Loading...
HomeMy WebLinkAboutNCC204928_NOT Closeout Documents_20221230CITY OF ROCKY MOUNT Erosion Control Site Inspection Report ROCKY MOUNT PUBLIC WORKS 7HE CENTER OF IT ALL Project: � � tirr ��+e_� -`� Date: J 0 Location: e Time: sY) Responsible Party: r 1 0 �1 Weather & Site Conditions: On -Going Activities at Time of Inspection: Contact Made With (Employee/Employer:) Site currently under NOV n Site currently under CNOV S & E Permit Issued by CRM Copy of Approved Plan On -Site Rain Guage Provided NPDES Records available On -Site Measures implemented per Plan Modifications approved by CRM Is the site in compliance with S.P.C.A.? Yes E�No❑ If no, check violations below: Failure to take all reasonable No Approved Plan measures Failure to follow approved plan Inadequate Buffer Zone Failure to submit revised plan Graded slopes and fills too steep Failure to provide adequate ground cover ❑ Insufficient measures to retain sediment on site Other (describe) Has off -site sedimentation occurred ❑ since last inspection? Yes Corrective Measures Needed Deadline: Unprotected exposed slopes Failure to maintain erosion control measures No1-1Degree if yes: William Pridgen 11