HomeMy WebLinkAbout20221387 Ver 1_20221215 WOCC Wetland Impacts Maps_20221221LU
LU
On
221:14:43 AM
0_
LU
0_
ADD\ DWG\WETLA
OAK CRK CRSNG-2021133\
R:\LANDDEV\ST
WILLIFORD
PG. 916
UILANE MAIN
PG. 898
LENTIN DIAZ-ABREGO
434 PG. 0822
LLINS EARP
7 PG. 995
PEGGY E.
WILLIFORD
D.B. 581
PG. 44
PEGGY E. WILLIFORD
D.B. 803 PG. 916
LARRY & DIANNA
MATTHEWS
D.B. 3645 PG. 294
MICHAEL MATTHEWS
D.B. 3976 PG. 465
JIMMY & BARRY MATTHEWS
D.B. 2493 PG. 657
lop 44/ 440#_,,, • • • • • irk
WOODPECKER COURT
• 50' R/W- 29' B/B
ai TCE *free it* 414- NS'.4111111r
FLICKER LANE
50' R/W - 29' B/B
SU\FIGHT LLC
D. 3. 2724 PG. 826
\AAP # 2009-860
4 -vow
WET
POND
WETLAND IMPACTS
LEGEND
WETLAND / STREAM / POND
PERMANENT IMPACT
WETLAND NOT TO BE DISTURBED
POND NOT TO BE DISTURBED
WETLAND TEMP. - IMPACT 2
132 SF
(0.00AC)
WETLAND - IMPACT 10
257 SF W-10
(0.01 AC)
COTTENTAIL DRIVE
50' R/W 29. B/B
W-1
W-2
W-�
P-4
W-F
W-6
S-7
W-8
S-9
W-10
S-12
Wetland/Stream Impact Table
Wetland Impact#1
Temporary
Permanent
510 SF
5,734 SF
0.01 AC
0.13 AC_
Wetland Impact#2
Temporary
Permanent
132 SF
0,051 SF
0.00 AC
0.00 AC
Wetland Impact#3
Temporary
Permanent
0 SF
953 SF
0.00 AC
0.02 AC
Pond Impact#4
Temporary
Permanent
213 SF
1,147 SF
0.00 AC
0.03 AC
Wetland Impact#5
Temporary
Permanent
0 SF
4,758 SF
0.00 AC
0.11 AC
Wetland Impact#6
Temporary
Permanent
0 SF
1,920 SF
0.00 AC
0.04 AC
Stream Impact#7
Temporary
Permanent
320 SF
680 SF
0.01 AC
0.02 AC-
L
Wetland Impact#8
Temporary
Permanent
555 SF
2,572 SF
0.01 AC
0.06 AC
Stream Impact#9
Temporary
Permanent
140 SF
0 SF
0.00 AC
0.00 AC
Wetland Impact#10
Temporary
Permanent
0 SF
257 SF
0.00 AC
0.01 AC
Pond Impact#11
Temporary
Permanent
0 SF
208 SF
0.00 AC
0.00 AC
Stream Impact#12
Temporary
Permanent
0 SF
321 SF
0.00 AC
0.01 AC
_
Impacts Total
Total Permanent
18,601 SF
0.43 AC
Maximum Allowed:
21,780 SF
0.50 AC
mom
imm EN
mom
WWI
:EN
To:
II�7ii"T ei■- ° 2:7-'t
WETLAND TEMP. - IMPACT 1
.....• 510 SF
W-1 (0.01 AC)
SUNFILGHT LLC
D.B. 2724 PG. 826
MAP # 2009-860
BERTI-/A COLLINS HEIRS LLC
C/ JOSEPH G. COLLINS
p.B. 4034 PG. 0460
POND TEMP. - IMPACT 4
213 SF
(0.00AC)
STREAM TEMP. -
S-9
STREAM - IMPACT #12
321 SF S-1 2
(0.01 AC) �7
SU\FIGHT LLC
D.3. 2724 PG. 826
MAP # 2009-860
50' 100'
SCALE 1 inch = 100 ft
ANGIER ASSOCIATES
D.B. 1337 PG. 2
TCE TCE
- LOD �� L
LOD 00 LODLOD
CALL BEFORE YOU DIG!
