nevrl7v gliAliuti ou Hu+► Ards Cntel-, M11ON1 wily A rat1011f tllc clralnsgc iU-CN4 t()4:01CUL11tr'. the 7 �a)o flrnu_ 1JgGq e$Linl<LLatl I4)WL l0%V tr wr{wteJ7511C� b:3Kd can "nutural-flm-y" conditi-mg, as thryn�,h tlLC LLPMFLr am ia1P0111Yt1aLL`ItiL waS JYULI- dXistUkt. 773]s iS bor4 lusc LILT mcrf]MV ir, IlsiLd d11CiAg high-110W CulldilivM; aCul WULlld mA lar iJ larAor 11ndcr 11lam•-fluvv cx}Rd itic}Rs_ '1%c :1T313111AL 7Q10 ttM'V rite Tan $P_g frn1TM 0,f 8,9 10 r).115 dam. mil:h an av rage find 3 mcdiun ubMt'a.J.2 c(F,. Th-c -cmails docimi nting t170 7QIQ tl4jw inIU17106LM CC{}31Y C«ti are prm3 cl il in ALtachnscut A - Existing 21jim-ink :v"v r R,~ ablation ASU ksim..s tf) USE axi-5tillg. Stnr11l1Miite.l' iRCrMtUtIClurt W QU331'CV the diF,chargc to Nf)rris 11rinCh. Dpu'trlarr V,�riFIQJ Illat th{: U)CL; Jl? �;!:Qv IiwaLaF sysLL!11L ]S MA t{n'p.Ci!d 13nd-P..I- R permit i1.5i1Yg tke NMF(2 titc?t'M ''ytPF P.�rll)il `IriA ker Alp. FW%-Yb41 J;' pCrifGrMCd .l C31}aCity Mal l3kitL[dl 011 thf. QXi5ti ll�, S Lu1AMI Ler .V-110m fOr it 2,- f Lr A03A)-2-vUYt t1 irLg a hydraulic Fmoci :Ling softwivc. DF,.kvl)e.71'4 pif)p,)7 of t%wo pjpL!ILLl0 iJYLE V0veCLk1L[ LLlLtFwdi-•t'S, WiLLL t}ph)itFFY}i Iif pix}h, bl-P cnst.� T3nfline frnTF'I �35W1aF0 tei ${,hoof), 19 Ab s111 L I]slll�'t'"c thU tx7st GpiMUDS Hu d taikd in thr: McW i 15�, gl-nrm 49c wer D'al Lkal.iorL MU]IYUranduaL, Locawd is ALLikclYmint U. BaKd on the cirakatimi -of the fixLqtijig �1nriik {,ewer sysi Lull aLld tlLe I)rOPUStLd i11LP11) •imtnt;, dw mL4ting stilmR s}-stem his, the Np;jcity M {•arl�. th-2 -a�ldil3'1113<11 lisokr�-ash dmcrirg-p. UPGLI LLPPFnval of the ntw disLhar, -c r}ntfil1, A.5l] will Selecl 11)UMMCL pipchnc ullcrnutiTres. Pig= 2 :r 4 NNlak Ibr Rr,]-{vp Finakintion of Metmis'l,estm"t Sysdemm -111L' NCDEQ htls MCLncttNI thL' M-1113ntion rrfM-o metjl-� m-ar'lew ;tlternative-� f5r L'+itk p'l1,1m3L to thc request io mGve the -discharge c'ntt,LLL w N-orrLs Branch- Dowt-erry [Levebptxl ix pre1133MUiry uvidinition cif rCV-CMC oani ni5 in(I ion e.xrhanp. Thr PrP.liktliNIFY e%'AlkiklIi01L iMIULLLA tol)c-tptuul �IZII K anLL dcvckprnent dr-ricer of mepnituIP.IN-Ai. . The MetjLL� TL+r,,itnjei)tAlLern Lti+'-(� is ILLNchcd in Attachment C. Reverse C7smosL9 a17d [(>n R-m.h7ng-� wn%Il{l 1}4' -4f-e-Aii-Ve at 1%e33LLF-k'i14g OUppft alld ZLni and cm achiei'e the Cft1kLCDt lira its 4 thr. rxisting' P [41:3 pe rm-3t. Table 2 s the ugirLir)na of probablc capitol nxau� A rr t IYe i r+il ritip.ni opi i0 ns a nd IS454 {j piptliLle. TAble z, Prelimiilury OIxiniuns of .Prubablr Costs Altr-mative Cost M-Lwe Di,. uhilrgc fipulhic 1,5.gj u- 5 61.imw) Inn Exchang-� S 21100Far ( R,wtrse OSEELus12, 1 s 4:12CJCJ CJCJCJ Hirtaric:aL dat7 indjmtp3 >).))% nnil >9-6% d aiiyt from kike r1'1'1' iwake ixm rt'3nia+'td In the 'r1• rP prnccs= and im not dimhar ;cad ImA to Norrt� Rr,Lnr]l-'nlL! cuppfl' i)aLl 6111C Mlno-%'- {1 are pmiumcd to he ix 3Luik cLl in the LLldpe f14711tj i lS(-. eX i4tin.t �141.1lp� [Mckc 11tr, TI)v cusLx of i-U11 C XhMkgU ai3d 3x!%'t'rsL mrmmiiti ire yen• ILidh fni thF- miiiirn,LI idditinnql mpl)er a i i J eLIL�: DO3kC' s1] LIka1 51'A 1_'V p1x}k'idc'd bL-xonii Vehat is ren7O'rxj and not L+ettlrrl-'d Lo [[I-c Ia�u. Rnt1) treatment pltern;itIwq haVU {i@iyiiL 13LL<3' LLigkrtinjai al QO*tL t1l.11L t11C Casts asaxiattd with moving t11e di{r:h,7rf,C LuL:ixLjLIIL. I31 ticlLlilion, ILit! LfL•iLhRen.L At-raatiVes will hotix! annual openuingtr ;t wh jr!h will Lu m in irn;lI f w a neu (I itrljgiy e IfWM i( . Tho. Lrt Nt n]cLLt ikitt runt i+'L's aLIMJ & M)t 1tLie3'e Ole l)rinl l Py cbjmti-vQ whiQjL iE tL� inuou iLLt OLLlfa]I duwa6tmirn of Ox watcrtrcatmcnt plain t Lntake. Ar,.SlLrh, ti-pfi I7pt'r, LItLL!raLilSed ILIW1 J]iuwiILK the {11LtLL1 iS lhG »LcSL cfft tint mcl110d tO schieVO. the I11iMLtV ol,jecL[V-eS UE rud11r'ing iI71pilot r,f Lh-2 �-ffILLe151 00 LILT• vrKii-r irLtakc anal ilnprrMngr!oml)liani!e with Fffli ent rnppgT knd ?31kL, Lim i Ls. U you al!pru al of thu new dlsc'ho rgt locstinn, ASU rill salrrt en altemitis'c Fni car ItiuLitiliug to t1)V Sc14'I1' an{l JiULHDit CIn11l di:-sil;n do cnuumlatif}n (irr At1Ihiirjy:iiinh bi ivrrl7Mrki{•i, I LLpprccl Ltl vcmri cnsidcralion of tLr: lxrmit mndirmitimi LF.tpLF-3t, P11W-t I&] free tO GURI&A 1]]e dt N 28.26V-878.1 uith :l:Lptitic ns roprrlin q t Ilia s1 dlmittaL. 8JCLL' , [salad Ge}-cltir Cz AilthOn4' Miflur, PE Leigh - L,FLl?udlrv. PE Pmx! i & : moQm• du: ?.2021 EocLuv,cri: 4tRlmwak-USOxL�9vL)Jk�&k AkMI L R B.Ex§tngSWIM &W- L auAbn RRa hmcntC-NkaliTret ment Alternativeg@RKg6 Attachment A Russell, Jocelyn From: Weaver, John C <jcweaver@usgs.gov> Sent: Tuesday, June 15, 2021 5:34 PM To: Russell, Jocelyn Cc: Dudley, Leigh -Ann; Albertin, Klaus P; Weaver, John C Subject: RE: [EXTERNAL] Appalachian State University Stormwater Discharge Streamstats Drainage Area [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Jocelyn, In the low -flow response to you on April 6, 2021, the estimated low -flow characteristics were based on "natural -flow' conditions as though the upstream impoundment was non-existent. Please review the information shown within the April 6 email using red font color. As I do not have any USGS records of discharge for the points of interest, there is no means to account for the presence of this upstream feature in the downstream low -flow characteristics. Therefore, the provided estimates were described as being reflective of "natural -flow" conditions. I didn't completely follow the meaning of your statement within your email saying, "From observations in the field, we know that the ASU Lake/impoundment's overflow ties in further downstream and does not contribute to the flow at the selected point." As the overflow is used during high -flow conditions, this would not be a factor under low -flow conditions. Examination of Google Earth imagery does indeed appear to show the overflow channel tying back into the stream downstream from the points of interest. But again, the low -flow estimates do not account for the presence of the impoundment. I completed a quick drainage -basin delineation within the USGS Streamstats application for the new location coordinates you provided in today's email. The drainage area for this point of interest is still 0.37 sgmi, indicating no change from the drainage area associated the point of interest for the April 6 low -flow estimates. Thus the low -flow estimated provided via the April 6 email remain in effect. If this still does not address your questions, please let me know. Thank you. Curtis Weaver J. Curtis Weaver, Hydrologist, PE Email: icweaverOusas.aov USGS South Atlantic Water Science Center Online: httas://www.usas.aov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Russell, Jocelyn <jrussell@Dewberry.com> Sent: Tuesday, June 15, 2021 11:23 AM To: Weaver, John C <jcweaver@usgs.gov> Cc: Dudley, Leigh -Ann <Idudley@Dewberry.com> Subject: [EXTERNAL] Appalachian State University Stormwater Discharge Streamstats Drainage Area This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Hi Curtis, In April we inquired about the 7Q10 for a potential future wastewater discharge to be located on Norris Branch, approximately 700 feet downstream from ASU Lake. We understand there is not flow data on Norris Branch so the 7Q10 evaluation was based on comparing the drainage area for the proposed location and the drainage area for Howards Creek which does have flow measurement. Since then, we have been able to identify a more exact discharge location (36.2380695,-81.6683120). The streamstat report shows that the ASU Lake/impoundment contributes to the flow in the stream at the proposed discharge location. From observations in the field, we know that the ASU Lake/impoundment's overflow ties in further downstream and does not contribute to the flow at the selected point. Prior to submitting an application to NC DEQ to move our outfall to the new location, we would like to confirm the estimated 7Q10 at the proposed discharge location. Can you help us understand if the drainage area being estimated by Streamstats is accurate since ASU lake does not discharge through the new point of interest? We would be happy to schedule a call to review our question if that would be helpful. Thank you! 4 Jocelyn Russell, EIT Staff Engineer 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 919.746.9627 C 518.353.2274 Dewberry rn V Co 0 www.dewberry.com Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Russell, Jocelyn From: Dudley, Leigh -Ann Sent: Thursday, June 10, 2021 10:43 AM To: Russell, Jocelyn Subject: FW: USGS response to DWR USGS Low Flows request # 2021-117 (dated 2021/03/31) for Norris Branch Watauga County ... RE: [EXTERNAL] Low -flow request approval Leigh -Ann Dudley, PE Associate, Project Manager Water Market Segment 2610 Wycliff Road, Suite 410 Raleigh, NC 27607-3073 D 919.424.3764 C 919.418.1727 LICENSED PE: NC, AL 49 Dewberry. in V Co Q www.dewberry.com From: Weaver, John C <jcweaver@usgs.gov> Sent: Tuesday, April 6, 2021 11:42 AM To: Whitmyer, Holly <hwhitmyer@Dewberry.com> Cc: Hill, David A <david.hill@ncdenr.gov>; adugna.kebede@ncdenr.gov; Montebello, Michael J <Michael.Montebello@ncdenr.gov>; Albertin, Klaus P <klaus.albertin@ncdenr.gov>; Weaver, John C <jcweaver@us�s.�ov> Subject: USGS response to DWR USGS Low Flows request # 2021-117 (dated 2021/03/31) for Norris Branch Watauga County... RE: [EXTERNAL] Low -flow request approval [CAUTION] External Email. DO NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Ms. Whitmyer, In response to your inquiry about the low -flow characteristics for a location on Norris Branch approximately 700 feet downstream from a small impoundment adjacent Howard Knob near Boone in central Watauga County, the following information is provided: For the record: The point of interest is located approximately 700 feet downstream from the dam for a small impoundment (ASU Lake) located on the stream. The estimated low -flow characteristics provided below do not account for the presence of this impoundment on the stream but rather reflect "natural flow" conditions as though the impoundment was nonexistent. No USGS discharge records are known to exist for the point of interest, identified by the lat/long coordinates (36.23790, -81.66773) provided via email dated 03/31/2021 from the DWR USGS Low Flow portal following your request submission. However, a check of the low -flow files here at the USGS South Atlantic Water Science Center (Raleigh office) indicates previous low -flow determinations for two points of interest on Norris Branch upstream from the point of interest (closer to the dam for the impoundment). Completed in 1968 and 1984, the low -flow characteristics were estimated based on transfer of flow characteristics from a nearby USGS partial -record site on Howard Creek at Sands (station id 03160310, drainage area at 10.3 sgmi). In the absence of site -specific discharge records sufficient for a low -flow analysis, estimates of low -flow characteristics at ungaged locations are determined by assessing a range in the low -flow yields (expressed as flow per square mile drainage area, or cfsm) at nearby sites where estimates have previously been determined. A basin delineation completed using the online USGS Stream5tats application for North Carolina (https://streamstats.usgs.gov/ss/) indicates the drainage area for the point of interest (StreamStats adjusted coordinates 36.23792,-81.66773 NAD83) is 0.37 sgmi, which confirms the drainage area submitted as part of the request information. For streams in Watauga County, low -flow characteristics published by the USGS are provided in two reports: (1) The first is a statewide report completed in the early 1990's. It is USGS Water -Supply Paper 2403, "Low -flow characteristics of streams in North Carolina" (Giese and Mason, 1993). An online version of the report is available at http://Pubs.usgs.gov/wsp/2403/report.pdf. The report provides the low -flow characteristics (based on data through 1988) via regional relations and at -site values for sites with drainage basins between 1 and 400 sgmi and not considered or known to be affected by regulation and/or diversions. (2) The second is a