Loading...
HomeMy WebLinkAbout20221387 Ver 1_20221215 WOCC Wetland Impacts Maps_20221221LU LU On 221:14:43 AM 0_ LU 0_ ADD\ DWG\WETLA OAK CRK CRSNG-2021133\ R:\LANDDEV\ST WILLIFORD PG. 916 UILANE MAIN PG. 898 LENTIN DIAZ-ABREGO 434 PG. 0822 LLINS EARP 7 PG. 995 PEGGY E. WILLIFORD D.B. 581 PG. 44 PEGGY E. WILLIFORD D.B. 803 PG. 916 LARRY & DIANNA MATTHEWS D.B. 3645 PG. 294 MICHAEL MATTHEWS D.B. 3976 PG. 465 JIMMY & BARRY MATTHEWS D.B. 2493 PG. 657 lop 44/ 440#_,,, • • • • • irk WOODPECKER COURT • 50' R/W- 29' B/B ai TCE *free it* 414- NS'.4111111r FLICKER LANE 50' R/W - 29' B/B SU\FIGHT LLC D. 3. 2724 PG. 826 \AAP # 2009-860 4 -vow WET POND WETLAND IMPACTS LEGEND WETLAND / STREAM / POND PERMANENT IMPACT WETLAND NOT TO BE DISTURBED POND NOT TO BE DISTURBED WETLAND TEMP. - IMPACT 2 132 SF (0.00AC) WETLAND - IMPACT 10 257 SF W-10 (0.01 AC) COTTENTAIL DRIVE 50' R/W 29. B/B W-1 W-2 W-� P-4 W-F W-6 S-7 W-8 S-9 W-10 S-12 Wetland/Stream Impact Table Wetland Impact#1 Temporary Permanent 510 SF 5,734 SF 0.01 AC 0.13 AC_ Wetland Impact#2 Temporary Permanent 132 SF 0,051 SF 0.00 AC 0.00 AC Wetland Impact#3 Temporary Permanent 0 SF 953 SF 0.00 AC 0.02 AC Pond Impact#4 Temporary Permanent 213 SF 1,147 SF 0.00 AC 0.03 AC Wetland Impact#5 Temporary Permanent 0 SF 4,758 SF 0.00 AC 0.11 AC Wetland Impact#6 Temporary Permanent 0 SF 1,920 SF 0.00 AC 0.04 AC Stream Impact#7 Temporary Permanent 320 SF 680 SF 0.01 AC 0.02 AC- L Wetland Impact#8 Temporary Permanent 555 SF 2,572 SF 0.01 AC 0.06 AC Stream Impact#9 Temporary Permanent 140 SF 0 SF 0.00 AC 0.00 AC Wetland Impact#10 Temporary Permanent 0 SF 257 SF 0.00 AC 0.01 AC Pond Impact#11 Temporary Permanent 0 SF 208 SF 0.00 AC 0.00 AC Stream Impact#12 Temporary Permanent 0 SF 321 SF 0.00 AC 0.01 AC _ Impacts Total Total Permanent 18,601 SF 0.43 AC Maximum Allowed: 21,780 SF 0.50 AC mom imm EN mom WWI :EN To: II�7ii"T ei■- ° 2:7-'t WETLAND TEMP. - IMPACT 1 .....• 510 SF W-1 (0.01 AC) SUNFILGHT LLC D.B. 2724 PG. 826 MAP # 2009-860 BERTI-/A COLLINS HEIRS LLC C/ JOSEPH G. COLLINS p.B. 4034 PG. 0460 POND TEMP. - IMPACT 4 213 SF (0.00AC) STREAM TEMP. - S-9 STREAM - IMPACT #12 321 SF S-1 2 (0.01 AC) �7 SU\FIGHT LLC D.3. 2724 PG. 826 MAP # 2009-860 50' 100' SCALE 1 inch = 100 ft ANGIER ASSOCIATES D.B. 1337 PG. 2 TCE TCE - LOD �� L LOD 00 LODLOD CALL BEFORE YOU DIG! WWW.NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! - z cn w. E O 0 U) 0 06 o c0 N 0 0 U EL 0 u_ CO REVISIONS: Z N 0 cc U w w cc U 0 w OCT. 5, 2022 DESIGNED BY: DRAWN BY: CHECKED BY: DBB DBB PROJECT No. 2021133 DRAWING No. W-4000 SCALE: AS SHOWN SHEET No. Do Not Use for Construction - paCEdO t ORMEU R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.02-DETAILED IMPACTS.DWG - W1.02 -12/21/20221:13:54 AM - DAVID BALLENTINE 1 0 OO _ LOD NO LOD OS LOD MULOD Apo LOD ilt to MI LO VOO 0_ LOp so 0 1 0 1 0 1 1 