Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0043975_Correspondence_20221227
Strickland, Bev From: Jonathan Allen <Jonathan.Allen@nv5.com> Sent: Tuesday, December 27, 2022 1:32 PM To: Robinson, Jason; Nick Parker Cc: Kurtz, Cassidy; Todd Taylor Subject: [External] RE: RE: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks Jason, we will add that note to the plans. The manhole location is pretty set as we are placing it between the existing water line and proposed duct banks. The Contractor will have to make adjustments to the pipe segments accordingly. Thanks, Jonathan Jonathan A. Allen, PE, LEED AP 1 Land Development Senior Project Manager 1 NV5 3300 Regency Parkway, Suite 100 1 Cary, NC 27518 P: 919.858.1831 1 C: 919.924.2510 Jonathan.AI len©nv5.com Electronic Communications Disclaimer From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Tuesday, December 27, 2022 1:26 PM To: Jonathan Allen <Jonathan.Allen@nv5.com>; Nick Parker <nparker@owasa.org> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Todd Taylor <ttaylor@owasa.org> Subject: RE: RE: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application Thanks Jonathan, Yes, please add the note to the drawing that a full length of ductile iron sewer pipe be centered over the existing water main so that the sewer pipe joints are as far from the water line as possible. From the drawing, it appears that this may require the reconfiguration of manholes. Will that be the case? Thanks, Jason Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** 1 E NORTH CAROLINA \ Q� Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jonathan Allen <Jonathan.Allen@nv5.com> Sent: Tuesday, December 27, 2022 9:33 AM To: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Nick Parker <nparker@owasa.org> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Todd Taylor <ttaylor@owasa.org> Subject: RE: [External] RE: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Jason, Sheet C-201 is attached for your reference. We are meeting the requirements of 15A NCAC 18C .0906c, in that we will have 18 inches of separation from the outside of the water main and the outside of the sewer. This stipulation allows for the water to be below the sewer. We can add a note to our drawing that requires a full length of ductile iron sewer pipe be centered over the existing water main so that the sewer pipe joints are as far from the water line as possible. Please let me know if you have any further questions or need any additional information. Thanks, Jonathan Jonathan A. Allen, PE, LEED AP I Land Development Senior Project Manager I NV5 3300 Regency Parkway, Suite 100 I Cary, NC 27518 P: 919.858.1831 I C: 919.924.2510 Jonathan.AllenOnv5.com Electronic Communications Disclaimer From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Thursday, December 22, 2022 5:00 PM To: Jonathan Allen <Jonathan.Allen@nv5.com>; Nick Parker <nparker@owasa.org> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Todd Taylor <ttaylor@owasa.org> Subject: RE: [External] RE: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application Hi Jonathan, You're correct in that a sewer over a watermain does not meet the separation requirements of 15A NCAC 02T (f). Therefore, 15A NCAC 02T (g)(3) must be met (see below). I don't think we have a copy of the plans (Sheet C- 201). Does the sewer crossing over the waterline meet watermain standards (18C .0906)? 2 (3) for public water main horizontal or vertical separations, alternatives as described in 1 SA NCAC 18C .0906; Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** E NORTH CAROLINA \ �� Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jonathan Allen <Jonathan.Allen@nv5.com> Sent: Tuesday, December 20, 2022 3:33 PM To: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Nick Parker <nparker@owasa.org> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Todd Taylor <ttaylor@owasa.org> Subject: [External] RE: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Jason, Sorry for not providing any clarification with that 'no' response. It does not comply with the chart shown in IX.1 where it states that water over sewer is preferred. As shown on Sheet C-201, we have a proposed sewer main crossing over existing water mains; however, we are still meeting the 18" separation. Please let me know if you have any further questions. Thanks, Jonathan Jonathan A. Allen, PE, LEED AP 1 Land Development Senior Project Manager 1 NV5 3300 Regency Parkway, Suite 100 1 Cary, NC 27518 P: 919.858.1831 1 C: 919.924.2510 Jonathan.AI len©nv5.com Electronic Communications Disclaimer 3 From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Tuesday, December 20, 2022 2:02 PM To: Nick Parker <nparker@owasa.org>; Jonathan Allen <Jonathan.Allen@nv5.com> Cc: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov>; Todd Taylor <ttaylor@owasa.org> Subject: QUESTION: WQ0043938 - UNC McColl Building Addition and Renovation (MBAR) sewer application Jonathan & Nick, We're reviewing the referenced application and have the following question: Item IX.2 is checked "no" for meeting water main separation requirements. This doesn't appear to be explained in the narrative. Please explain. Thanks, Jason Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 **Subscribe to Collection System & Sewer Permitting Updates** 11 E NORTH CAROLINA \ CO Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4