statewide report published in March 2015. It is USGS Scientific Investigations Report 2015-5001, "Low -flow characteristics and flow -duration statistics for selected USGS continuous -record streamgaging stations in North Carolina through 2012" (Weaver, 2015). The report is available online at http://Pubs.usgs.gov/sir/2015/5001/. The report provides updated low -flow characteristics and flow -duration statistics for 266 active (as of 2012 water year) and discontinued streamgages across the state where a minimum of 10 climatic years discharge records were available for flow analyses. Low -flow characteristics estimated for point of interest: Inspection of the two reports indicates the presence of four (4) nearby selected USGS partial -record site (4) and continuous -record streamgages (0) in the general vicinity of the point of interest where low -flow characteristics were published. Among these 4 sites, the low -flow discharge yields for the indicated flow statistics are as follows: Annual 7Q10 low -flow yields =_> from 0.23 to 0.42 cfsm (average about 0.32 cfsm, median about 0.33 cfsm) Annual 30Q2 low -flow yields =_> from 0.49 to 0.91 cfsm (average about 0.72 cfsm, median about 0.74 cfsm) Winter 7Q10 low -flow yields =_> from 0.31 to 0.57 cfsm (average about 0.46 cfsm, median about 0.48 cfsm) Annual 7Q2 low -flow yields ==> from 0.39 to 0.7 cfsm (average about 0.57 cfsm, median about 0.61 cfsm) Average annual discharge yields ==> from 1.9 to 3.2 cfsm (average about 2.3 cfsm, median about 2 cfsm) Application of the above range in yields to the drainage area (0.37 sgmi) for the point of interest results in the following estimated low -flow discharges: Annual 7Q10 low -flow discharges =_> from 0.085 to 0.16 cfs (both average and median about 0.12 cfs) Annual 30Q2 low -flow discharges =_> from 0.18 to 0.34 cfs (both average and median about 0.27 cfs) Winter 7Q10 low -flow discharges =_> from 0.11 to 0.21 cfs (average about 0.17 cfs, median about 0.18 cfs) Annual 7Q2 low -flow discharges ==> from 0.14 to 0.26 cfs (average about 0.21 cfs, median about 0.23 cfs) Average annual discharge discharges ==> from 0.7 to 1.2 cfs (average about 0.85 cfs, median about 0.74 cfs) Please note: (1) The estimated flows are provided in units of cubic feet per second (cfs). (2) The low -flow yields provided above are rounded to 2 significant figures. Estimated low -flow discharges less than 1 cfs are rounded to 2 significant figures. If between 1 and 100 cfs, then rounded to 1 decimal place; if greater than 100, then rounded to the nearest whole number (zero decimal places). (3) The information provided in this message is based on a preliminary assessment and considered provisional, subject to revision pending collection of future data and further analyses. These provisional streamflow statistics are provided via the DWR USGS Low Flows cooperative agreement between the USGS and the N.C. Department of Environmental Quality, Division of Water Resources. Hope this information is helpful. Thank you. Curtis Weaver 3. Curtis Weaver, Hydrologist, PE Email: icweaver(a)usas.aov USGS South Atlantic Water Science Center Online: httns://www.usas.aov/centers/sa-water North Carolina - South Carolina - Georgia 3916 Sunset Ridge Road Raleigh, NC 27607 Phone: (919) 571-4043 // Fax: (919) 571-4041 From: Albertin, Klaus P <klaus.albertin@ncdenr.gov> Sent: Wednesday, March 31, 2021 9:16 AM To: hwhitmyer@dewberry.com Cc: Albertin, Klaus P <klaus.albertin@ncdenr.gov>; Hill, David A <david.hill@ncdenr.gov>; adugna.kebede@ncdenr.gov; Weaver, John C <Icweaver@usgs.gov>; Montebello, Michael J <Michael.Montebello@ncdenr.gov> Subject: [EXTERNAL] Low -flow request approval This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Your request has been approved and will be forwarded to USGS. A response from USGS usually takes 7 -10 business days. Request Flow Statistic Approval Request ID: 117 Requestor: Holly Whitmyer Requestor e-mail:.hwhitmver@dewberry.com Requestor Phone: 614-546-8383 Local Government: Public Water Supply: Consultant: Dewberry Contact: Holly Whitmyer Reason: Permit River/Stream: Norris Branch Drainage Area (sq. mi.): 0.37 Latitude: 36.23790 Longitude:-81.66773 Other Information: Statististics: ["7Q10","7Q10 - Winter","30U',"Average Annual"] Approved by: Albertin, Klaus P 4 ff De be , MEMORANDUM DATE: July 7, 2021 TO: Mr. Daniel Gryder (Appalachian State University) FROM: Anthony D. Miller, PE SUBJECT: Appalachian State University Water Treatment Plan — Stormwater Infrastructure Analysis Message 1.0 Introduction Appalachian State University (ASU) is submitting a major permit modification request and supporting information to move the current sludge thickener discharge outfall location. The ASU Water Treatment Plant (WTP) currently discharges backwash and CIP waste to Norris Branch Reservoir under the auspices of NPDES Permit NC0044423. The existing permit expired March 31, 2021 and ASU has applied for but has not yet received a renewed permit. The current permit has been administratively extended, and as such, ASU is submitting a permit application addendum to request a change in the discharge outfall location. The current NPDES discharge outfall is in close proximity to the WTP's intake structure in Norris Branch Reservoir. ASU desires to move the discharge outfall location downstream of the reservoir into Norris Branch. The primary driver to move the outfall is to reduce impact from the discharge on the water intake. A secondary benefit to moving the outfall will be potential improvements to the numerical zinc and copper limits at the new outfall. ASU, NCDEQ, and Dewberry participated in a conference call on May 4, 2021 to discuss the potential outfall move. DEQ indicated it was feasible to move the discharge location to Norris Branch. In addition, DEQ agreed to consider allowing ASU to use existing stormwater infrastructure to convey the discharge to Norris Branch. The following memo highlights existing conditions, proposed outfall relocation options, and an evaluation of the existing stormwater system. 