HomeMy WebLinkAbout20221526 Ver 1_Timber Farms Impact Tables Rev 12-27-22_20221228Timber Farms Phase 1 Open Water Impacts (Rev 12-27-22)
2. Open Water Impacts J
4a. Site #
4a1 Reason
4b. Impact Type
4c. Name of Waterbody
4d. Activity
Type
4e. Waterbody
Type
4f. Impact Area
OW1
Road Construction
P
N/A
Fill
Ditch
0.0447
OW2
Road Construction
P
N/A
Culverts
Ditch
0.0365
OW3
Road Construction
P
N/A
Culverts
Ditch
0.023
OW4
Stormwater Pond
and Road
Construction
P
N/A
Excavation
Ditch
0.0258
OW5
Road and Building
Construction
P
N/A
Fill
Ditch
0.1468
OW6
Grading
P
N/A
Fill
Ditch
0.0055
OW7
Building
Construction
P
N/A
Fill
Ditch
0.0279
OW8
Install
P
N/A
Fill
Ditch
0.1029
OW9
Grading
P
N/A
Fill
Ditch
0.0084
OW10
Construction of
Canal
P
N/A
Excavation
Ditch
0.0098
OW11
Construction of
Canal
P
N/A
Excavation
Ditch
0.0515
OW12
Construction of
Canal
P
N/A
Excavation
Ditch
0.0072
OW13
Construction of
Canal
P
N/A
Excavation
Ditch
0.0062
TOTAL
0.4962