Loading...
HomeMy WebLinkAboutWQ0044023_Application (FTSE)_20221229State of North Carolina Department i ionEnvironmental f WarRQuality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvlsion of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: moo�gf)2,-� (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: Applicant's name: Town of Gibsonville (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Ben Baxley per 15A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 129 West Main Street City: Gibsonville State: NC Zip: 27249- 5. Applicant's contact information: Phone number: (336) 449-4144 Email Address: bbaxley6Wbsonville.net II. PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other 1. Project name: Edinborough Phase 3, 4 & 5. 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Pen-nit/Project If a modification, provide the existing permit number: W000 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: W000 3. County where project is located: Guilford 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.11932293' Longitude:-79.5535879' 5. Parcel ID (if applicable): 104893 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Anthony D. Lester License Number: 19773 Firm: Evans Engineering, Inc. Mailing address: 4609 Dundas Drive City: Greensboro State: NC Zip: 27407- Phone number: 336 854-8877 Email Address: adl@evans-eng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: East Burlington WWTP Permit Number: NCO023868 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): W00042918 2. Downstream (Receiving) Sewer Information: 10 inch Z Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS W00042918 Owner Name(s): Town of Gibsonville FORM: FTA 06-21 Page I of 5 Vl. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ®No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(t)) Daily Design Flow a,b No. of Units Flow Single Family Home (4 Bedrooms) 120 gal/ Bedroom 59 28,320 GPD Townhouse Units (3 Bedrooms) 120 gal/Bedroom 32 11,520 GPD gaV GPD gav GPD gal/ GPD gal/ GPD Total 39,840 GPD a See 15A NCAC 02T .0114(b). (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 39,840 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 Vll. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 3,036 L.F. SDR-35 8" 634 L.F. DIP 101, 1,880 L.F. SDR-35 101, 317 L.F. DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(l): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B),. ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? ® Yes [—]No 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class lI impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(fl or (e), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/scaled by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary infonnation identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Cape Fear ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undennines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Pennittine of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: I. Anthony D. Lester , attest that this application for Edinborough Phases 3, 4, & 5 (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item ll.l ) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC North Carolina Professional Engineer's seal, signature, and date: SEAL 19773 '= 11.g.2Z 3. Applicant's Certification per 15A NCAC 02T .0106(b): 2boorough attest that this application for E Phases 3, 4, & _° (Signature Authority Name frcFi Application Item 1.3.) (Project Name from Application Item 11.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: Q Q FORM: FTA 06-21 Page 5 of 5 TOPO! map printed on 04/01/22 from "North Carolina.tpo" and "Untitled.tpg" 79-35.000' W 79°34.000' W 79�33.000' W WGS84 79-32.000' W 9"' 1 �M FEET 0 w Iwo FARIAS Y Printcd f. TOPO! 9.001 Natio al G.g phk Holdi,4, (wx c.Fopo.<om) o 1: .N az^ �mm ' '4T - 15, � • �>E r r �e r RtlipiCounty,Farm Rd State of North Carolina Department of EnvironmentalQuality Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Gibsonville Project Name for which flow is being requested: Edinborough Phase 3/4/5 More than one FTSE tnay be reguiredfor a single project if the owner of the IVIIITP is not responsible for al[ pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Gibsonville Collection System b. WWTP Facility Permit #: 00349 AllfTows are in MGD c. WWTP facility's permitted flow 1.55 d. Estimated obligated flow not yet tributary to the WWTP .049 e. WWTP facility's actual avg. flow .659 f. Total flow for this specific request .039 g. Total actual and obligated flows to the facility .933 h. Percent of permitted flow used 60.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pomp stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow*" Current Tributary Flow Plus (Name or Pemtit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MOD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): Highway 61 North Outfall Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 iII. Certification Statement: I Ben Baxley certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signahore %awn M41) Title of Signing Official Page 2 of 6 12114120; Z FTSE 10-18 \ Q eIsamp ! ;)}§ # ! ! ))(\))) )\ § ){ via K ! !i : 4p Q q !