HomeMy WebLinkAboutNCC230035_ESC Approval Submitted_20230109Ixiter of Approval with Modifications
Laglc l'ropertles. LLL
December 30, 20?2
Page 2 of 3
1. The approved L&SC plan as well as any approved deviation.
2. The NCGOI pennii andthe COC, once it is recei■•ed_
3. Records of inspccticros made during the previous U months.
Also, this letter gives the notice required by G S. I I3A-61.I(a) of our right of periodic inspection to
insure- comptiuttcr with the approved pleat.
Notch Carolina's Sedimentation Pollution Control Act is performance -oriented, nquiring protection of
existing natural resources and adjoining proprrtics. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution C ontroI Act of 1973 (North Carolina General Statule 113A-51 through 66). this
office may require revisions to the plan and implementation of the revisions to ens= compliance with
the :tot.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws. regulations. and nuke. In addititm. local city or county ordinances or rules may also apply
to this land -disturbing activity. Ibis approval does not supersede any other permit or approval.
Plus note that this approv:al is based in Team tin the accuracy of the information provided in the
Fin isl Responsibility Form, which you provided You are requested to file an amended farm if there
is any change in the information included ort the form. In addition. it would be helpful if you notify this
office of the proyposed starting date for this project.
Your cooprtuticm is appreciated.
Sirwerely.
Tamera L-plig(PF
Regional Engineer
Land (duality Section
Enclosures: Certirkate of Approval
Modifications Required for Approval
c_ Berson & Carter, P.A.
Attention; Alex T. Carter. PF
PO Box 669
Walkertowv. NC 27051