2.0 Existing Conditions Figure 1 attached shows the WTP and the existing stormwater system. The existing stormwater system consists of a series of storm pipes ranging in sizes from 12" to 24". The existing stormwater system flows from west to east and outfalls to the northeast of the WTP into the Norris Branch. At the discharge point to the northeast, there is an existing stormwater structure that dissipates energy at the outfall of the system. The stormwater system conveys stormwater generated from overland flow within the WTP. Off -site stormwater flow is conveyed through a storm system that is located at the southwestern portion of the WTP. Overland flow to this system originates to the south of the site and then bypasses the site. Therefore, stormwater from this area was not considered in the evaluation. The existing sludge thickener that is located at the WTP currently sends its discharge to the north of the site to Norris Branch Reservoir. The existing reservoir is currently used as a monitoring station and holding area. The location of the sludge thickener discharge raises concerns due to impact from the discharge on the water intake. The concentration of copper and zinc in the wastewater at times exceeds the limits of copper and zinc of 4 pg/L and 63 pg/L, respectively. This is due in part to the current discharge of the sludge thickener. ASU WTP STORMWATER INFRASTRUCTURE ANALYSIS 1 OF 3 3.0 Proposed Improvements Proposed improvements for this project include the installation of a new 6" Ductile Iron sludge thickener outlet pipe extension. Based on conversations with ASU, two options utilizing the existing treatment plant processes are proposed for the improvements. See attached Figure 2 for a diagram of the proposed options. Option 1: Proposed improvements associated with this option include the installation of approximately 35 LF of 6" Ductile Iron pipe. This option would tie the proposed outlet pipe into a nearby storm structure at an invert elevation of 3458.17 and utilize the existing stormwater system to discharge into Norris Branch downstream of the dam. The proposed outfall monitoring point will be located at the end of the new 6" Ductile Iron pipe. With the invert of 3460.92 at the sludge thickener discharge, the sludge thickener could dewater approximately 2.75' lower than the existing invert of the 6" outlet pipe. Preliminary probable construction cost for this option is $15,000. Option 2: Proposed improvements associated with this option include the installation of approximately 240 LF of 6" Ductile Iron pipe and a new doghouse manhole to be placed on the existing 24" storm pipe downstream and utilize the existing stormwater system to discharge into Norris Branch downstream of the dam. The proposed outfall monitoring point will be located at the end of the new 6" Ductile Iron pipe. The proposed doghouse manhole would be placed on the storm pipe so the invert elevation would be 3451.00. This would allow for the sludge thickener to be drained to an elevation of 3451.00, which is approximately 2.5' above the bottom of the sludge thickener. Preliminary probable construction cost for this option is $61,000. 4.0 Stormwater Evaluation To determine the feasibility of the proposed improvements to the sludge thickener outfall, Dewberry performed a capacity evaluation of the existing stormwater system. Existing hydrologic conditions were evaluated based on the Rational Method for the 25-year storm event. Rainfall values for the project area were determined by utilizing NOAA Atlas 14 for precipitation intensity. A weighted Rational Method Runoff Coefficient (c-value) was determined for the drainage area(s) using the existing land use. Time of concentration values were set to 5 minutes for the catchment(s) as most of the stormwater flow comes from paved surfaces and ultimately is channelized within storm conveyances. See Figure 3 attached for a drainage area map. Hydraulic computer modeling for evaluating the existing storm system was performed using the AutoCAD Express software program. The modeling software determined the hydrograph for the existing system based on the drainage area, c-value, and time of concentration. In addition to the flow generated by rainfall through the stormwater system, the evaluation also included the discharge rate from the sludge thickener of 400 GPM (0.89 cfs). Using the 25-year outflow from the hydrograph and added flow from the sludge thickener pipe capacity was determined for the stormwater system. See the calculation reports at the back of this memo. Option 1 will discharge to an existing 18" storm drain located near the sludge thickener. Based on the flow rate resulting from the 25-year storm event and the added flow from the sludge thickener, the existing 18" pipe is at 46% capacity and the downstream 24" pipe is at 23% capacity. Option 2 will discharge to an existing 24" storm drain located near the existing clearwell. Based on the flow rate resulting from the 25-year storm event and the added flow from the sludge thickener, the existing 24" pipe is at 23% capacity. IF Dewberry- ASU WTP STORMWATER INFRASTRUCTURE ANALYSIS 2 OF 3 5.0 Conclusion Based on the proposed improvements associated with project and the evaluation of the existing stormwater system, the existing storm drainage conveyance system has the capacity to carry the additional 400 GPM discharge from the sludge thickener. Attachments 1. Figure 1: Existing Conditions 2. Figure 2: Proposed Improvements 3. Figure 3: Drainage Area Map 4.Option 1 Stormwater Evaluation 5.Option 2 Stormwater Evaluation 6.Option 1 Preliminary Opinion of Probable Construction Cost 7.Option 2 Preliminary Opinion of Probable Construction Cost ASU WTP STORMWATER INFRASTRUCTURE ANALYSIS 3 OF 3 1 2 3 /` EXISTING RESERVOIR I r �i/ r / el * .lf ry qr r / y y * r ,''''� ■- ■ L+'+r '•ate .rim /� j lb Pk b r 1 i x *�ya'••� D .�, ' 'fit ' * . F'�' ti"• X ` IN t. r IL Orm \ / / I ti N. 9r. r Ir Adf s APPROXIMATE LOCATION OF EXISTING SLUDGE BASIN INVERT OUT: 3460.92 DISCHARGE PIPE DI T0P=3467.77 ,,,vtv �} • , 3 _. 