Loading...
HomeMy WebLinkAbout550018_Compliance Evaluation Inspection_20221229Facility Number ®1 ivision of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 'ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: (-outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: Arrival Time: 7-00 ?--- 0co rr Departure Time: Mailing Address: Physical Address: Facility Contact: 2 Owner Email: Phone: County: Region: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Integrator: Phone: Certification Number: Certification Number: Longitude: A/c 5`s-fig 140101)1144.11Petrtagmoirlice,A, Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow f 7O Js , - Dairy Calf /6 Dairy Heifer 5-7 Dry Cow ik3 Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑No ❑NA ❑NE ❑ Yes No 'El NA ❑NE ❑ Yes No ❑NA NE ❑ Yes 7No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued Facility Number: Sr- - / S Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ' o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 27 72 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ r No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Yes [tTo ❑ NA ❑ NE ❑ Yes El40 ❑NA ❑NE ❑ Yes LJ 1 o ❑ NA ❑ NE ❑ Yes 124 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ YesTo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [r No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 10 ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes II14o E NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes10 ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ['Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ✓❑�No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Page 2 of 3 5/12/2020 Continue OZOZ/ZI/S 2202 e •Z' :a;EQ £.% £ and :annuals ao;oadsuj/aamaina21 :auoud :autEN zo;oadsuj/aamaina)j avo aSc2evp � ��o )'yaidn1o9 ✓). p�e -aJT-P1 C-9)(7 Ce )1C2c-) 09(4 cv) 5rJQJa,) `if e pr) Q Aki 6-) Tiv-d-.a47 l S )''eS or 0 O/kr rvija1/) rtriAl KrlY sQ n2 ` P-,14215gV )17)101-Ygi_ o0 • ,VO s) •(daussaaau su saud juuoj;jppu asn) suoj;un;is ujuidxa as;;aq o; Aajjpuj jo aupttuap asn •s;uamtuoo law Suu ao suoj;upuannuoaaa iunomppu /Wu ao/put saantsuu sa . fun ujuidx3 :(# uoj;sanb o; aajaa) s;uauuutoD 3N El VN ❑ oNsaA ❑ am ❑ dN ❑ N,saA ❑ am ❑ VN ❑ oN,Ei soA ❑ 1,Xouagt °tuts aui Xq ;isin dn-mojioj E a unbaz /ijiouj au; saoa •i£ Lani;u;uasaadaz ous-uo uu gum uofoadsui/maunaa ssnosup o; IJ ao;oadsuj/aamolnaj au; pia •££ ,dYiiMVO ao;iuuad all Jo aoutildutoo-uou asnuo uoigM pa;ou sutojgoad iuuoi;ippu Xuu °Jam •Z£ :a01140 ❑ Puod oRmo;s/uooguq ❑ mold not;togddd ❑ gN� dN ❑ ON ❑ saA ❑ •mojaq xoq a;Eudoaddu au; �joauo `saXjj j,,t;iliouj au;;E;six° stump alu; aou3.tnsgns oQ ' j £ // (uoupuoiiddt-aano `sutajgoad pztogaaaj `aaieuosip `•a•i) 1,1iuuad HN ❑ dN ❑ obi",-, soA ❑ au; Xq paunbaz st suoitnus iioua�.taulo Jo aoudjO ituoI5a-I au; j;ou o; jttj XupoEJ au; pm .0£ J•Sia;tipautu ! anpuivasaadau kinuno zty Ituopau t;ou;uoo `sac jj 3N ❑ dN ❑ o\ EI sax ❑ �,u.zaouoo �tltnb ni .to iopo uu °sod iirjiotj au; pip not;oadsui au; jo gulp au; id '6Z '—' ouuzou utu; ioq iq azam lap saw.' kiju .iouu aaodaa put HN ❑ dN ❑ om/EI sox ❑ ;uauunoop zo/put smog tZ u;im sjtuziuu prop jo asodsip iilaadoad o; jrej AIIII0t3 all PIG •gZ sanssj aaq;p gN ❑ di El ON ❑ soA ❑ Luot;uogploo (Zd7d) s;uauussasst ssoj snzoudsoud u moos o; au; PIG 'LZ 3PI ❑ VN ❑ o El sax ❑ Lamp ui zo;uzado pagi ao JCjani;at LIE Jo uout;uauunoop apinozd o; ji j Xiijiouj au; PIG '9Z 3m ❑ v> /! am ❑ dN ❑ ON ❑ sa2k ❑ o saA ❑ :aouEudutoo-uou tupuoipui Xanans ;sag jo a;Ep put (s)azn;onz;s ;surf uooEui ui sjanaj apnIs;uEilduzoo-uoN ❑ sjanaj 02pnIs aoJ VOd E dojaAop o; °mire j ❑ Xanans apnjs junuuu a;aidutoo of °mired ❑ •mojaq (sa)xoq a;Eiadoaddu au; raw `sajj e,a2pnjs o; pomp.' suogipuoo;iuuad gum aoutijdutoo Jo ;no 1t;iiioEJ au; sI •gZ i,;iuuad alp fig paunbaz sE;uauudinba uopuoilddu a;s2m a;uzgilEo o; jiEJ iijiou3 au; PIQ •1Z —z2/50/Z/ :uoi;aadsuJ jo a;u j - - _s- :aagtunN,Cl!W' I