Loading...
HomeMy WebLinkAboutU-5850 Stream Mitigation Correction.pdfSile2-Allowable 2- Allowable WinMitigation �SkeamA P-71 Stream No es (square teal 1,035 is9uas feeli 4.00 (.,a Leuare is.,)Site 852 b4i's. fear) Gh. Total buffer impacts: Zone 1 Zone 2 Total Temporary Impacts: 0.00 0.00 Zone Zone _... __ ... Total Permanent Impacts: 6,339.00 4,682.00 Zone 1 Zone 2 Total combined buffer impacts: 6,339.00 4,682.00 61. Comments: There Is 584 sq. 0. of wetland fill Impacts which over ap with miligable Zone 2 impacts which will be subtracted from mitigation totals. Numbers reported In section 6b. above have not been reduced by the overtopping area. E. Impact Justification and Mitigation _ 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed Impacts In designing the project:" Fill slopes for the road widening have been designed at 2:1 slopes. 1b. Specifically descrbe measures taken to avoid or minimize the proposed Impacts through construction techniques:` NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. Wetlands will be hand cleared instead of cleared with mechanized equipment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the Stale? Yes No 2c. If yes, mitigation Is required by (check all that apply): I DWR .v Corps 2d. If yes, which mitigation ordeals) will be used for this project? Mitigation bank +Payment to In -lieu fee program. Permillee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from In -lieu fee program is attached. Yes • No 4b. Stream mitigation requested: em... a.0 do. If using stream mitigation, what Is the stream temperature: NC Stream Temperature Classification Maps can be found under the Mitigation Concepts lab on the Wilmington Dlstdgrs RIBITS website. 4d. Buffer mitigation requested (DWR only): she. Riparian wetland mitigation requested: iswsre iseq (.ores) 19119 0.09 at. Non -riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested: (acres) (arras' 0 0 an. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) ' Recent changes to the slormwaler miss have required updates to this section .- 1. Diffuse Flow Plan