18 "RCP IN=3458.77 4 } Y � 18"HDPE IN=3462.371 • r ' r* ` EXISTING SLUDGE 18 "RCP OUT=3458. 17 1-1-M m M..a. '• THICKENING TANK DI TOP=3471.33 A JB TOP=3465.20 ,ti y : rpp- � = - - _ - 18 "RCP I N= 345 6. 83 15 "RCP I N= 345 7. 10 •T' : •i_�i;t ' • - 24"RCP OUT=3456.63 15 RCP IN=3456.90 / 24,RCP IN=3455.60 � - DI TOP=3469.19 ' r ! / _ i 24 RCP OUT=3454.60 •Ir 18 HDPE IN=3462.79 + 18 "HDPE OUT=3462.79 - _ - IN * 3469.12 ` JB TOP= 3442.83 h ' ' •.. �E 24 RCP IN=3437.73 ' DI TOP=3469.39 _ 24 "RCP IN=3434. 18 F• •'4 18"HDPE IN=3463.04 IE -... 24 "RCP OUT=3434. 18 y 4 + * r 18 "HDPE OUT=3463.04 EXISTING FILTER-- - BUILDING -f. r 1 - DI TOP=3470.89 WEIR TOP=3467. 71'_' { •�� ,;i y� 12 "PVC OUT=3469.69 J15 RCP IN=3457.81 •- ` . '. 15 "RCP OUT=3457.71 '� r - - - - DI TOP=3469 58 I EXISTING „ EXISTING NORRIS KEY PLAN BRANCH SCALE: 0' 15' 30' 60' SCALE: 1" = 30' REVISIONS DI TOP=3464.86 CLEARWELL 18 HDPE IN=3463.58 t - 'r 18 "HDPE OUT=3463.58 \ \ \ \ 12 "RCP OUT=3460.76 - A ' - - \ \ WEIR TOP=3468.10 - DI TOP=3469.00 ' x ' * �, \ ' 12 RCP IN=3460.80 I 4 No. DATE BY Description 18 HDPE IN=3463.55 \ •L 18 "HDPE OUT=3463.55 ,, - - 12 RCP IN=3460.70 :� �. ` i ,�- •} ' \ ' ` 15 "RCP OUT=3460. 7O ,4 t • - " y DRAWN BY JGL DI TOP=3468.42 °� ` II'�'-, i ,, • : _,'• ADM " � - } r k y • � L ,. rr * � ' APPROVED BY 18 HDPE OUT=3464.02 . _ •ti CHECKED BY BML %L DATE JULY 7, 2021 41 TOP=3Ix467.79 r r r ■�,r` { + +� .,•rw �F r� ��� • � TITLE \ - 12 "RCP OUT=3461.89 �+ �� y 4 • F' �` x � ' 4W *� i , , -' i , I +�' EXISTING o,._ .; A. 94 CONDITIONS } y \\ \ t \ 1 DEI PROJECT NO: 50140792 - r ~' , ti i' _ �r .+ TL 4 ■ * .. r' i , t _ s �,' r ` xr f#.� SHEET NO. s, 1 4 IL L .96 -rip r '1� � FIGURE IT N \ IL Pr -+ r ' 17 E D �- {- A , k ti • 'tip -y C EXISTING RESERVOIR lk�, 2 3 r14 Ar so FA - IF Low Al Ir t v EXISTING 8" SLUDGE BASIN DECANTER PIPE TO BE ABANDONED IN - - - - - PLACE DI TOP=3467.77 EXISTING SLUDGE 18"RCP IN=3458.77 THICKENING TANK 18"HDPE IN=3462.37 _ TREE REMOVAL ZONE 18"RCP OUT=3458.17�, - -� DI TOP=3471.33 JB TOP=3465.20 INVERT OUT: 3460.92 15"RCP IN=3457.10 ' .18"RCP IN=3456.83 OPTION 1 SAMPLING •-- 24 "RCP -OUT=3456. 63 15 "RCP IN=3456.90 LOCATION 24 RCP IN=3455.60 DI TOP=3469. 19�, 24 "RCP OUT=3454.60 :4' "s ` 18"HDPE IN=3462.79 4o'h "HDPE OUT=3462.79OPTION 2 SAMPLING INV= f LOCATION 3469.12 \ ' �` �` - ---'"" JB TOP=3442.83 '*• 24"RCP IN=3437.73 - G E n r- / i OPTION 1: 35 LF OF NEW 6" - . �� DI TOP=3469.39 GE � DUCTILE IRON PIPE AT OPTION 2: 240 LF OF NEW 6" 4,24"RCP IN=3434.18 1�8 HDPE IN=3463.04 0 DUCTILE IRON PIPE AT 4.13% 24"RCP OUT=3434.18 . ' 18 HDPE OUT=3463.04 EXISTING FILTER 7.86 /o TO TIE INTO TO TIE INTO NEW DOGHOUSE - - • BUILDING EXISTING DROP INLET AT MANHOLE ON EXISTING 24" ' _ 3458.17 LOCATED IN DRIVE j RCP AT ELEVATION OF 3451.00 DI TOP-3470.89 I WEIF� 12 "PVC OUT=3469.69 \ \ J 15 RCP I N 345 7. 81 15 RCP 0 UT 345 7.71 - - - - - DI TOP=3469.58, \ ` ��� EXISTING CLEARWELL 18"HDPE IN=3463.58 \ �� / DI TOP=3464.86 * - - 77 12 RCP OUT=3460.76 18 HDPE OUT=3463.58 \\`� 4 - --- �\ WEIR TOP=3468.10 - DI TOP=3469.00 " \ �\ 12"RCP IN=3460.80 18„HDPE IN=3463.55 • a' 12"RCP IN=3460.70 18 HDPE OUT=3463.55 15 RCP OUT=3460.70 DI TOP=3468.42, x = - 18 HDPE OUT 3464.02�t P ' DI TOP=3467.79 - - 12 "RCP OUT=3461.89 I - IL i v 1 � i \ \ F Y-. - law v 5 ;�m ,�O*� Dewberr Dewberry Engineers Inc. Dewberry Engineers Inc. 0 9300 Harris Corners Pkwy - Suite 220 o Charlotte, NC 28269 M Phone: 704.509.9918 Z o Fax: 704.509.9937 www.dewberry.com ir z 0 Q _- NCBELS #F-0929 t. 0L) z ZZ O 1 zU O J LEI J - LL Q - � LU O m L m z - ~z Q O C/) LL LU Q Q LU i J 24"RCP ti I NV= 332497 SEAL --KEY PLAN 4�L d:' :'+� ' ram � - • _�• L ir 'k 'A t + _ a -* _REVISIONS jq Js' U• _ -_ r ' NL 6'1` PC Y l� •; � ' } y 'ilk ki a y { v - r• � � Y dIL i `- A { I%L No. DATE BY Description DRAWN BY JGL APPROVED BY ADM CHECKED BY BML DATE JULY 7, 2021 TITLE PROPOSED IMPROVEMENTS DEI PROJECT NO: 50140792 SHEET NO. .4 w r ��•_•�� Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy - Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z O �ZU O w J zJ wQ �LL r Q W � O �z frC/) WQ � o0 QW 3:0 0 J C) SEAL PRELIMINARY DO NOT USE FOR CONSTRUCTION KEY PLAN SCALE: 0' 15' 30' 60' SCALE: 1" = 30' REVISIONS No. DATE I BY I Description DRAWN BY JGL APPROVED BY ADM CHECKED BY BML DATE JULY 7, 2021 TITLE DRAINAGE AREA MAP DEI PROJECT NO: 50140792 SHEET NO. FIGURE 3 Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Drainage Area - Option 1 Hydrograph type = Rational Storm frequency (yrs) = 25 Drainage area (ac) = 1.100 Rainfall Inten (in/hr) = 8.403 OF Curve = ASU.IDF Q (cfs) 7.00 .M 5.00 i 3.00 2.00 0.00 0 Runoff Hyd - Qp = 6.47 (cfs) Thursday, Jul 8 2021 Peak discharge (cfs) = 6.470 Time interval (min) = 1 Runoff coeff. (C) = 0.7 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 25-yr frequency 5 Hydrograph Volume = 1,941 (cuft); 0.045 (acft) Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 MR1111 N- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Existing 18_in Outfall Circular Diameter (ft) = 2.00 Invert Elev (ft) = 3434.18 Slope (%) = 1.62 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 7.36 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Friday, Jul 9 2021 = 0.69 = 7.360 = 0.97 = 7.60 = 2.52 = 0.96 = 1.90 = 1.59 Elev (ft) Section Depth (ft) 2.82 3437.00 2.32 3436.50 1.82 3436.00 1.32 3435.50 3435.00 0.82 3434.50 0.32 3434.00 3433 50 -0.18 0 68 0 2 Reach (ft) 3 4 Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Jul 8 2021 Drainage Area - Option 2 Hydrograph type = Rational Peak discharge (cfs) = 14.37 Storm frequency (yrs) = 25 Time interval (min) = 1 Drainage area (ac) = 3.490 Runoff coeff. (C) = 0.49 Rainfall Inten (in/hr) = 8.403 Tc by User (min) = 5 OF Curve = ASU.IDF Rec limb factor = 1.00 Q (cfs) 15.00 12.00 .M 3.00 0.00 -Y 0 Runoff Hyd - Qp = 14.37 (cfs) Runoff Hydrograph 25-yr frequency 5 Hydrograph Volume = 4,311 (cuft); 0.099 (acft) Q (cfs) 15.00 12.00 M 3.00 -N- 0.00 10 Time (min) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Existing 24_in Outfall Circular Diameter (ft) = 2.00 Invert Elev (ft) = 3434.18 Slope (%) = 32.71 