HomeMy WebLinkAbout20070648 Ver 2_95-07 Hooper Renewal_20220104Permit Class
RENEWAL
Permit Number
95-07
Issued to
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Basil Hooper, PO Box 112, Avon, NC 27915
Authorizing development in Dare
Road and O'Neal Lane in Avon,
dated "RECEIVED DCM-EC" 12/2/2022.
County adj, to Avon Harbor, adj. to the intersection of Harbor
, as requested in the permittee's application dated letter
This permit, issued on January 04, 2023 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 95-07, which was issued to the permittee on 10/23/2007,
as well as all subsequent modifications, and renewals, and copies of all documents shall be readily
available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
07-0648 V2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2007-01479.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Braxton C. Davis, Director
Division of Coastal Management
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31, 2024
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permit