Loading...
HomeMy WebLinkAboutNCC214623_NOT Closeout Documents (2)_20230104J RVIS CONSULTING., INC. CONSULTING ENGINEERS -PLANNERS -SURVEYORS 603 ELLIOTT ROAD, PO 294 BATH, NORTH CAROLINA 27808 TELEPHONE (252)-765-1098 C-3490 September 1, 2022 RE: New Dixie Mart # 216, HALIF-2021!-005 Ivana Barham, PE Assistant Regional Engineer Land Quality Section NC Department of Environmental Quality Division of Fuergy, Mineral and Land Resources 1628 Mail Service Center 3800 Barrett Drive Raleigh, North Carol in 27609 Dear Ms Barham: The project referenced above was finished with all the asphalt, piping, site work, and final landscaping in the late Fa11 of2021. During the construction, all the devices were installed and maintaincd. There was not any damage to any of the devices. no discharges. or violations on the site. The NC DOT was involved with roadway construction with the widening of NC 125 and the new construction of Premier Boulevard adjacent to this site. Their construction site was under a Sedimentation and Erosion Control Permit and is downstream from the New Dixie # 216 site.Should there have been any discharges, they would have been contained by contained by their devices. There were no discharges and the site for New Dixie Mart 4216 was covered with stone as soon as possible and the construction traffic was monitored carefully to avoid the bare earth. Representatives for the New Dixie Mart Contractor were on the job site continuously as well as inspectors for the NCDOT project that was coordinated with the two Contractors because often NC DOT was performing work on the New Dixie site related to their roadway work. The rainfall data recorded for the NCDOT project and the New Dixie project are the same data and is available if needed. Please let us know if you need additional information. We have attached the NOT for the NPDES Permit and ask that the perinits be terminated, Very Truly Yours Satn Jarvis P P . Jarvis Cron ing, Inc.