WWW.NC811.ORG
N.C. ONE -CALL CENTER
IT'S THE LAW!
-
z
cn
w.
E
O 0
U) 0
06 o
c0
N
0
0
U
EL
0
u_
CO
REVISIONS:
Z
N
0
cc
U
w
w
cc
U
0
w
OCT. 5, 2022
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DBB
DBB
PROJECT No. 2021133
DRAWING No. W-4000
SCALE: AS SHOWN
SHEET No.
Do Not Use for Construction - paCEdO t ORMEU
R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.02-DETAILED IMPACTS.DWG - W1.02 -12/21/20221:13:54 AM - DAVID BALLENTINE
1
0
OO _ LOD NO LOD OS LOD MULOD
Apo
LOD ilt to
MI LO VOO
0_ LOp so
0
1
0
1
0
1
1
0
1
1
1
0
1
1
0
WET
POND
STORMWATER
CONTROL MEASURE
EX. UNDERSIZED
CULVERT TO BE
REPLACED
RETAINING WALL
EXISTING FARM POND
I
— RETAINING WALL
WETLAND IMPACT W-2, W-3 AND W-10
AND POND IMPACT P-4 ENLARGEMENT
SCALE: 1" = 40'
1
0
1
0
1
0
1
0
1
WETLAND - IMPACT 2
51 SF W-2
(O.00AC)
TCE TC
LOD i= LOD LOD LOD i= LOD =I LOD
L
L
\
\
\
\
\
\
\
\
CE \
TCE TCE T(
L00 LOD MN
r Lop lla TCE TCE TCE TCE TCE �pDLoO _ Lop TCE TCE LOD TCE TCE TCE TCE \ LOD LOD LOD
LOD LOD LOD LOD _ LOD LOD LOD LOD LOD LOD LOD L00 LOD LOD LOD LOD LOD LOD OD
NM ft LOD w LOO \
n/w niw \
nAd► ; n/w n/w
■
mr /
$ S $ $ $ $ .S
$ $
lif
®
/el
—R/W—
—R/W—
k
LL
—R/W—
°
WETLAND
f, q /—
- IMPACT 1
5,734 SF
■
VV 1
V
(0.13AC)
�'
II
MI
■
L_
z
a
CX
J
1.LLI
(4
.I, .I, .I,
4
',1
— —rpm �� .i, .i, .,, .,,
�V
"3
WETLAND
`/�/
YY-1
TEMP.
- IMPACT 1
510 SF
(0.01AC)o
�' .1, .1, �'
— �'��
�f
co
RETAINING WALL
g
1p_
—I —
_
-1
\��
I_i•„.....
--1
-
I
I..
.
—
OO-
EXISTING FARM POND
��
— —
,..],
_
•
— — —
ter'
l l
s
7
,
_ .
.
...
_ LOD inn
gm LOD LOD LOD LOD _ LOD 100 no(0p\
I on 1
LOD MILOD EnOD
LOD -• •-
POND
P-11(208
- IMPACT
11
OOAC)
6' WIDE GREENWAY TRAIL
1
1
N
WETLAND IMPACT W-1 AND POND
IMPACT P-11 ENLARGEMENT
SCALE: 1" = 40'
WETLAND IMPACTS
LEGEND
WETLAND / STREAM / POND
PERMANENT IMPACT
WETLAND / STREAM / POND
TEMPORARY IMPACT
WETLAND NOT TO BE DISTURBED
POND NOT TO BE DISTURBED
CALL BEFORE YOU DIG!
WWW.NC811.ORG
N.C. ONE -CALL CENTER
IT'S THE LAW!
NCGRID (NAD83/2011)
NC License: F-0334
• Uco
Z�
a)
LLI .-
1-
E
0 0
U) U
< u)
o w
U
O
O
N
C
N
MI/
i c. cO r L L
07 03 O V
03 = i
= = d •-•
• acv at
= - =
W Q
Six Forks
NC 27609
61
Q.
cv
c3
VJ
_
R
J
REVISIONS:
W
0
DESCRIPTION
DATE:
OCT. 5, 2022
DESIGNED BY: DBB
DRAWN BY: DBB
CHECKED BY: DBB
PROJECT No. 2021133
DRAWING No. W-4000
SCALE: AS SHOWN
SHEET No.
