HomeMy WebLinkAbout20230020 Ver 1_Shoreline Stabilization_20230105Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email*
hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 12/23/2022
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
TNGC CHARLOTTE LLC
JAMES.SOWERS@TRUMPGOLF.COM
(704)363-7406
(xxx)xxx-xxxx
Street Address
120 Trump square
Address Line 2
City
Mooresville
Postal / Zip Code
28117
Is there an agent working on the project? * Yes
No
Agent/Consultant Information
State / Province / Region
NC
Country
US
Name: * TAMARA HAGER
Company Affiliation: * LAKE PERMIT LLC
Email:* hager@lakepermit.com
Phone Number:*
(704)575-2227
(xxx)xxx-xxxx
Mailing Address:*
Street Address
PO BOX 5335
Address Line 2
City State / Province / Region
MOORESVILLE NC
Postal / Zip Code Country
28117 US
A signed and dated copy of the Agent Authorization letter:*
the point auth.pdf 165.11 KB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name:*
TNGC CHARLOTTE LLC
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. *
Upload File
Look up address
Upload Map: the point SURVEY.pdf 195.14KB
Latitude:*
35.531971
Longitude: *-80.918628
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
the point sketch.pdf 106.14KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
IMG_0605.jpg.pdf 178.25KB
4. Location of the property (where work is to be conducted)
Nearest Town: * MOORSVILLE
County: * Iredell
Lake/ river/ ocean adjacent to NORMAN/CATAWBA
property:
Subdivisions name or site address: *
THE POINT LOT # 26 & 27
Include phase/lot number
Directions to site: *
FROM MARSHALL STEAM STATION, TRAVEL EAST ON HWY 150
5.4 MILES, TURN RIGHT ONTO MORRISON PLANTATION PKWY
1.1 MILES, TURN RIGHT ONTO BRAWLEY SCHOOL RD 5.0
MILES, TURN RIGHT ONTO MEETING HOUSE CIR 700 FT, TURN
RIGHT 600 FT, TURN RIGHT 200 FT DESTINATION IN 70 FT.
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
RESIDENTIAL/ GOLF COURSE AT THE TRUMP POINT.
Residential, undeveloped, etc.
6. Property Size .58
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
REFURBISH RIVER ROCK TO BARE ERODED AREAS
8. How will the work be done?*
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
0
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NONE BY BARGE
Sketch: the point sketch.pdf 106.14KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* TNGC CHARLOTTE LLC
Signature:
age c , LOrTT /rc
Submittal Date: 12/23/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number: * 20230020 Version: * 1
Select Reviewer: * Andrew Pitner:eads\ahpitner
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received?* No Payment Needed
Fee Received
Need Fee - send electronic notification
What amount is owed?* $240.00
$570.00
PTI
Contractorf agent:
-W71FKAT10R E9R
pCfrtt � C�,S'`'r
Ths appmvat is for the purpose srid design describad In 'gout P.ppllWlon. Impacts not Indicated In thfr
applfcstlOn Is a vlokMon a zr the Buffer Rule. 51te specific workshouId be provided in ILhe eppllcatlon. 125A NCAC
42H .4506 end ISA NCAC 02B _0243(81]
TrEes are nGt ellowsd to be rernoved lrom Zona 1 of the Buter {wfthln30ft of the full pond on), un:ess
