Loading...
HomeMy WebLinkAboutNC0020061_NOV-2022-LM-0080_Resp Rvcd NOV-2022-LV-0861_Resp Rvcd NOV-2022-LV-0086_Resp Rvcd_20221219MH TOWN OF SPRING HOPE, NC 12 December 2022 Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 3800 Barrett Dr. Raleigh, NC 27609 NC Dept of Environmental Quality DEC 1 9 2022 Raleigh Regional Office Notice of Violation Tracking No. NOVs 2022-LM-0080; 2022-LV-X0861; and 2022-LV-0862 Collection System Permit No. N00020061, Spring Hope WWTP, Nash County Mr. Vinson and Ms. Manuel: The Town of Spring Hope appreciates the opportunity to respond to NOVs-2022-LM-0080, 2022-LV-00861, and 2022- LV-00862, all dated 21 November 2022, and we trust that the information provided herein will result in no further punitive action by the Division. For the previous 10 years and up until 4 July 2022, the Town of Spring Hope relied on the third part contract operator Envirolink to operate the collection system and Spring Hope WWTP. It was clear that the Town's collection and treatment operations had suffered as a result. Proper maintenance and repairs of the system and the plant were clearly ignored. I cannot emphasize enough the extent of the neglect that had taken place under Envirolink. Effective 5 July 2022 the Town of Spring Hope returned to in-house wastewater collection and treatment operations. The WWTP was turned over to a transitional operator, Mr. Danny Gray of G-2 Utilities. Mr. Gray served in this capacity from 5 July 2022 until 1 September 2022 whereupon Mr. Andy Matthews of Matthews Environmental took over as the Town's contract WWTP operator. The Town also works closely and seeks technical assistance from North Carolina Rural Water Association. Upon taking over the facility on 05 July 2022, Mr. Bobby Ball, Spring Hope Public Works Director, discovered the chlorine injection pump not working at the WWTP. On 08 July 2022 Mr. Ball ordered a chlorine injection pump. In the interim, he substituted the existing pump from the Ash St well (Ash St well was off line and awaiting well service). The new pump arrived at the Town two weeks later and was installed at the Ash St well on the week of 25 July 2022. Mr. Gray identified the substituted chlorine pump as not working on 02 August 252-478-5186 www.springhope.net 2 2022. A new pump was ordered that week for the WWTP, but was not received until 12 September 2022, and was installed that week. The Town of Spring Hope is dedicated to operating the collection system and WWTP facility as completely compliant. While violations are rare, they sometimes occur. The circumstances in the current case have extenuating circumstances. Therefore, we respectfully request that the Division consider these mitigating factors and take no further punitive action. If we can be of any further assistance or additional information is needed, please this office at 252-478-5186. Sincerely. Andrew Delonno, Town Manager CC: Bobby Ball, Director of Public Works Andy Matthews, Matthews Environmental