WI.02
Do Not Use for Construction -
�G3
Allinummy
R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.02-DETAILED IMPACTS.DWG - W1.03 -12/21/20221:13:54 AM - DAVID BALLENTINE
TCE TCE TCE TCE TCE TCE
ow oo Lop MB LOD MB Lop
BM
LOD LOD MN LOD MM LOD LOD MM LOD LOD SOD
M. LOD I.
FUTURE MULTI -FAMILY
DEVELOPMENT
CONCEPTUALLY SHOWN
NC 55 BYPASS
DISCHARGE TO BE
ROUTED AROUND
DEVELOPMENT
FUTURE DRIVEWAY ACCESS TO
FUTURE MULTI -FAMILY DEVELOPMENT
100' TOWN OF ANGIER STREAM
BUFFER MEASURED FROM TOP
OF BANK EACH SIDE
WETLAND IMPACT W-6 ENLARGEMENT
SCALE: 1 " = 40'
STREAM - IMPACT #12
321 SF S_12
(0.01 AC)
STREAM IMPACT S-9 AND S-12 AND
WETLAND IMPACT W-5 ENLARGEMENT
SCALE: 1 " = 40'
FUTURE MULTI -FAMILY
DEVELOPMENT
CONCEPTUALLY SHOWN
WETLAND IMPACTS
LEGEND
WETLAND / STREAM / POND
PERMANENT IMPACT
WETLAND / STREAM / POND
TEMPORARY IMPACT
WETLAND NOT TO BE DISTURBED
POND NOT TO BE DISTURBED
NCGRID (NAD83/2011)
CALL BEFORE YOU DIG!
WWW.NC811.ORG
N.C. ONE -CALL CENTER
IT'S THE LAW!
NC
•
E
0
0
(n
a)
0
U
O
0
O
N
C
N
0
y y
CD CD
Gf =
= =
as —°
= d
LIJ
O
CO
CV
C!J
- CC
(D
U
0_
O
0
X
"Up —
35
CD
i
y
N
REVISIONS:
0
Q
EL
k
0
cc
Z
N
co
O
cc
0
w
w
cc
0
0
W
0
h
h
W
cc
ec
0
0
>-
m
w
0
DESCRIPTION
O
Z
DATE:
OCT. 5,
2022
DESIGNED BY:
DBB
DRAWN BY:
DBB
CHECKED BY:
DBB
PROJECT No.
2021133
DRAWING No.
W-4000
SCALE: AS
SHOWN
SHEET No.
WI.03
Do Not Use for Construction -
�G3
AmEnAlau
.39 AM - DAVID BALLENTINE
R:\LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133\CADD\ DWG\WETLAND IMPACT MAPS \W1.04-DETAILED IMPACTS.DWG - W1.04 -12/21/20221:
LOD
TCE
120 SF
(0.00AC)
WETLAND TEMP. - IMPACT 8
555 SF
(0.01 AC1)
STREAM TEMP - IMPACT 7A
S-7A (0 0000 AC)
STREAM IMPACT S-7, S-7A, S7-B, AND
WETLAND IMPACT W-8 ENLARGEMENT
SCALE: 1" = 40'
285
284
283
282
281
280
279
278
277
276
275
274
273
272
271
270
269
268
267
266
265
264
263
262
261
260
259
258
257
256
ORIOLE
DRIVE
CENTER
-LINE
FINISHED
GRADE
RETAINING
WALL
RETAINING
WALL
15" RCP
INV:275.28
—60"
CMP - 68.46
LF @ 1.72%
I
EXISTING
GROUND
RIPRAP
______
_ _
_ _ _ _
9+50
+75
10+00
+25
+50
+75
11 +00
+25
+50
+75
285
284
283
282
281
280
279
278
277
276
275
274
273
272
271
270
269
268
267
266
265
264
263
262
261
260
259
258
257
256
12+00
ORIOLE DRIVE STREAM CROSSING
CULVERT 800-801 PROVIFLE
SCALE: H: 1" = 40' V: 1" = 4'
NCGRID (NAD83/2011)
WETLAND IMPACTS
LEGEND
WETLAND / STREAM / POND
PERMANENT IMPACT
WETLAND / STREAM / POND
TEMPORARY IMPACT
WETLAND NOT TO BE DISTURBED
POND NOT TO BE DISTURBED
CALL BEFORE YOU DIG!