0 1 1 1 0 1 1 0 WET POND STORMWATER CONTROL MEASURE EX. UNDERSIZED CULVERT TO BE REPLACED RETAINING WALL EXISTING FARM POND I — RETAINING WALL WETLAND IMPACT W-2, W-3 AND W-10 AND POND IMPACT P-4 ENLARGEMENT SCALE: 1" = 40' 1 0 1 0 1 0 1 0 1 WETLAND - IMPACT 2 51 SF W-2 (O.00AC) TCE TC LOD i= LOD LOD LOD i= LOD =I LOD L L \ \ \ \ \ \ \ \ CE \ TCE TCE T( L00 LOD MN r Lop lla TCE TCE TCE TCE TCE �pDLoO _ Lop TCE TCE LOD TCE TCE TCE TCE \ LOD LOD LOD LOD LOD LOD LOD _ LOD LOD LOD LOD LOD LOD LOD L00 LOD LOD LOD LOD LOD LOD OD NM ft LOD w LOO \ n/w niw \ nAd► ; n/w n/w ■ mr / $ S $ $ $ $ .S $ $ lif ® /el —R/W— —R/W— k LL —R/W— ° WETLAND f, q /— - IMPACT 1 5,734 SF ■ VV 1 V (0.13AC) �' II MI ■ L_ z a CX J 1.LLI (4 .I, .I, .I, 4 ',1 — —rpm �� .i, .i, .,, .,, �V "3 WETLAND `/�/ YY-1 TEMP. - IMPACT 1 510 SF (0.01AC)o �' .1, .1, �' — �'�� �f co RETAINING WALL g 1p_ —I — _ -1 \�� I_i•„..... --1 - I I.. . — OO- EXISTING FARM POND �� — — ,..], _ • — — — ter' l l s 7 , _ . . ... _ LOD inn gm LOD LOD LOD LOD _ LOD 100 no(0p\ I on 1 LOD MILOD EnOD LOD -• •- POND P-11(208 - IMPACT 11 OOAC) 6' WIDE GREENWAY TRAIL 1 1 N WETLAND IMPACT W-1 AND POND IMPACT P-11 ENLARGEMENT SCALE: 1" = 40' WETLAND IMPACTS LEGEND WETLAND / STREAM / POND PERMANENT IMPACT WETLAND / STREAM / POND TEMPORARY IMPACT WETLAND NOT TO BE DISTURBED POND NOT TO BE DISTURBED CALL BEFORE YOU DIG! WWW.NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! NCGRID (NAD83/2011) NC License: F-0334 • Uco Z� a) LLI .- 1- E 0 0 U) U < u) o w U O O N C N MI/ i c. cO r L L 07 03 O V 03 = i = = d •-• • acv at = - = W Q Six Forks NC 27609 61 Q. cv c3 VJ _ R J REVISIONS: W 0 DESCRIPTION DATE: OCT. 5, 2022 DESIGNED BY: DBB DRAWN BY: DBB CHECKED BY: DBB PROJECT No. 2021133 DRAWING No. W-4000 SCALE: AS SHOWN SHEET No. WI.02 Do Not Use for Construction - �G3 Allinummy R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.02-DETAILED IMPACTS.DWG - W1.03 -12/21/20221:13:54 AM - DAVID BALLENTINE TCE TCE TCE TCE TCE TCE ow oo Lop MB LOD MB Lop BM LOD LOD MN LOD MM LOD LOD MM LOD LOD SOD M. LOD I. FUTURE MULTI -FAMILY DEVELOPMENT CONCEPTUALLY SHOWN NC 55 BYPASS DISCHARGE TO BE ROUTED AROUND DEVELOPMENT FUTURE DRIVEWAY ACCESS TO FUTURE MULTI -FAMILY DEVELOPMENT 100' TOWN OF ANGIER STREAM BUFFER MEASURED FROM TOP OF BANK EACH SIDE WETLAND IMPACT W-6 ENLARGEMENT SCALE: 1 " = 40' STREAM - IMPACT #12 321 SF S_12 (0.01 AC) STREAM IMPACT S-9 AND S-12 AND WETLAND IMPACT W-5 ENLARGEMENT SCALE: 1 " = 40' FUTURE MULTI -FAMILY DEVELOPMENT CONCEPTUALLY SHOWN WETLAND IMPACTS LEGEND WETLAND / STREAM / POND PERMANENT IMPACT WETLAND / STREAM / POND TEMPORARY IMPACT WETLAND NOT TO BE DISTURBED POND NOT TO BE DISTURBED NCGRID (NAD83/2011) CALL BEFORE YOU DIG! WWW.NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! NC • E 0 0 (n a) 0 U O 0 O N C N 0 y y CD CD Gf = = = as —° = d LIJ O CO CV C!J - CC (D U 0_ O 0 X "Up — 35 CD i y N REVISIONS: 0 Q EL k 0 cc Z N co O cc 0 w w cc 0 0 W 0 h h W cc ec 0 0 >- m w 0 DESCRIPTION O Z DATE: OCT. 5, 2022 DESIGNED BY: DBB DRAWN BY: DBB CHECKED BY: DBB PROJECT No. 2021133 DRAWING No. W-4000 SCALE: AS SHOWN SHEET No. WI.03 Do Not Use for Construction - �G3 AmEnAlau .39 AM - DAVID BALLENTINE R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.04-DETAILED IMPACTS.DWG - W1.04 -12/21/20221: LOD TCE 120 SF (0.00AC) WETLAND TEMP. - IMPACT 8 555 SF (0.01 AC1) STREAM TEMP - IMPACT 7A S-7A (0 0000 AC) STREAM IMPACT S-7, S-7A, S7-B, AND WETLAND IMPACT W-8 ENLARGEMENT SCALE: 1" = 40' 285 284 283 282 281 280 279 278 277 276 275 274 273 272 271 270 269 268 267 266 265 264 263 262 261 260 259 258 257 256 ORIOLE DRIVE CENTER -LINE FINISHED GRADE RETAINING WALL RETAINING WALL 15" RCP INV:275.28 —60" CMP - 68.46 LF @ 1.72% I EXISTING GROUND RIPRAP ______ _ _ _ _ _ _ 9+50 +75 10+00 +25 +50 +75 11 +00 +25 +50 +75 285 284 283 282 281 280 279 278 277 276 275 274 273 272 271 270 269 268 267 266 265 264 263 262 261 260 259 258 257 256 12+00 ORIOLE DRIVE STREAM CROSSING CULVERT 800-801 PROVIFLE SCALE: H: 1" = 40' V: 1" = 4' NCGRID (NAD83/2011) WETLAND IMPACTS LEGEND WETLAND / STREAM / POND PERMANENT IMPACT WETLAND / STREAM / POND TEMPORARY IMPACT WETLAND NOT TO BE DISTURBED POND NOT TO BE DISTURBED CALL BEFORE YOU DIG! WWW.NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! NC License: F-0334 1); • Q Co N U) 0 U as 0_ 0 w X 0 0= Six Forks NC 27609 w .— M a) LOC cc REVISIONS: w 0 DESCRIPTION V Q k 0 Z N N O cc 0 w w cc 0 0 W Z J cc cc h 0 Lti cc k Z 0 0 DATE: OCT. 5, 2022 DESIGNED BY: DBB DRAWN BY: DBB CHECKED BY: DBB PROJECT No. 2021133 DRAWING No. W-4000 SCALE: AS SHOWN SHEET No. WI.04 Do Not Use for Construction - �G3 AmEdmInw ..LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133VCADDV DWG\WETLAND IMPACT MAPS1.W2.01 IMPACTS DETAILS.DWG -W2.01-12/21/20221:14:25 AM - DAVID BALLS GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. PLAN 1LT FENCE ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SECTION A -A rATUAL LOCATION DETERMINED IN FIELD 7.5, OF THE STRUCTURES CAPAC, BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE kagT PLAN r �ooE so��eEaN " SECTION B-B NOTES 1 ACTUAL LOCATION DETERMINED IN FIELD ANDeoR SOLID REACHES 7, OF iHE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours ofa rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours ofa rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours ofa rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours ofa rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SECTION 1. 2. 