Loading...
HomeMy WebLinkAbout20221526 Ver 1_Timber Farms Impact Tables Rev 12-27-22_20221228Timber Farms Phase 1 Open Water Impacts (Rev 12-27-22) 2. Open Water Impacts J 4a. Site # 4a1 Reason 4b. Impact Type 4c. Name of Waterbody 4d. Activity Type 4e. Waterbody Type 4f. Impact Area OW1 Road Construction P N/A Fill Ditch 0.0447 OW2 Road Construction P N/A Culverts Ditch 0.0365 OW3 Road Construction P N/A Culverts Ditch 0.023 OW4 Stormwater Pond and Road Construction P N/A Excavation Ditch 0.0258 OW5 Road and Building Construction P N/A Fill Ditch 0.1468 OW6 Grading P N/A Fill Ditch 0.0055 OW7 Building Construction P N/A Fill Ditch 0.0279 OW8 Install P N/A Fill Ditch 0.1029 OW9 Grading P N/A Fill Ditch 0.0084 OW10 Construction of Canal P N/A Excavation Ditch 0.0098 OW11 Construction of Canal P N/A Excavation Ditch 0.0515 OW12 Construction of Canal P N/A Excavation Ditch 0.0072 OW13 Construction of Canal P N/A Excavation Ditch 0.0062 TOTAL 0.4962