WWW.NC811.ORG
N.C. ONE -CALL CENTER
IT'S THE LAW!
NC License: F-0334
1);
•
Q
Co
N
U)
0
U
as
0_
0
w
X
0
0=
Six Forks
NC 27609
w .—
M a)
LOC
cc
REVISIONS:
w
0
DESCRIPTION
V
Q
k
0
Z
N
N
O
cc
0
w
w
cc
0
0
W
Z
J
cc
cc
h
0
Lti
cc
k
Z
0
0
DATE:
OCT. 5, 2022
DESIGNED BY:
DBB
DRAWN BY:
DBB
CHECKED BY:
DBB
PROJECT No. 2021133
DRAWING No. W-4000
SCALE: AS SHOWN
SHEET No.
WI.04
Do Not Use for Construction -
�G3
AmEdmInw
..LANDDEV\STEPHENSON-WHITE OAK CRK CRSNG-2021133VCADDV DWG\WETLAND IMPACT MAPS1.W2.01 IMPACTS DETAILS.DWG -W2.01-12/21/20221:14:25 AM - DAVID BALLS
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCGO1 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
perimeter slopes
7
None
(b) High Quality Water
7
None
(HQW) Zones
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
7
not steeper than 2:1, 14 days are
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
(d) Slopes 3:1 to 4:1
14
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
(e) Areas with slopes
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
will not dislodge the soil. Use one of the
Stabilize the ground sufficiently so that rain
techniques in the table below:
Temporary Stabilization
Permanent Stabilization
• Temporary grass seed covered with straw or
other mulches and tackifiers
• Hydroseeding
• Rolled erosion control products with or
without temporary grass seed
• Appropriately applied straw or other mulch
• Plastic sheeting
• Permanent grass seed covered with straw or
other mulches and tackifiers
• Geotextile fabrics such as permanent soil
reinforcement matting
• Hydroseeding
• Shrubs or other permanent plantings covered
with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
PLAN
1LT FENCE
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
SECTION A -A
rATUAL LOCATION DETERMINED IN FIELD
7.5, OF THE STRUCTURES CAPAC,
BELOW GRADE WASHOUT STRUCTURE
NOT TO SCALE
kagT
PLAN
r �ooE so��eEaN "
SECTION B-B
NOTES
1 ACTUAL LOCATION DETERMINED IN FIELD
ANDeoR SOLID REACHES 7, OF iHE
STRUCTURES CAPACITY TO PROVIDE
ADEQUATE HOLDING CAPACITY WITH A
MINIMUM 12 INCHES OF FREEBOARD
CONCRETE WASHOUT STRUCTURE NEEDS
TO BE CLEARY MARKED WITH SIGNAGE
NOTING DEVICE
ABOVE GRADE WASHOUT STRUCTURE
NOT TO SCALE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
SELF -INSPECTION,
SECTION A: SELF -INSPECTION
PART III
RECORDKEEPING AND REPORTING
normal business hours in accordance with the table
site conditions would cause the safety of the inspection
may be delayed until the next business day on
In addition, when a storm event of equal to or
of normal business hours, the self -inspection shall be
of the next business day. Any time when inspections
Inspection Record.
Self -inspections are required during
below. When adverse weather or
personnel to be in jeopardy, the inspection
which it is safe to perform the inspection.
greater than 1.0 inch occurs outside
performed upon the commencement
were delayed shall be noted in the
Inspect
Frequency
(during normal
business hours)
Inspection records must include:
(1) Rain gauge
maintained in
good working
order
Daily
Daily rainfall amounts.