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 15.26 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Jul 8 2021 = 0.46 = 15.26 = 0.55 = 27.62 = 2.01 = 1.41 = 1.69 = 12.32 Elev (ft) Section Depth (ft) 3437.00 2.82 2.32 3436.50 1.82 3436.00 1.32 3435.50 3435.00 0.82 3434.50 0.32 3434.00 -0.18 3433 50 0 68 0 2 Reach (ft) 3 4 Preliminary Opinion of Probable Construction Cost Dewberry ASU Sludge Basin Outfall Feasibility D—bn y Engross=a Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 H—i, Co=nee P�k—y - snit, 220 Ch�l tta, NC 28269 PHASE: Preliminary Cost Estimate DATE: 07/07/21 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. NIT $/UNIT COST Misc. Items Mobilization 1 LS $5,000.00 $5,000.00 Demolition/ESC Demolition of Existing Asphalt 12 SY $25.00 $300.00 Temporary Silt Fence 35 LF $4.15 $145.25 Stone Outlets 1 EA $250.00 $250.00 Temporary Seeding and Mulching 0.01 AC $4,000.00 $40.00 Inlet Protection 1 EA $500.00 $500.00 Erosion and Sediment Control Maintenance 1 MO $1,500.00 $1,500.00 Site Work 8" Aggregate Base Course 12 SY $5.50 $66.00 4" Asphalt Surface Course 12 SY $25.00 $300.00 Permanent Seeding 0.01 AC $4,500.00 $45.00 Grading and Stormwater Utilities Connect to Existing Structure 1 EA $1,000.001 $1,000.00 Pipe Excavation 35 LF $25.00 $875.00 6" DIP 1 35 LF $45.00 1 1 $1,575.00 SUB -TOTAL $11,596.25 30.0% Construction Contingency $2,443.88 SUB -TOTAL $2,443.88 TOTAL $14,040.13 $15,000.00 NOTES: Preliminary Opinion of Probable Construction Cost D wherry ASU Sludge Basin Outfall Feasibility I newkerny Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harrie Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 07/07/21 Cnarmtte, NC 28269 LINE ITEM MATERIALS LABOR EQUIPMENT TOTAL NO. ITEM NO. UNITS $/UNIT NO. UNITS $/UNIT NO. NIT $/UNIT COST Misc. Items Mobilization 1 LS $10,000.00 $10,000.00 Demolltion/ESC Site Clearing & Grubbing 0.02 AC $6,000.00 $120.00 Tree Removal 1 LS $9,000.00 $9,000.00 Flagging of Clearing Limits 65 LF $1.25 $81.25 Temporary Silt Fence 250 LF $4.15 $1,037.50 Stone Outlets 2 EA $250.00 $500.00 Temporary Seeding and Mulching 0.02 AC $4,000.001 $80.00 Inlet Protection 3 EA $500.00 $1,500.00 Erosion and Sediment Control Maintenance 3 MO $1,500.00 $4,500.00 Site Work Permanent Seeding 0.02 AC $4,500.00 $90.00 Utilities Connect to Proposed Manhole 1 EA $1,000.00 $1,000.00 Pipe Excavation 245 LF $25.00 $6,125.00 6" DIP 245 LF $45.00 $11,025.00 Doghouse Manhole 1 EA $7,500.00 $7,500.00 SUB -TOTAL $52,558.75 30.0%1 Construction Contingency $8,072.63 SUB -TOTAL $8,072.63 TOTAL 60 631.38 r000,00 Attachment C Dewberry MEMORANDUM DATE: July 7, 2021 TO: Mr. Daniel Gryder (Appalachian State University) FROM: Ryan P. Ames, PE (Dewberry) SUBJECT: Appalachian State University Water Treatment Plant — Metals Treatment Alternatives Analysis Message Appalachian State University (ASU) operates a water treatment plant (WTP) that draws water from Norris Branch Reservoir. Currently, wastewater generated by the water treatment process is discharged back to Norris Branch reservoir under NPDES permit NC0044423. The monthly average copper and zinc limits, which became effective on January 1, 2021, are 4 pg/L and 63 pg/L, respectively. The concentration of copper and zinc in the wastewater at times exceeds these limits. ASU is in the process of requesting a major permit modification to change the location of the NPDES discharge to a point in Norris Branch downstream of the reservoir. The primary driver to move the outfall is to reduce impact from the discharge on the water intake. A secondary benefit to moving the outfall will be that the 7Q10 flow will allow for higher discharge limits for copper and zinc. As part of that permit application, the North Carolina Department of Environmental Quality (NCDEQ) has requested evaluation of two alternatives for treatment of copper and zinc to ensure that moving the outfall location is the most technologically and economically feasible. Reverse osmosis and ion exchange were evaluated as potential alternatives for removal of copper and zinc from the wastewater prior to discharge to the Norris Branch Reservoir. The following sections describe expected effectiveness, preliminary sizing, order of magnitude cost and qualitative comparison of advantages and disadvantages of each treatment alternative. An evaluation of the cost to move the discharge outfall is provided under a separate memo. Ion Exchange Ion exchange (IX) is a process in which wastewater flows through a bed of specialized media, or resin, that is designed to adsorb ions that have affinity for active sites on the media. When an ion, such as copper, is adsorbed onto an active site, it displaces an ion that has a lower affinity for that active site, such as hydrogen or sodium. Resins for IX processes can be engineered to have greater affinity for target contaminants, thereby selectively removing those contaminants from the waste stream. Figure 1 shows a block flow diagram of the conceptual design of an IX treatment system for removal of copper and zinc from the WTP wastewater. Dewberry proposes that the normal wastewater discharge would be directed to a 50,000 gallon surge tank over the normal 2 hour discharge period from the existing sludge thickener. The wastewater would then be pumped to the IX system at a lower rate over approximately 6 hours per discharge day. At the average discharge volume of approximately 18,000 gallons per day (gpd) this equates to a process flow rate of approximately 50 gpm. This approach helps to reduce the size and cost of the IX system. Wastewater would be pumped from the 50,000 gallon surge tank through a cloth media filter. The filter would reduce solids and turbidity prior to the IX resin beds to prevent fouling and degradation of the media. Backwash water from the cloth media filter will be directed to the existing sludge thickener and solids from the backwash water would be disposed with other solids from the water treatment process. The cloth media filter would discharge to a small tank where sulfuric acid would be added to reduce the pH to approximately 4 standard pH