HomeMy WebLinkAbout20071411 Ver 1_More Info Letter_20071005~QF W A T~9p Michael F. Easley, Governor
`Q ti William G. Ross Jr., Secretary
Vj ~ North Carolina Department of Environment and Natural Resources
p .~ Coleen H. Sullins, Director
Division of Water Quality
October 5, 2007
DWQ Project # 07-1411
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Robert Robertson
BRG Construction, Inc.
101 N. Salem Street
Apex, NC 27502
Subject Property: Whitehall Manor Greenway
Ut to Beaver Creek [030605, 16-41-10-(0.5), WS1V, NSW] AFTER-THE-FACT
REQUEST FOR MORE INFORMATION
Dear Mr. Robertson:
On August 17, 2007, the Division of Water Quality (DWQ) received your After-the-Fact application
dated August 17, 2007, to fill or otherwise impact 0.05 acres of 404/Wetland, 148 linear feet perennial
stream impact, and 115 linear feet intermittent stream impact, to construct the proposed residential
subdivision. On September 10, 2007 and October 2, 2007, the DWQ received additional information
from you, however, the DWQ has determined that your application remains incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in order to
process your application to impact protected wetlands and/or streams on the subject property. Therefore,
unless we receive five copies of the additional information requested below, we will have to move toward
denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as
incomplete until we receive this additional information. Please provide the following information so that
we may continue to review your project.
Additional Information Requested:
You reported your After-the-Fact impact at Grappenhall Drive (Impact Area No. 2) to be 148
linear feet of perennial stream in your PCN application, however, this Office measured 172 linear
feet of perennial stream impact at this location based on your submitted materials and a site visit
conducted on September 28, 2007. Therefore, 172 linear feet of compensatory stream mitigation
is required for this project. Please provide a compensatory mitigation plan. The plan must
conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of
impacts proposed.
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
Noe Carolina
401 Oversight/Express Review Permitting Unit ~UEllCR~~I,J
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http•//h2o enr state nc us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper
BRG Construction, Inc.
Page 2 of 2
October 5 2007
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to disc this matter.
Sinc ly,
Cyndi Karoly, Supervisor
~ 401 Oversight/Bxpress Review Permitting Unit
CBK/ijm
cc: Lauren Cobb, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Nicole Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614
071411 WhitehallManorGreenway(Wake)On_Hold