# tm E9 \( ]§ \ * ! jE / / ) ) \ ) State of North Carolina %Flii> bt}sl 91r Ti��: � f^'.v:Il Jf3:A". Entity Requesting Allocation: Town of Elon Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Project Name for which flow is being requested: Edinborough -Phase 3-5 (Gibsonville) More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible far all pump stations along the route of the proposed wastewaterJlow. I. Complete this section only if you arc the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Elon Collection System b. WWTP Facility Permit #: WQCS00226 Aff lows are in MGD c. WWTP facility's permitted flow 0.900 Elon East Allocation d. Estimated obligated flow not yet tributary to the WWTP 0.065640 - Elon East e. WWTP facility's actual avg. flow 0.172 - Elon East f. Total flow for this specific request N/A g. Total actual and obligated flows to the facility 0.238 - Elon East It. Percent of permitted flow used 26.5% - Elon East II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Pump Daily Current Not Yet Current Flow Pump Station Station Firm Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Finn / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** TravisCreek 2.0 0.800 0.422 .114 0.536 0.264 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): Travis Creek Outfall Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 III. Certification Statement: I Richard Roedner certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works JiQ adequate capacity to transport and treat the proposed new wastewater. GibL Z12— Page 2 of 6 FTSE 10-18 Town of Elon - East Plant (North) Allocation East Plant - FY 21-22 Flows Station Name GPD % of Allocation Elon Flow 172,600 19.2% East Plant Allocation 900,000 Travis Creek - FY21-22 Flows Station Name GPD % of Station Capacity Travis Creek Pump Station 421,900 52.7% Total Flow 421,900 Elon Metered Flow 204,400 Manning Meter Flow (GIB to Elon) 31,800 Elon Flow 172,600 Gibsonville Flow 249,300 W WTP - Allocated Flows - Non -Tributary Project Name GPD Shallowford Phase 1 & 2 18,600 Wexford 47,040 Total Allocated - Non Tributary Flows 65,640 Total Allocated - Non Tributary Flows - Gibsonville 49,080 Proposed Flows Project Name GPD Edinborough Phase 3/4/5 - GIBSONVILLE 39,840 Elon Allocation + Tributary Flows 238,240 26.5% Total Allocation Flows 154,560 17.2% Total Pump Station Flows (Eton & Gib) 576,460 72.1% Situation GPD % of Capacity Peak Capacity of Station - Current 2,000,000 28.8% Average Daily Flow Capacity- Current 800,000 72.1% State of North Carolina Department of Environment and Natural Resources 1 1r f` Division of Water Resources Division or water nesoiirces Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Edinborough Phase 3,4 and 5 More than one FTSE may be required for a single project if the owner of the WWII' is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: East Burlington WWTP b. WWTP Facility Permit 4: NC 0023868 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility In. Percent of permitted flow used All flows are in MGD 12.00 1.821025 3.8360 (.03984) Gibsonville Allocation 5.657025 47.1% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: None (A) (B) (C) (D)=(B+C) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Name GPD (Firmlpf), GPD GPD GPD Flow (E)=(A-D) Available Capacity*** Travis Creek 2.000,000 8,000,000 576,000 26,400 638,000 162,000 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.6. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity.-5 0. Downstream Facility Name (Sewer) Downstream Permit Number: HWY 61 Outfall Page 1 of 2 FTSE 10-18 III Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature City Engineer Title of Signing Official Date Page 2 of 2 FTSE 10-18 —Since 1974— Surveyors Planners December 22, 2022 Jenny Graznak Assistant Regional Supervisor NCDEQ Division of Water Resources 450 W. Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 RE: FTA — Edinborough Subdivision Phases 3, 4 & 5 Jenny, Please find enclosed the FTA for the proposed Edinborough Subdivision Phases 3, 4 & 5 in Gibsonville, NC. The FTA includes the following: 1. One original and one copy of the FTA. 2. Application fee check for $480 made payable to NCDEQ. 3. FTSE form from the Town of Gibsonville, Town of Elon College & City of Burlington 4. Site vicinity map and USGS topo map of the site and surrounding area. The purpose of this application is to permit the sanitary sewer extension that will serve this 91 lot subdivision (phases 3, 4 & 5). We have requested a flow of 39,840 GPD. Please process for approval. Let me know if you have any questions. Sincerely, Anthony D. Lester, PE, PLS Vice President Evans Engineering, Inc. NC Department of Environmental Quality .a .. Received DEC 2 9 2022 Winston-Salem Regional office [.Ulu]