PppravEd- EXCRODn, tha,etrees that ive severely undarm Inat a!ongth� irrl in adbite sho reline can be removed_
Minimal shaaIng and sloptn8 aIorlgthe rlrrnediate shcrPllne Ls al:aw*d.. [aSA MCsC 023.0243(6)1
Unchfng, grading fn the buffer fs eat arlowed. Excerslsre dlMrbance of gro Lind cover- [15A N CAC a 2B A243 {6};
Boat es, impervious p>atAor, fmgervious%MMUCwaus, e%. sre not zilowed inthe buffer u Mass spai:Mcal ly -Approved
by the ;? %dslon. 'ihsre are ilm$tat on an its far decks. (1SA NCAC 42B .0243 (4) and W
Work to be conducted %rom land must indicate ar, a--r$as and indlata anv trees t�at are to be rem-o +ed. +ne
work corridor should be described, i he approv±d access carrfdor shall be restored. Si -aging, spoil, constructi
maf�-rfsl must be outslcla the buffer- (15A NCAC OY .05 02 and 15A NCAL'. C.2B , 242 , 4'1. OR fa)",
Storm.wstxr cannot ba plp=d w. d-ianrielad for dlract dlsch*qM to trsa lake. Ali constructed gtffrmwasar
dIschrrg■_s court be et the nwtvral vlauatfon and discharged prFor to entadng tha buffer dIrecta 6 as drff*rsa a
:heat ffiow at non-erosfva vC&lodt[as to T.he Iola. [15A NCAC 428.0243 i5j, {6}'
AcbrowJSCfgerner7t ff1rlVo>� car#fon
hereby state that f h-ive bss� fnforrned O, the Catawba
R(perlan Buffer Rule. Any work conducmd Ir. the buffer, not speciflcaliv shad fn the application .nd ipprovsd
by the Dfvislon of Water Resourcas (GWR), is a Volimcn and sub)art to enforcemant. Due dtllgence WIII ba
raker, LUCK that the aonstrucLton .Nils be bunt within WbStant lat MfnpIIaACe and intent of the 402 tAlate r
Quallty CertificEbon and B[nfierR. uIss,I:he v.npraved plan(s) and "ciftcatlonis), and othersvpportin;
12I I
Jlii1lr$ {owed
Evil
i TjN
t
J �rC y
f
f'
Full ponrl!
Norrn
5
Lake
At Full Pancl/l rWIWater d2Vel}
►�'N i I�tk � D rSrea� t3,q?
LaS)Nb, Lv1UG, iZ�c
VI
Pleas@ approximetaly Sri the
f6llow,n infvrrrt
3
5[rcfi u3l0ftxloo fp* aCton an this plan (provide di►"c4sion� fivraa�#i
All Pmlcased Yegetatlon dearfng
t.ocat;on of rlp rap or flit to be placed above 3• Wc2ttan of p ratho Full Pond/740rmal Weter Level elevation
Locatl
4_ p or fill to be placed below the on Full Pond/ Normal water Level alevation
ofany proposed stru
5• Lotatlor1 of any exoavatlon or dred such as bulldings, retalnFng rvellF, decks, Qt=
6, [.reify, t1.5truction ac> mrrldors
, of r� gtng below tha Full Pond/ Normal Water Level elevatinr,
FORM: $SGp 10-20I3
am
Poe 3 Uf 3
A•.lp
7774��
� J
r•
- 1 4- .Ix �
� r�
- ��
Full ponrl!
Norrn
5
Lake
At Full Pancl/l rWIWater d2Vel}
►�'N i I�tk � D rSrea� t3,q?
LaS)Nb, Lv1UG, iZ�c
VI
Pleas@ approximetaly Sri the
f6llow,n infvrrrt
3
5[rcfi u3l0ftxloo fp* aCton an this plan (provide di►"c4sion� fivraa�#i
All Pmlcased Yegetatlon dearfng
t.ocat;on of rlp rap or flit to be placed above 3• Wc2ttan of p ratho Full Pond/740rmal Weter Level elevation
Locatl
4_ p or fill to be placed below the on Full Pond/ Normal water Level alevation
ofany proposed stru
5• Lotatlor1 of any exoavatlon or dred such as bulldings, retalnFng rvellF, decks, Qt=
6, [.reify, t1.5truction ac> mrrldors
, of r� gtng below tha Full Pond/ Normal Water Level elevatinr,
FORM: $SGp 10-20I3
am
Poe 3 Uf 3