If no daily rain gauge observations are made during weekend or
holiday periods, and no individual -day rainfall information is
available, record the cumulative rain measurement for those un-
attended days (and this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
Measures
At least once per
7 calendar days
and within 24
hours ofa rain
event > 1.0 inch in
24 hours
1. Identification of the measures inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Indication of whether the measures were operating
properly,
5. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
discharge
outfalls (SDOs)
At least once per
7 calendar days
and within 24
hours ofa rain
event > 1.0 inch in
24 hours
1. Identification of the discharge outfalls inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Evidence of indicators of stormwater pollution such as oil
sheen, floating or suspended solids or discoloration,
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
site
At least once per
7 calendar days
and within 24
hours ofa rain
event > 1.0 inch in
24 hours
If visible sedimentation is found outside site limits, then a record
of the following shall be made:
1. Actions taken to clean up or stabilize the sediment that has left
the site limits,
2. Description, evidence, and date of corrective actions taken, and
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
wetlands onsite
or offsite
(where
accessible)
At least once per
7 calendar days
and within 24
hours ofa rain
event > 1.0 inch in
24 hours
If the stream or wetland has increased visible sedimentation or a
stream has visible increased turbidity from the construction
activity, then a record of the following shall be made:
1. Description, evidence and date of corrective actions taken, and
2. Records of the required reports to the appropriate Division
Regional Office per Part III, Section C, Item (2)(a) of this permit.
(6) Ground
stabilization
measures
After each phase
of grading
1. The phase of grading (installation of perimeter E&SC
measures, clearing and grubbing, installation of storm
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
SECTION
1.
2.
3.
SELF -INSPECTION, RECORDKEEPING
B: RECORDKEEPING
PART III
AND REPORTING
deviation shall be kept on the site. The
throughout the coverage under this permit.
plan shall be kept on site and available for
hours.
Documentation Requirements
E&SC Plan Documentation
The approved E&SC plan as well as any approved
approved E&SC plan must be kept up-to-date
The following items pertaining to the E&SC
inspection at all times during normal business
Item to Document
(a) Each E&SC measure has been installed
and does not significantly deviate from the
locations, dimensions and relative elevations
shown on the approved E&SC plan.
Initial and date each E&SC measure on a copy
of the approved E&SC plan or complete, date
and sign an inspection report that lists each
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation of the E&SC measures or if
the E&SC measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
in accordance with the approved E&SC
plan.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
requirements for all E&SC measures
have been performed.
Complete, date and sign an inspection report.
(e) Corrective actions have been taken
to E&SC measures.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
deposition in a
stream or wetland
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
• If the stream is named on the NC 303(d) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure compliance
with the federal or state impaired -waters conditions.
(b) Oil spills and
release of
hazardous
substances per Item
1(b)-(c) above
• Within 24 hours, an oral or electronic notification. The notification
shall include information about the date, time, nature, volume and
location of the spill or release.
(c) Anticipated
bypasses [40 CFR
122.41(m)(3)]
• A report at least ten days before the date of the bypass, if possible.
The report shall include an evaluation of the anticipated quality and
effect of the bypass.
(d) Unanticipated
bypasses [40 CFR
122.41(m)(3)]
• Within 24 hours, an oral or electronic notification.
• Within 7calendar days, a report that includes an evaluation of the
quality and effect of the bypass.
(e) Noncompliance
with the conditions
of this permit that
may endanger
health or the
environment[40
CFR 122.41(I)(7)]
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
noncompliance, and its causes; the period of noncompliance,
including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time noncompliance is expected to
continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6).
• Division staff may waive the requirement for a written report on a
case -by -case basis.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING
EFFECTIVE: 04/01/19
SECTION A -A
RIPRAP SCHEDULE
CULVERT
DOWNSTREAM
APPROXIMATE
WEIGHT
LOCATION
SIZE
D0
L a
D t
D
TSB-1
10"
0.83 ft
6
0.83 ft
1.30 ft
2 TONS
TSB-2
10"
0.83 ft
6
0.83 ft
1.30 ft
7 TONS
FES-1
30"
2.50 ft
16
2.50 ft
3.75 ft
10 TONS
FES-2
30"
2.50 ft
16
2.50 ft
3.75 ft
15 TONS
FES-3
15"
1.25 ft
8
1.25 ft
1.90 ft
50 TONS
Do
PLAN
VIEW
RIP RAP AND SCHEDULE
D
FILTER CLOTH
UNDERLINER
La
..c...'. a.pa.Aa
ilro__________
CLASS "B"
RIPRAP
CLASS "B"
RIPRAP
FILTER CLOTH
UNDERLINER
• • I • I • I I • 4 • -r
A- motaitizegoottooki Ammar
41�0�0,4,4,..0,4,411.,41,4,4,..