units (SU) to ensure that copper is in an ionic form that can be removed by the IX resin. The pH adjusted wastewater would then be pumped through the IX resin beds. ASU METALS TREATMENT ALTS. ANALYSIS 1 OF 3 Mr. Daniel Gryder July 7, 2021 For conceptual design purposes, we have assumed that the IX system would be configured in two parallel trains, and that each train would utilize one vessel of copper selective resin and one vessel of zinc selective resin. It may be feasible to find a single resin that will efficiently remove both copper and zinc. Following the IX system, a caustic dosing system will adjust the pH of the treated wastewater to meet pH limits in the discharge permit. The IX system would need to be installed in a building. For conceptual design purposes a new 45 foot x 30 foot process building is proposed. Dewberry developed a conceptual opinion of cost based on the IX treatment system described above. The approximate capital cost of this system would be on the order of $2.1 million. The opinion of cost is summarized in Table 1. Aside from the cost of the media, the IX system would have a low cost of operation. Power cost would be low because the power demands for the system are limited to low pressure transfer pumps, chemical feed pumps and mixers. Labor requirements would also be relatively low, limited to periodic filling of pH adjustment chemicals, monitoring of pressure loss across the resin bed, and sampling to monitor system performance. Some IX systems have a significant chemical cost for regeneration of the IX media, and as a result, also have a significant regeneration waste stream that must be managed and disposed. The media proposed for this system is typically not regenerated, however, this means that the media must be replaced approximately annually. The cost of annual media replacement would likely be between $50,000 to $100,000. Installation of an IX system is not recommended based on this analysis, however, if it is deemed the most feasible option, pilot testing of IX is recommended prior to detailed design to evaluate resin selection, resin performance, bed life, relative costs of regeneration versus replacement, and pH adjustment chemicals. Reverse Osmosis Reverse osmosis (RO) is a membrane process that represents a physical barrier for removal of many contaminants at the molecular level. The water to be treated is pumped through the membrane at high pressure (125 to 1,000 psi) and contaminants, such as copper and zinc are retained by the membrane in a concentrated waste stream. To minimize the volume of this concentrated waste stream, a three stage RO system is proposed. In a multistage RO system, the retained concentrate from one RO system is directed to the influent of another RO system. Each stage can typically achieve 50% to 75% recovery of treated water from the wastewater stream. Figure 2 shows a block flow diagram of the conceptual design of a RO treatment system for removal of copper and zinc from the WTP wastewater. Dewberry proposes that the normal wastewater discharge would be directed to a 50,000 gallon surge tank over the normal 2 hour discharge period from the existing sludge thickener. The wastewater would then be pumped to the RO system at a lower rate over approximately 6 hours per discharge day. At the average discharge volume of approximately 18,000 gallons per day (gpd) this equates to a process flow rate of approximately 50 gpm. This approach helps to reduce the size and cost of the RO system. Wastewater would be pumped from the 50,000 gallon surge tank to a microfilter system. A microfilter will be installed upstream of the RO system to remove particulates to protect the RO membranes. The micro filter will discharge into a small tank that will serve as a supply tank for backwashing the microfilter. Backwash water will be directed to the existing sludge thickener and solids from the backwash water would be disposed with other solids from the water treatment process. FO Dewberry. ASU METALS TREATMENT ALTS. ANALYSIS 2 OF 3 Mr. Daniel Gryder July 7, 2021 A high-pressure pump will convey pretreated wastewater from the backwash supply tank to the three stage RO system. Permeate will be directed to the outfall for final disposal. The concentrated RO reject stream will be accumulated in a holding tank for periodic disposal off site. The microfilter and the RO membrane can be fouled by mineral deposits from the wastewater or by biological growth. This fouling must be cleaned periodically to maintain the performance of the microfilter and RO systems. A clean -in -place (CIP) system will be required to remove fouling. The CIP system will pump an acidic solution through the membranes to remove mineral fouling and a sodium hypochlorite solution through the membranes to remove biofouling. A chemical feed system will also be included to add anti-scalant chemical upstream of the RO system to limit mineral fouling. The RO system would need to be installed in a building. For conceptual design purposes a new 45 foot x 30 foot process building is proposed. Dewberry developed a conceptual opinion of cost based on the RO treatment system described above. The approximate capital cost of this system would be on the order of $4.2 million, or approximately two times the cost of the IX system described above. The opinion of cost is summarized in Table 2. The cost of operation of the RO system is likely to be greater than the cost of operation of the IX system. The power cost for the RO system is expected to be higher due to the power required to operate the high pressure pumps that feed the RO process. The difference in chemical costs is difficult to evaluate because the RO system will utilize chemicals for the periodic CIP, but may not require regular chemical dosing for pH adjustment. Labor requirements would also likely be similar between the RO and the IX systems due to similar activities such as filling of CIP chemicals, monitoring of pressure loss across filters, and sampling to monitor system performance. The RO system will have a significant operational cost