3. SELF -INSPECTION, RECORDKEEPING B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be kept on site and available for hours. Documentation Requirements E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC inspection at all times during normal business Item to Document (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 SECTION A -A RIPRAP SCHEDULE CULVERT DOWNSTREAM APPROXIMATE WEIGHT LOCATION SIZE D0 L a D t D TSB-1 10" 0.83 ft 6 0.83 ft 1.30 ft 2 TONS TSB-2 10" 0.83 ft 6 0.83 ft 1.30 ft 7 TONS FES-1 30" 2.50 ft 16 2.50 ft 3.75 ft 10 TONS FES-2 30" 2.50 ft 16 2.50 ft 3.75 ft 15 TONS FES-3 15" 1.25 ft 8 1.25 ft 1.90 ft 50 TONS Do PLAN VIEW RIP RAP AND SCHEDULE D FILTER CLOTH UNDERLINER La ..c...'. a.pa.Aa ilro__________ CLASS "B" RIPRAP CLASS "B" RIPRAP FILTER CLOTH UNDERLINER • • I • I • I I • 4 • -r A- motaitizegoottooki Ammar 41�0�0,4,4,..0,4,411.,41,4,4,.. CLASS "B" RIPRAP Dt 1/2 DIAMETER OF OR 12" WHICHEVER GREATER FILTER FABRIC NCDOT#5 OR PIPE #57 WASHED STONE IS o� 6" DEEP . 4. „ %1St*, se tii -a,i) t: :4 • -I I - ffiI I I I I I I 1. CULVERTS CAPACITY OF PIPE TOGETHER = BANKFULL FLOW ELEVATION CLASS "B" NCDOT #5 OR #57 WASHED STONE j po oOp o�O Cy °N0 °o 0 o0°O°000•0o0 O 0 Oo o 0 0 0 O o O. 0 0 0 o Oo °O °o O OO .-, 00 0 O °., O O O O ° 0 0 0 0 ° O 0 0 - 0 0 0° O ° 0° C ° 0 ° 0 0 0 0 °O 00°°poo0 oo0 0 0 o°O p 0� �bOoo 25' MINIMUM TOP OF BANK 0 O�, 00.. O O STREAM CHANNEL PLAN CLASS "B" 00°O°0O gO 0O0 0° O 0 0 Oo OO f O O 0 0° °O co',„ ° O 0 0 0° ° ° O 0 °o ° °0 °0 '7 0000 0° o 0 0O 0 00 0° O 00 0 ° O°°oo 000 oho°°o°o°o °o 25' MINIMUM TOP OF BANK CONSTRUCTION SPECIFICATIONS: 1. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED AND APPROACH SECTIONS TO A MINIMUM. 2. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE STREAM. 3. KEEP STREAM CROSSINGS AT RIGHT ANGLES TO THE STREAM FLOW. 4. ALIGN ROAD APPROACHES WITH THE CENTER LINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FEET. RAISE BRIDGE ABUTMENTS AND CULVERT FILLS A MINIMUM OF 1 FOOT ABOVE THE ADJOINING APPROACH SECTIONS TO PREVENT EROSION FROM SURFACE RUNOFF AND TO ALLOW FLOOD FLOWS TO PASS AROUND STRUCTURE. 5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER, INCLUDING PLANNED OVERFLOW AREAS, WITH RIPRAP OR OTHER SUITABLE MEANS IF DESIGN VELOCITY EXCEEDS THE ALLOWABLE FOR THE IN -PLACE SOIL. 6. ENSURE THAT BYPASS CHANNELS NECESSARY TO DEWATER THE CROSSING SITE ARE STABLE BEFORE DIVERTING THE STREAM. UPON COMPLETION OF THE CROSSING, FILL, COMPACT, AND STABILIZE THE BYPASS CHANNEL APPROPRIATELY. 7. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO ITS ORIGINAL CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. 