CLASS "B"
RIPRAP
Dt
1/2 DIAMETER OF
OR 12" WHICHEVER
GREATER
FILTER FABRIC
NCDOT#5 OR
PIPE #57 WASHED STONE
IS o� 6" DEEP
. 4. „ %1St*, se tii -a,i) t: :4 •
-I I -
ffiI I I I I I I
1.
CULVERTS
CAPACITY OF PIPE
TOGETHER = BANKFULL FLOW
ELEVATION
CLASS "B"
NCDOT #5 OR
#57 WASHED STONE
j
po oOp o�O Cy °N0 °o 0 o0°O°000•0o0
O
0
Oo o 0 0 0 O o O.
0 0 0 o Oo °O °o O OO
.-, 00 0 O °., O O O O ° 0 0 0
0 °
O 0
0 - 0
0 0° O ° 0° C
° 0 ° 0 0 0 0
°O 00°°poo0 oo0
0 0 o°O p 0�
�bOoo
25'
MINIMUM
TOP OF BANK
0 O�, 00.. O O
STREAM CHANNEL
PLAN
CLASS "B"
00°O°0O gO 0O0
0° O 0 0 Oo
OO f O O 0 0°
°O co',„ ° O 0 0 0° ° ° O
0 °o ° °0 °0 '7 0000
0° o 0 0O 0 00 0° O
00 0 ° O°°oo 000
oho°°o°o°o °o
25'
MINIMUM
TOP OF BANK
CONSTRUCTION SPECIFICATIONS:
1. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED AND APPROACH SECTIONS TO A MINIMUM.
2. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE STREAM.
3. KEEP STREAM CROSSINGS AT RIGHT ANGLES TO THE STREAM FLOW.
4. ALIGN ROAD APPROACHES WITH THE CENTER LINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FEET. RAISE BRIDGE ABUTMENTS AND CULVERT FILLS A
MINIMUM OF 1 FOOT ABOVE THE ADJOINING APPROACH SECTIONS TO PREVENT EROSION FROM SURFACE RUNOFF AND TO ALLOW FLOOD FLOWS TO PASS
AROUND STRUCTURE.
5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER, INCLUDING PLANNED OVERFLOW AREAS, WITH RIPRAP OR OTHER SUITABLE MEANS IF DESIGN
VELOCITY EXCEEDS THE ALLOWABLE FOR THE IN -PLACE SOIL.
6. ENSURE THAT BYPASS CHANNELS NECESSARY TO DEWATER THE CROSSING SITE ARE STABLE BEFORE DIVERTING THE STREAM. UPON COMPLETION OF THE
CROSSING, FILL, COMPACT, AND STABILIZE THE BYPASS CHANNEL APPROPRIATELY.
7. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO ITS ORIGINAL
CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS.
8. ANY IN -STREAM SEDIMENT CONTROL MEASURES MUST BE REMOVED UPON STABILIZATION OF THE AREA.
MAINTENANCE:
INSPECT TEMPORARY STREAM CROSSINGS AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR,
RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION.
TEMPORARY STREAM CROSSING (TSC - 6.70)
TYPICAL ENERGY DISSIPATOR WITH RIPRAP
TYPICAL CONCRETE
FLARED END
SECTION
RIPRAP PROTECTION AT OUTLET
3 x PIPE DIA
OR AS SHOWN
XON PLANS
FLARED
END
SECTION
RIPRAP AS SHOWN
ON PLAN
FILTER
CLOTH
UNDERLINER
TYPICAL ENERGY DISSIPATORS
RIPRAP IS VARIABLE
N.T.S.
SEEDING SCHEDULE:
APPLY DOLEMATIC LIMESTONE AT THE RATE OF 2 TONS PER ACRE. IF HYDRATED LIME IS USED, FOLLOW
RECOMMENDATION FROM SOIL TEST. COST OF THE TEST SHALL BE BORNE BY THE CONTRACTOR.
APPLY 10-10-10 FERTILIZER OUTSIDE OF NCDOT RIGHT-OF-WAY AT A RATE OF 1,000 POUNDS PER ACRE.
APPLY 10-20-20 FERTILIZER WITHIN NCDOT RIGHT-OF-WAY AT A RATE OF 500 POUNDS PER ACRE.