associated with disposal of the concentrate stream. Depending on membrane performance, the concentrate waste stream could range from 5,000 to 50,000 gallons per month. The RO membranes would have a service life of approximately 3 years and replacement cost would be approximately $20,000. Installation of an RO system is not recommended based on this analysis, however, if it is deemed the most feasible option, pilot testing of RO is recommended prior to detailed design to evaluate membrane performance, volume of the reject stream, potential for fouling, and associated chemical requirements. Attachments Figure 1: Ion Exchange Block Flow Diagram Figure 2: Reverse Osmosis Block Flow Diagram Table 1: Opinion of Conceptual Capital Cost — Ion Exchange Table 2: Opinion of Conceptual Capital Cost — Reverse Osmosis 10 Db ASU METALS TREATMENT ALTS. ANALYSIS 3 OF 3 PRELIMINARY NOT FOR CONSTRUCTION SULFURIC CAUSTIC ACID BACKWASH WATER SUPPLY BACKWASH COPPER ZINC IX IX COLUMN COLUMN WITH 30 WITH 30 CF RESIN CIF RESIN EXISITING 50,000 GALLON DISCHARGE SLUDGE COVERED COPPER ZINC THICKENER SURGE TANK IX IX COLUMN COLUMN CLOTH MEDIA FILTER WITH 30 WITH 30 CF RESIN CF RESIN SOLIDS TO OFFSITE DISPOSAL LEGEND PUMP YTANK WITH MIXER ABBREVIATIONS APPALACHIAN STATE UNIVERSITY METALS TREATMENT ALTERNATIVE ANALYSIS CHEMICAL FEED PUMP ION EXCHANGE BLOCK FLOW DIAGRAM PROPOSED (BLACK) IX = ION EXCHANGE SIZE DATE DWG NO REV EXISTING (GREY) PROVIDEDFOR 7/7/2021 FIGURE 1 ASU SCALE NOT TO SCALE SHEET 1 OF 2 PRELIMINARY NOT FOR CONSTRUCTION ANTI- SCALANT HOLDING TANK FOR RO CONCENTRATE FOR OFFSITE DISPOSAL BACKWASH 3 STAGE RO MICROFILTER BACKWASH SYSTEM DISCHARGE EXISITING 50,000 GALLON SYSTEM SUPPLY SLUDGE COVERED TANK THICKENER SURGE TANK CIP SYSTEM SOLIDS TO OFFSITE DISPOSAL SODIUM HYPO- ACID CHLORITE LEGEND PUMP 42i CHEMICAL FEED PUMP ABBREVIATIONS APPALACHIAN STATE UNIVERSITY METALS TREATMENT ALTERNATIVE ANALYSIS PROPOSED (BLACK) Dewberry y RO =REVERSE OSMOSIS REVERSE OSMOSIS BLOCK FLOW DIAGRAM EXISTING (GREY) CIP = CLEAN IN PLACE SIZE DATE DWG NO REV PROVIDED FOR'. 7/7/2021 FIGURE 2 ASU SCALE NOT TO SCALE SHEET 2 OF 2 Table 1- Preliminary Opinion of Probable Construction Cost Vewbierry Ion Exchange ASU Metals Treatment Alternative Analysis Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 7/7/2021 Charlotte, NC 28269 Item Description Unit gty Unit Cost Total 1.0 Equipment 1 50,000 gallon batch feed tank EA 1 $ 75,000 $ 75,000 2 Pre -filter feed pump - 50 gpm EA 1 $ 5,000 $ 5,000 3 Pre -Filter - Disk Filter EA 1 $ 125,000 $ 125,000 4 Ion Exchange feed pump EA 1 $ 5,000 $ 5,000 5 pH adjustment system - acid EA 1 $ 18,000 $ 18,000 6 Ion Exchange System - 4 x 30 CF columns EA 1 $ 100,000 $ 100,000 7 ph adjustment system - base EA 1 $ 18,000 $ 18,000 TOTAL PROCESS EQUIPMENT COST $ 346,000 2.0 Auxiliary Items (Installed) 8 45' x 30' Building and appurtenances LS 1 $ 270,000 $ 270,000 TOTAL AUXILIARY ITEMS INSTALLED COST $ 270,000 3.0 Proiect Capital Costs TOTAL PROCESS EQUIPMENT COST (TPEC) $ 346,000 9 Installation, Piping, Electrical, Instrumentation and Controls $ 500,000 TOTAL INSTALLED PROCESS EQUIPMENT COST (TIPEC) $ 846,000 10 Installed Auxiliary Items Cost (Item 2.0) $ 270,000 Sub -Total SUM TIPEC+ITEM 15 $ 1,116,000 11 Contractor Overhead and Profit 10% $ 110,000 12 Contractor General Conditions Month 6 $ 12,500 $ 75,000 Sub -Total $ 1,301,000 Contingency 40% $ 520,000 FIXED CAPITAL COST ESTIMATE: $ 1,821,000 13 Engineering and Permitting 15.0% $ 273,000 TOTAL ESTIMATED CAPITAL COST (TCC): $ 2,100,000 NOTES AND ASSUMPTIONS 1 System is sized for 50 gpm and will typically operate 6 hours per day. 2 Assumes the project is tax exempt 3 Assumes minimum soil bearing capacity of 2000 psf; estimate does not include piles or other special foundations. 4 Assumes adequate primary electrical service exists within 100 feet of the site, or that utility will provide if new service is required. 5 Does not include costs for auxilliary power source, i.e. generator. 6 Electrical & controls allowance is intended to cover MCCs, wiring & conduit and basic controls. 7 Significant dewatering will not be required for construction of building and tank foundations. Table 2- Preliminary Opinion of Probable Construction Cost t Dewberry Reverse Osmosis ASU Metals Treatment Alternative Analysis Dewberry Engineers Inc. PROJECT NO.: 50140792 TRADE: SITE 9300 Harris Corners Parkway - Suite 220 PHASE: Preliminary Cost Estimate DATE: 7/7/2021 Charlotte, NC 28269 Item Description Unit gty Unit Cost Total 1.0 Equipment 1 50,000 gallon batch feed tank EA 1 $ 75,000 $ 7S,000 2 Micro Filter, 3-State Reverse Osmosis System, pumps, CIP system EA 1 $ 1,454,352 $ 1,454,400 TOTAL PROCESS EQUIPMENT COST $ 1,529,400 2.0 Auxiliary Items (Installed) 3 45' x 30' Building and appurtenances LS 1 $ 270,000 $ 270,000 TOTAL AUXILIARY ITEMS INSTALLED COST $ 270,000 3.0 Project Capital Costs TOTAL PROCESS EQUIPMENT COST (TPEC) $ 1,529,400 4 Installation, Piping, Electrical, Instrumentation and Controls $ 500,000 TOTAL INSTALLED PROCESS EQUIPMENT COST (TIPEC) $ 2,029,000 5 Installed Auxiliary Items Cost (Item 2.0) $ 270,000 Sub -Total SUM TIPEC+ITEM 15 $ 2,299,000 6 Contractor Overhead and Profit 10% $ 230,000 7 Contractor General Conditions Month 6 $ 12,500 $ 75,000 Sub -Total $ 2,604,000 Contingency 40% $ 1,042,000 FIXED CAPITAL COST ESTIMATE: $ 3,646,000 8 Engineering and Permitting 15.0% $ 547,000 TOTAL ESTIMATED CAPITAL COST (TCC): $ 4,200,000 NOTES AND ASSUMPTIONS 1 System is sized for 50 gpm and will typically operate 6 hours per day. 2 Assumes the project is tax exempt 3 Assumes minimum soil bearing capacity of 2000 psf; estimate does not include piles or other special foundations. 4 Assumes adequate primary electrical service exists within 100 feet of the site, or that utility will provide if new service is required. 5 Does not include costs for auxilliary power source, i.e. generator. 6 Electrical & controls allowance is intended to cover MCCs, wiring & conduit and basic controls. 7 Significant dewatering will not be required for construction of building and tank foundations.