8. ANY IN -STREAM SEDIMENT CONTROL MEASURES MUST BE REMOVED UPON STABILIZATION OF THE AREA. MAINTENANCE: INSPECT TEMPORARY STREAM CROSSINGS AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. TEMPORARY STREAM CROSSING (TSC - 6.70) TYPICAL ENERGY DISSIPATOR WITH RIPRAP TYPICAL CONCRETE FLARED END SECTION RIPRAP PROTECTION AT OUTLET 3 x PIPE DIA OR AS SHOWN XON PLANS FLARED END SECTION RIPRAP AS SHOWN ON PLAN FILTER CLOTH UNDERLINER TYPICAL ENERGY DISSIPATORS RIPRAP IS VARIABLE N.T.S. SEEDING SCHEDULE: APPLY DOLEMATIC LIMESTONE AT THE RATE OF 2 TONS PER ACRE. IF HYDRATED LIME IS USED, FOLLOW RECOMMENDATION FROM SOIL TEST. COST OF THE TEST SHALL BE BORNE BY THE CONTRACTOR. APPLY 10-10-10 FERTILIZER OUTSIDE OF NCDOT RIGHT-OF-WAY AT A RATE OF 1,000 POUNDS PER ACRE. APPLY 10-20-20 FERTILIZER WITHIN NCDOT RIGHT-OF-WAY AT A RATE OF 500 POUNDS PER ACRE. PROVIDE PERMANENT SEEDING IN ACCORDANCE WITH T OUTSIDE OF NCDOT R/W (JANUARY 1- MARCH 31) COMMON BERMUDA GRASS (UNHULLED) (APRIL 1 - JULY 31) COMMON BERMUDA GRASS (HULLED) CENTIPEDE (AUGUST 1- DECEMBER 31) COMMON BERMUDA GRASS (UNHULLED) TALL FESCUE CENTIPEDE WITHIN NCDOT R/W (JANUARY 1- DECEMBER 31) FESCUE PENSACOLA BAHIAGRASS CENTIPEDE HE FOLLOWING SCHEDULE: - 20 POUNDS PER ACRE - 15 POUNDS PER ACRE - 8 POUNDS PER ACRE - 15 POUNDS PER ACRE - 120 POUNDS PER ACRE - 8 POUNDS PER ACRE - 50 POUNDS PER ACRE - 25 POUNDS PER ACRE - 5 POUNDS PER ACRE NOTES: 1. USE STANDARD STRENGTH FABRIC WITH 8' POST SPACING & WIRE FENCINGWHERE REINFORCED SILT FENCE IS REQUIRED. 2. USE 6' POST SPACING AND NO WIRE FENCING WITH EXTRA STRENGTH FABRIC. 3. WIRE FENCING TO BE 32" WITH 6 LINE WIRES & STAY WIRES ON 12" CENTERS(BOTTOM & TOP WIRES -10 GA., INTERMEDIATE WIRES -12.5 GA.) 4. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. 5. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 6. SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION SPECIFICATIONS, WHERE PRACTICE APPLIES AND PLANNING CONSIDERATIONS. 7. SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED SLOPES GREATER THAN 10' IN HEIGHT. NG VARIABLE AS DIRECTED BY ENGINEER (8' WITH WIRE FENCING - 6' WITHOUT FENCE) ►♦: 0II ' �/ ♦♦♦♦ ., • .VA r.t♦.♦♦.1. ♦♦fi♦' ♦♦ Oki JO. • •0 itIt♦♦♦'IIII ♦♦♦ ♦♦♦ ''• EXTRA STRENGTH .... FABRIC :.: ::.'•:• 11■ �♦�♦� ■■■im ■�♦�♦�i�♦�♦• ii ■ 1 �1 .ii:a n r0:%%'%ip NG �\j/j/j/j//j//jjjjjjjj jjj j /�//�/�/�/�/�/�/�/�/�/�/�/�/�/�/�/�/ / / %/' / 24" IIII illy Ijll STEEL POST WIRE FABRIC & UV RESISTANT GEOTEXTILE FABRIC TAMPED BACKFILL 0 GROUND LINE BURY FABRIC 8" DEEP WITH 4" TURNOUT MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL, MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. FENCE LIFE IS 6 TO 9 MONTHS. 3. REMOVE SEDIMENT DEPOSITS AT 50% CAPACITY AND AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SILT FENCE (SF - 6.62) CALL BEFORE YOU DIG! WWW.NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! REVISIONS: °d 03 Wp m N N 0 0 ER & OWNER 0 z CC w z 0 (7 W cc DESCRIPTION (/I) cc 0 k cc rrk CC vJ 0 r0^ rv^J vJ II� 0 Z; - O Ore 0 v) h W 0 Wh CC Q Q� 0� WQ DATE: OCTOBER 4, 2022 DESIGNED BY: BKE DRAWN BY: BKE CHECKED BY: JSJ PROJECT No. 2021133 DRAWING No. W-3400 SCALE: AS SHOWN SHEET No. W2.01 Construction Set - FORMIL DG3LQMUKIU