PROVIDE PERMANENT SEEDING IN ACCORDANCE WITH T
OUTSIDE OF NCDOT R/W
(JANUARY 1- MARCH 31)
COMMON BERMUDA GRASS (UNHULLED)
(APRIL 1 - JULY 31)
COMMON BERMUDA GRASS (HULLED)
CENTIPEDE
(AUGUST 1- DECEMBER 31)
COMMON BERMUDA GRASS (UNHULLED)
TALL FESCUE
CENTIPEDE
WITHIN NCDOT R/W
(JANUARY 1- DECEMBER 31)
FESCUE
PENSACOLA BAHIAGRASS
CENTIPEDE
HE FOLLOWING SCHEDULE:
- 20 POUNDS PER ACRE
- 15 POUNDS PER ACRE
- 8 POUNDS PER ACRE
- 15 POUNDS PER ACRE
- 120 POUNDS PER ACRE
- 8 POUNDS PER ACRE
- 50 POUNDS PER ACRE
- 25 POUNDS PER ACRE
- 5 POUNDS PER ACRE
NOTES:
1. USE STANDARD STRENGTH FABRIC WITH 8' POST SPACING & WIRE FENCINGWHERE REINFORCED SILT FENCE IS REQUIRED.
2. USE 6' POST SPACING AND NO WIRE FENCING WITH EXTRA STRENGTH FABRIC.
3. WIRE FENCING TO BE 32" WITH 6 LINE WIRES & STAY WIRES ON 12" CENTERS(BOTTOM & TOP WIRES -10 GA., INTERMEDIATE WIRES -12.5 GA.)
4. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE.
5. END OF SILT FENCE NEEDS TO BE TURNED UPHILL.
6. SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION SPECIFICATIONS, WHERE PRACTICE APPLIES AND PLANNING CONSIDERATIONS.
7. SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED SLOPES GREATER THAN 10' IN HEIGHT.
NG
VARIABLE AS DIRECTED BY ENGINEER
(8' WITH WIRE FENCING - 6' WITHOUT FENCE)
►♦:
0II
'
�/
♦♦♦♦ .,
•
.VA
r.t♦.♦♦.1.
♦♦fi♦'
♦♦
Oki
JO.
•
•0
itIt♦♦♦'IIII
♦♦♦ ♦♦♦
''•
EXTRA
STRENGTH
....
FABRIC
:.:
::.'•:•
11■
�♦�♦�
■■■im
■�♦�♦�i�♦�♦•
ii
■
1
�1
.ii:a
n
r0:%%'%ip
NG
�\j/j/j/j//j//jjjjjjjj jjj
j
/�//�/�/�/�/�/�/�/�/�/�/�/�/�/�/�/�/
/
/ %/'
/
24"
IIII
illy
Ijll
STEEL POST
WIRE FABRIC & UV RESISTANT
GEOTEXTILE FABRIC
TAMPED
BACKFILL
0
GROUND LINE
BURY FABRIC 8" DEEP WITH 4" TURNOUT
MAINTENANCE:
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL, MAKE ANY REQUIRED REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. FENCE LIFE IS 6 TO 9 MONTHS.
3. REMOVE SEDIMENT DEPOSITS AT 50% CAPACITY AND AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE
ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE
AREA HAS BEEN PROPERLY STABILIZED.
TEMPORARY SILT FENCE (SF - 6.62)
CALL BEFORE YOU DIG!
WWW.NC811.ORG
N.C. ONE -CALL CENTER
IT'S THE LAW!
REVISIONS:
°d 03
Wp
m
N
N
0
0
ER & OWNER
0
z
CC
w
z
0
(7
W
cc
DESCRIPTION
(/I)
cc
0
k
cc
rrk
CC
vJ
0
r0^
rv^J
vJ
II�
0
Z;
- O
Ore
0
v)
h
W
0
Wh
CC
Q
Q�
0�
WQ
DATE:
OCTOBER 4, 2022
DESIGNED BY:
BKE
DRAWN BY:
BKE
CHECKED BY:
JSJ
PROJECT No. 2021133
DRAWING No. W-3400
SCALE: AS SHOWN
SHEET No.
W2.01
Construction Set - FORMIL DG3LQMUKIU